1
Facilities Condition Assessment
 Kick-started by 2013 ROD grant availability
 In-depth needs assessment by architects and engineers
 Building envelope
 Mechanical and electrical systems
 Technology, security, and communications systems
REPLACE WINDOWS
ROOF LEGEND
WOOD REPAIR / REPLACEMENT
13 LF OF STONE
COPING AND BRICK
PARAPET WALL
B
REPLACE WINDOWS
TOTAL = 856 SF
1947
12 LF OF STONE
COPING WITH BRICK
PARAPET WALL
78 LF OF STONE
COPING WITH BRICK
PARAPET WALL
217 LF OF STONE
COPING WITH BRICK
PARAPET WALL
D
L
34 LF OF STONE
COPING WITH BRICK
PARAPET WALL
?
MATERIAL
ASPHALT
SHINGLES
EPDM
WARRANTY
DATE/ YEAR
INSTALLED
?
NOTES
?
APPROX.
AREA (SF)
2,378
1947 / 1964
D
?
?
ASPHALT
SHINGLES
2000?
?
1964
E
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
2,867
1964
F
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
14,060
MODIFIED
BITUMEN
?
GUARANTEE
DURATION
?
2000?
?
115
?
85
13,778
1964
G
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
1,681
1964
H
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
6,922
I
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
5,499
J
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
7,870
K
SIPLAST
PATRIOT
ROOFING
2 PLY MOD.
BITUMEN
9/5/2005
20 YEARS
1
2,617
2002
L
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
2002
M
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
2002
N
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
5,633
2002
P
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
1,065
2002
P1
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
506
2002
Q
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
130
2002
Q1
20 YEARS
2
2002
1964
2002
INSTALLER
?
1964
REPLACE WINDOWS
?
?
?
1964
WOOD CORNICE REPAIR/ RESTORATION
ROOF REPLACEMENT
C
REPLACE ALL WINDOWS
ON THIS ELEVATION,
INCLUDING BAY
WINDOWS, TOTAL = 4,616 SF
MANUF.
B
C
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
228
5,816
Architecture/Engineering
BRICK MASONRY REPAIR
44 LF OF METAL
COPING AND BRICK
PARAPET WALL
A
1947
79
R
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
191
2002
S
SIPLAST
BROWN &
GUARINO
2 PLY MOD.
BITUMEN
8/22/2002
20 YEARS
2
2,249
2005?
T
SIPLAST
A.F. CALLAN
& CO. INC.
2 PLY MOD.
BITUMEN
8/16/2006
20 YEARS
3
456
NOTES:
1. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 290 SQUARES ARE INSTALLED OVER A GYP. DECK WITH 1/4"
STRUCTURAL SLOPE, 2" POLYISO INSULATION AND 1/4" DENS DECK (MECH. ATTACHED), 1" WOOD FIBERBOARD SET IN HOT
ASPHALT AND 2 PLY MODIFIED BITUMEN ROOFING IN HOT ASPHALT. 60 SQUARES ARE INSTALLED OVER A GYPSUM DECK WITH 1/4"
DENS DECK., 2" POLYISO INSULATION/ 1" WOOD FIBERBOARD (SIMULTANEOUSLY SCREW FASTENED), AND 2 PLY MODIFIED
BITUMEN ROOFING IN COLD ADHESIVE.
M
2. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 154 SQUARES INSTALLED OVER A METAL ROOF DECK WITH 1-1/2"
POLYISO INSULATION, TAPERED INSULATION AND 1/4" DENS DECK PRIME (ALL INSULATION AND DENS DECK MECHANICALLY
ATTACHED- SIMULTANEOUSLY) WITH 2 PLY MODIFIED BITUMEN (20 EG & 30 FR SHEETS) IN COLD ADHESIVE.
P1
G
527 LF OF SHINGLE
ROOF EDGE WITH
CAST STONE
CORNICE/ INTEGRAL
GUTTER
1964
Q
22 LF OF METAL
COPING WITH EIFS
PARAPET WALL
R
1964
K
2005
EXISTING ROOF PLAN
1/16" = 1'-0"
I
Contractor shall check and verify all
conditions and dimensions at the site
before proceeding with this work.
Revisions
Date
Description
#
H
470 LF OF STONE
COPING WITH BRICK
PARAPET WALL
39 LF STONE COPING
WITH CAST STONE
PARAPET WALL FINISH
29 LF OF METAL
COPING WITH EIFS
PARAPET WALL
F
470 LF OF STONE
COPING WITH BRICK
PARAPET WALL
Set Issue:
Schematic
T
E
30 SF OF CAST STONE WINDOW HEAD
18 SF OF CAST STONE DOOR TRIM
9 LF OF CAST STONE ORNAMENTAL HEAD
DOOR TRIM
50 SF CAST STONE PANELS AND
ORNAMENTAL TRIM AT PARAPET.
25 LF OF ORNAMENTAL TOP OF PARAPET
1
51 LF OF STONE
COPING WITH BRICK
PARAPET WALL
22 LF OF STONE
COPING WITH BRICK
PARAPET WALL
36 SF OF CAST STONE DOOR TRIM
145 SF CAST STONE PANELS &
ORNAMENTAL DOOR HEAD
50 SF CAST STONE PANELS AND
ORNAMENTAL TRIM AT PARAPET.
100 SF OF CAST STONE WINDOW
TRIMS
2
REPLACE WINDOWS
COURTYARD
'Q' & 'Q1' TOTAL 51 LF
OF STONE COPING
WITH BRICK PARAPET
WALL
for the
122 LF OF STONE
COPING WITH BRICK
PARAPET WALL
Q1
Central Elementary School
N
REPLACE WINDOWS
TOTAL = 1,786 SF
D
3 Lincoln Ave, Haddonfield, New Jersey 08033
38 LF OF METAL
COPING WITH EIFS
PARAPET WALL
356 LF OF STONE
COPING WITH BRICK
PARAPET WALL
Preliminary Building Envelope Condition Assessment at
J
27 LF OF METAL
COPING WITH EIFS
PARAPET WALL
P
1 Lincoln Ave, Haddonfield, New Jersey 08033
3. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 5 QUARES INSTALLED OVER 1/4" SLOPED METAL ROOF DECK WITH 2"
POLYISO INSULATION AND TAPERED INSULATION (SIMULTANEOUSLY MECHANICALLY ATTACHED), 1" HD FIBERBOARD AND 2 PLY
MODIFIED BITUMEN ROOFING IN POLYURETHANE ADHESIVE.
98 LF OF METAL
COPING WITH EIFS
PARAPET WALL
Haddonfield Board of Education
64 LF OF SHINGLE
ROOF EDGE WITH
WOOD FASCIA/
SOFFIT
REPLACE WINDOWS
164 LF OF STONE
COPING WITH BRICK
PARAPET WALL
Issue Date:
S
2002
309 LF OF STONE
COPING WITH BRICK
PARAPET WALL
205 LF OF STONE
COPING WITH BRICK
PARAPET WALL
170 SF, 51 LF OF CAST STONE ORNAMENTAL
30 SF OF CAST STONE DOOR TRIM
90 SF OF CAST STONE JAMB / HEAD WINDOW TRIM
144 SF CAST STONE PANELS
April 7, 2015
Drawing Title:
Existing Roof Plan
& Roof Legend
Drawn by:
Checked by:
RS
SAB
Project Number:
15HPS00001
Drawing Number:
A-2.1
NJ Certificates of Authorization: Architecture - 21AC00027100 / Engineering- 24GA28022600
BRICK MASONRY REPLACEMENT
ROOF AREA
1890
1947?
BECICA ASSOCIATES LLC
1890
BLDG. YEAR
500 South Kings Highway
Cherry Hill, New Jersey 08034
P: 856.795.1180
F: 856.354.6367
W: www.becica.com
CAST STONE REPAIR
Signature/Date
STONE COPING REPAIR
A
STEVEN A. B ECICA, R.A. N.J.AI 21AI01137600
PARAPET REPAIR / RE-CONSTRUCTION
148 LF OF SHINGLE
ROOF EDGE WITH
WOOD FASCIA/
SOFFIT AND METAL
GUTTER
Elizabeth Haddon Elementary School
3
Elizabeth Haddon Elementary School
4
Elizabeth Haddon Elementary School
5
Elizabeth Haddon Elementary School
6
J. Fithian Tatem Elementary School
7
J. Fithian Tatem Elementary School
8
J. Fithian Tatem Elementary School
9
Central
Elementary School
10
Haddonfield Middle School
Central
Elementary School
11
Haddonfield Middle School
Central
Elementary School
12
Haddonfield Middle School
Haddonfield Memorial High School
13
Haddonfield Memorial High School
14
Haddonfield Memorial High School
15
Haddonfield Memorial High School
16
Facilities Challenges
 Building age
 Multiple additions
 Patchwork upgrades
 Varying educational conditions
MS
HMHS
Haddon
Haddon
Haddon
1913
17 Taft
Tatem
192326
Coolidge
HMHS
MS
HMHS
Tatem
Tatem
Haddon
Central
Central
Tatem
Haddon
Central
1947-52
1954-55
1963
1964
1971
1989-90
2002-05
Kennedy
Johnson
Nixon
GH Bush
GW Bush
Truman Eisenhower
Critical Infrastructure Issues throughout District
Building Envelope:
 Damaged masonry and eroding mortar joints and corroded lintels
 Stability issues – masonry walls, stone elements, parapets
 Deteriorating wood trim with peeling paint
 Problem roof areas
Building Systems:
 Inefficient and outdated heating plant controls
 Air-conditioning not in all instructional spaces
 Inadequate electrical service and distribution
18
 Obsolete and/or inadequate special systems (public address,
clock, security)
Proposed Scope of Work
Building Envelope:

Roof Replacement

Window Replacement

Exterior Wall and Structural Repairs

Chimney Repairs
Building System Improvements:

Air Condition Classrooms and Electrical Upgrades

Boiler Upgrades and Central Building Controls

Security/Cameras

Master Clock System

Telephone and Public Address Systems

Technology Upgrades
Education Facility Improvements
Haddonfield Memorial High School New Student Commons

Food Service / Locker Rooms / Dance Gym / Support Facilities

Barrier-Free / ADA Accessibility / Structural Integrity / Program Needs
Long Range Facility Plan
19

Master Plan for the Future
Elizabeth Haddon Elementary School
Proposed Building Envelope Scope of Work
20
J. Fithian Tatem Elementary School
Proposed Building Envelope Scope of Work
21
Central
Elementary School
Haddonfield Middle School
Proposed Building Envelope Scope of Work
22
Haddonfield Memorial High School
Proposed Building Envelope Scope of Work
“B” Wing Gym,
Façade Reconstruction and
Structural Repairs
Construct New Student Commons
Reconstruct Cafeteria, Kitchen and
Second Floor Dance Gym and
Support Spaces
23
Proposed HVAC & Electrical Uprgrades
Air Condition Classrooms
ELIZABETH HADDON
24
J. FITHIAN TATEM
CENTRAL ELEMENTARY / MIDDLE
HADDONFIELD HIGH SCHOOL
Haddonfield Memorial High School
Proposed New Student Commons and Alterations
Construct New Student Commons
Reconstruct Cafeteria, Kitchen and
Second Floor Dance Gym and
Support Spaces
Provide Gym Level Locker Rooms
“B” Wing Gym
Façade Reconstruction and
Structural Repairs
25
Haddonfield Memorial High School
Proposed New Student Commons and Alterations
Replace Auditorium HVAC System
Air Condition “A” Wing Classrooms
Administrative Office
Renovations
26
Haddonfield Memorial High School
Proposed New Student Commons and Alterations
“C” Wing Home Ec Renovations
27
“C” Wing Science Lab Alterations
Haddonfield Memorial High School
Proposed Long Range Facilities Plan
Vision For Future Improvements
28
Haddonfield Memorial High School
Long Range Facilities Plan
Vision For Future Improvements
29
Haddonfield Memorial High School
Proposed Long Range Facilities Plan
Vision For Future Improvements
30
Central
Haddonfield Middle School
Elementary School
Proposed Long Range Facilities Plan
Vision For Future Improvements
31
Ground Floor
Central
Haddonfield Middle School
Elementary School
Proposed Long Range Facilities Plan
Vision For Future Improvements
32
First Floor
Central
Haddonfield Middle School
Elementary School
Proposed Long Range Facilities Plan
Vision For Future Improvements
33
Second Floor
Elizabeth Haddon Elementary School
Proposed Long Range Facilities Plan
Vision For Future Improvements
34
J. Fithian Tatem Elementary School
Proposed Long Range Facilities Plan
Vision For Future Improvements
35
Bond Referendum Proposal
ESTIMATED MOST PROBABLE COST FOR PROPOSED PROJECTS
ELIZABETH HADDON SCHOOL
$
3,443,500
CENTRAL ELEMENTARY/MIDDLE SCHOOL
$
8,715,000
J. FITHIAN TATEM SCHOOL
$ 7,347,000
HADDONFIELD MEMORIAL HIGH SCHOOL
$ 28,700,000
RE-SURFACE RUNNING TRACK
$
437,500
STADIUM STRUCTURAL RESTORATION
$
1,323,000
SUB-TOTAL
$ 49,966,000
NJSDA REGULAR OPERATING DISTRICT (ROD) GRANTS
OFFER FOR PROPOSED SCOPE OF WORK
$ 6,034,500
BOND REFERENDUM
$ 43,931,500