Pulaski Skyway Bridge y y g y y g Contract No. 3

Transcription

Pulaski Skyway Bridge y y g y y g Contract No. 3
Pulaski Skyway
y y Bridge
g
Contract No. 3
APRIL 26, 2013
Parsons Brinckerhoff
Hardesty and Hanover
AECOM
Arora and Associates
S&R Engineers
Advantage Engineers
Pulaski Skyway Contract No. 3
Agenda
g
ƒ Project Overview
S h d l
ƒ Schedule
ƒ Key
y Elements
ƒ Questions
Pulaski Skyway Contract No. 3
Skyway
y y Bridge
g
Newark Ramp
Tonnele Ave Circle
Kearny Ramp
KEARNY
Broadway Ramp
EB/WB Tonnele
Ave Ramps
JERSEY CITY
NEWARK
ƒ
ƒ
ƒ
ƒ
ƒ
3 ½ miles long
Direct Link to Holland Tunnel via Route 139
Links Newark at Raymond Blvd. & Jersey City at Tonnele Ave Circle
SB Entrance,
Entrance NB Exit to Jersey City at Broadway Ramp
SB Exit, NB Entrance to Kearny @ Kearny Ramp
Pulaski Skyway Contract No. 3
Existing
g Structure
18,480 ft. Long Bridge
ƒ 118 Spans on Structure
ƒ 2-550 ft. Through Truss Main Spans & 350 ft. Flanking
Spans
p
Over Passaic & Hackensack Rivers
ƒ 48 Haunched Deck Truss Spans (175 ft. to 350 ft.)
ƒ Simply Supported Steel Deck Girder and Stringer Spans
at Low Level Approaches (50 @ East End,
End 11 @ West End)
ƒ 3 Steel Through Trusses Over Railroad in Jersey City
ƒ Skyway was Constructed in 12 Construction Sections:
Deck was Separate Contract
ƒ Original Concrete Deck Slab
ƒ No As-Built Information
Contractor to Field Verify Plan Dimensions
Pulaski Skyway Contract No. 3
Limits of Pulaski, Contract 3
CONTRACT 3: PROJECT LIMITS
Pulaski Skyway Contract No. 3
Five Ramp
p Structures
ƒ
Newark Ramp: Exit Ramp From Rt
Rt. 1&9SB to
Raymond Boulevard (19 Simple Span MultiGirder Section)
ƒ
Kearny Ramp: Entrance/Exit Ramps to
Kearny (Multi-Girder Section Hung from 4
Deck Truss Spans + 2 Simple Spans)
ƒ
B
Broadway
d
R
Ramp: E
Entrance/Exit
t
/E it R
Ramps to
t
Jersey City (Multi-Girder Section Hung from
4 Deck Truss Spans)
ƒ
Exit Ramp From Rt. 1&9NB to Tonnele
Avenue (Simple Span Multi-Girder Section)
ƒ
Entrance Ramp to Rt. 1&9SB From Tonnele
Avenue (Simple Span Multi-Girder Section)
Pulaski Skyway Contract No. 3
Superstructure
p
Main Thru-Truss
Multi-Girder Spans
Deck Truss
Thru-Truss (Span 20)
(NOT IN CONTRACT 3)
Pulaski Skyway Contract No. 3
Thru-Truss (Span 44)
Interim Rehab/Repair
Contracts
Recent Interim construction projects:
ƒ No.
No 1 - Deck repairs Spans A0 to 44
ƒ No. 2 - Deck repairs Spans 45 to 108 & overlay
entire
i deck
ƒ No 3. - Priority
y repairs
p
from inspection
p
report
p
ƒ No 4. – Drainage protection repairs
Pulaski Skyway Contract No. 3
Project
j
Description
p
Deck Replacement of the NB Lanes of the
Pulaski Skyway (Mainline)
ƒ Demolition of Deck and Cross Beams,
Safetywalk, Ballustrade, and Truss Stringers
ƒ Install New Stringers, Precast Deck Elements,
Deck Joints, CIP Curb, Railings, Light
Standards, and Drainage Items
Pulaski Skyway Contract No. 3
SCHEDULE
Pulaski Skyway Contract No. 3
Contract Schedule
ƒ Award
June 14,
14 2013
ƒ Notice to Proceed (NTP)
June 28, 2013
ƒ Pre-Closure Work
ƒ Closure of NB Lanes
March 1, 2014
ƒ Completion of NB Deck
December 1, 2014
ƒ Final Completion
February 13,
13 2015
Pulaski Skyway Contract No. 3
Pre--Closure Work
Pre
WORK TO BE COMPLETED PRIOR TO MARCH 1, 2014
ƒ MPT to be in place
ƒ NJ Turnpike will have opened 3rd NB Lane at Newark
Bay Extension
ƒ Meadowlands Commission implementation of
Adaptive
d
i Si
Signall C
Controll along
l
1&9T
9 and
d Route 440
ƒ Peregrine Falcon Mitigation
ƒ Communipaw
C
i
Interchange
t
h
ƒ Via Addendum
ƒ Temporary
T
CCTV’s
CCTV’
ƒ Via Addendum
Pulaski Skyway Contract No. 3
Pre--Closure Work
Pre
TASK TO BE ACCELERATED
ƒ Field Verification
ƒ Shop Drawings
ƒ Fabrication of Pre-Cast Elements
ƒ Installation of Temporary Shielding
Pulaski Skyway Contract No. 3
COORDINATION
ƒ Utility Coordination
ƒ PATH and Conrail Approvals
ƒ Guidelines in Special Provisions
ƒ Emergency Personnel
ƒ Access to Structure
Pulaski Skyway Contract No. 3
KEY ELEMENTS OF
CONTRACT
Pulaski Skyway Contract No. 3
Configuration: One bound closed
at all times. One direction of travel
only
Duration:
Begin Closure: March 1st
End Closure: 9 Months
SB
NB
*Illustrative only
Even
nings
Access: 4 access points via Ramps
and approaches for contractors and
emergency personnel
personnel. Allows for
three (3) independent Work Zones.
SB
NB
*Illustrative only
Ove
ernights/
Wee
ekends
Time Period: Full time Closure
Mornings
Proposed
Staging
p
g g
SB
NB
*Illustrative only
Pulaski Skyway Contract No. 3
ACCESS POINT TO STRUCTURE
B
C
D
A
Access Points on Structure for Contractors and Emergency Personnel
A. North Approach (Newark)
B. Kearny Ramp
C. Broadway Ramp
D. South Approach (Jersey City)
Pulaski Skyway Contract No. 3
Height
g Limitations
Hackensack River (14
(14’-2”)
2 )
Broadway Ramp
Passaic River (14
(14’-2”)
2 )
Kearny Ramp
Pulaski Skyway Contract No. 3
Proposed
p
Deck Type
yp
Precast Concrete Deck Panels
ƒ Truss and Girder Spans
(Precast Deck on X-Beams)
ƒ Lightweight Concrete (Class P)
Filled Grid Deck Panels
ƒ Future Safety Widening
ƒ Lightweight Concrete (Class P)
ƒ Spans 51 to 61 only
Pulaski Skyway Contract No. 3
Proposed
p
Curb
Existing
g Curb
Proposed Curb
Pulaski Skyway Contract No. 3
Historical Lighting
g
g
Original Light Fixture
Approved by SHPO
Pulaski Skyway Contract No. 3
Environmental Mitigation
g
Peregrine Falcon
IGLOO Dog House
or Wood Nest Box
Temporary Shielding
Nesting Season
March 1st to July 31st
Mitigation must be in
place by February 15th
Pulaski Skyway Contract No. 3
Storage and
Construction Zone Access
ƒ Contractor is not allowed to stockpile
any materials on the structure.
ƒ NB Approach
A
h Express
E
lanes
l
can be
b
utilized as long as Emergency Response
access is
i maintained.
i t i d
ƒ Construction personnel parking is
prohibited within the work zone. A work
access plan will need to be developed
and submitted to NJDOT.
Pulaski Skyway Contract No. 3
Upcoming
p
g Addendum
ƒ Peregrine Falcon Mitigation
ƒ Communipaw Interchange
ƒ Barrier Shift to increase storage for the double left along Rt 1&9T NB
ƒ Traffic Signal Improvements
ƒ Pavement Improvements along Foundry St & Roanoke
Ave
ƒ Temporary CCTV’s
ƒ Floorbeam Replacement at Bent 6
ƒ Temporary Support Tower
ƒ Full Closure Skyway for a weekend
ƒ Replacement of Floorbeam Pier Cap
Pulaski Skyway Contract No. 3
Construction
QUESTIONS?
Pulaski Skyway Contract No. 3