DolWin beta visit and conference
Transcription
DolWin beta visit and conference
DolWin beta visit and conference Steffen Schleicher, WAB 17 November 2014 DolWin beta at Haugesund Photo: Øyvind Sætre/Aibel 2 Content Content Page Special terms and conditions 5 Important contacts 6 Program overview 19 – 21 November 2014 7 Detail program Haugesund 19 – 21 November 2014 8-9 Conference Sessions 20 November 2014 10 Conference detail program 20 November 2014 10 – 14 DolWin beta – Introduction 21 November 2014 15 Participants 16 – 22 Venues 23 3 Content Content Page DolWin beta / WAB Aircraft – Flight times 24 DolWin beta / WAB Aircraft – Flight details 19 November 2014 26 DolWin beta / WAB Aircraft – Flight details 21 November 2014 27 Hotel Adress 28 Map German Offshore Projects and TenneT Offshore Converterstations in the North Sea 29 Project table German Offshore Projects in North Sea 30 - 33 Project table TenneT Offshore Cluster German North Sea 34 4 Please note Special terms and conditions Exclusion of competitors at cooperation events and during company tours Terms and Condition 7 For WAB events held in cooperation with other businesses/institutions, WAB reserves the right to exclude direct market competitors from the event, in consultation with the cooperation partners. Notification of this right will be separately highlighted in the respective programme. In addition, the competitive business concerned will be notified of exclusion immediately after it has registered. Indirect competitors will be subject to separate review by the cooperation partners. Such enterprises will also receive timely acknowledgement upon receipt of their registration. In cases where participation is excluded, no fees will be charged. Participation fees already paid will be refunded in full. Supplements / Photo forbiddance Terms and Condition 13 The involved companies consent while the visit of the DolWin beta Converterstation and at the whole Aibel Yard at Haugesund an consequent photo forbiddance. Photos will be publish from the organisers after the visit for the participants. 5 Important contacts Firstname, Surname, Company Mobil, E-Mail Ronny Meyer, CEO WAB Mobil: +49 173 794 6082 ronny.meyer@wab.net Steffen Schleicher, WAB Tour Leader Mobil: +49 173 238 2801 Steffen.Schleicher@wab.net Armine Egberink, TenneT Tour Leader Mobil +31 657 7115 67 Armine.Egberink@tennet.eu Rik Stapel, TenneT Platform manager, Tour Guide DolWin beta Mobil +31 653 45 03 80 Kjetil Jacobsen, Aibel, Project manager, Tour Guide DolWin beta Daniela Schimrigk, WAB, Flight contact person Mobil: +49 152 5662 4413 Bus contact Tide Riser +47 91 77 97 30 Flight operation OFD +49 4921-899220, Robert Lehr, Reinhold Beekhuis 6 Program overview 19 – 21 November 2014 Wednesday 19 November 17.00 Departure Bremen by WAB Aircraft* Thursday 20 November Friday 21 November 9.30 – 10.30 Politicals/Keynotes 8.00 – 8.15 Bus drive to Aibel Yard 11.00 – 13.00 Session A Introduction DolWin beta, 13.00 – 14.00 Lunch 9.30 – 9.40 Walk to DolWin beta 14.00 – 15.30 Session B 10.00 – 12.00 Visit DolWin beta 16.00 – 17.00 Session C 12.00 – 13.30 Lunch 8.15 – 9.15 Tennet, ABB, Aibel Project Travel 20.30 Reception, Rica Maritime Hotel, Haugesund 19.00 – 23.00 Dinner 17.00 Departure Haugesund WAB Aircraft Conference Excursion Dress code: Business Casual, DolWin beta visit: Personal Protection Equipment 7 Detail program Haugesund 19 – 21 November Schedule Date Time Notice 19 November 2014 20.30 Reception, Hotelbar 20 November 2014 9.30 – 17.00 Conference, Hotel 20 November 2014 19.00 Dinner, Hotel Restaurant 21 November 2014 8.00 Bus to Aibel Yard, store the luggage at the Hotel 21 November 2014 8.15 Guests report at Aibel reception 21 November 2014 8.30 Start introduction DolWin beta Project, TenneT, ABB, Aibel 8 Detail program 19 – 21 November Schedule Date Time Notice 21 November 2014 9.30 Safety instruction for visit DolWin beta 21 November 2014 9.45 Divide into groups and change into Personal Protective Equipment PPE* 21 November 2014 10.00 – 12.00 Visit DolWin beta, PPE change 21 November 2014 12.00 – 13.00 Lunch at Aibel Canteen 21 November 2014 13.00 Departure back to the hotel, by bus or walk, leisure time 21 November 2014 15.15 Bus departure from Hotel to the Airport Haugesund *PPE: Hard hat, safety shoes, glasses, gloves and overall will be provided by Aibel 9 Conference sessions Thursday 20 November 2014 Time Session 09.30 – 10.30 Key notes, Words of welcome, Projects 10.30 – 11.00 Coffee Break 11.00 – 13.00 A Offshore Converterstations - Technicals/Standardisations/DC Grid Connections 13.00 – 14.00 Lunch 14.00 – 15.30 B Offshore Converterstations - Operation and Maintenance / Experiences with DC Grid Connection 15.30 – 16.00 Coffee Break 16.00 – 17.00 C Offshore Converterstations - Safety Concepts / Risk Insurability 19.00 – 23.00 Dinner 10 Conference detail program 20 November 2014 Keynotes/Words of welcome/Projects Time Speech 09.30 – 09.45 Conference opening, Words of welcome Mayer Haugesund, Petter Steen 09.45 – 10.00 Words of welcome - German Offshore Wind Developments, WAB e.V. CEO, Ronny Meyer 10.00 – 10.15 Words of welcome, TenneT Offshore Director Offshore, Wilfried Breuer 10.15 – 10.30 Words of welcome, ABB Head of Technology and R&D at ABB Offshore Wind Connections, Peter Sandeberg 10.30 – 11.00 Coffee Break 11 Conference detail program 20 November 2014 A Technicals/Standardisations/DC Grid Connections Time Speech 11.00 – 11.30 Offshore Platforms – Technical Challenges, TenneT Offshore Director Offshore, Wilfried Breuer 11.30 – 12.00 Connecting Europe – how interconnectors can change the European energy system, Statnett Vice President Corporate Communications, Christer Gilje 12.00 – 12.30 Standardization and DC grid connection, ABB Head of Technology and R&D at ABB Offshore Wind Connections, Peter Sandeberg 12.30 – 13.00 Power from shore on the Norwegian continental shelf, Head of Electrical Systems Oil, Gas and Petrochemicals Unit, Asmund Maland 13.00 – 14.00 Lunch 12 Conference detail program 20 November 2014 B Offshore-Converterstations: Operation & Maintenance / Experiences with DC Grid Connection Time Speech 14.00 – 14.30 Perspectives on Offshore HVDC Projects, Statoil ASA, Advisor ProcDownstr Electr Tech, Dr Kamran Sharifabadi 14.30 – 15.00 SeaRenergy Offshore: First-hand experiences in T&I of HVDC platforms, SeaRenergy Offshore Holding, Head of Business Development & Procurement, Dr Benjamin Vordemfelde 15.00 – 15.30 Logistic standards for commissining of HVDC Platforms in the Northsea, Rhenus Offshore Logistics, Project Manager Offshore Wind, Thore Schreiber 15.30 – 16.00 Coffee Break 13 Conference detail program 20 November 2014 C Offshore-Converterstations: Safety Concepts / Risk Insurability Time Speech 16.00 – 16.30 Accumulation and insurability of risks in dependence of HVDC transmission platform clusters, Nordwest Assekuranzmakler, Managing Partner, Dr Patrick Wendisch 16.30 – 17.00 National IT security policy for offshore wind farms, Bilfinger GreyLogix, Business Development Manager IT, Martin Junghans 19.00 Dinner 14 Dolwin beta - Introduction 21 November 2014 Introduction Time Speech 8.30 – 8.45 Welcome and opening WAB, CEO Ronny Meyer Aibel, EVP Renewables Deputy CEO Erling Matland 8.45 – 9.00 Scope of TenneT´s task and projects, TenneT Offshore Platform manager DW2, Rik Stapel 9.00 – 9.15 HVDC offshore grid connection DW2 ABB Inocean, Project Manager Conny Löfstrand 9.15 – 9.30 DolWin beta - our first wind platform Aibel, EVP Renewables Deputy CEO Erling Matland 9.30 – 9.45 Safety instruction for visit DolWin beta Next Program DolWin beta visit see page 8 15 Participants Update: 17 November 2014 No Company Position Title First name Head of Technology and R&D at ABB Peter Offshore Wind Connections Head of Electrical Systems Oil, Gas and Asmund Petrochemicals Unit Surname 1 ABB Sandeberg 2 ABB 3 ABB Communications Manager Patrik Strandin 4 Aibel EVP Renewables Deputy CEO Erling Matland 5 Aibel Project Manager Conny Löfstrand 6 Airbus Helicopters Sales Manager Dennis Bernitz 7 Atlas Professionals Adam Galt 8 Bilfinger GreyLogix Business Development Manager IT Martin Karl Junghans Maland 16 Participants Update: 17 November 2014 No Company Position Title First name Surname Bilfinger GreyLogix Julia Spielmann Bugsier Reederei- und 10 Bergungsgesellschaft Carsten Wibel 11 Buss Port Logistics Project Manager Moritz Christern 12 Buss Port Logistics Concept Manager Denise Wagner Christoph Hoppe David Kükelhahn Meinrad Baumgärtner Paul Vossen 9 Dipl.-Ing.H.Sitte GmbH & Co. 13 Schiffsinstallationen.KG Dipl.-Ing.H.Sitte GmbH & Co. 14 Schiffsinstallationen.KG Projektleiter-/Koordinator/ Abt. Offshore-Wind Manager Electrical Engineering/ 15 EnBW Energie Baden-Württemberg Wind- und maritime Technik 16 GS Staalwerken Groep 17 Participants Update: 17 November 2014 No Company Position 17 Haugesund local Government Mayer 18 Hempel (Germany) Technical Customer Support, Key Account Windenergy 19 IMPaC Offshore Engineering 20 IMPaC Offshore Engineering Title First name Surname Petter Steen Karsten Mühlberg Christian Roß Katrin Altmayer 21 LSA Logistikmanagement 4 PL Manager Fred Stefan 22 LSA Logistikmanagement Manager Offshore Logistics Olav Dela Munich RE Green Tech Solutions 23 Special Enterprise Risks Dr Mathias Hörmann 24 NavConsult AWSS Gerrit Schmitt Jr 18 Participants Update: 17 November 2014 No Company Position 25 NavConsult AWSS 26 Nordwest Assekuranzmakler Managing Partner 27 OIS Title First name Surname Christian Sonnemann Patrick Wendisch Andreas L. Leßmeister 28 PNE WIND Axel Ahlf 29 PNE WIND Thorsten Fastenau 30 PPM Engineering Tobias Meyer 31 PPM Engineering Thomas Seitzinger 32 Rhenus Offshore Logistics Project Manager Offshore Wind Thore Schreiber Dr 19 Participants Update: 17 November 2014 No Company Position 33 RWE Innogy 34 Schiffsdieseltechnik Kiel 35 Schiffsdieseltechnik Kiel 36 SEAR 37 SEAR First name Surname Jörn Runge Ferat Koyun Hauke Wollesen Michael Schmidt Heiko Seefeldt Benjamin Vordemfelde Christer Gilje Dr Kamran Sharifabadi 39 Statnett Head of Business Development & Procurement Vice President Corporate Communications 40 Statoil ASA Advisor ProcDownstr Electr Tech 38 SeaRenergy Offshore Title Dr Dr 20 Participants Update: 17 November 2014 No Company Position Title First name Surname 41 TenneT Offshore Director Offshore Wilfried Breuer 42 TenneT Offshore TenneT platform manager DW2 Rik Stapel 43 TenneT TSO Communications Consultant Armine Egberink 44 TenneT Offshore Frank Koers 45 Vattenfall Europe Windkraft Hanna Friese 46 Vattenfall Europe Windkraft Javier Gemio 47 WAB CEO Ronny Meyer 48 WAB Project manager offshore Steffen Schleicher 49 WAB Project Leader Cluster Development Daniela Schimrigk 21 Participants Update: 17 November 2014 No Company 50 Intpow Position Title First name Jon Surname Dougstad 22 Venues Venues Adress, Notice Hotel Rica Maritime Hotel Haugesund, Åsbygaten 3, 5528 Haugesund, Norway Reception 19 November 2014, 20.30 Rica Maritime Hotel Haugesund, Bar Conference 20 November 2014, 9.30 – 17.00 Rica Maritime Hotel Haugesund, Room RØVÆR/UTSIRA/URTER Dinner 20 November 2014, 19.00 – 23.00 Rica Maritime Hotel Haugesund, Restaurant Visit DolWin beta, Startpoint, 21 November Aibel Yard Canteen, Garpaskjærveien 2, Haugesund Lunch 20 November 2014, 12.00 – 13.00 Aibel Yard Canteen, Garpaskjærveien 2, Haugesund 23 DolWin beta / WAB Aircraft Flight times Date Time Destination 19 November 2014 16.00 Check in Bremen Airport 19 November 2014 17.00 Departure Bremen - Haugesund 19 November 2014 19.15 Arrival Haugesund 21 November 2014 16.00 Check in Haugesund Airport 21 November 2014 17.00 Departure Haugesund - Bremen 21 November 2014 19.15 Arrival Bremen Airport 24 DolWin beta / WAB Aircraft Example Fokker 50 Source: OO-VLO FK50 Cityjet 25 DolWin beta / WAB Aircraft Flight details Wednesday 19 November 2014 Description Time / Description Destination Bremen - Haugesund Check in Airport Bremen 16.00 Terminal Terminal I Mee-ng point AHS Aviation Handling Services Check in Counter 13 or 14 Flight VG 9621 Departure 17.00 Flight time 2.10 h 26 DolWin beta / WAB Aircraft Flight details Friday 21 November 2014 Description Time / Description Destination Haugesund - Bremen Check in Haugesund Airport 16.00 Departure 17.00 Flight VG 9622 Mee-ng point SAS Groundhandling Haugesund Flight time 2.10 h Flight operation Operation OFD : +49 4921-899220, Robert Lehr, Reinhold Beekhuis 27 Location Hotel, Accommodation, Dinner, Conference Participants stay at Rica Maritime Hotel, Haugesund Rica Maritime Hotel, Haugesund • Single Room per night 1.050 NOK ≈ 134 Euro incl. Breakfast • (not included in the travelfee) • Rooms reserved by WAB, but must be paid by participants Contact Rica Maritime Hotel, Haugesund: Åsbygaten 3, 5528 Haugesund, Norway http://hotelmaritim.no/rom/?lang=en 28 GERMAN OFFSHORE PROJECTS / NORTH SEA Offshore windfarms Overleaping project areas 87 14/15 in earlier planning process undergoing license procedures licensend under construction in operation -----------------------------------------Esbjerg Offshore substations 9 Denmark 9 Global Tech 1 80 Converter platform (HVDC) 24 88 under construction Fanø 99 48 97 98 49 66 100 70 76 77 72 H F 103 102 101 94 35 56 31 G 90 50 E 2 Bard Offshore 1 Offshore substation with accomodation platform 22 36 41 B 91 57 84 82 39 40 C BorWin gamma A 13 18 18 81 29 DolWin gamma 7 16 DolWin alpha 11 NordseeOst measurement mast FINO 1 21 1 20 34 33 32 16 HelWin alpha Gröde Feh SüderoogSand D 10/11 Meerwind Süd/Ost Helgoland Trischen 26 27 25 Scharhörn 30 7 Borkum Riffgrund 1 Spiekeroog Langeoog Baltrum Cuxhaven Wangerooge AC Mellum Juist Riffgat (AC) 3 KS Büttel Neuwerk Norderney UW Hagermarsch 5 UW Inhausen Norddeich Wilhelmshaven Borkum Ameland Bremerhaven Terschelling Eemshaven 4 Vlieland Texel Langeland Pellworm 10 73 DolWin delta DolWin beta 13 Trianel Windpark Borkum Schiermonnikoog Als 1 alpha ventus 17 3 Riffgat Amrum HelWin beta 6 74 12 75 61 38 47 in operation Alternating current from offshore substation (AC 155 kV) is converted to High voltage direct current (HVDC) and then transferred to the land. -----------------------------------------Fyn Grid connection (HVDC) in development (soon) under construction in operation 6 Amrumbank West 12 Nordsee Ost BorWin alpha 23 60 58/59 45 46 19 under construction Föhr Amrumbank measurement mast 105 44 BorWin delta BorWin epsilon BorWin beta SylWin beta 104 9 2 19 Butendiek in development Ærø 28 86 43 8 Dan Tysk EEZ 9 Global Tech 1 89 85 42 Dutch Exclusive Economic Zone I 52 in operation Alternating current (AC) from turbines is converted from 33 kV to 155 kV and then transferred to the Tennet Rømøconverter platform -----------------------------------------EEZ = German Exclusive Economic Zone (from 12 to 200 nautical miles from the coast) Sylt Accomodation platform SylWin alpha 62 63 65 53 64 54 55 37b 37a 95 79 35 92 96 51 8 FINO 3 68 69 78 North Sea 83 93 67 71 83 Samsø in earlier planning process Netherlands KS Dörpen West Emden KS Diele KS Emden/Ost Bremen Germany GERMAN OFFSHORE PROJECTS / NORTH SEA Project name Cluster on map/ Cluster Tennet Location Nr. Developer/Operator Turbine Type E.ON, EWE, Vattenfall (DOTI/Offshore-Testfeld) BARD Engineering GmbH EWE ERNEUERBARE ENERGIEN GmbH EWE ERNEUERBARE ENERGIEN GmbH BARD Engineering GmbH 6 x REpower 5M, 6 x AREVA Wind M5000 Bard 5.0 Siemens SWT-3.6-120 Enercon E112 Bard 5.0 E.ON climate renewables / Amrumbank West DONG Energy Dan Tysk Offshore Wind GmbH (Vattenfall Europe Windkraft 51%, Stadtwerke München 49%) Global Tech I Offshore Wind WindMW WindMW RWE Innogy Trianel Windkraftwerk Borkum Siemens SWT-3.6-120 Siemens SWT-4.0-130 Siemens SWT-3.6-120 AREVA Wind M5000 - 116 Siemens SWT-3.6-120 Siemens SWT-3.6-120 REpower Systems 6.0 AREVA Wind M5000 - 116 Number of WTGs Total output [MW] Distance Water to nearest depth coast [Km] [m] ■ Operational (5) 1 alpha Ventus 2 BARD Offshore 1 3 Borkum Riffgat 4 Ems Dollart 5 Hooksiel Summary A EEZ B/BorWin EEZ 12 NM-Zone 12 NM-Zone 12 NM-Zone 12 80 30 1 1 124 60 400 108 4.5 5.0 577.5 45 87 25 0.01 1 30 39–41 16–20 3 3–8 80 77 80 80 40 40 48 40 302 277 288 400 144 144 288 200 35 34 70 75 53 53 30 45 21–25 23–29 23–31 39–41 22–26 22–26 19–24 25–35 485 2,043 69 10 97 80 40 345 50 349 400 200 105 93 34 40 45 40 40 23–29 30–35 25–35 80 48 32 42 119 80 54 84 15 83 80 18 64 54 288 240 160 273 595 492 324 504 90 581 400 110 320 332 32 40 40 94 85 73 33 38 41 110 45 15 86 46 17–22 29–35 29–35 40 26–39 39 28 –33 28–34 30–40 39–41 28–33 2–10 27–38 26–29 48 60 72 80 1,312 295 369 288 400 7,056 46 46 90 87 26–34 26–34 30–40 39–41 ■ Under Construction (8) 6 7 8 9 10 11 12 13 Amrumbank West Borkum Riffgrund 1 Dan Tysk Global Tech I Meerwind Ost Meerwind Süd Nordsee Ost Trianel Windpark Borkum (Borkum West II, 1. Phase) Summary D/HelWin A/DolWin I/SylWin B/BorWin D/HelWin D/HelWin D/HelWin A/DolWin EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ ■ Licensed Wind Farms (23) 14 15 16 17 18 Albatros Albatros 1 Borkum Riffgrund 2 Borkum Riffgrund West 1 Trianel Windpark Borkum (Borkum West II, 2. Phase) 19 Butendiek 20 Delta Nordsee 1 21 Delta Nordsee 2 22 Deutsche Bucht 23 EnBW He Dreiht 24 EnBW Hohe See 25 Gode Wind 1 26 Gode Wind 2 and 4 27 Gode Wind III 28 Kaikas 29 MEG 1 30 Nordergründe 31 Nördlicher Grund 32 Nordsee One (formerly Innogy Nordsee 1) 33 Innogy Nordsee 2 34 Innogy Nordsee 3 35 Sandbank 36 Veja Mate Summary B/BorWin B/BorWin A/DolWin A/DolWin A/DolWin EEZ EEZ EEZ EEZ EEZ SylWin A/DolWin A/DolWin B/BorWin B/BorWin B/BorWin A/DolWin A/DolWin A/DolWin E A/DolWin Northern Energy Projekt (NEP) / Strabag Offshore Wind Entwicklungs-, Vertriebs- und Service GmbH (OW.EVS) Northern Energy Projekt (NEP), STRABAG Offshore Wind GmbH (SOW), FIT Firmen internes Testfeld/Norderland Projekt (NLP) DONG Energy DONG Energy EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ 12 NM-Zone I/SylWin EEZ A/DolWin EEZ wpd offshore OWP Delta Nordsee, E.ON Energy Projects OWP Delta Nordsee, E.ON Energy Projects Windreich EnBW Erneuerbare und Konventionelle Erzeugung AG EnBW Erneuerbare und Konventionelle Erzeugung AG DONG Energy DONG Energy PNE Wind wpd offshore Windreich wpd offshore Nördlicher Grund RWE Innogy A/DolWin A/DolWin I/SylWin B/BorWin RWE Innogy RWE Innogy Vattenfall Europe Windkraft Cuxhaven Steel Construction EEZ EEZ EEZ EEZ Siemens SWT-3.6 Siemens SWT-3.6 5.0 5.0 5.0 Repower 6M Repower 6M Repower 6M Siemens SWT-4.0-130 GERMAN OFFSHORE PROJECTS / NORTH SEA Project name Cluster on map/ Cluster Tennet Location Nr. Developer/Operator Turbine Type Number of WTGs Total output [MW] Distance Water to nearest depth [m] coast [Km] ■ Wind Farms undergoing licensing procedures (57) 37a 37b 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 Aiolos Apollon Area C I Area C II Area C III Atlantis I (formerly Aquamarin) Atlantis II (formerly Bernstein) Atlantis III (formerly Citrin) Austerngrund Bight Power I Bight Power II Borkum Riffgrund West II Concordia I Concordia II Diamant Euklas GAIA I GAIA II GAIA III GAIA IV GAIA V Gannet Global Tech II Global Tech III He Dreiht II Heron Horizont I Horizont II Horizont III Horizont IV HTOD 1 (formerly NSWP4) HTOD 2 (formerly NSWP5) HTOD 3 (formerly NSWP 6) HTOD 4 (formerly NSWP 7) HTOD 5 (formerly Nautilus II) HTOD 6 Jules Verne Kaskasi I (formerly Kaskasi) Kaskasi II (formerly Hochsee Testfeld Helgoland HTH) Meerwind West Nautilus I Nautilus II Nemo F F C C C B/BorWin E E E B/BorWin B/BorWin A/DolWin H H G G F F F F F C B/BorWin B/BorWin B/BorWin C F F F F H H H H H H H D/HelWin D/HelWin H H H EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ wpd Offshore wpd Offshore Windreich Windreich Windreich PNE Wind AG PNE Wind AG PNE Wind AG Windreich Windreich Windreich Energiekontor AG KNK Concordia (WV Energie AG/Wintershall Holding) KNK Concordia (WV Energie AG/Wintershall Holding) BARD Schiffsbetrieb GmbH & Co. Nathalie KG BARD Foundation Northern Energy GAIA I Northern Energy GAIA II Northern Energy GAIA III Northern Energy GAIA IV Northern Energy GAIA V Northern Energy Projekt (NEP) Northern Energy Projekt (NEP)/STRABAG OW.EVS Northern Energy Projekt (NEP)/STRABAG OW.EVS EnBW Nordsee Offshore Northern Energy Projekt (NEP) Mainstream Renewable Power Mainstream Renewable Power Mainstream Renewable Power Mainstream Renewable Power HOCHTIEF Offshore Development Eins HOCHTIEF Offshore Development Zwei HOCHTIEF Offshore Development Drei HOCHTIEF Offshore Development Vier HOCHTIEF Offshore Development Fünf HOCHTIEF Offshore Development Sechs PNE Wind RWE Innogy RWE Innogy Windland Energieerzeugungs GmbH PNE Wind AG SSP Technology Holding ApS / PNE Wind AG PNE Wind Nemo AG 5.0 5 6 6 6 6 6.0 6–8 6–8 80 80 80 80 80 80 80 80 80 80 80 43 80 80 80 160 80 40 80 68 80 80 76 21 28 80 65 76 71 51 81 85 84 95 80 64 80 16 34 161 80 80 80 640 640 400 400 400 400 400 400 400 400 400 215 400 400 400 480 400 200 400 340 400 400 380 105 140 400 390 456 426 306 486 510 504 570 400 384 480 96 204 800 480 560 480 115 122 66 66 66 83 108 111 87 74 74 52 156 156 111 143 110 110 110 110 110 86 70 70 85 84 125 121 131 125 205 200 190 158 55 188 174 28 33 30 39–41 39–41 36–41 37 37 38 41 41 40 37 37 29–33 47–48 46 41 45 39–41 39–41 39–41 39–41 39–41 38 37–39 37 39 37 38 42–43 41 42 42–43 43 43 43 29–33 39–41 39–41 18–24 18–25 25–39 178 183 40–42 39–41 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Nordpassage Notos OWP West Petrel Sandbank Extension Seagull SeaStorm I (OWP) SeaStorm II (OWP) SeaWind I (OWP) SeaWind II (OWP) SeaWind III (OWP) SeaWind IV (OWP) Skua (OWP) Witte Bank I/SylWin B/BorWin A/DolWin C I/SylWin C F F F F F F C F EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ Vattenfall Europe Windkraft wpd offshore Northern Energy OWP West / STRABAG OW.EVS Northern Energy Projekt (NEP) Vattenfall Europe Windkraft Northern Energy Projekt (NEP) Northern Energy SeaStorm I (NEP) Northern Energy SeaStorm II (NEP) Northern Energy Projekt (NEP) / STRABAG OW.EVS Northern Energy Projekt (NEP) / STRABAG OW.EVS Northern Energy SeaWind III (NEP) Northern Energy SeaWind IV (NEP) Northern Energy Projekt (NEP) Projekt Ökovest (Projekt GmbH) 5 80 53 42 80 40 80 80 56 80 80 57 78 80 118 400 265 400 400 200 400 400 280 400 400 285 390 400 590 22,682 Wind Farms undergoing licensing procedures Summary 4,243 Total projects in the North Sea Summary 5,652 30,088 75 89 58 78 90 81 110 110 90 90 110 110 85 120 24–34 39 29–33 37–38 25–34 36–37 41 41 39 39–41 41 41–42 38 45 180 170 175 180 240 240 240 114 178 179 181 105 105 46 44 42 42 47 47 47 38–40 44 44 44 37–39 38–39 ■ Windfarms in earlier planning process (13) 93 Enova Offshore NSWP 8 - 15 94 Neptun 1 95 Neptun 2 96 Neptun 3 97 Nord-Ost Passat I 98 Nord-Ost Passat II 99 Nord-Ost Passat III 100 Norderland 101 Prowind 1 102 Prowind 2 103 Prowind 3 104 Stribog I 105 Stribog II Summary H G G G F G G G C C EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ EEZ Enova Energieanlagen Neptun Energy Projektgesellschaft Neptun Energy Projektgesellschaft Neptun Energy Projektgesellschaft Tiefbau Unterweser (TAGU) Tiefbau Unterweser (TAGU) Tiefbau Unterweser (TAGU) Norderland Projekt Wind PROffshore International Wind PROffshore International Wind PROffshore International Neptun Energy Projektgesellschaft Neptun Energy Projektgesellschaft MW = megawatts, WTG = wind turbine generator, 12 NM zone = 12 nautical mile zone (coastal seas) in Germany licensed by German states EEZ = German Exclusive Economic Zone (from 12 to 200 nautical miles from the coast); in Germany licensed by: German Maritime and Hydrographic Agency (Bundesamt für Seeschifffahrt und Hydrografie, BSH) 360 360 360 63 80 143 389 389 389 560 560 3,367 TenneT Cluster (North Sea) Cluster Demand Connecting Offshore Wind Farms [MW] Offshore Substation supplier Operater/Investor in operation/planned operation ABB TenneT Holding B.V., Mitsubishi Corporation (MC) 2010 Siemens/Prysmian TenneT Holding B.V., Mitsubishi Corporation (MC) 2015 ABB Tennet 2014 Siemens/Prysmian Tennet 2014 Siemens/Prysmian Siemens/Prysmian TenneT Holding B.V., Mitsubishi Corporation (MC) Tennet 2015 2015 In operation BorWin alpha 400 (2) Bard Offshore 1, (9) GlobalTech 1 Phase 1 Installed BorWin beta DolWin alpha HelWin alpha HelWin beta SylWin alpha Summary 800 (9) GlobalTech 1 Phase 2, (22) Deutsche Bucht Phase 1, (36) Veja Mate 800 (7) Borkum Riffgrund Phase 1, (16) Borkum Riffgrund 2 Phase 1, (29) MEG 1, (13) Trianel Windpark Borkum Phase 1 576 (11,12) Meerwind Süd/Ost, (12) Nordsee Ost 690 (5) Amrumbank West 864 (19) Butendiek, (8) DanTysk, (35) Sandbank 3.730 Under construction BorWin gamma DolWin beta DolWin gamma Summary 900 (15) Albatros I, (24) EnBW Hohe See 900 (25,26) Godewind 1,2, (32) Nordsee 1 900 (7) Borkum Riffgrund Phase 2, (16) Borkum Riffgrund 2 Phase 2 2.700 Siemens/Prysmian 2019 ABB/Aibel TenneT Holding B.V., Mitsubishi Corporation (MC) 2015 Alstom TenneT Offshore GmbH 2017 In planing BorWin delta BorWin epsilon 900 (22) Deutsche Bucht Phase 2 900 (23) EnBw He Dreight, (58) GlobalTech II (20) Delta Nordsee 1, DolWin delta (33) Nordsee 2 (17) Borkum Riffgrund West, DolWin epsilon (47) Borkum Riffgrund West II, (81) OWP West 720 (31) Nördlicher Grund, SylWin beta (83) Sandbank Extension 2.520 Summary 9.350 Summary all not decided not decided not decided not decided not decided 2019 Information: www.wab.net/Veranstaltungen Contact: Steffen Schleicher WAB e.V. T +49 471 391 77 14 M +49 173 238 2801 Steffen.Schleicher@wab.net www.wab.net