Bomono Permit - Bowleven plc Oil and Gas Company
Transcription
Bomono Permit - Bowleven plc Oil and Gas Company
Bomono Permit November 2014 Bomono PSC location Bomono PSC 53km • Moambe – – – 40km Zingana Key Data Area : 2,327.5 km2 Effective date : 12 Dec. 2007 Licence term : 5 yrs + 2 yrs Douala Logbaba Limbe Refinery • – – – – – Dibamba HFO 87MW Etinde Block 5 Completed work programme (Phase 1) • Phase 2 work programme – – Phase 1 work programme completed. Phase 2 underway. Geological/Geochemistry/Seep studies 6,222km aeromagnetic acquisition 3,125 km aerogravity acquisition 500 km 2D seismic acquisition All existing data integrated/ interpreted – – Requires two wells, expires December 2014 Awaiting official confirmation of PSC extension to allow completion of current drilling operation (contractor’s right under the PSC terms) Rig in process of being mobilised from Senegal to drill Zingana and Moambe prospects Expected spud around year-end Exploration Targets Oil potential • • • Focused on the deeper D&E sands Zingana and Moambe targeting medium risk 50-100mbbl STOIIP pools (P50-Mean range) in each sand Oil seep and borehole data encouraging for liquids; albeit lower risk for gas/condensate Zingana-1 SW Moambe-1 NE Bo-03 (yellow) – gas in B & C sds Gas/condensate • • • • Shallower B&C sands Historic well data indicates high chance of success –1953 wells tested gas in B and C sands near Zingana location. Two wells targeting 5-40bcf GIIP pools (P90-P50 range) in each sand, with associated condensate If successful, subsequent appraisal to prove volume will be fast-tracked, potentially by scaled early production system (gas to power) Line No: BOM-10-106 ‘B’ Sand twt Structure Map Cretaceous • • Deeper, higher pressure targets will not be tested by the initial exploration programme Potential for 2-3tcf (in place) but high pressure, high temperature Moambe Prospect: Zingana Prospect 3 Strategic Partner Partnership with Fortesa • • • October 2014 executed farm-out of 20% of Bomono to Africa Fortesa Corporation, privately owned driller and gas-to-power producer based in Senegal Fortesa subsidiary (AODL) will provide rig to drill Zingana and Moambe at cost Experience of active onshore gas-to-power production and operations in Senegal Identification of gas sales opportunities • • • • • Ideally located adjacent to Douala City Actis acquisition of AES/Sonel in June brings new momentum to growth of the local power market Talks initiated with potential power producers Opportunity for rapid installation of gas-fired generators at the well sites, with cabling to local consumers Early phase liquids trucked to Limbe refinery 4