Cameco Corporation
Transcription
Cameco Corporation
Transformations Underway at Cameco Doug Jensen Manager, Cobourg Operations – Cameco Fuel Manufacturing Jean-Pierre (J.P.) Pascoli Manager, Maintenance and Reliability – Port Hope Conversion Facility Safety Moment No job is so important that we cannot take the time to do it safely Wiring warnings Faulty wiring and other electrical problems cause many home fires each year - some of them resulting in death or injury. These are signs of electrical hazards: • Flickering lights • Hot electrical outlets • The smell of electrical insulation burning • Repeated tripping of a circuit breaker indicating the circuit is overloaded • Loose connections such as outlets into which plugs do not fit snugly • Defective, damaged or worn plugs, extension cords and lights. • Extension cords running under carpets and rugs where they can overheat and become damaged. The Nuclear Fuel Cycle and Cameco‟s Businesses Cameco Vision To be a dominant nuclear energy company producing uranium fuel and generating clean electricity Our Values ● Safety and Environment ● People ● Integrity ● Excellence Our Measures of Success ● A safe, healthy and rewarding workplace ● A clean environment ● Supportive communities ● Outstanding financial performance Fuel Services Division Blind River refinery Port Hope conversion facility Cameco Fuel Manufacturing Port Hope Conversion Facility ● Cameco‟s UF6 conversion facility is one of only two such plants in North America, and one of only four in the western world UO2 UF6 Conversion Facility Production UF6 Production ● Converts UO3 from Blind River to UF6 for enrichment and light-water power reactor use outside Canada ● Licensed to convert 12.5 M kg of uranium into UF6 per year, all for export ● One UF6 cylinder provides enough fuel to power a city of 90,000 people for one year UO2 Production ● Western world's only commercial supplier of natural uranium dioxide (UO2) conversion services needed to produce fuel for CANDU nuclear reactors ● Licensed to produce 2.8 M kg of UO2 per year and runs 24 hour/3-5 day campaigns ● Provides the uranium products used to fuel approx. 50% of all power generated in Ontario, 15% of all in Canada ● Customers in Canada, US, Korea and Japan Cameco Fuel Manufacturing Fuel Supply ● Canada – Ontario Power Generation – New Brunswick Power – Bruce Power – Hydro-Quebec ● China ● South Korea ● Romania ● Argentina CFM today ● CANDU Reactor Fuel – over 1,500,000 CANDU fuel bundles produced at the Port Hope facility – current fuel supply to Bruce Power and Hydro-Quebec ● Reactor Components – CFM manufactures more components for use within the CANDU reactor than any other company in the world ● Quality Assurance – ISO 9001:2008 – CSA Z299.1-85 – 10CFR50 Appendix B – N285.0 / ASME Section III / NQA-1 CFM Manufacturing Process CFM Transformation to Manufacturing Excellence ● Why Change? CFM has been in operation since the 1950‟s producing a stable product in a stable market. ● Early 2009 – CFM at a critical juncture – Increasing stakeholder expectations Regulators Customers Shareholders – Loss of focus in core operations – New management team – lots of energy; no baggage Lean tools were the obvious choice. CFM Manufacturing Excellence Program ● Basis is lean manufacturing – principles and tools – Start with the customer Start any improvement with the customer in mind (external and internal) – Focus on Waste elimination Systemically identify and eliminate waste (or non-value adding activities that the customer will not pay for) The Zen of Lean (taken from “The Lean Manager”) – “When you first study lean, it‟s all about the tools. Which is fair enough because you‟ve got to get into the problem somehow. Then, when you‟ve studied lean for years, you realize that it‟s not about the tools, but about “management attitude.” – “… but then when you finally get it, you realize it‟s all about the tools in the end. Not the tools in themselves, but how you apply the tools to get results.” CFM Manufacturing Excellence Program ● Not a sprint to the finish: – Multi-faceted – Multi year ● Culture change effort ● Bias towards results – Alignment and Communication – Problem Solving and Focused Improvement – Better data; better decisions – 5S and workplace organization – Two Key Pillars: People development AND Business Process Improvement Leadership Commitment Align the Organization Corporate Objectives Site Objectives Individual Objectives Key Performance Indicators Turning the Organization Upside Down Managers Supervisors & Support Operators Operators Supervisors & Support Who has to change the most? Managers First who, then what… ● Focusing on the “improvement layer” – Several changes made to ensure that leadership, focus and skill sets are appropriate for accelerating our rate of improvement ● Maintenance: – Appointment of two full time maintenance planners – Additional temporary resources to transition data into SAP ● Operations: – Appointment of two full time Manufacturing Excellence coordinators to help steer the change effort ● Reactor Components – Separated resources away from dual roles and created financial accountability for each project on its own. People Before Parts ● All senior managers read and participated in chapter by chapter review/discussion in 2010. ● Concepts revisited for 2011 objectives setting ● „Book Club‟ approach repeated with all supervisory staff in 2011. ● All Supervisors and Managers enrolled in SME Lean Bronze Certification program for 2014 completion. Support provided through: – „Book club‟ sessions – In-class training Manufacturing Excellence has two main objectives Stabilize Throughput Improve Customer Confidence Internally Focused Improved cost and level of engagement Externally Focused Improved quality and process consistency Top Level KPIs Good Bundles per day (PH) Good Tubes per day (CB) Top Level KPIs First Time Yield - Bundles (PH) First Time Yield -Tubes (CB) Manufacturing Excellence - Overview Objectives Improve Throughput Improve Customer Confidence Strategies Reduce Unplanned Downtime Reduce defect levels and process variability Make the organization more effective Strengthen Quality Management Systems Initiatives Understand manufacturing process constraints; baseline OEE for each process area Establish & track downtime and defect codes for each process area Establish effective equipment maintenance program Deploy process improvement teams Define next generation system for shop floor data management Manufacturing Excellence Overview Objectives Improve Throughput Improve Customer Confidence Strategies Reduce Unplanned Downtime Reduce defect levels and process variability Make the organization more effective Strengthen Quality Management Systems Initiatives Implement lean toolbox and conduct lean principles training Establish effective top-down and bottom-up communications mechanisms Build supervisor capabilities and effectiveness Elevate operator, maintenance and process analyst capabilities Improve Root Cause Analysis capabilities Design next generation shop scheduling protocols (pull based) Improve tracking and communication of cost drivers Manufacturing Excellence Overview Objectives Improve Throughput Improve Customer Confidence Strategies Reduce Unplanned Downtime Reduce defect levels and process variability Make the organization more effective Strengthen Quality Management Systems Initiatives Standardize Defect database and pareto causes Strengthen Corrective Action process; implement CIRS Establish Phase 1 of electronic document management Begin structuring an IMS that ties together CSA Z299 ,ISO 9001, 14001 and 18001 Jointly develop and deploy a set of supplier performance measurement KPIs Visibility = Accountability CFM PLT System – Operator Screen Establishing a Maintenance Program Major Accomplishments and Milestones Establish organization Added two maintenance planning positions Evaluate quality of existing PM procedures for assets Establish logical hierarchy for assets Identify critical asset information Identify all assets Establish equipment significance (high, medium, low) Prior to identification: PH-517, CB-256; Total- 773 After walk-downs: PH-719, CB-657; Total- 1378 Establish appropriate PM instructions for all assets Establish all business processes for the Maintenance program Establish spares and inventory management program More than 50% missing or incomplete Complete In Process or planned Train and deploy Load all equipment data into system (MP2, now SAP) Workplace organization – lead by example ● Initiative kicked-off in 2010, using offices and shared spaces – Training Courses Developed – Managers, supervisors, production support staff – Built into site objectives and each employee‟s performance objectives ● Rationale: shop floor buy-in created by walking the talk ● Several lab areas were the next focus ● Selected shop floor areas chosen as focused improvement events were undertaken – UT area in Cobourg underwent significant changes to support standardized work and waste elimination/ identification ● “Sustain” Audits of office areas continue. Office standards and self-audit tracking sheets Supervisor Standardized Work ● Weekly Checksheet – Divided into Start of Shift, Daily, End of Shift and Weekly Tasks. – Form is submitted to co-ordinator / manager at week‟s end for quality check. – KPI tracked monthly for completion of forms Bundle Manufacturing Next Generation Technology ● Extensive automation of bundle assembly processes – Pellet loading through final inspection ● Most significant investment in the facility in decades Pack Inspect FG EPW WIP ECW WIP WIP WIP Current Process Loading WIP Kitting Weld Prep Future Process Weld Prep Pack Inspect WIP EPW ECW Loading Kitting WIP Performance Operations Improvement Landscape OPTIMIZE STANDARDIZE STABILIZE Time • Highlight & contain major issues and barriers to success • All operations have clear, repeatable standardized work • Continually improve process efficiency and effectiveness • Build consistency (people & process) • Build capability & skills • Develop continuous improvement mindset • Begin eliminating problems • Begin managing performance • Maintain & improve levels of consistency • Drive performance improvement through effective performance management • Build flexibility (people & process) • Determine next level of performance improvement • Drive performance using stretch goals & objectives Operational Reliability at Port Hope Conversion Facility Operational Reliability ● Assessment (gap analysis) in 2008 ● Program started in fall 2010. Still on-going. ● Objective – Put in place processes, people, procedures and culture to enable the Port Hope facility to 1. Enable consistent production at the designated license capacity 2. Attain greater efficiencies in order to achieve reduced unit manufacturing costs regardless of annual budgeted volume 2008 LCE Assessment Findings for Port Hope SUSTAINABILITY RELIABILITY ENGINEERING EQUIPMENT HISTORY AUDITS CONFIGURATION MANAGEMENT BUDGETING & COST CONTROL MANAGEMENT REPORTING OPTIMIZATION EAMS SUPERVISION ORGANIZATIONAL STRUCTURE TRAINING WORK PLANNING WORK MEASUREMENT LOSS ELIMINATION FACILITIES & EQUIPMENT PROCESSES WORK CONTROL SCHEDULING & COORDINATION OPERATOR CARE EQUIPMENT & PROCESS DESIGN PREVENTIVE / PREDICTIVE MAINTENANCE PROCUREMENT MATERIALS MANAGEMENT CULTURE STATUS ASSESSMENT GOVERNING PRINCIPLES OBJECTIVES & GOALS MASTER PLAN ORGANIZATIONAL BEHAVIOR PERFORMANCE MANAGEMENT PRINCIPLES PLANT PARTNERSHIPS Reactive 0.000 to 0.399 MANAGEMENT COMMITMENT .313 Emerging 0.400 to 0.549 Proactive 0.550 to 0.749 Excellence 0.750 to 1.000 Assessment opportunity themes ● Lack of an overall plan (looking forward) ● Ineffective communication – Silos between Operations, Maintenance, & Engineering ● Lack of clear and/or embraced work processes ● Lack of clear roles, responsibilities and accountabilities ● Lack of effective metrics/KPIs (Key Performance Indicators) ● Low employee involvement and/or engagement ● Not operating reliably (fire fighting/reactive environment) – High operating costs due to lack of reliability – Won‟t meet future demands – Lack of regulator and public confidence Project Methodology ● Partner with proven specialists - LCE ● Cameco „owned‟ project – – Employ in-house resources for majority of work – Drives ownership & accountability ● Create four main focus groups (teams) ● Supplementary special teams – Reliability Action team (Quick Wins) – RBAM (Risk Based Asset Management – LCE SMEs) – HR/Culture change management team ● Site Steering Team – Leadership, engagement, sponsorship, review, approval, & direction when required ● Corporate Support Team – Removing corporate roadblocks, direction when required Key Activities for Focus Teams ● Team charters with scope ● „As-Is‟ process definition, review, and critique ● „To-Be‟ process definition ● Performance metrics definition and implementation ● Training development and implementation ● Communication and Engagement activities Focus Team Spotlight ● Work Identification (notifications) ● Planning of work operations and tasks ● Acquisitioning (ordering, reserving) of parts, materials, and services ● Scheduling of work (weekly, daily) ● Staging of parts at job site ● Permitting (clearances) ● Execution of work ● Feedback and close-out Focus Team Spotlight ● Material Master processes (new, change/delete) ● Purchasing of parts, materials, and services ● Receiving of parts and materials ● Inspection of parts ● Issuing parts and materials ● Kitting of parts ● Repair and replace processes ● Returning to inventory and/or vendor ● Obsolescence program (Inventory Reduction) Focus Team Spotlight ● Asset (equipment) importance ranking ● Asset identification, entry and management in SAP ● Asset control strategies – Maintenance strategy – Operating strategy ● Root-Cause analysis (RCA) of equipment failures ● PM (Preventive Maintenance) Optimisation ● Failure prevention ● Loss elimination Focus Team Spotlight ● Operator Care Rounds (Health monitoring) ● Production loss tracking (accounting) ● Production loss action log ● 5S support RBAM Activities Asset (Equipment) Importance Ranking completed EAM/CMMS asset hierarchy review & clean-up completed Regulatory PM Review completed Simplified FMEAs completed White Paper Fair 2011 Work Management: Planning & Scheduling ●Standardized processes and tools for planners ●Performance indicators ●Improved efficiency ●Better work quality Materials Management: Kitting ●Parts prepared for tradespeople ●Reduced time spent getting parts ●Reduced time spent looking for lost parts. ●Just in time delivery Production Loss Tracking ●Now running in all 4 areas of UF6 plant. ●Large TV screen in control room provides visibility to all who enter. ●Now part of morning meeting. Production Loss Tracking in Action New monitor ●Recommended actions developed for Top 3 issues for each process area. From: 11 10 01 UF6 To: 11 10 31 Pareto Chart 10 Downtime (hour) Production Loss Tracking in Action Production Area 100% 9 90% 8 80% 7 70% 6 60% 5 50% 4 40% 3 30% 2 20% 1 10% 0 0% Results Table Rank Equipment Number & Description 1 2 3 4 5 6 7 8 9 10 Primary Cause 402GD002 - Disperser 402JD019 - Feed Screw Conveyor 402GD014 - Disperser 402GD005 - Disperser 402JD015 - Feed Screw Conveyor 402JD017 - Disperser 402FE007 - Feed Hopper & Dust Line 403EA004 - Cold Trap Others Total (all events) Production Loss Hour % 9.0 26% 9.0 26% 5.0 15% 3.0 9% 3.0 9% 2.0 6% 2.0 6% 1.0 3% 0.0 0% 0.0 0% 0.0 34.0 26% 53% 68% 76% 85% 91% 97% 100% 100% 100% important Operator Care Checklist Cell Room Document # Revision #: 0 Limits Task MIN MAX Units On Std By Maint. On Std By Purge 0.5 8 kPa On Std By CHECK Rectifier cooling water Outlet water TEMP n/a 37 C Rectifier cooling water pumps STATUS: On Std By Maint. 45 90 % 37 C Std By Maint. 8:00 11:00 14:00 17:00 20:00 23:00 2:00 5:00 Corrective Action / Comments H2 Room 301GB02 Std By Maint. last round 301GB01 On Air Dry Maint. On Std By Purge Air Dry Maint. On Std By On Std By Maint. last round H2 Blowers STATUS: first round VISUAL inspection of H2 room & mezzanine On Std By Maint. Leaks CHECK status of switches & valve position (OPEN / CLOSED) INSPECT belt condition, unusual noise (whine or squealing) 301FD04 301FD07 CHECK valve position (ON – online) (OFF – offline) CHECK differential pressure VERIFY ON line and OFF line Header. (North or South) VERIFY rupture disks - one ON-LINE, other carseal CLOSED INSPECT pump 401GA17 / piping (typically on standby) last round INSPECT pump 401GA22 / piping first round CHECK H2 Scrub: level, KOH, N2, Flush seal pot, pH, water flow H2 Scrubber pumps STATUS: * 502GA03 * 502GA04 CHECK Rectifier Tank Level (502FB02) - Target 75% VERIFY strainers using temperature gauge first round Second Floor Cell Room 502EA01 502EA02 * VERIFY that HF & N2 line purging is NOT OPEN at same time CHECK HF purge meters & HF piping joints On Leaks last round Heat exchangers STATUS: first round CHECK MCC's for equipment modicon bypass last round 301FD03 first round CHECK VFD for errors (fault lights, or flashing) H2 Filter STATUS: Process Implementation Tracker Port Hope - Process Implementation Tracker 17-Oct-12 UF6 UO2 Power House Work Management (WM) 1 Work Identification Process 2 2 2 2 Planned Work Approval 2 2 2 3 Unplanned Work Execution 2 2 2 4 Planned Work Execution 2 2 2 5 Work Planning 3 3 3 6 Work Scheduling 3 3 3 7 Daily Work Scheduling 3 3 8 Labour Estimating 3 3 9 Job Plan / Task List 2 2 10 Work Order Close Out 2 2 40% 40% Asset Enrty Process 3 3 2 Asset Importance Ranking 3 3 3 Asset Control Strategy Development 2 2 4 Asset Maintenance Strategy Development 2 2 5 Asset Operating Strategy 2 2 6 Loss Elimination Process 2 2 7 MP Optimization Process 3 3 8 Procedure Content Review 2 2 2 9 Asset Revision 3 3 3 44% 44% 44% % Complete (Green Status) 3 Training has started but not all personnel have been trained on new 3 OR Training not yet initiated processes 2 2 in the area have been trained on the new processes. All personnel Processes have been implemented across the area 40% Audit Indicates ~50% compliance to processes Reliability Engineering (RE) 1 % Complete (Green Status) 3 All personnel in the area have been trained on the new processes. 3 have been implemented across the area Processes Audit indicates ~85% compliance to processes 2 AND KPI's are being observed to validate the new processes 2 All Traiing2complete Audit indicates ~95% compliance to processes 2 KPIs are in use for these processes Training plans 3 are integrated with SOPs for future employees Weekly KPI Dashboard PHCF WEEKLY ROLLING DASHBOARD As of October 17, 2012 Cal Week # / Week Beginning & Ending 36 37 38 39 40 41 '12/Sep/02 '12/Sep/09 '12/Sep/16 '12/Sep/23 '12/Sep/30 '12/Oct/07 Performance Indicator 1-wk Chg 6-wk Avg UoM Target '12/Sep/08 '12/Sep/15 '12/Sep/22 '12/Sep/29 '12/Oct/06 '12/Oct/13 Plant Performance UF6 OEE % 67% UF6 Uptime % 95% UF6 Rate % 70% UF6 Weekly Production tU 206 UF6 Quality % 99.9% Operations Improvement UF6 Oper Rounds Compliance % 85% UF6 PM Compliance % 85% Work Management Emergency/Unplanned Work % 15% Maint. Schedule Compliance % 85% UF6 Mech Crew % 85% Central Mech (UO2) Crew % 85% E&I Crew % 85% Maint. PM Compliance % 85% UF6 Mech Crew % 85% Central Mech (UO2) Crew % 85% E&I Crew % 85% Maint. Backlog - Total wks 8.0 'Ready' Backlog wks 4.0 Materials Management Stock Outs # 0 Kitting Issues (problems reported) # 0 n/a 0% 0% 0 n/a 10% 53% 19% 31 99.9% 35% 73% 48% 109 99.9% 64% 98% 65% 198 99.9% 61% 95% 65% 189 99.9% 71% 99% 72% 220 99.9% 48% 70% 45% 125 99.9% 100% n/a 99% n/a 100% 36% 100% 100% 100% 100% 100% 50% 100% 72% 21% 82% 91% 79% 79% 82% 91% 72% 58% 7.8 3.9 27% 78% 78% 45% 94% 88% 90% 95% 77% 7.8 3.9 23% 89% 84% 77% 97% 92% 54% 99% 92% 8.0 4.5 19% 90% 84% 84% 98% 89% 50% 86% 100% 8.0 4.5 22% 88% 89% 84% 90% 87% 100% 89% 100% 8.1 4.3 23% 91% 91% 93% 90% 82% 63% 75% 97% 8.1 4.3 23% 86% 86% 77% 91% 87% 75% 86% 87% 8.0 4.2 0 0 0 0 3 0 0 0 0 0 3 0 1.0 0.0 6-wk Trend Crew-specific KPI boards Change Management ● Communication & Engagement Updates in bi-weekly supervisory bulletins PIE quizzes issued Communication blitzes conducted. Several change management assessments conducted (ADKAR) Change management meetings with supervisors Communication boards refreshed every 3 weeks White Paper Fair ● Partnership Agreements ● UF6 Production & Maintenance partnership agreement ● UF6 Production & Tech Services partnership agreement ● Maintenance & Engineering partnership agreement Communication Boards Communication Boards in the field Summary ● Major initiative for Port Hope Conversion Facility ● Employee owned – through participation ● Unsuccessful without senior management support ● Change management strategies imperative – Establish the „why‟ – Communicate early and often Blitzes, bulletin boards, meetings, etc. – Coaching and auditing for sustainment ● What gets measured gets managed ● Not a „project‟ but a never ending journey – Many continuous improvement opportunities being discovered as processes are put through their paces Questions?