• Brigil Homes - City of Ottawa
Transcription
• Brigil Homes - City of Ottawa
• Brigil Homes Stormwater Management & Servicing Report Type of Document Site Plan Submission Project Name Petrie’s Landing, Phase II Project Number OTT-00214935-A0 Prepared By exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada Date Submitted November 2013 Brigil Homes Stormwater Management and Servicing Report Type of Document: Site Plan Submission Project Name: Petrie’s Landing, Phase II Project Number: OTT-214935-A0 Prepared By: exp 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada T: 613 688-1899 F: 613 225-7337 www.exp.com _______________________________________ Jason Fitzpatrick, P.Eng. Project Engineer Infrastructure Services Date Submitted: November 2013 ____________________________________ Bruce Thomas, P.Eng. Senior Project Manager Infrastructure Services exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Legal Notification This report was prepared by exp Services Inc. for the account of Brigil Homes. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. Exp Services Inc. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this project. EX-i exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Table of Contents Page 1 Introduction ............................................................................................................. 1 2 Existing Conditions ................................................................................................ 1 3 Development Proposal ........................................................................................... 1 4 Background Information ........................................................................................ 2 5 Watermain Servicing .............................................................................................. 2 5.1 Methodology ................................................................................................................ 3 5.2 Design Criteria ............................................................................................................ 3 5.3 Water Demands .......................................................................................................... 3 5.4 Fire Flow Requirements .............................................................................................. 4 5.5 Boundary Conditions ................................................................................................... 4 5.6 Modelling Results ........................................................................................................ 4 6 Sanitary Sewer System .......................................................................................... 5 7 Storm Sewer Servicing ........................................................................................... 6 8 9 7.1 Storm Servicing Criteria .............................................................................................. 6 7.2 Storm Sewer Design ................................................................................................... 7 Stormwater Management ....................................................................................... 7 8.1 Summary of Previous Design ...................................................................................... 7 8.2 Stormwater Management Criteria ............................................................................... 8 8.3 Allowable Release Rate .............................................................................................. 8 8.4 Uncontrolled Storm Drainage Areas............................................................................ 9 8.5 Quantity Control ........................................................................................................ 10 8.6 Quality Control .......................................................................................................... 10 Erosion and Sediment Controls during Construction ....................................... 11 10 Summary................................................................................................................ 12 i exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 List of Appendices Appendix A – Figures Appendix B – Storm Design Sheets Appendix C – Sanitary Sewer Calculation Sheets Appendix D – Hydraulic Analysis Tables Appendix E – H20Net Hydraulic Analysis Model Results Appendix F – Stormwater Management Tables List of Figures Figure 1: Site Location Plan ....................................................................... Appendix A Figure 2: Architectural Site Plan ................................................................ Appendix A Figure 3: Sanitary Drainage Area Plan ...................................................... Appendix A Figure 4: Storm Drainage Area Plan .......................................................... Appendix A Drawings Included Separately. ii exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 List of Tables Table 3-1: Summary of Petrie’s Landing Development .......................................................... 1 Table 7-1: Summary of Post Development Conditions .......................................................... 6 Table B-1: 5-year Storm Sewer Calculation Sheet Table B-2: 100-year Storm Sewer Calculation Sheet Table C-1: Sanitary Sewer Calculation Sheet Table D-1: Water Consumption/Demand Allocation Table Table D-2: Sample Calculation of Fire Flow Requirements (Phase 2) Table D-3: Calculation of Fire Flow Requirements (All Buildings) Table F-1: Pre-Development Runoff Calculations Table F-2: Allowable Runoff Calculations Table F-3: Average Runoff Coefficients (Post Development) Table F-4: Summary of Post Development Runoff (Uncontrolled and Controlled) Table F-5: Storage Volumes for 5-Year and 100-Year Storms iii exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 1 Introduction Exp Services Inc. (exp) was retained by Brigil Homes to complete the site servicing and stormwater management design for the second phase of Petrie’s Landing, a high-rise condominium development. The development is located at 8911 North Service Road in the City of Ottawa. Phase II of this development will be located immediately east of Phase I, which is also a 15 storey high-rise condominium. The site abuts the Ottawa River to the north, Highway 174 to the south, vacant land to the east and an existing City of Ottawa public works yard to the west. The entire development will consist of five residential high-rise condominiums buildings. The site location is shown on Figure 1 in Appendix A . 2 Existing Conditions Currently the site is occupied by an existing 15 storey residential condominium tower which was constructed in 2007 and 2008 as Phase I of this development. The total site area is 5.77 hectares, of which approximately 1.1 hectares was developed as part of Phase 1. The remaining 4.67 hectares remains undeveloped and consists of brush, woods and meadows. Existing municipal services were provided for Phase II as part of the servicing of Phase I. A 250mm diameter sanitary sewer, 375mm and 600mm diameter storm sewers, and two 200mm watermains were stubbed at the limits of Phase 1 for the second phase of this development. An onsite stormwater management facility consisting of a dry pond and oil/grit separator was provided up-front during the construction of Phase 1 to service the entire development. Additional information on the existing services is provided in the appropriate sections of this report. 3 Development Proposal It is intended to construct Phase II of this overall development, which will consist of a 15 storey residential condominium building. The following Table 3-1 below summarizes the breakdown of the existing, currently proposed and future phases of Petrie’s Landing development by Brigil. A site plan showing Petrie’s Landing, Phase II, is provided on Figure 2 in Appendix A. Table 3-1: Summary of Petrie’s Landing Development Phase Status Area (hectares) No. of Storeys No. of Units Phase 1 Existing (Built 2007 & 2008) 1.080 15 89 Phase 2 Phase 3 Phase 4 Phase 5 Total = Current Future Future Future 0.697 0.590 0.586 0.959 3.912 15 15 15 15 138 138 138 336 839 This report will demonstrate that the existing infrastructure will support the proposed development. The report will identify the servicing and stormwater management requirements and provide a servicing design brief for submission with the engineering drawings for City of Ottawa Site Plan approval. 1 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 4 Background Information The original “Stormwater Management and Site Servicing Report” for this entire development was prepared by David McManus Engineering (DME), with the latest report revision August 2008. The report was prepared to address the following: • Determine the appropriate water and sanitary and storm sewer services for the development, • Determine; the allowable stormwater release rate based on pre-development conditions, post development runoff, and storage volume requirements, • Determine method of achieving stormwater quality objectives. Although additional information on each individual servicing requirement will be identified in Sections 5, 6 and 7, a brief summary of the results of the Phase 1 DME servicing report is as follows: 5 • Two 200mm watermains service the development. These twin (parallel) watermains are connected to the existing 400mm watermain near the west limits of Phase 1. Two watermains were installed for reliability in the event one watermain is down for service. Additional information on the watermain servicing is provided in Section 5. • A 300mm sanitary sewer was extended from the intersection of North Service Road and Trim Road to service the development. Please refer to Section 6 for the Sanitary Servicing. • The site is serviced by a gravity storm sewer system, dry pond and oil/grit separator which is located adjacent to Phase 1. Strom sewer stubs were left at the limits of Phases 1 for future phases. The dry pond was sizes to accommodate the entire directly connected storm drainage areas. Additional information on stormwater management is provided in Section 7. Watermain Servicing The two existing 200mm diameter watermains will be extended into Phase 2 to service the second 15 storey residential high-rise building. Construction will proceed in a phased manner with the watermain being extended for each phase. As part of the original DME report, a Watercad hydraulic model was prepared based on boundary conditions provided by the City of Ottawa. The proposed watermain diameter was selected based on providing adequate pressures and flow to service the entire development. For Phase 2, a re-confirmation of the anticipated water system pressure and fire flows that will be available was completed based the latest City of Ottawa Design Guidelines. H20Net modelling software was used to calculate pressures and flows under maximum day plus fire flow and peak hour conditions. 2 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 5.1 Methodology The water distribution system proposed for this development is designed in accordance with the City of Ottawa Design Guidelines (July 2010). The following steps indicate the basic methodology that was used in the hydraulic analysis: • Create the water distribution model adding junction nodes at intersections and creating watermains between junctions. • Determine demands based on populations for each junction node based on the number of contributing residential units. • Based on the populations determined above calculate water consumption rates for maximum day and maximum hour. • Set boundary conditions from information obtained from the City of Ottawa. • Determine the required fire flow, and • Proceed with the simulation of the proposed water distribution model and compare the results with the City of Ottawa criteria. 5.2 Design Criteria A summary of design parameters used in the water distribution model were taken from Section 4.0 of the City’s Guidelines, and are as follows: • • • • • • • • • 5.3 Population Density (1-bedroom) = Population Density (2-bedroom) = Average daily water consumption (Residential) = Maximum Day Factor Maximum Hour Factor C factor (200 mm – 300 mm) Minimum Allowable Pressure = Maximum Allowable Pressure = Minimum Static Pressure (Under Fire Flow Conditions) = 1.4 person/unit 2.1 person/unit 350 L/cap/day (2.5 x Avg. Day) (2.2 x Max. Day) 110 275 kPa (40 psi) 690 kPa (100 psi) 140 kPa (20 psi) Water Demands The total average, maximum day and peak hour demands were calculated at 5.8 L/sec, 14.5 L/sec and 31.8 L/sec respectively. A complete breakdown of the demand allocations for each junction is provided in Table D-1 located in Appendix D. 3 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 5.4 Fire Flow Requirements Water for fire protection will be available utilizing the proposed fire hydrants located within the site. The Phase 2 building will have a sprinkler system as per NFPA 13, however the required fire flow for the proposed development was calculated based on typical values as established by the Fire Underwriters Survey 1999, as required by the City of Ottawa Design Guidelines. The following equation from the Fire Underwriters document “Water Supply for Public Fire Protection”, 1991, was used for calculation of the on-site supply rates required to be supplied by the hydrants: F = 200 * C * √ (A) where F = Required Fire Flow in Litres per minute C = Coefficient related to type of Construction A = Effective Floor Area in square metres Phase 2 Building F = 200 * 1.5 * √ (5,493) F = 9,783L/min or 10,000 L/min (rounded to closest 1,000) A reduction for low hazard occupancy of -25% for residential dwellings, -30% for an automatic sprinkler system, and an increase for fire area exposure of +50% results in a required fire flow of 7,875 L/min (132 L/sec). A complete breakdown of fire flow requirements for all buildings is provided in Table D-2 and Table D-3 Appendix D. The fire flow requirements range from 123 L/sec to a maximum of 136 L/sec. 5.5 Boundary Conditions The original boundary conditions that were provided by the City of Ottawa during the servicing of Phase 1 were used for the purpose of hydraulic modeling. Boundary conditions were provided at the connection point to the existing 400mm watermain, at the west limits of Phase 1. The following summarizes the boundary conditions used: Maximum Day Plus Fire Flow HGL Peak Hour HGL High Pressure Check HGL 5.6 = 110.0m = 108.0m = 115.0m Modelling Results The calculated minimum and maximum working pressures anticipated within the development are 517 kPa (75 psi) and 565 kPa (82 psi) under peak hour conditions. The estimated fire flows available are in excess of 200 L/sec at all junctions based on two watermains in service. A scenario was run to determine the available fire flows with one of the existing watermains in Phase 1 out of service. Based on this scenario an estimated 150 L/sec would be available to Phases 2 - 4. Detailed results are included in Appendix E. Based on the modelling results there is sufficient water pressures under peak hour conditions and adequate fire flows under maximum day plus fire flow conditions available under all phases of this development. 4 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 6 Sanitary Sewer System The sanitary sewer system was designed in accordance with City of Ottawa design guidelines. It is designed on a population based flow, and area based infiltration allowance as indicated below. A sanitary sewer design sheet, which is provided in Appendix C, was prepared for the entire site, and included an allowance for lands west of the site on the North Service Road. Please refer to the Sanitary Drainage Area Plan provided on Figure 3 in Appendix A. The original design sheet prepared for Phase I was updated to reflect the latest City of Ottawa design standards, updated unit counts, and population densities. Updated pipe lengths and slopes, based on AsBuilt information, were used for existing sanitary sewers in Phase 1 and along the North Service Road. Site Area (Phases 1 - 5) External Commercial Area = 3.91 hectares = 9.90 hectares Number of Residential Units Residential Unit Type Unit Density (1-bed) Unit Density(2-bed) Avg. Residential Flow = Avg. Commercial Flow = Minimum Sewer Velocity = 584 (1-bed) + 255 (2-bed) = apartments = 1.4 persons per unit = 2.1 persons per unit = 350 L/cap/day = 50,000 L/gross ha/day = 0.80 m/s Total Residential Population Residential Peaking Factor Commercial Peaking Factor = 584 x 1.4 + 255 x 2.1 = 1352 = 1 + 14 / (4 + (P/1000))0.5 = 1 + 14 / (4+1.352/1000)0.5 = 3.71 = 1.5 QDOMESTIC QCOMMERCIAL QINFILTRATION QSAN = 1352 x 350 x 3.71 x (1/86,400 sec/day) = 20.32 L/sec = 50,000 x 9.9 x 1.5 x (1/86,400 sec/day) = 8.59 L/sec = 0.28 L/ha/sec x 13.81 ha = 3.87 L/sec = 20.32 + 8.59 + 3.87 = 32.78 L/sec A total peak sewage rate of 32.8 L/sec was estimated for the entire development, with sewage flow from Phase 2 estimated at 3.7 L/sec. Please refer to Appendix D for the Sanitary Sewer Design Sheet. The minimum reserve capacity in the sanitary sewer is estimated at 4.5 L/sec within the last manhole run on the North Service Road (MH116 – ExSanMH). This is due to the flat slope of the last run at 0.15%, which is under the minimum velocity of 0.60 m/s at 0.47 m/s. It should be noted that the peak sanitary flow calculated is for the ultimate condition with all Phases and additional offsite lands being serviced. 5 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 7 Storm Sewer Servicing This section will outline the storm sewer servicing requirements for Phase 2 of this development and confirm that the previously installed storm sewer infrastructure is appropriate to service this next phase. The following summarizes the steps completed: • Calculated average runoff coefficients for all phases • Calculated the 5-year and 100-year runoff for each phase based on updated runoff coefficients • New storm design sheets were created based on the Phase 2 Site Plan and As-Built pipe information for existing sewers in Phase 1. • Calculated 5-year and 100-year storage requirements for entire site. • Reviewed the existing SWM facility size to accommodate the storage requirements. Table 7-1: Summary of Post Development Conditions 7.1 Phase Area (hectares) Average Runoff Coefficient Phase 1 1.080 0.57 Phase 2 Phase 3 Phase 4 Phase 5 Total = 0.697 0.590 0.586 0.959 3.912 0.52 0.53 0.47 0.66 0.56 0.56 Storm Servicing Criteria Currently there are no inlet control devices in catch basins within Phase 1 to control peak runoff into the minor system. All runoff is directed to the SWM facility located in Phase 1. The SWM facility is controlled within the outlet structure using a single orifice to control outflow. For each phase, the majority of surface runoff is captured by area drains, as the area drains are located on top of the underground parking structure. The building area drains will be connected directly into the internal plumbing system and connected to the storm sewer system north of the buildings. The access road along the south and west portion of the site has a separate storm sewer system connected to the SWM facility. A new storm sewer system will be installed to service Phase 2 of the development. It will consist of a storm sewer with a diameter of 375mm or 600mm. The storm sewers were sized based on the Rational Method using average runoff coefficients based on computed areas of hard and soft surfaces. 6 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Design of the storm sewer system was completed in conformance with the City of Ottawa Design Guidelines (November 2004), specifically Section 5 “Storm and Combined Sewer Design” and Technical Bulletin ISDTB-2012-4 issued June 20, 2012. A summary of the design criteria that relates to this design report is listed below. • Storm sewers have been designed and sized based on the rational formula and Manning’s Equation under free flow conditions for the 5-year storm using a 20-minute inlet time. • Since a detailed site plan was available for the site including building footprints, calculations of the average runoff coefficients for each drainage area was completed. • Average runoff coefficients were calculated for each inlet drainage area using a runoff coefficient of 0.20 for pervious surfaces and 0.90 for impervious surfaces. • Minimum sewer slopes to be based on minimum velocities for storm sewers of 0.60 m/s. 7.2 Storm Sewer Design Average runoff coefficients were calculated for all drainage areas for sizing of the storm sewers. Inlet times of 20 minutes were used for the street storm sewer, consistent with the original Servicing Report. The average post development runoff coefficient was calculated as 0.56. The Storm Drainage Plan is illustrated on Figure 4 in Appendix A. A total of nineteen (19) drainage areas are shown on this drawing with average runoff coefficients calculated for each drainage area. The directly-connected post development 5-year and 100-year peak flows (uncontrolled) from the site are 326 L/sec and 563 L/sec respectively. Under the 5-year storm event, pipe capacity is adequately provided with no overcapacity within the proposed development. Under the 100-year storm event, 3 of the 17 storm sewer runs upstream of the SWM facility have minor surcharging (max 10% over capacity). Design sheets for the 5-year sizing of the storm sewer system and the 100-year calculations for runoff are included for reference in Appendix D. 8 Stormwater Management 8.1 Summary of Previous Design The following is a summary of the stormwater management (SWM) servicing design for the previous phase. • Total directly connected drainage area = 3.77 ha • Allowable Runoff Coefficient = 0.25 • Allowable Release rate based on pre-development = 184.2 L/sec 7 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 • 5-year and 100-year storage requirements = 296 m3 and 680 m3 • Post-development runoff coefficient (calculated) = 0.58 • Maximum available storage in SWM facility = 708 cubic metres • Flow Control from Pond = 270mm dia Orifice • 5-year and 100-year elevation in Pond = 49.47m & 50.07m • Overflow Elevation of Pond = 50.07m • Orifice Flow from Pond based on Maximum head =1.42m • Quality Control Requirements (RVCA) =80% TSS • Vortech Separator. Design Treatment capacity = 240 L/sec • Vortech Separator. Design TSS removal efficiency = 83% TSS 8.2 Stormwater Management Criteria A summary of the major system design is listed below. • The major system has been designed to accommodate on-site detention with sufficient capacity to attenuate the 100-year design storm. On site storage is calculated based on the 100-year design storm with on-site detention storage provided in the SWM facility. • Calculation of the 100-year storage requirements was completed based on the Modified Rational Method as noted in the City of Ottawa’s Design Guidelines. • Overland flow routes are provided. • No surface ponding is provided on the surface of roadways or parking areas. 8.3 Allowable Release Rate The pre-development parameters used to determine the allowable release rates from the proposed site using the Rational Formula are re-iterated below: Q5ALL = 2.78 CAVG IT A where: Q5ALL CAVG = = 5-year Peak Allowable Discharge (L/s) Average Runoff Coefficient (0<C<1) 8 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 IT = A = Average Rainfall Intensity (mm/h) for return period T (years) and time of concentration, Tc, (minutes) Drainage Area (hectares) Using a time of concentration (TC) of 20 minutes and a runoff coefficient of 0.25, the allowable release rate (Q5ALL) from the site is determined for the 5-year storm (City of Ottawa Guidelines), I5, using the IDF Curve as follows: 0.814 I5 = 998.071 / (20 + 6.053) Q5ALL = 2.78 (0.25) (70.25 mm/hr) (3.77 ha) = 70.3 mm/hr = 184.2 L/sec The allowable release rate from the proposed site is 184.2 L/sec based on a 5-year storm event. The remaining runoff above the 5-year rate, up to the 100-year storm event, will be controlled on site. The original release rate from the site, as identified in Section 7.1 of the Phase 1 Stormwater Management and Servicing Report, is 184.2 L/sec. This release rate was also based on an area of 3.77 hectares, runoff coefficient of 0.25 and a 5 year storm intensity of 70.3 mm/hour (Tc = 20 min). Therefore the allowable release rate of 184.2 L/sec will be maintained. 8.4 Uncontrolled Storm Drainage Areas There are two drainage areas (Areas A17, A18) that will flow overland offsite. To account for this additional flow, it is necessary to subtract the quantity of uncontrolled flow from the allowable release rate. Using a post-development time of concentration (TC) of 15 minutes and a runoff coefficient of 0.20 for each area, the 100-year uncontrolled flow rate, Q100UNC, from the proposed site is determined using the Rational Method as follows: Q100UNC = 2.78 C I100 A where: Q100UNC = C = I100 = A = Peak Discharge (L/s) Runoff Coefficient [0<C<1] (C = 0.25) Average Rainfall Intensity (mm/h) for 100 year return period Drainage Area (0.024+0.052 hectares) I100 1735.688/ (15 + 6.014) = Q100UNC = 0.820 = 142.89 mm/hr 2.78 x 0.20*1.25 x 142.89 x 0.076 ha = 7.5 L/sec Therefore the allowable capture rate to the storm sewers (minor system) is determined from: Q100REL = = = QALL - Q100UNC 184.2 – 7.5 176.6 L/s Therefore the total captured rate into the minor system from the proposed site is restricted to 176.6 L/sec, along with the uncontrolled runoff of 7.5 L/sec. This results in a total allowable flow of 184.2 L/sec. 9 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 8.5 Quantity Control During the establishment of the grading for Phase 1, it was determined that because the majority of the site was above the underground parking structure, surface ponding would not be utilized in the stormwater design. All drainage was to discharge to a central stormwater facility. Since not all runoff from the 100 year storm will be captured into the storm sewer, additional flow will be stored onsite within the existing dry pond. The required 5-year and 100-year storage volumes based on the Modified Rational Method is 302 and 687 cubic metres respectively. As indicated in the Phase 1 report, the pond has a maximum capacity of 708 cubic metres, and therefore has adequate volume to accommodate Phase 2. 8.6 Quality Control During the design of Phase 1, the Conservation Authority established that the water quality criteria for the site as “enhanced” protection which is an 80% total suspended solids (TSS) removal. As part of the construction of Phase 1, a hydro dynamic Vortech separator model 5000 was installed. The separator, manufactured by Contech Stormwater Solutions Inc, was designed for a maximum treatment capacity of 240 L/sec for a drainage area of 3.9 hectares and maximum runoff coefficient of 0.60. The design net annual TSS removal efficiency is 83%. Details on the design of the chamber can be found in the original Phase 1 report. Therefore quality control for the entire site is achieved using the existing Vortech separator. It is located downstream of the dry pond prior to outletting into the existing ravine. For Phase 2 no additional quality control will be required. 10 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 9 Erosion and Sediment Controls during Construction During all construction activities, erosion and sedimentation shall be controlled by the following techniques: • extent of exposed soils shall be limited at any given time, • exposed areas shall be re-vegetated as soon as possible, • filter cloth shall be installed between frame and cover on all proposed catch basins and catch basin manholes, • silt fence shall be installed 0.3 meters inside and along the site property line to locations shown on drawing (GP – Grading, Erosion and Sediment Control Plan), • visual inspection shall be completed daily on sediment control barriers and any damage repaired immediately. Care will be taken to prevent damage during construction operations, • in some cases barriers may be removed temporarily to accommodate the construction operations. The affected barriers will be reinstated at night when construction is completed, • sediment control devices will be cleaned of accumulated silt as required. The deposits will be disposed of as per the requirements of the contract, • during the course of construction, if the engineer believes that additional prevention methods are required to control erosion and sedimentation, the contractor will install additional silt fences or other methods as required to the satisfaction of the engineer, and • construction and maintenance requirements for erosion and sediment controls are to comply with Ontario Provincial Standard Specification (OPSS) OPSS 805, and City of Ottawa specifications. 11 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 10 Summary This servicing design brief outlines the rationale which will be used to service the proposed development. • The storm sewer system is sized to accommodate the 5-year design storm under free flow conditions. • Runoff from the site is controlled to less than the allowable rate of 184.2 L/sec. This includes the controlled runoff from the SWM facility and the uncontrolled areas. No modifications are proposed to the existing orifice controls. • On-site storage is utilized to control runoff to allowable rates up to the 100 year storm. All storage is provided in one centralized SWM facility, rather than controlling at the source (i.e. catch basins) • The total required 100-year storage is 687 m3, with a total storage volume of 708 m3 provided. • An overland flow route is provided for the major storm event. • The sanitary sewer from the development will discharge to the existing sanitary sewer which was left at the limits of Phase 1. The total estimated sewage flow is 32.8 L/sec from all five phases combined with an allowance for a 9.9 hectare commercial development adjacent to the North Service Road. • The estimated fireflow requirements for Phase 2 is 131 L/sec. Fire flow requirements for all phase were estimated between 123 L/sec and 136 L/sec as calculated in accordance with the Fire Underwriters Survey, 1999. • Adequate flows are available within the entire development under maximum day plus fireflow conditions. • The calculated minimum and maximum working pressures anticipated within the development are 517 kPa (75 psi) and 565 kPa (82 psi) under peak hourly conditions. This meet the City of Ottawa’s design requirements. • Erosion and sediment control methods will be used during construction to limit erosion potential. 12 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Appendix A – Figures Figure 1: Site Location Plan Figure 2: Architectural Site Plan Figure 3: Sanitary Drainage Area Plan Figure 4: Storm Drainage Area Plan exp Services Inc. t: +1.613.688.1899 | f: +1.613.225.7330 2650 Queensview Drive, Unit 100 Ottawa, ON K2B 8H6 Canada www.exp.com BUILDINGS INDUSTRIAL EARTH & ENVIRONMENT INFRASTRUCTURE ENERGY SUSTAINABILITY P. I. N. 1453 8 - 89.22 (P 0069 1&Set) N56 °24'0 0"E (Me as) PROJECT INFORMATION 5497 4 7177 61478 Me a 2( 0"E °20'3 N19 2.44 2 93.46 4402 °01'4 21.9 0"E 8 N59 ND N56 °25 10.3 '20"E 6 W 0" 4'4 °3 .36 N0 10 °04 '30"E 30.2 4 PO 3 M Landscape open space PH 2 Roof plan "E ND 55.1 O/H O/H O/H O/H O/H O/H O/H O/H 333,4 m² O/H O/H O/H O/H O/H O/H O/H O/H O/H UP 3 588 ft² O/H 806,8 m² 806,8 m² 8 684 ft² 8 684 ft² 913,0 m² 913,0 m² 9 827 ft² 9 827 ft² O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H 8 O/H O/H O/H "E 1'05 O/H O/H O/H °0 N18 6.68 =11 1 CBasement 928,3 m² 9 992 ft² 9 992 ft² 9 992 ft² 4 512,8 m² 4 182,1 m² 4 147,5 m² 48 575 ft² 45 016 ft² 44 643 ft² 3 717,0 m² 4 182,1 m² 4 147,5 m² 40 009 ft² 45 016 ft² O/H O/H O/H 928,3 m² O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H FIRE ROUTE 928,3 m² O/H O/H O/H O/H O/H O/H O/H BIKE RACK O/H O/H O/H RAMP TO U/G PARKING @ ±13% SLOPE R90 00 3 588 ft² O/H Floors 2 to 13 Ground floor NO .1 PH4 333,4 m² 3 588 ft² ) eas 806,8 m² 6(M 8 684 16.7 Seft²t) 1 A=1 P & 88 ( 913,0 m² 20.1 9 = 9 827 ft² R Penthouse '30 PHASE 4 PHASE 1 PH3 333,4 m² O/H PO PHASE 3 PHASE 2 148 ft 0,0 m² GROSS BUILDING AREA N59 600 0 " '39 °52Set) 52 &PH4 (P1 45,0 m 0 ft² BO TT O Building Height °24 O/H O/H GW O/H Basement 2 O/H O/H O/H O/H O/H O/H 44 643 ft² O/H O/H O/H 00 0 O/H 24 20 60 O/H O/H 00 TOTAL AREA O/H R1 5 0 R17 000 75 137 ft² 45 0°53 .38 '4 5" PH3 PH12 3 5 E (M45,0 m (P1m1°44'0 (P1 45,0 &S 0" &S ea 148 ft et) 148 sft) et) PROJECT STATISTICS N41°03'40"E ED ) 6 980,49 m² N54 TOWER 'A' ST RE ET R5AH(101)A.S.L. et) N7 OS 3m 128.92 (P1&S 2 3000 min. N36°39'00"E N38°34'40"E 10.00 OP (33 City of Ottawa zoning By-law No. 2008-250 Zoning as) 70654 5.0 15 N42°37'45"E (Me 34.01 PR ND IN G EL EV BO =4 TT 9.6 OM 5 41694 PO ND O/H O/H 22 195,0 m² 22 125,8 m² O/H O/H 00 O/H 237 457 ft² 238 905 ft² 238 159 ft² PH 2 PH3 PH4 6700 FIRE ROUTE 00 0 FIRE ROUTE 211 5698 PAVERS ONE WAY ONE WAY R9 0 O/H R3 5200 FIRE ROUTE UP FIRE ROUTE O/H O/H O/H O/H O/H O/H O/H 3900 3900 O/H 6700 O/H 2600 15 STOREYS OWER ABOVE 5 .73 O/H O/H O/H ) eas M P1& ( O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H ENTRANCE FOR PHASE 4 O/H O/H O/H O/H O/H 7200 6700 22 060,5 m² O/H FIRE ROUTE O/H R O/H O/H O/H as (Me ) O/H O/H 00 80 UNIT STATISTICS Bachelor units TOTAL 1 1 1 1 Bedroom Units 12 12 12 36 1 Bedroom + Den Units 65 65 65 195 2 Bedroom Units TOTAL 3 60 60 60 180 138 138 138 414 PH 2 PH3 PH4 TOTAL 196 196 196 588 TOTAL O/H O/H O/H O/H O/H 8% SLOPE 5200 O/H O/H FIRE ROUTE 15% SLOPE 13414 N1 O/H O/H 3°2 9'3 0"E O/H O/H O/H O/H CAR PARKING REQUIRED ratio/units O/H O/H O/H O/H O/H O/H Residential 1,4 O/H O/H O/H O/H O/H CAR PARKING O/H O/H O/H O/H O/H O/H O/H UP PH 2 PH3 PH4 Basement 2 93 133 117 Basement 1 127 133 110 O/H O/H O/H O/H O/H O/H O/H 8% STEPS PAVERS 6700 SLOPE PO et) 0"W N60°34'4 10.35 5y " '45 13 t) 6° Se 16 1& (P 1&S Property Area 0"W °33'42.54 1 N71 0"E °30'1 N20 0 27.4 O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H 7920 7200 O/H O/H Exterior 19 13 6 TOTAL 239 279 233 751 PH 2 PH3 PH4 TOTAL 70 70 70 210 TOTAL O/H O/H O/H O/H O/H O/H BIKE PARKING REQUIRED O/H O/H O/H ENT HOME O/H ratio/units O/H R90 00 O/H O/H O/H O/H 7200 0 25 16 O/H O/H O/H O/H R ) O/H O/H O/H FIRE ROUTE O/H O/H O/H 6.89 O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H 6 UP as (Me GW ENTRANCE FOR PHASES 2 & 3 Residential 43) 63- O/H O/H O/H O/H 5"E °21'5 N17 O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H O/H UP 14 O/H O/H O/H (Meas) O/H O/H O/H CLIENT Client . GW 53 OUVRAGE Project 8 8 Petrie's LandingAI, N Phase 2 41 PL EMPLACEMENT Location OTTAWA DESSINE PAR Drawn by A.B. NO.PROJET Project No. 10557 VÉRIFIÉ PAR Checked by ANT.C. 8 08 0,5 BIKE PARKING O/H O/H 9000 4.01 4 (P 3 s) 81.5 (P1 PH 2 PH3 PH4 Basement 2 54 40 37 Basement 1 39 40 37 93 80 74 247 TOTAL TOTAL STORAGE SPACES (LOCKERS) PH 2 PH3 PH4 Basement 2 68 74 79 Basement 1 76 74 62 144 148 141 TOTAL 433 TITRE DU DESSIN Drawing Title Site plan global DATE (aa.mm.jj) 13.06.05 RÉVISION Revision -- ÉCHELLE Scale 1:1000 NO. DESSIN Dwg Number A100 10 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Appendix B – Storm Design Sheets Table B-1: 5-year Storm Sewer Calculation Sheet Table B-2: 100-year Storm Sewer Calculation Sheet TABLE B-1: 5-YEAR STORM SEWER CALCULATION SHEET Return Period Storm = Default Inlet Time= 5 20 Manning Coefficient = 0.013 (5-years, 100-years) (minutes) Frontyards (dimensionless) LOCATION AREA (hectares) FLOW (UNRESTRICTED) SEWER DATA Velocity (m/s) Location From Node To Node Area No. Area (ha) ∑ Area (ha) Average R Indiv. 2.78*A*R Accum. 2.78*A*R NORTH DRAINAGE MH207 MH212 1 6 0.4840 0.0180 0.47 0.47 0.63 0.02 MH212 MH206 MH206 MH205 2 7 0.446 0.036 0.53 0.53 0.66 0.05 MH205 MH204 MH203 MH204 H203 MH202 MH202 MH201 MH201 POND-IN 3 8 4 9 5 0.523 0.043 0.472 0.033 0.194 0.484 0.502 0.502 0.502 0.948 0.984 0.984 0.984 1.507 1.550 2.022 2.055 2.249 0.52 0.52 0.57 0.57 0.57 0.76 0.06 0.75 0.05 0.31 0.63 0.66 0.66 0.66 1.31 1.37 1.37 1.37 2.12 2.18 2.93 2.98 3.29 MH211 MH213 MH214 MH213 MH214 MH215 10 12 13 14 0.099 0.094 0.108 0.148 0.099 0.193 0.301 0.449 0.53 0.52 0.57 0.57 0.15 0.14 0.17 0.23 19 0.035 0.035 0.57 0.06 SOUTH DRAINAGE CB9 MH215 MH215 MH208 MH208 MH209 TEMP CB CBMH1 CBMH1 MH209 MH209 POND-IN 0.968 0.120 POND-OUT Vortech MH Vortech MH MH210 MH210 MH210A MH210A OUTLET TOTALS = Definitions: Q = 2.78*AIR, where Q = Peak Flow in Litres per second (L/s) A = Watershed Area (hectares) I = Rainfall Intensity (mm/h) R = Runoff Coefficients (dimensionless) 3.821 Indiv. Flow Return Period Q (L/s) 1.65 5.00 46.1 447.87 5.00 45.1 Dia (mm) Dia (mm) Actual Nominal Type Slope (%) Length (m) Capacity (L/sec) Vf Va 450 PVC 0.20 23.00 125.9 0.80 0.57 447.87 450 PVC 0.20 15.50 125.9 0.80 Time in Pipe, Tt (min) Hydraulic Ratios Qa/Qf Va/Vf 0.68 0.37 0.71 0.56 0.46 0.36 0.70 20.00 70.25 20.68 68.80 21.14 21.83 22.39 67.85 66.48 65.41 3.60 5.00 5.00 5.00 92.7 90.8 89.4 533 533 533 525 525 525 CONC CONC CONC 0.20 0.16 0.16 26.00 19.00 21.00 200.2 179.1 179.1 0.89 0.79 0.79 0.63 0.56 0.56 0.69 0.56 0.62 0.46 0.51 0.50 0.71 0.71 0.71 23.01 64.26 3.99 5.00 140.4 610 600 CONC 0.14 47.50 240.1 0.81 0.73 1.08 0.58 0.90 24.10 24.93 62.38 61.01 3.26 18.75 5.00 5.00 186.2 200.8 610 610 600 600 CONC CONC 0.25 0.25 49.00 3.50 320.8 320.8 1.09 1.09 0.98 0.99 0.84 0.06 0.58 0.63 0.90 0.91 0.15 0.28 0.45 0.69 20.00 23.26 24.08 24.08 70.25 63.83 62.40 62.40 10.25 8.67 10.68 14.63 5.00 5.00 5.00 5.00 10.2 18.0 28.3 42.9 366.42 366.42 375 375 PVC PVC 0.25 0.25 88.40 26.00 82.4 82.4 0.79 0.79 0.45 0.52 3.26 0.83 0.12 0.22 0.57 0.66 366.42 375 PVC 0.25 55.00 82.4 0.79 0.56 1.63 0.52 0.71 0.06 20.00 70.25 3.90 5.00 3.9 366.42 375 PVC 0.87 31.00 153.7 1.48 0.46 1.13 0.03 0.31 0.74 0.74 25.72 21.83 59.77 66.48 5.00 5.00 44.4 49.4 366.42 366.42 375 375 PVC PVC 0.87 2.00 69.00 18.00 153.7 233.1 1.48 2.25 1.04 1.48 1.11 0.20 0.29 0.21 0.70 0.66 0.67 0.86 20.00 20.59 70.25 68.99 5.00 5.00 47.3 59.5 299.36 299.36 300 300 PVC PVC 1.00 1.97 34.00 35.00 96.2 135.0 1.37 1.92 0.97 1.36 0.59 0.43 0.49 0.44 0.71 0.71 1.572 1.61 21.02 68.10 5.00 109.4 366.42 375 PVC 4.75 8.00 359.3 3.46 2.42 0.06 0.30 0.70 3.821 3.821 3.821 3.821 4.90 4.90 4.90 4.90 21.07 21.23 21.33 21.77 67.99 67.67 67.47 66.58 5.00 5.00 5.00 5.00 333.0 331.4 330.4 326.1 533 533 533 533 525 525 525 525 CONC CONC CONC CONC 1.50 1.50 1.50 1.30 20.50 13.00 59.00 13.00 548.4 548.4 548.4 510.5 2.43 2.43 2.43 2.27 2.19 2.19 2.19 2.08 0.16 0.10 0.45 0.10 0.61 0.60 0.60 0.64 0.90 0.90 0.90 0.92 0.484 0.484 16 15 Tc (mins) I (mm/h) 0.968 1.088 0.25 0.57 0.67 0.19 47.26 13.12 4.90 Notes: Ottawa Rainfall Intensity Values: From Sewer Desing Guidelines, 2004 674.40 5yr a = 998.071 b= 0.814 c = 6.053 100yr 1735.688 0.820 6.014 Designed: J. Fitzpatrick, P.Eng. Project: Petrie Landings Phase II Checked: B. Thomas, P.Eng. Location: Ottawa, Ontario Dwg Reference: Overall Storm Drainage Plan, SD1 File Ref: 214935 Storm Design Sheets Sheet No: 1 of 1 TABLE B-2: 100-YEAR STORM SEWER CALCULATION SHEET Return Period Storm = Default Inlet Time= 100 20 Manning Coefficient = 0.013 (5-years, 100-years) (minutes) Frontyards (dimensionless) LOCATION AREA (hectares) FLOW (UNRESTRICTED) SEWER DATA Velocity (m/s) Location From Node To Node Area No. Area (ha) ∑ Area (ha) Average R Indiv. 2.78*A*R Accum. 2.78*A*R NORTH DRAINAGE MH207 MH212 1 6 0.4840 0.0180 0.47 0.47 0.63 0.02 MH212 MH206 MH206 MH205 2 7 0.446 0.036 0.53 0.53 0.66 0.05 MH205 MH204 MH203 MH204 H203 MH202 MH202 MH201 MH201 POND-IN 3 8 4 9 5 0.523 0.043 0.472 0.033 0.194 0.484 0.502 0.502 0.502 0.948 0.984 0.984 0.984 1.507 1.550 2.022 2.055 2.249 0.52 0.52 0.57 0.57 0.57 0.76 0.06 0.75 0.05 0.31 0.63 0.66 0.66 0.66 1.31 1.37 1.37 1.37 2.12 2.18 2.93 2.98 3.29 MH211 MH213 MH214 MH213 MH214 MH215 10 12 13 14 0.099 0.094 0.108 0.148 0.099 0.193 0.301 0.449 0.53 0.52 0.57 0.57 0.15 0.14 0.17 0.23 19 0.035 0.035 0.57 0.06 SOUTH DRAINAGE CB9 MH215 MH215 MH208 MH208 MH209 TEMP CB CBMH1 CBMH1 MH209 MH209 POND-IN 0.968 0.120 POND-OUT Vortech MH Vortech MH MH210 MH210 MH210A MH210A OUTLET TOTALS = 3.821 Q (L/s) 2.82 100.00 78.7 447.87 100.00 77.4 Dia (mm) Dia (mm) Actual Nominal Type Slope (%) Length (m) Capacity (L/sec) Vf Va 450 PVC 0.20 23.00 125.9 0.80 0.73 447.87 450 PVC 0.20 15.50 125.9 0.80 Time in Pipe, Tt (min) Hydraulic Ratios Qa/Qf Va/Vf 0.53 0.62 0.91 0.73 0.35 0.61 0.91 20.53 118.00 20.88 21.38 21.74 116.72 114.98 113.75 6.19 100.00 100.00 100.00 159.5 157.1 155.4 533 533 533 525 525 525 CONC CONC CONC 0.20 0.20 0.16 26.00 19.00 21.00 200.2 200.2 179.1 0.89 0.89 0.79 0.87 0.87 0.79 0.50 0.36 0.44 0.80 0.78 0.87 0.98 0.98 1.00 22.18 112.29 6.98 100.00 245.3 610 600 CONC 0.14 47.50 240.1 0.81 0.85 0.94 1.02 1.04 23.12 23.84 109.32 107.14 5.72 32.94 100.00 100.00 326.3 352.7 610 610 600 600 CONC CONC 0.25 0.25 49.00 3.50 320.8 320.8 1.09 1.09 1.13 1.13 0.72 0.05 1.02 1.10 1.04 1.04 0.15 0.28 0.45 0.69 20.00 22.81 23.58 23.58 119.95 110.27 107.90 107.90 17.50 14.98 18.47 25.31 100.00 100.00 100.00 100.00 17.5 31.1 48.9 74.2 366.42 366.42 375 375 PVC PVC 0.25 0.25 88.40 26.00 82.4 82.4 0.79 0.79 0.52 0.56 2.81 0.77 0.21 0.38 0.66 0.71 366.42 375 PVC 0.25 55.00 82.4 0.79 0.79 1.15 0.90 1.00 0.06 20.00 119.95 6.65 100.00 6.7 366.42 375 PVC 0.87 31.00 153.7 1.48 0.46 1.13 0.04 0.31 0.74 0.74 24.74 21.38 104.57 114.98 100.00 100.00 77.7 85.4 366.42 366.42 375 375 PVC PVC 0.87 2.00 69.00 18.00 153.7 233.1 1.48 2.25 1.05 1.59 1.10 0.19 0.51 0.37 0.71 0.71 0.67 0.86 20.00 20.41 119.95 118.41 100.00 100.00 80.7 102.2 299.36 299.36 300 300 PVC PVC 1.00 1.97 34.00 35.00 96.2 135.0 1.37 1.92 1.37 1.88 0.41 0.31 0.84 0.76 1.00 0.98 1.572 1.61 20.72 117.28 100.00 188.3 366.42 375 PVC 4.75 8.00 359.3 3.46 2.45 0.05 0.52 0.71 3.821 3.821 3.821 3.821 4.90 4.90 4.90 4.90 20.78 20.91 21.00 21.39 117.08 116.60 116.30 114.95 100.00 100.00 100.00 100.00 573.4 571.1 569.6 563.0 533 533 533 533 525 525 525 525 CONC CONC CONC CONC 1.50 1.50 1.50 1.30 20.50 13.00 59.00 13.00 548.4 548.4 548.4 510.5 2.43 2.43 2.43 2.27 2.53 2.53 2.53 2.36 0.14 0.09 0.39 0.09 1.05 1.04 1.04 1.10 1.04 1.04 1.04 1.04 0.968 1.088 0.25 0.57 0.46 0.67 0.19 80.70 22.52 4.90 Notes: Q = 2.78*AIR, where Q = Peak Flow in Litres per second (L/s) Ottawa Rainfall Intensity Values: From Sewer Desing Guidelines, 2004 I = Rainfall Intensity (mm/h) R = Runoff Coefficients (dimensionless) Return Period 119.95 Definitions: A = Watershed Area (hectares) Indiv. Flow 20.00 0.484 0.484 16 15 Tc (mins) I (mm/h) 674.40 5yr a = 998.071 b= 0.814 c = 6.053 100yr 1735.688 0.820 6.014 Designed: J. Fitzpatrick, P.Eng. Project: Petrie Landings Phase II Checked: B. Thomas, P.Eng. Location: Ottawa, Ontario Dwg Reference: Overall Storm Drainage Plan, SD1 File Ref: 214935 Storm Design Sheets Sheet No: 1 of 1 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Appendix C – Sanitary Sewer Calculation Sheets Table C-1: Sanitary Sewer Calculation Sheet TABLE C-1: SANITARY SEWER CALCULATION SHEET Petrie Landings, Phase II LOCATION Street COMMERCIAL/RETAIL RESIDENTIAL AREA AND POPULATION From To Area No. Singles 1-bed Apart POPULATION 2-bed Apart Indiv Pop Cumul Pop Peak Factor Peak Flow ACCU AREA PEAK FLOW (L/sec) AREA (Ha) (Ha) (L/s) INFILTRATION SEWER DATA AREA (ha) ACCU AREA (Ha) INFILT FLOW (L/s) TOTAL FLOW (L/s) (mm) Reserve Capacity Capacity Slope Length actual (%) (m) (L/s) (L/s) Full Velocity (m/s) Dia. Phase 4 104 105 6 78 60 235 235 4.00 3.81 0.59 0.59 0.16 3.97 250 251.46 0.30 69.0 33.08 29.11 0.66 Phase 2, 3 105 106 106 107 4, 5 156 120 470 705 705 3.89 3.89 11.11 11.11 1.29 1.87 1.87 0.52 11.63 11.11 250 250 251.46 251.46 0.30 0.30 16.0 28.5 33.08 33.08 21.45 21.97 0.66 0.66 705 705 705 882 882 882 1352 1352 1352 1352 1352 3.89 3.89 3.89 3.83 3.83 3.83 3.71 3.71 3.71 3.71 3.71 11.11 11.11 11.11 13.68 13.68 13.68 20.32 20.32 20.32 20.32 20.32 1.87 1.87 1.87 2.95 2.95 2.95 3.91 13.81 13.81 13.81 13.81 0.52 11.63 11.11 11.63 13.68 13.68 13.68 21.41 28.91 32.78 28.91 32.78 250 250 250 250 250 250 300 300 300 300 300 251.46 251.46 251.46 251.46 251.46 251.46 299.36 299.36 299.36 299.36 299.36 0.29 0.24 0.50 0.54 0.63 0.29 0.15 0.32 0.19 0.25 0.15 62.9 37.9 12.0 14.9 12.6 38.2 79.4 34.7 85.0 59.5 61.2 32.53 29.59 42.71 44.38 47.94 32.53 37.24 54.39 41.91 48.08 37.24 20.89 18.48 31.07 30.70 34.26 18.84 15.82 25.48 9.13 19.16 4.46 0.65 0.59 0.86 0.89 0.96 0.65 0.47 0.69 0.53 0.61 0.47 Phase 1 Phase 5 ExMh107 ExMh108 ExMh108 ExMh109 ExMh109 ExMh110 ExMh110 ExMh111 ExMh111 ExMh111A ExMh111A ExMh112 ExMh112 ExMh113 ExMh113 ExMh114 ExMh114 ExMh115 ExMh115 ExMh116 ExMh116 Ex San MH 3 14 2 1 336 584 75 177 470 Industrial Flow = 350 50,000 L/cap/day) (L/ha/day) Pop. Densities Persons Per Unit or = 0.579 35,000 or = 0.405 (L/ha/sec) (L/ha/day) (L/ha/sec) Singles = 1-Bed Apt = 2-Bed Apt = 3.4 1.4 2.1 Max Res Peak Factor = 4.0 Comm Peak Factor = 1.5 9.90 9.90 9.90 9.90 9.90 8.59 8.59 8.59 8.59 0.96 9.90 0.52 1.10 3.87 3.87 255 1352 Average Daily Flow = Commercial Flow = 1.08 9.90 Q(p) = Peak Population Flow = PqM/86.4 + Iac Q(i) = Peak Extraneous Flow = I * Ac Ai = Individual; Area (hectares) Ac = Cumulative Area (hectares) M = Peaking Factor = 1 + (14/(4+P^0.5)) P = Population (thousands) Qcap, (Manning) = 1/n S1/2 R 2/3 Ac Manning N = 0.013 I = Peak Extran Flow (L/s/ha) = 0.28 13.81 10.567 Designed: J. Fitzpatrick, P.Eng. Project: Petrie Landings, Phase II Checked: B. Thomas, P.Eng. Location: Ottawa, Ontario Dwg Reference: File Ref: Sheet No: Figure A-3: Sanitary Draiange Area Plan 214935 Sanitary Design Sheet, October 2013 1 of 1 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Appendix D – Hydraulic Analysis Tables Table D-1: Water Consumption/Demand Allocation Table Table D-2: Sample Calculation of Fire Flow Requirements (Phase 2) Table D-3: Calculation of Fire Flow Requirements (All Buildings) TABLE D-1 - WATER CONSUMPTION/DEMAND ALLOCATION TABLE Location: Project No: Designed by: Checked By: Date: Petrie's Landing, Phase II 214935 F. Lacasse B.Thomas October 2013 Water Consumption Residential = 350 Population Densities Bachelor = 1 Bedroom = 2 Bedroom = 3 Bedroom = L/cap/day 1.4 1.4 2.1 3.1 person/unit person/unit person/unit person/unit Residental No. of Units Junction Bachelor 1 Bedroom 2 bedroom J-6* J-2 J-1 J-5 2 1 14 154 77 336 75 120 60 Totals = 3 581 255 Total Persons Phase 1 Phase 2&3 Phase 4 Phase 5 Commercial Average Demand (L/day) Maximum Demand (L/day) Peak Hourly Demand (L/day) 2.5 x Avg Day 2.2 x Max Day Area (m2) Average Demand (L/day) Demands in (L/sec) Maximum Demand (L/day) Peak Hourly Demand (L/day) 1.5 x Avg Day 1.8 x Max Day Avg Max Day Day (L/s) (L/s) Max Hour (L/s) 253 470 235 470 88,550 164,640 82,320 164,640 221,375 411,600 205,800 411,600 487,025 905,520 452,760 905,520 1.02 1.91 0.95 1.91 2.56 4.76 2.38 4.76 5.64 10.48 5.24 10.48 1429 500,150 1,250,375 2,750,825 5.79 14.47 31.84 * Phase 1 was approved and constructed based on previous criteria in force at the time of review - see Stormwater Management and Servicing Report, 2008 in appendix for details 214935 Water Demand Chart, November 2013.xlsx Table D-1 Page 1 of 1 TABLE D-2: SAMPLE CALCULATION OF FIRE FLOW REQURIEMENTS (Phase 2) Calculation Based on Fire Underwriters Survey, 1999 Sample Calculation Based on Phase 2 1) An estimate of the Fire Flow required for a given fire area may be estimated by: F = 220 x C x where A F = required fire flow in litres per minute A = total floor area in m2 (including all storeys, but excluding basements at least 50% below grade) C = coefficient related to the type of construction: 1.5 1.0 0.8 0.6 for wood construction (structure essentially combustible) for ordinary construction (brick or other masonry walls, combustible floor and interior) for noncombustible construction (unprotected metal structural components, masonary or metal walls) for fire-resistive construction (fully protected frame, floors, roof) No. of Floor = 15 Area / Floor = 928.3 Area / Floor = 913 m (Floors 2 -13) 806.8 m2 (Penthouse) m2 (Ground Floor) 2 A= 12691.1 m2 Ai = C= F= 5493.3 0.6 9,783 m2 (Two Largest Floors + 50% of each floor immediateley above to a maximum of 8 floors) L/min -----------------------> Rounded to nearest 1000 = 10,000 L/min 7,500 L/min 5,250 L/min 2,625 L/min 5,250 2,625 7,875 131.3 L/min L/sec 2) The value obtained in 1. may be reduced by as much as 25% for occupancies having a low contents fire hazard. Non-combustible = Limited Combustible = Combustible = Free Burning = Rapid Burning = -25% -15% 0% 15% 25% Reduction due to low occupancy hazard = -25% x 10,000 = = 3) The value above my be reduced by up to 50% for automatic sprinlker system Reduction due to automatic sprinker system = -30% x 7,500 = 4) The value obtained in 2. may be increased for structures exposed within 45 metres by the fire area under consideration. Separation (metres) 0m to 3.0m 3.1m to 10.0m 10.1m to 20.0m 20.1m to 30.0m 30.1m to 45.0m 45.1m to Exposures Side 1 Side 2 Front Back Distance(m) 16.0 13.0 75.0 8.0 Increase due to separation = Condtion 3 3 6 2 Condtion 1 2 3 4 5 6 Charge 25% 20% 15% 10% 5% 0% --------> --------> --------> --------> Charge 15% 15% 0% 20% 50% 50% x 5,250 = The fire flow requirement is = Increase due to Separation = or TABLE D-2: SAMPLE CALCULATION OF FIRE FLOW REQURIEMENTS (Phase 2) Calculation Based on Fire Underwriters Survey, 1999 Floor Areas (m2) Total Effective Calculated Fire Flow Occupancy Fire Flow Reduction Fire Flow Area, Ai Const. Fire Flow Required Reduction Required Due to Required Side 1 (s.m) Coeff, C (L/min) (L/min) (%) (L/min) Sprinkler (L/min) Exposure Distance / Charge Bldg No No. Bldg of Type Floors Ground Floors PentFloor 2-13 house COL1 COL2 COL3 COL4 COL5 COL6 COL7 COL8 COL9 COL10 COL11 COL12 COL13 COL14 COL15 COL16 COL17 COL18 COL19 COL20 COL21 COL22 COL23 COL24 COL25 COL26 Phase 1 Phase 2 Phase 3 Phase 4 Res Res Res Res 15 15 15 15 928.3 928.3 928.3 928.3 913 913 913 913 806.8 806.8 806.8 806.8 12,691 12,691 12,691 12,691 5,493 5,493 5,493 5,493 0.60 0.60 0.60 0.60 9,783 9,783 9,783 9,783 10,000 10,000 10,000 10,000 -25% -25% -25% -25% 7,500 7,500 7,500 7,500 30% 30% 30% 30% 5,250 5,250 5,250 5,250 42.0 16.0 13.0 14.0 2,100 2,625 2,363 2,888 7,350 7,875 7,613 8,138 Notes COL7: All Floor Areas = No. of Floors * Total Building Footprint = COL4 + COL4 + COL6 COL8: Total Effective Area = Two largest Floors + 50% of each floor above them to a maximum of 8 floors COL9: Coefficent Related to Construction, (1.5, 1.0, 0.8, 0.6) COL10: Calcualed Fire Flow Required is based on Fire Underwriter Survey, F = 220 * C * sqrt(A), = 220 * COL7 * sqrt(COL6) COL11: Fire Flow Required is calculated Fire Flow rounded to nearest 1000 COL16 to COL23: Exposure Charges are Based on Exposure Distances Separation (m) Condtion Charge 0m to 3.0m 1 25% 3.1m to 10.0m 2 20% 10.1m to 20.0m 3 15% 20.1m to 30.0m 4 10% 30.1m to 45.0m 5 5% 45.1m to 6 0% Side 2 5% 15% 15% 15% 16.0 13.0 14.0 22.0 Front 15% 15% 15% 10% 101.0 75.0 55.0 22.0 Total Exposure Charge (%) Fire Flow Increase Due to Fire Flow Explosures Requried (L/min) L/min (L/s) Total All Floor Areas (s.m) Back 0% 0% 0% 10% 7.0 8.0 11.0 10.0 20% 20% 15% 20% 40% 50% 45% 55% (123) (131) (127) (136) exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Appendix E – H20Net Hydraulic Analysis Model Results Filename: p:\projects\civil engineering services\214000\ott-00214935-a0 - petrie's landing, phase 2 - brigil construction\p - h2onet\214935 - h2onet.dwg Last Plotted: 10/23/2013 10:36:09 AM Plotted by: lacassef References: PO ND exp Services Inc. t: +1.613.688.1899 | f: +1.613.225.7337 2650 Queensview Drive, Suite 100 Ottawa, ON K2B 8H6 Canada www.exp.com INDUSTRIAL BUILDINGS INFRASTRUCTURE EARTH & ENVIRONMENT SUSTAINABILITY ENERGY Petrie's Landing Phase 2 Client: Brigil Construction Project: OTT 00214935 A0 Date: 21st October, 2013 HGL LOCATION A Maximum Day Analysis Junction Report ID J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 Demand (L/s) 2.38 4.76 0 0 4.76 2.56 0 0 0 0.00 0.00 0.00 0.00 Elevation (m) 52.28 52.27 50.85 54.25 53.44 51.8 50.33 53.44 50.85 52.27 54.77 54.93 52.62 Head (m) 107.92 107.92 107.93 107.93 107.93 107.96 107.99 107.96 107.94 107.92 107.93 107.92 107.93 Pressure (psi) 79 79 81 76 77 80 82 78 81 79 76 75 79 Pressure (kPa) 545 546 559 526 534 550 565 534 560 546 521 519 542 Maximum Day Analysis Pipe Report ID From Node To Node Length (m) Diameter (mm) Roughness Flow (L/s) Velocity (m/s) Headloss (m) HL/1000 (m/km) Status P-1 P-2 P-3 P-4 P-5 P-6 P-7 P12 P14 P20 P22 P24 P26 P28 P30 RES9000 J-7 J-6 J-4 J-3 J-2 J-7 J-5 J-10 J-13 J-13 J-12 J-8 J-9 J-10 J-7 J-6 J-5 J-13 J-2 J-1 J-8 J-4 J-2 J-3 J-11 J-2 J-9 J-10 J-1 8.27 41.76 60.67 67.68 49.02 42.37 98.7 16.36 2.98 23.96 37.38 13.2 110.5 52.5 41.3 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 14.46 9.38 6.82 2.06 2.06 0.99 5.08 2.06 3.7 2.06 0 0.00 5.08 5.08 1.39 0.45 0.29 0.21 0.06 0.06 0.03 0.16 0.06 0.11 0.06 0 0.00 0.16 0.16 0.04 0.01 0.03 0.02 0 0 0 0.02 0 0 0 0 0.00 0.03 0.01 0.00 1.63 0.73 0.41 0.04 0.04 0.01 0.24 0.04 0.13 0.04 0 0.00 0.24 0.24 0.02 Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Static Head (m) Fire-Flow Demand (L/s) Residual Pressure (psi) 107.92 107.92 107.93 107.93 107.93 107.96 107.99 107.96 107.94 107.92 107.93 107.92 107.93 135 135 135 135 135 135 135 135 135 135 135 135 135 64 66 68 66 68 74 81 68 68 66 58 60 66 Maximum Day Analysis Fireflow Report ID J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 Static Static Pressure Demand (psi) (L/s) 2.38 4.76 0 0 4.76 2.56 0 0 0 0 0 0 0 79 79 81 76 77 80 82 78 81 79 76 75 79 Maximum Day Analysis Reservoir Report ID RES9000 Flow (L/s) -14.46 Head (m) 108 Available Available Flow at Flow Hydrant Pressure (L/s) (psi) > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 > 200 20 Flow Reversal Count 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Petrie's Landing Phase 2 Client: Brigil Construction Project: OTT 00214935 A0 Date: 21st October, 2013 HGL LOCATION A Peak Hour Analysis Junction Report ID J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 Demand (L/s) 5.24 10.48 0.00 0.00 10.48 5.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Elevation (m) 52.28 52.27 50.85 54.25 53.44 51.80 50.33 53.44 50.85 52.27 54.77 54.93 52.62 Head (m) 107.67 107.67 107.68 107.70 107.70 107.81 107.94 107.84 107.73 107.68 107.69 107.67 107.69 Pressure (psi) 79 79 81 76 77 80 82 77 81 79 75 75 78 Pressure (kPa) 543 543 557 524 532 549 565 533 558 543 519 517 540 Peak Hour Analysis Pipe Report ID From Node To Node Length (m) Diameter (mm) Roughness Flow (L/s) Velocity (m/s) P-1 P-2 P-3 P-4 P-5 P-6 P-7 P12 P14 P20 P22 P24 P26 P28 P30 RES9000 J-7 J-6 J-4 J-3 J-2 J-7 J-5 J-10 J-13 J-13 J-12 J-8 J-9 J-10 J-7 J-6 J-5 J-13 J-2 J-1 J-8 J-4 J-2 J-3 J-11 J-2 J-9 J-10 J-1 8.27 41.76 60.7 67.7 49.0 42.4 98.7 16.36 2.98 23.96 37.38 13.22 110.52 52.54 41.27 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 31.84 20.64 15.00 4.52 4.52 2.19 11.2 4.52 8.14 4.52 0 0 11.2 11.2 3.05 0.98 0.64 0.46 0.14 0.14 0.07 0.35 0.14 0.25 0.14 0 0 0.35 0.35 0.09 Peak Hour Analysis Reservoir Report ID RES9000 Flow (L/s) Head (m) -31.84 108 Headloss HL/1000 (m) (m/km) 0.06 0.13 0.11 0.01 0.01 0.00 0.1 0 0 0 0 0 0.11 0.05 0 7.05 3.16 1.75 0.19 0.19 0.05 1.02 0.19 0.56 0.19 0 0 1.02 1.02 0.09 Status Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Flow Reversal Count 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 November 2013 Appendix F – Stormwater Management Tables Table F-1: Pre-Development Runoff Calculations Table F-2: Allowable Runoff Calculations Table F-3: Average Runoff Coefficients (Post Development) Table F-4: Summary of Post Development Runoff (Uncontrolled and Controlled) Table F-5: Storage Volumes for 5-year and 100-year Storms TABLE F-1: PRE-DEVELOPMENT RUNOFF CALCULATIONS Time of Storm = 5 yr I5 Q5PRE Conc, Tc Area Description Area (ha) (min) (mm/hr) Cavg (L/sec) Total Site 3.7700 20 70.25 0.25 184.1 0.814 1) Intensity, I = 998.071/(Tc+6.035) (5-year, City of 0ttawa) 2) Intensity, I = 1735.688/(Tc+6.014)0.820 (100-year, City of Ottawa) 3) Cavg for 100-year is increased by 25% to a maximum of 0.95 Storm = 100 yr I5 (mm/hr) 119.95 Cavg 0.31 CGRASS = 0.20 Q100PRE (L/sec) 32.6 TABLE F-2: ALLOWABLE RUNOFF CALCULATIONS Time of Storm = 5 yr I5 QALLOW Conc, Tc (mm/hr) Cavg (L/sec) Area Description Area (ha) (min) Total Site 3.7700 20 70.29 0.25 184.2 3.7700 184.2 1) Allowable Capture Rate is based on 5-year storm at Tc=20 minutes. 0.814 2) Intensity, I = 998.071/(Tc+6.035) (5-year, City of 0ttawa) 0.820 3) Intensity, I = 1735.688/(Tc+6.014) (100-year, City of Ottawa) 4) Cavg for 100-year is increased by 25% to a maximum of 0.95 5) External area A8 will be directed through site, with no storage provided. TABLE F3: AVERAGE RUNOFF COEFFICIENTS (Post Development) CASPH = Runoff Coeffients Area No. Asphalt Areas (m2) Phase 1 Phase 2 Phase 3 Phase 4 Future Phase Total 4842 2297 1819 1300 2733 12,991 A * CASPH 4357.8 2067.3 1637.1 1170.0 2459.7 11,692 0.90 Roof Areas (m2) 870 928 928 928 3527 7,181 Site % IMP = 52% CROOF = 0.90 Grassed Areas (m2) A * CGRASS 5091 1018.2 3749 749.8 3157 631.4 3631 726.2 3328 665.6 18,956 3,791 A * CROOF 783.0 835.2 835.2 835.2 3174.3 Average Runoff Coeff (All Areas) = Sum AC 6159.0 3652.3 3103.7 2731.4 6299.6 21,946 CAVG = Total Area (m2) 10803 6974 5904 5859 9588 39,128 21,946 39,128 CAVG 0.57 0.52 0.53 0.47 0.66 0.56 = 0.56 TABLE F-4: SUMMARY OF POST DEVELOPMENT RUNOFF (Uncontrolled and Controlled) CAVG Total Indiv Area (ha) Area (ha) 1.0803 1.0803 0.6974 0.6974 0.5904 0.5904 5.7830 5.8590 0.0760 0.9588 0.9588 9.1859 9.1859 Storm = 100 yr Storm = 5 yr I5 (mm/hr) Area No 0.57 83.56 Phase 1 Phase 2 0.52 83.56 Phase 3 0.53 83.56 Phase 4 0.47 83.56 17, 18 0.20 83.56 Future Phase 0.66 83.56 Totals Notes 1) Captured Flow from Future Phase is included with Phase 1 - 4 I5 = 998.071 / (Tc + 6.053)0.814 Q (L/sec) 143.1 84.8 72.1 626.2 3.5 146.3 1076.1 I100 =1735.688 / (Tc + 6.014) 0.820 Time of Concentration (min), Tc = 15 mins For Flows under column Qcap which are bold, denotes flows that are controlled QCAP (L/sec) 176.6 3.5 Note1 180.2 CAVG (100-yr) 0.71 0.65 0.66 0.58 0.25 0.82 I100 (mm/hr) 142.89 142.89 142.89 142.89 142.89 142.89 Q (L/sec) QCAP (L/sec) 305.8 181.4 176.6 154.1 1338.7 7.5 7.5 312.8 Note1 2300.4 184.2 Table F-5: Storage Volumes for 5 Year and 100 Year Storms Area No: CAVG = Time Interval = Drainage Area = Duration (min) All 0.56 5 3.913 (mins) (hectares) Release Rate = 176.6 Return Period = 5 IDF Parameters, A = 998.071 ( I = A/(Tc+C) Rainfall Intensity, I (mm/hr) (L/sec) (years) ,B= ,C= 0.814 6.053 Release Rate = 176.6 (L/sec) Return Period = 100 (years) IDF Parameters, A = 1735.688 ( I = A/(Tc+C) ,C= Rainfall Peak Flow Release Storage Storage (m3) Intensity, I (L/sec) Rate (L/sec) Rate (L/sec) (mm/hr) 0.820 6.014 Peak Flow Release Storage Storage (m3) (L/sec) Rate (L/sec) Rate (L/sec) 0 230.5 1406.2 176.62 1229.5 0.00 398.6 2432.0 176.624 2255.3 0.00 5 141.2 861.3 176.62 684.7 205.41 242.7 1480.7 176.624 1304.1 391.23 10 104.2 635.7 176.62 459.1 275.43 178.6 1089.4 176.624 912.8 547.66 15 83.6 509.8 176.62 333.2 299.84 142.9 871.8 176.624 695.2 625.65 20 70.3 428.6 176.62 252.0 302.37 120.0 731.8 176.624 555.2 666.23 25 60.9 371.5 176.62 194.9 292.35 103.8 633.6 176.624 456.9 685.42 30 53.9 329.0 176.62 152.4 274.30 91.9 560.5 176.624 383.9 180.16 35 48.5 296.0 176.62 119.4 250.70 82.6 503.8 176.624 327.2 687.09 40 44.2 269.6 176.62 92.9 223.07 75.1 458.5 176.624 281.8 676.41 45 40.6 247.9 176.62 71.3 192.38 69.1 421.3 176.624 244.7 660.56 50 37.7 229.7 176.62 53.1 159.29 64.0 390.2 176.624 213.6 640.68 55 35.1 214.3 176.62 37.7 124.29 59.6 363.8 176.624 187.1 617.56 60 32.9 201.0 176.62 24.4 87.71 55.9 341.0 176.624 164.4 591.80 65 31.0 189.4 176.62 12.8 49.81 52.6 321.2 176.624 144.6 563.83 70 29.4 179.2 176.62 2.6 10.81 49.8 303.8 176.624 127.1 533.99 75 27.9 170.1 176.62 -6.5 -29.15 47.3 288.3 176.624 111.7 502.56 80 26.6 162.1 176.62 -14.6 -69.93 45.0 274.5 176.624 97.9 469.75 85 25.4 154.8 176.62 -21.9 -111.44 43.0 262.1 176.624 85.4 435.73 90 24.3 148.2 176.62 -28.4 -153.58 41.1 250.8 176.624 74.2 400.64 95 23.3 142.2 176.62 -34.4 -196.30 39.4 240.6 176.624 64.0 364.61 -39.9 -239.51 302.37 37.9 231.2 176.624 54.6 327.73 687.09 100 22.4 136.7 176.62 Max = Notes 1 ) Peak flow is equal to the product of 2.78 x C x I x A 2) Rainfall Intensity, I = A/(Tc+C)B 3) Release Rate = Min (Release Rate, Peak Flow) 4 ) Storage Rate = Peak Flow - Release Rate 5) Storage = Duration x Storage Rate 6) Maximium Storage = Max Storage Over Duration 7) Parameters a,b,c are for City of Ottawa