Modern Neighbourhood to The Tower of London

Transcription

Modern Neighbourhood to The Tower of London
Horizontal section
Modern Neighbourhood to The Tower of London
“We knew we would
get a very flat and crisp
appearance.”
Project
The Grange City Hotel,
London, UK
Year of Installation
Phase 1: 2000 – 2002,
Phase 2: 2005
Staying at the new, It is a flagship of Grange Hotels, who already run eight luxury hotels in central
luxury Grange City
London. The potential of the former office building was identified in 1999,
Hotel standing right
followed by the feasibility studies of the architects. Planning permission was
next to The Tower of
received in May 2000, Construction started in late 2000. The existing 12
London gives visitors
storey building was stripped back to its basic structure and extended both at
a real taste of the
high level for bedrooms and podium level for a new restaurant and conference
new and old London. centre. Buchanan Associates decided to use white ALUCOBOND ® to clad the
upper levels of the building. The choice of cladding material is important for any
Owner
project but even more for this project with its prominent position and such a
Grange Hotels
famous architectural neighbour. Architect Dean Buchanan said: We had used
ALUCOBOND ® on two previous developments for Grange Hotels and being
Architect
Buchanan Associates, London
very satisfied with the results, we decided to use the same tried and tested
material again. We knew we would get a very flat and crisp appearance, and
that was particularly important as we were combining the ALUCOBOND ®
ALUCOBOND ® Fabricator / Installer
Laser Claddings, Stourbridge
with high quality Portland stone and polished granite. Laser Claddings’ Stuart
Davis added: The successful completion of this prestigious cladding project
was due very much to the close relationship we have with the architect, client
Construction
and Alcan Composites.
SZ20 tray panel system
The first phase of the work was completed and the hotel opened, in May 2002. The
extension also clad in ALUCOBOND , was completed in September 2005.
®
Product
Moderner Nachbar des
Du moderne dans le voisinage
Tower in London
de la Tour de Londres
4 700 m2 (50 600 sq.ft.) ALUCOBOND ®
White 10
Beim Aufenthalt im neuen, luxuriösen
diesem Fall aufgrund der bedeutenden
Le séjour au nouveau Grange City
chaque projet, mais encore plus pour
Grange City Hotel direkt neben dem
Lage im Umfeld berühmter Architektur
Hotel situé juste à droite de la Tour
celui-ci avec sa situation proéminente
Tower von London spürt der Gast das
noch wichtiger. So der Architekt Dean
de Londres alloue un goût réel de
et un voisin si fameux. L’architecte Dean
alte und neue London.
Buchanan: Wir haben ALUCOBOND ®
l’ancien et du nouveau Londres.
Buchanan explique : « Nous avons utilisé
bereits bei zwei Projekten der Grange
Das Projekt ist das Aushängeschild der
Hotels eingesetzt und waren äußerst
Il s’agit d’un projet de prestige, les
Hotelkette, die bereits acht Luxushotels
zufrieden. Daher entschieden wir uns
Grange Hotels avec déjà huit hôtels
des résultats, on a décidé de prendre ce
in London betreibt. Als 1999 das Potential
erneut für dieses erprobte Material. Wir
de luxe au centre ville. Le potentiel de
matériau déjà testé. On savait qu’on ob-
Grange Hôtels et étant très satisfaits
tiendrait une apparence plane et croquante
des früheren Bürogebäudes erkannt wurde, wussten, dass wir ein sehr klares und pla-
l’ancien bâtiment de bureaux fut reconnu
folgte die Machbarkeitsanalyse der Archi- nes Bild schaffen würden, was besonders
en 1999 après une étude de faisabilité. – et ceci était très important à cause de la
tekten. Die Genehmigung wurde im Mai
aufgrund der Material-Kombination mit
Avec la permission de planification en
2000 erteilt, der Bau begann bereits Ende
hochwertigem Portland-Stein und polier-
Mai 2000, la construction commença
pierre de Portland de haute qualité et le
des Jahres. Das bestehende 12-stöckige
tem Granit ausschlaggebend war. Stuart
à la fin de l’année 2000. La structure
granite brillant. Laser Claddings ajoute :
Gebäude wurde bis auf die Grundsubstanz
Davis von Laser Claddings fügt hinzu: Der
existante de 12 niveaux fut d’abord
Le succès de ce projet prestigieux est
demontiert. Die Erweiterung erfolgte verti- Erfolg dieses Projekts basiert im Grunde
Vertical section
ALUCOBOND ® déjà pour deux autres
combinaison de l’ALUCOBOND ® avec la
réduite à la base pour ensuite l’éten- surtout dû à l’étroite collaboration entre
kal durch den Ausbau der Zimmerkapazität
auf der engen Zusammenarbeit zwischen
dre en partie basse avec un nouveau
l’architecte, le maître-d’oeuvre et Alcan
und horizontal mit neuem Restaurant und
Architekt, Bauherr und Alcan Composites.
restaurant et centre de conférence et
Composites. Après finition de la première
Konferenzräumen. Buchanan Associates
Nach Beendigung der ersten Bauphase
en partie haute avec plus de cham- phase de construction, l’hôtel ouvrit ses
entschieden sich für ALUCOBOND® in weiß
eröffnete das Hotel im Mai 2002. Die
bres. Buchanan Associates ont décidé
portes en mai 2002. L’extension, égale-
zur Verkleidung der oberen Stockwerke
ebenfalls mit ­ALUCOBOND ® verkleidete
d’utiliser ALUCOBOND ® en blanc pour
ment réalisée en ALUCOBOND ® a été
des Gebäudes. Die Materialauswahl ist
Erweiterung wurde im September 2005
revêtir la partie haute du bâtiment. Le
accomplie en Septembre 2005.
bei jedem Projekt entscheidend, aber in
fertiggestellt.
choix du matériau est important pour
Staying at the hotel gives a real taste of the new and old London.
Horizontal section
Modern Neighbourhood to The Tower of London
“We knew we would
get a very flat and crisp
appearance.”
Project
The Grange City Hotel,
London, UK
Year of Installation
Phase 1: 2000 – 2002,
Phase 2: 2005
Staying at the new, It is a flagship of Grange Hotels, who already run eight luxury hotels in central
luxury Grange City
London. The potential of the former office building was identified in 1999,
Hotel standing right
followed by the feasibility studies of the architects. Planning permission was
next to The Tower of
received in May 2000, Construction started in late 2000. The existing 12
London gives visitors
storey building was stripped back to its basic structure and extended both at
a real taste of the
high level for bedrooms and podium level for a new restaurant and conference
new and old London. centre. Buchanan Associates decided to use white ALUCOBOND ® to clad the
upper levels of the building. The choice of cladding material is important for any
Owner
project but even more for this project with its prominent position and such a
Grange Hotels
famous architectural neighbour. Architect Dean Buchanan said: We had used
ALUCOBOND ® on two previous developments for Grange Hotels and being
Architect
Buchanan Associates, London
very satisfied with the results, we decided to use the same tried and tested
material again. We knew we would get a very flat and crisp appearance, and
that was particularly important as we were combining the ALUCOBOND ®
ALUCOBOND ® Fabricator / Installer
Laser Claddings, Stourbridge
with high quality Portland stone and polished granite. Laser Claddings’ Stuart
Davis added: The successful completion of this prestigious cladding project
was due very much to the close relationship we have with the architect, client
Construction
and Alcan Composites.
SZ20 tray panel system
The first phase of the work was completed and the hotel opened, in May 2002. The
extension also clad in ALUCOBOND , was completed in September 2005.
®
Product
Moderner Nachbar des
Du moderne dans le voisinage
Tower in London
de la Tour de Londres
4 700 m2 (50 600 sq.ft.) ALUCOBOND ®
White 10
Beim Aufenthalt im neuen, luxuriösen
diesem Fall aufgrund der bedeutenden
Le séjour au nouveau Grange City
chaque projet, mais encore plus pour
Grange City Hotel direkt neben dem
Lage im Umfeld berühmter Architektur
Hotel situé juste à droite de la Tour
celui-ci avec sa situation proéminente
Tower von London spürt der Gast das
noch wichtiger. So der Architekt Dean
de Londres alloue un goût réel de
et un voisin si fameux. L’architecte Dean
alte und neue London.
Buchanan: Wir haben ALUCOBOND ®
l’ancien et du nouveau Londres.
Buchanan explique : « Nous avons utilisé
bereits bei zwei Projekten der Grange
Das Projekt ist das Aushängeschild der
Hotels eingesetzt und waren äußerst
Il s’agit d’un projet de prestige, les
Hotelkette, die bereits acht Luxushotels
zufrieden. Daher entschieden wir uns
Grange Hotels avec déjà huit hôtels
des résultats, on a décidé de prendre ce
in London betreibt. Als 1999 das Potential
erneut für dieses erprobte Material. Wir
de luxe au centre ville. Le potentiel de
matériau déjà testé. On savait qu’on ob-
Grange Hôtels et étant très satisfaits
tiendrait une apparence plane et croquante
des früheren Bürogebäudes erkannt wurde, wussten, dass wir ein sehr klares und pla-
l’ancien bâtiment de bureaux fut reconnu
folgte die Machbarkeitsanalyse der Archi- nes Bild schaffen würden, was besonders
en 1999 après une étude de faisabilité. – et ceci était très important à cause de la
tekten. Die Genehmigung wurde im Mai
aufgrund der Material-Kombination mit
Avec la permission de planification en
2000 erteilt, der Bau begann bereits Ende
hochwertigem Portland-Stein und polier-
Mai 2000, la construction commença
pierre de Portland de haute qualité et le
des Jahres. Das bestehende 12-stöckige
tem Granit ausschlaggebend war. Stuart
à la fin de l’année 2000. La structure
granite brillant. Laser Claddings ajoute :
Gebäude wurde bis auf die Grundsubstanz
Davis von Laser Claddings fügt hinzu: Der
existante de 12 niveaux fut d’abord
Le succès de ce projet prestigieux est
demontiert. Die Erweiterung erfolgte verti- Erfolg dieses Projekts basiert im Grunde
Vertical section
ALUCOBOND ® déjà pour deux autres
combinaison de l’ALUCOBOND ® avec la
réduite à la base pour ensuite l’éten- surtout dû à l’étroite collaboration entre
kal durch den Ausbau der Zimmerkapazität
auf der engen Zusammenarbeit zwischen
dre en partie basse avec un nouveau
l’architecte, le maître-d’oeuvre et Alcan
und horizontal mit neuem Restaurant und
Architekt, Bauherr und Alcan Composites.
restaurant et centre de conférence et
Composites. Après finition de la première
Konferenzräumen. Buchanan Associates
Nach Beendigung der ersten Bauphase
en partie haute avec plus de cham- phase de construction, l’hôtel ouvrit ses
entschieden sich für ALUCOBOND® in weiß
eröffnete das Hotel im Mai 2002. Die
bres. Buchanan Associates ont décidé
portes en mai 2002. L’extension, égale-
zur Verkleidung der oberen Stockwerke
ebenfalls mit ­ALUCOBOND ® verkleidete
d’utiliser ALUCOBOND ® en blanc pour
ment réalisée en ALUCOBOND ® a été
des Gebäudes. Die Materialauswahl ist
Erweiterung wurde im September 2005
revêtir la partie haute du bâtiment. Le
accomplie en Septembre 2005.
bei jedem Projekt entscheidend, aber in
fertiggestellt.
choix du matériau est important pour
Staying at the hotel gives a real taste of the new and old London.