Modern Neighbourhood to The Tower of London
Transcription
Modern Neighbourhood to The Tower of London
Horizontal section Modern Neighbourhood to The Tower of London “We knew we would get a very flat and crisp appearance.” Project The Grange City Hotel, London, UK Year of Installation Phase 1: 2000 – 2002, Phase 2: 2005 Staying at the new, It is a flagship of Grange Hotels, who already run eight luxury hotels in central luxury Grange City London. The potential of the former office building was identified in 1999, Hotel standing right followed by the feasibility studies of the architects. Planning permission was next to The Tower of received in May 2000, Construction started in late 2000. The existing 12 London gives visitors storey building was stripped back to its basic structure and extended both at a real taste of the high level for bedrooms and podium level for a new restaurant and conference new and old London. centre. Buchanan Associates decided to use white ALUCOBOND ® to clad the upper levels of the building. The choice of cladding material is important for any Owner project but even more for this project with its prominent position and such a Grange Hotels famous architectural neighbour. Architect Dean Buchanan said: We had used ALUCOBOND ® on two previous developments for Grange Hotels and being Architect Buchanan Associates, London very satisfied with the results, we decided to use the same tried and tested material again. We knew we would get a very flat and crisp appearance, and that was particularly important as we were combining the ALUCOBOND ® ALUCOBOND ® Fabricator / Installer Laser Claddings, Stourbridge with high quality Portland stone and polished granite. Laser Claddings’ Stuart Davis added: The successful completion of this prestigious cladding project was due very much to the close relationship we have with the architect, client Construction and Alcan Composites. SZ20 tray panel system The first phase of the work was completed and the hotel opened, in May 2002. The extension also clad in ALUCOBOND , was completed in September 2005. ® Product Moderner Nachbar des Du moderne dans le voisinage Tower in London de la Tour de Londres 4 700 m2 (50 600 sq.ft.) ALUCOBOND ® White 10 Beim Aufenthalt im neuen, luxuriösen diesem Fall aufgrund der bedeutenden Le séjour au nouveau Grange City chaque projet, mais encore plus pour Grange City Hotel direkt neben dem Lage im Umfeld berühmter Architektur Hotel situé juste à droite de la Tour celui-ci avec sa situation proéminente Tower von London spürt der Gast das noch wichtiger. So der Architekt Dean de Londres alloue un goût réel de et un voisin si fameux. L’architecte Dean alte und neue London. Buchanan: Wir haben ALUCOBOND ® l’ancien et du nouveau Londres. Buchanan explique : « Nous avons utilisé bereits bei zwei Projekten der Grange Das Projekt ist das Aushängeschild der Hotels eingesetzt und waren äußerst Il s’agit d’un projet de prestige, les Hotelkette, die bereits acht Luxushotels zufrieden. Daher entschieden wir uns Grange Hotels avec déjà huit hôtels des résultats, on a décidé de prendre ce in London betreibt. Als 1999 das Potential erneut für dieses erprobte Material. Wir de luxe au centre ville. Le potentiel de matériau déjà testé. On savait qu’on ob- Grange Hôtels et étant très satisfaits tiendrait une apparence plane et croquante des früheren Bürogebäudes erkannt wurde, wussten, dass wir ein sehr klares und pla- l’ancien bâtiment de bureaux fut reconnu folgte die Machbarkeitsanalyse der Archi- nes Bild schaffen würden, was besonders en 1999 après une étude de faisabilité. – et ceci était très important à cause de la tekten. Die Genehmigung wurde im Mai aufgrund der Material-Kombination mit Avec la permission de planification en 2000 erteilt, der Bau begann bereits Ende hochwertigem Portland-Stein und polier- Mai 2000, la construction commença pierre de Portland de haute qualité et le des Jahres. Das bestehende 12-stöckige tem Granit ausschlaggebend war. Stuart à la fin de l’année 2000. La structure granite brillant. Laser Claddings ajoute : Gebäude wurde bis auf die Grundsubstanz Davis von Laser Claddings fügt hinzu: Der existante de 12 niveaux fut d’abord Le succès de ce projet prestigieux est demontiert. Die Erweiterung erfolgte verti- Erfolg dieses Projekts basiert im Grunde Vertical section ALUCOBOND ® déjà pour deux autres combinaison de l’ALUCOBOND ® avec la réduite à la base pour ensuite l’éten- surtout dû à l’étroite collaboration entre kal durch den Ausbau der Zimmerkapazität auf der engen Zusammenarbeit zwischen dre en partie basse avec un nouveau l’architecte, le maître-d’oeuvre et Alcan und horizontal mit neuem Restaurant und Architekt, Bauherr und Alcan Composites. restaurant et centre de conférence et Composites. Après finition de la première Konferenzräumen. Buchanan Associates Nach Beendigung der ersten Bauphase en partie haute avec plus de cham- phase de construction, l’hôtel ouvrit ses entschieden sich für ALUCOBOND® in weiß eröffnete das Hotel im Mai 2002. Die bres. Buchanan Associates ont décidé portes en mai 2002. L’extension, égale- zur Verkleidung der oberen Stockwerke ebenfalls mit ALUCOBOND ® verkleidete d’utiliser ALUCOBOND ® en blanc pour ment réalisée en ALUCOBOND ® a été des Gebäudes. Die Materialauswahl ist Erweiterung wurde im September 2005 revêtir la partie haute du bâtiment. Le accomplie en Septembre 2005. bei jedem Projekt entscheidend, aber in fertiggestellt. choix du matériau est important pour Staying at the hotel gives a real taste of the new and old London. Horizontal section Modern Neighbourhood to The Tower of London “We knew we would get a very flat and crisp appearance.” Project The Grange City Hotel, London, UK Year of Installation Phase 1: 2000 – 2002, Phase 2: 2005 Staying at the new, It is a flagship of Grange Hotels, who already run eight luxury hotels in central luxury Grange City London. The potential of the former office building was identified in 1999, Hotel standing right followed by the feasibility studies of the architects. Planning permission was next to The Tower of received in May 2000, Construction started in late 2000. The existing 12 London gives visitors storey building was stripped back to its basic structure and extended both at a real taste of the high level for bedrooms and podium level for a new restaurant and conference new and old London. centre. Buchanan Associates decided to use white ALUCOBOND ® to clad the upper levels of the building. The choice of cladding material is important for any Owner project but even more for this project with its prominent position and such a Grange Hotels famous architectural neighbour. Architect Dean Buchanan said: We had used ALUCOBOND ® on two previous developments for Grange Hotels and being Architect Buchanan Associates, London very satisfied with the results, we decided to use the same tried and tested material again. We knew we would get a very flat and crisp appearance, and that was particularly important as we were combining the ALUCOBOND ® ALUCOBOND ® Fabricator / Installer Laser Claddings, Stourbridge with high quality Portland stone and polished granite. Laser Claddings’ Stuart Davis added: The successful completion of this prestigious cladding project was due very much to the close relationship we have with the architect, client Construction and Alcan Composites. SZ20 tray panel system The first phase of the work was completed and the hotel opened, in May 2002. The extension also clad in ALUCOBOND , was completed in September 2005. ® Product Moderner Nachbar des Du moderne dans le voisinage Tower in London de la Tour de Londres 4 700 m2 (50 600 sq.ft.) ALUCOBOND ® White 10 Beim Aufenthalt im neuen, luxuriösen diesem Fall aufgrund der bedeutenden Le séjour au nouveau Grange City chaque projet, mais encore plus pour Grange City Hotel direkt neben dem Lage im Umfeld berühmter Architektur Hotel situé juste à droite de la Tour celui-ci avec sa situation proéminente Tower von London spürt der Gast das noch wichtiger. So der Architekt Dean de Londres alloue un goût réel de et un voisin si fameux. L’architecte Dean alte und neue London. Buchanan: Wir haben ALUCOBOND ® l’ancien et du nouveau Londres. Buchanan explique : « Nous avons utilisé bereits bei zwei Projekten der Grange Das Projekt ist das Aushängeschild der Hotels eingesetzt und waren äußerst Il s’agit d’un projet de prestige, les Hotelkette, die bereits acht Luxushotels zufrieden. Daher entschieden wir uns Grange Hotels avec déjà huit hôtels des résultats, on a décidé de prendre ce in London betreibt. Als 1999 das Potential erneut für dieses erprobte Material. Wir de luxe au centre ville. Le potentiel de matériau déjà testé. On savait qu’on ob- Grange Hôtels et étant très satisfaits tiendrait une apparence plane et croquante des früheren Bürogebäudes erkannt wurde, wussten, dass wir ein sehr klares und pla- l’ancien bâtiment de bureaux fut reconnu folgte die Machbarkeitsanalyse der Archi- nes Bild schaffen würden, was besonders en 1999 après une étude de faisabilité. – et ceci était très important à cause de la tekten. Die Genehmigung wurde im Mai aufgrund der Material-Kombination mit Avec la permission de planification en 2000 erteilt, der Bau begann bereits Ende hochwertigem Portland-Stein und polier- Mai 2000, la construction commença pierre de Portland de haute qualité et le des Jahres. Das bestehende 12-stöckige tem Granit ausschlaggebend war. Stuart à la fin de l’année 2000. La structure granite brillant. Laser Claddings ajoute : Gebäude wurde bis auf die Grundsubstanz Davis von Laser Claddings fügt hinzu: Der existante de 12 niveaux fut d’abord Le succès de ce projet prestigieux est demontiert. Die Erweiterung erfolgte verti- Erfolg dieses Projekts basiert im Grunde Vertical section ALUCOBOND ® déjà pour deux autres combinaison de l’ALUCOBOND ® avec la réduite à la base pour ensuite l’éten- surtout dû à l’étroite collaboration entre kal durch den Ausbau der Zimmerkapazität auf der engen Zusammenarbeit zwischen dre en partie basse avec un nouveau l’architecte, le maître-d’oeuvre et Alcan und horizontal mit neuem Restaurant und Architekt, Bauherr und Alcan Composites. restaurant et centre de conférence et Composites. Après finition de la première Konferenzräumen. Buchanan Associates Nach Beendigung der ersten Bauphase en partie haute avec plus de cham- phase de construction, l’hôtel ouvrit ses entschieden sich für ALUCOBOND® in weiß eröffnete das Hotel im Mai 2002. Die bres. Buchanan Associates ont décidé portes en mai 2002. L’extension, égale- zur Verkleidung der oberen Stockwerke ebenfalls mit ALUCOBOND ® verkleidete d’utiliser ALUCOBOND ® en blanc pour ment réalisée en ALUCOBOND ® a été des Gebäudes. Die Materialauswahl ist Erweiterung wurde im September 2005 revêtir la partie haute du bâtiment. Le accomplie en Septembre 2005. bei jedem Projekt entscheidend, aber in fertiggestellt. choix du matériau est important pour Staying at the hotel gives a real taste of the new and old London.