APPENDIX C ds Recor Stages

Transcription

APPENDIX C ds Recor Stages
61
Method Statement
PE Calculation (where
applicable)
Material Submission
• Runner/Studs/Tracks
• Boards
• Compound
• Accessories
• Test reports
Sample Submission
• Runner/Studs/Tracks
• Boards
• Compound
• Accessories
1.2
1.3
1.4
1.5
Section 3
Section 3
Section 2
Section 3
Section 2
Section 3
Section 2
Section 3
Conform to
Specification
Date:
Approved By
Conform to
Specification
Conform to
Specification
Prior to
Start Work
Approved
Submission
Approved
Submission
Approved
Submission
Prior to
Start Work
Prior to
Start Work
Approved
Submission
Prior to
Start Work
Approved
Submission
Records
Page 1
ADOS – Architect /Designer / Owner / Supervisory Personnel
Each type of
Dry Wall
Each type of
Dry Wall
Stages
APPENDIX C
Conform to
Prior to
Specification
Start Work
& Construction
Drawings
Specific type Conform to
of Dry Wall
Regulation &
Specification
Each type of
Dry Wall
Each type of
Dry Wall
Requirement Frequency Acceptance
Reference
Criteria
QPDW – Qualified Person Dry Wall
The graphic shown here serves as a guide only.
Legend BR – Builder Rep.
Date:
Date:
Review
BR / ADOS
Verified By:
Review
BR / ADOS
Prepared By:
Review
Review
Review
Inspection
Method
BR / QPDW /
ADOS
BR / ADOS
BR / ADOS
Shop Drawings (include M&E
services)
1.1
People–In–
Charge
Submission (Shop Drawing / Method Statement)
Activity
1
S/No
Project:
Scope of work: Dry Wall
Sample of Inspection & Test Plan APPENDIX C
BR / ADOS
Visual / Testing
Visual /
Specifications
Section 3
Section 4
Section 4
Requirement
Reference
QPDW – Qualified Person Dry Wall
The graphic shown here serves as a guide only.
Legend BR – Builder Rep.
Date:
Selection of Material for Testing
• Runner / Studs / Tracks
• Boards
• Accessories
2.3
BR / ADOS
Visual /
Specifications
Date:
Storage of Material
• Runner / Studs / Tracks
• Boards
• Compound
• Accessories
2.2
BR / ADOS
Verified By:
Types of Material Delivered
• Runner / Studs / Tracks
• Boards
• Compound
• Accessories
2.1
People–In– Inspection
Charge
Method
Prepared By:
Incoming Material Inspection
Activity
2
S/No
Project:
Scope of work: Dry Wall
Sample of Inspection & Test Plan Date:
Approved By
Conform to
Specification
Conform to
Specification
Conform to
Specification
Prior to
Start Work
Prior to
Start Work
Prior to
Start Work
Delivery
Document
Delivery
Document
Delivery
Document
Records
Page 2
ADOS – Architect /Designer / Owner / Supervisory Personnel
Random
Selection
Each
Delivery
Each
Delivery
Frequency Acceptance Stages
Criteria
APPENDIX C
APPENDIX C
62
63
Method of Installation
Setting Out Check
Framing Works
4.1
4.2
4.3
BR / ADOS
BR / ADOS
BR / ADOS
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
QPDW – Qualified Person Dry Wall
Section 6
Section 6
Section 6
Section 6
Section 2
Section 3
Requirement
Reference
Date:
Approved By
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Specification
Checklist
Before
Checklist
Closing Any
Board
Before
Installation
Checklist
Approved
Submission
Prior to
Start Work
Before
Installation
Approved
Submission
Prior to
Start Work
Records
Page 3
ADOS – Architect /Designer / Owner / Supervisory Personnel
Each
Location
Each
Location
Each
Location
Each
Location
Each
Location
Frequency Acceptance Stages
Criteria
The graphic shown here serves as a guide only.
Legend BR – Builder Rep.
Date:
Installation
4
BR / ADOS
Visual /
Specifications
Date:
Mock Up Unit
3.2
BR / ADOS
Verified By:
Method of Installation
3.1
People–In– Inspection
Charge
Method
Prepared By:
Preparation
Activity
3
S/No
Project:
Scope of work: Dry Wall
Sample of Inspection & Test Plan APPENDIX C
APPENDIX C
Vertical and Alignment Check
M&E Services Installation
4.7
4.8
BR / ADOS
BR / ADOS
BR / ADOS
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
QPDW – Qualified Person Dry Wall
Section 6
Section 6
Section 6
Section 6
Section 6
Date:
Approved By
Conform to
Approved
Drawings &
Specification
Conform to
CONQUAS
Standards
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Conform to
Approved
Drawings &
Specification
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Before
Checklist
Closing Any
Board
Records
Page 4
ADOS – Architect /Designer / Owner / Supervisory Personnel
Each M&E
Service
Each
Location
Each M&E
Service
Each type of
Dry Wall
Every
Opening
Requirement Frequency Acceptance Stages
Reference
Criteria
The graphic shown here serves as a guide only.
Legend BR – Builder Rep.
Date:
Additional Support for M&E
Services
4.6
BR / ADOS
Visual /
Measurement
Date:
Lateral Bracing
4,5
BR / ADOS
Verified By:
Openings
4.4
People–In– Inspection
Charge
Method
Prepared By:
Installation (Continued)
Activity
4
S/No
Project:
Scope of work: Dry Wall
Sample of Inspection & Test Plan APPENDIX C
APPENDIX C
64
65
Final Closing of Board
Installation
Joint, Corner and Interfacing
Treatment (include Damage
repair)
4.11
4.12
BR / ADOS
BR / ADOS
BR / QPDW /
ADOS
Visual
Visual /
Measurement
Visual /
Measurement
Visual /
Measurement
Section 6
Section 6
Section 6
Section 6
Section 6
Conform to
Approved
Material &
Sample
Conform to
Approved
Material &
Sample
Date:
Approved By
Conform to
CONQUAS
Standards
Conform to
Approved
Material &
Sample
After
Closing Any
Board
Before
Closing Any
Board
Before
Closing Any
Board
Before
Closing Any
Board
Before
Closing Any
Board
Checklist
Checklist
Checklist
Checklist
Checklist
Page 5
ADOS – Architect /Designer / Owner / Supervisory Personnel
Each
Location
Each Unit
Specific type Conform to
of Dry Wall
Approved
Drawings &
Specification
Each Unit
Each Unit
Records
APPENDIX C
Requirement Frequency Acceptance Stages
Reference
Criteria
QPDW – Qualified Person Dry Wall
The graphic shown here serves as a guide only.
Legend BR – Builder Rep.
Date:
Inspection by PE (where
applicable)
4.11
BR / ADOS
Visual /
Measurement
Date:
Infill / Insulation Material
Installation
4.10
BR / ADOS
Verified By:
1st Closing of Board Installation
4.9
People–In– Inspection
Charge
Method
Prepared By:
Installation (Continued)
Activity
4
S/No
Project:
Scope of work: Dry Wall
Sample of Inspection & Test Plan APPENDIX C
Visual
Section 7
Section 10
Section 6
Date:
Approved By
Conform to
Specification
Conform to
Specification
& CONQUAS
Standards
Conform to
Specification
After Final
Repair Done
After On
Site Testing
After Final
Closing of
Board
Checklist
Checklist
Checklist
Page 6
ADOS – Architect /Designer / Owner / Supervisory Personnel
Each type of
Dry Wall
Each type of
Dry Wall
Each type of
Dry Wall
Records
APPENDIX C
Requirement Frequency Acceptance Stages
Reference
Criteria
QPDW – Qualified Person Dry Wall
The graphic shown here serves as a guide only.
Legend BR – Builder Rep.
Date:
BR / ADOS
Visual
Date:
Protection
4.15
BR / ADOS
Visual/
Specification/
Measurement
Verified By:
Final Check and Repair before
receiving Painting works
4.14
BR / ADOS
People–In– Inspection
Charge
Method
Prepared By:
Performance Test
Installation (Continued)
Activity
4.13
4
S/No
Project:
Scope of work: Dry Wall
Sample of Inspection & Test Plan APPENDIX C
66