APPENDIX C ds Recor Stages
Transcription
APPENDIX C ds Recor Stages
61 Method Statement PE Calculation (where applicable) Material Submission • Runner/Studs/Tracks • Boards • Compound • Accessories • Test reports Sample Submission • Runner/Studs/Tracks • Boards • Compound • Accessories 1.2 1.3 1.4 1.5 Section 3 Section 3 Section 2 Section 3 Section 2 Section 3 Section 2 Section 3 Conform to Specification Date: Approved By Conform to Specification Conform to Specification Prior to Start Work Approved Submission Approved Submission Approved Submission Prior to Start Work Prior to Start Work Approved Submission Prior to Start Work Approved Submission Records Page 1 ADOS – Architect /Designer / Owner / Supervisory Personnel Each type of Dry Wall Each type of Dry Wall Stages APPENDIX C Conform to Prior to Specification Start Work & Construction Drawings Specific type Conform to of Dry Wall Regulation & Specification Each type of Dry Wall Each type of Dry Wall Requirement Frequency Acceptance Reference Criteria QPDW – Qualified Person Dry Wall The graphic shown here serves as a guide only. Legend BR – Builder Rep. Date: Date: Review BR / ADOS Verified By: Review BR / ADOS Prepared By: Review Review Review Inspection Method BR / QPDW / ADOS BR / ADOS BR / ADOS Shop Drawings (include M&E services) 1.1 People–In– Charge Submission (Shop Drawing / Method Statement) Activity 1 S/No Project: Scope of work: Dry Wall Sample of Inspection & Test Plan APPENDIX C BR / ADOS Visual / Testing Visual / Specifications Section 3 Section 4 Section 4 Requirement Reference QPDW – Qualified Person Dry Wall The graphic shown here serves as a guide only. Legend BR – Builder Rep. Date: Selection of Material for Testing • Runner / Studs / Tracks • Boards • Accessories 2.3 BR / ADOS Visual / Specifications Date: Storage of Material • Runner / Studs / Tracks • Boards • Compound • Accessories 2.2 BR / ADOS Verified By: Types of Material Delivered • Runner / Studs / Tracks • Boards • Compound • Accessories 2.1 People–In– Inspection Charge Method Prepared By: Incoming Material Inspection Activity 2 S/No Project: Scope of work: Dry Wall Sample of Inspection & Test Plan Date: Approved By Conform to Specification Conform to Specification Conform to Specification Prior to Start Work Prior to Start Work Prior to Start Work Delivery Document Delivery Document Delivery Document Records Page 2 ADOS – Architect /Designer / Owner / Supervisory Personnel Random Selection Each Delivery Each Delivery Frequency Acceptance Stages Criteria APPENDIX C APPENDIX C 62 63 Method of Installation Setting Out Check Framing Works 4.1 4.2 4.3 BR / ADOS BR / ADOS BR / ADOS Visual / Measurement Visual / Measurement Visual / Measurement Visual / Measurement QPDW – Qualified Person Dry Wall Section 6 Section 6 Section 6 Section 6 Section 2 Section 3 Requirement Reference Date: Approved By Conform to Approved Drawings & Specification Conform to Approved Drawings & Specification Conform to Approved Drawings & Specification Conform to Approved Drawings & Specification Conform to Specification Checklist Before Checklist Closing Any Board Before Installation Checklist Approved Submission Prior to Start Work Before Installation Approved Submission Prior to Start Work Records Page 3 ADOS – Architect /Designer / Owner / Supervisory Personnel Each Location Each Location Each Location Each Location Each Location Frequency Acceptance Stages Criteria The graphic shown here serves as a guide only. Legend BR – Builder Rep. Date: Installation 4 BR / ADOS Visual / Specifications Date: Mock Up Unit 3.2 BR / ADOS Verified By: Method of Installation 3.1 People–In– Inspection Charge Method Prepared By: Preparation Activity 3 S/No Project: Scope of work: Dry Wall Sample of Inspection & Test Plan APPENDIX C APPENDIX C Vertical and Alignment Check M&E Services Installation 4.7 4.8 BR / ADOS BR / ADOS BR / ADOS Visual / Measurement Visual / Measurement Visual / Measurement Visual / Measurement QPDW – Qualified Person Dry Wall Section 6 Section 6 Section 6 Section 6 Section 6 Date: Approved By Conform to Approved Drawings & Specification Conform to CONQUAS Standards Conform to Approved Drawings & Specification Conform to Approved Drawings & Specification Conform to Approved Drawings & Specification Before Checklist Closing Any Board Before Checklist Closing Any Board Before Checklist Closing Any Board Before Checklist Closing Any Board Before Checklist Closing Any Board Records Page 4 ADOS – Architect /Designer / Owner / Supervisory Personnel Each M&E Service Each Location Each M&E Service Each type of Dry Wall Every Opening Requirement Frequency Acceptance Stages Reference Criteria The graphic shown here serves as a guide only. Legend BR – Builder Rep. Date: Additional Support for M&E Services 4.6 BR / ADOS Visual / Measurement Date: Lateral Bracing 4,5 BR / ADOS Verified By: Openings 4.4 People–In– Inspection Charge Method Prepared By: Installation (Continued) Activity 4 S/No Project: Scope of work: Dry Wall Sample of Inspection & Test Plan APPENDIX C APPENDIX C 64 65 Final Closing of Board Installation Joint, Corner and Interfacing Treatment (include Damage repair) 4.11 4.12 BR / ADOS BR / ADOS BR / QPDW / ADOS Visual Visual / Measurement Visual / Measurement Visual / Measurement Section 6 Section 6 Section 6 Section 6 Section 6 Conform to Approved Material & Sample Conform to Approved Material & Sample Date: Approved By Conform to CONQUAS Standards Conform to Approved Material & Sample After Closing Any Board Before Closing Any Board Before Closing Any Board Before Closing Any Board Before Closing Any Board Checklist Checklist Checklist Checklist Checklist Page 5 ADOS – Architect /Designer / Owner / Supervisory Personnel Each Location Each Unit Specific type Conform to of Dry Wall Approved Drawings & Specification Each Unit Each Unit Records APPENDIX C Requirement Frequency Acceptance Stages Reference Criteria QPDW – Qualified Person Dry Wall The graphic shown here serves as a guide only. Legend BR – Builder Rep. Date: Inspection by PE (where applicable) 4.11 BR / ADOS Visual / Measurement Date: Infill / Insulation Material Installation 4.10 BR / ADOS Verified By: 1st Closing of Board Installation 4.9 People–In– Inspection Charge Method Prepared By: Installation (Continued) Activity 4 S/No Project: Scope of work: Dry Wall Sample of Inspection & Test Plan APPENDIX C Visual Section 7 Section 10 Section 6 Date: Approved By Conform to Specification Conform to Specification & CONQUAS Standards Conform to Specification After Final Repair Done After On Site Testing After Final Closing of Board Checklist Checklist Checklist Page 6 ADOS – Architect /Designer / Owner / Supervisory Personnel Each type of Dry Wall Each type of Dry Wall Each type of Dry Wall Records APPENDIX C Requirement Frequency Acceptance Stages Reference Criteria QPDW – Qualified Person Dry Wall The graphic shown here serves as a guide only. Legend BR – Builder Rep. Date: BR / ADOS Visual Date: Protection 4.15 BR / ADOS Visual/ Specification/ Measurement Verified By: Final Check and Repair before receiving Painting works 4.14 BR / ADOS People–In– Inspection Charge Method Prepared By: Performance Test Installation (Continued) Activity 4.13 4 S/No Project: Scope of work: Dry Wall Sample of Inspection & Test Plan APPENDIX C 66