COMNAVAIRFORINST 3500.20C This Appendix provides sample messages and end of mission reports.

Transcription

COMNAVAIRFORINST 3500.20C This Appendix provides sample messages and end of mission reports.
COMNAVAIRFORINST 3500.20C
APPENDIX V
SAMPLE MESSAGES / END OF MISSION REPORTS
This Appendix provides sample messages and end of mission
reports.
APPENDIX V-A SHIP TO TYCOM - CART I COMPLETION MESSAGE......V-A-1
APPENDIX V-B ISIC TO ATG - TRAINING SUPPORT REQUEST.........V-B-1
APPENDIX V-C ISIC TO TYCOM - CREW CERT PHASE I/II/III
COMPLETION MESSAGE................................V-C-1
APPENDIX V-D ISIC TO TYCOM - CART II COMPLETION
MESSAGE...........................................V-D-1
APPENDIX V-E TYCOM TO FFC - MID-PHASE PROGRESS REPORT–
BASIC PHASE ULT...................................V-E-1
APPENDIX V-F ISIC TO TYCOM - END OF PHASE REPORT BASIC PHASE ULT...................................V-F-1
APPENDIX V-G TYCOM TO NUMBERED FLEET - END OF PHASE
REPORT – BASIC PHASE ULT..........................V-G-1
APPENDIX V-H SHIP MESSAGE NATO SEA SPARROW MISSILE
CERTIFICATION.....................................V-H-1
APPENDIX V-I ISIC MESSAGE NATO SEA SPARROW MISSILE
CERTIFICATION.....................................V-I-1
APPENDIX V-J ATG TO ISIC CART II MEMO.......................V-J-1
APPENDIX V-K ATG TO ISIC CART II MEMO – CS TEAM.............V-K-1
APPENDIX V-L ATG TO ISIC CART II MEMO – DAMAGE CONTROL
TEAM..............................................V-L-1
APPENDIX V-M ATG TO ISIC CART II MEMO - STT.................V-M-1
APPENDIX V-N ATG TO ISIC CART II MEMO – MEDICAL TEAM........V-N-1
APPENDIX V-O ATG TO ISIC CART II MEMO - NTT.................V-O-1
APPENDIX V-P ATG TO ISIC CART II MEMO - AVIATION TEAM.......V-P-1
APPENDIX V-Q ATG TO ISIC FEP MEMO...........................V-Q-1
APPENDIX V-R ATG TO ISIC FEP MEMO - CS TEAM.................V-R-1
V-1
COMNAVAIRFORINST 3500.20C
APPENDIX V-S ATG TO ISIC FEP MEMO - DAMAGE CONTROL
TEAM..............................................V-S-1
APPENDIX V-T ATG TO ISIC FEP MEMO - STT.....................V-T-1
APPENDIX V-U ATG TO ISIC FEP MEMO – MEDICAL TEAM............V-U-1
APPENDIX V-V ATG TO ISIC FEP MEMO - NTT.....................V-V-1
APPENDIX V-W ATG TO ISIC FEP MEMO - AVIATION TEAM...........V-W-1
V-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-A
SHIP TO TYCOM - CART I COMPLETION MESSAGE
RAAUZYUW
0007 2041621-UUUU--RHMCSUU.
ZNR UUUUU
R XXXXXXZ MAY 09 ZYB
FM USS XXXXXX CVN XX//
TO COMNAVAIRFOR SAN DIEGO CA//N7//
APPROPRIATE CARRIER STRIKE GROUP COMMANDER
APPROPRIATE NUMBERED FLEET COMMANDER
APPROPRIATE AIR WING COMMANDER
APPROPRIATE AFLOAT TRAINING GROUP
BT
UNCLAS
MSGID/GENADMIN/CCSG XX//
SUBJ/COMPLETION OF COMMAND ASSESSMENT OF READINESS AND TRAINING
(CART I) REQUIREMENTS FOR CVN XX//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
AMPN/REF A IS COMNAVAIRFOR CARRIER TRAINING AND READINESS
MANUAL.//
POC/XXXXXXXX/XXXXX/CCSG XX/LOC:XXXXXX, XX/
TEL:XXX XXX-XXXX//
GENTEXT/REMARKS/1. IAW REF A, CVN XX HAS COMPLETED CART I
REQUIRED ASSESSMENTS/ACTIONS:
(A) PROVIDE ASSESSMENT OF INTEGRATED TRAINING TEAM (ITT)
ORGANIZATION
(B) PROVIDE ASSESSMENT OF AFLOAT SELF ASSESSMENT CHECKSHEETS
(C) PROVIDE ASSESSMENT OF SHIP'S WATCH TEAM REPLACEMENT PLAN TO
INCLUDE:
- NEC PRODUCING/NON NEC FLTMPS REQUIRED SCHOOLS
- ENLISTED DISTRIBUTION AND VERIFICATION REPORT
- OFFICER DISTRIBUTION CONTROL REPORT
(D) PROVIDE ASSESSMENT OF LONG RANGE TRAINING PLAN (LRTP)
TO INCLUDE:
- IDENTIFICATION OF TADTAR REQUIREMENTS
- IDENTIFICATION OF REQUIRED SCHOOLS AND TEAM TRAINING
(E) DEVELOPE, REFINE AND UPDATE SHIP'S REQUIRED MASTER SCHOOLS
LIST.
2. DISCREPANCIES IDENTIFIED DURING THE CART I ASSESSMENT WILL
BE DOCUMENTED ON THE CURRENT SHIP'S DISCREPANCY LOG (CSDL)
UTILIZING THE RESTRICTIVE, MAJOR, MINOR FORMAT.
3. THE FOLLOWING IS A PRELIMINARY SCHEDULE OF MAJOR TRAINING
EVENTS TO BE ACCOMPLISHED DURING CVN XX FRTP.
EVENT
DATE
SBTT
TBD
FDC
TBD
CART II
TBD
V-A-1
COMNAVAIRFORINST 3500.20C
TSTA INPT
TSTA I/II/III/FEP
NSSMS CERT
TBD
TBD
TBD (PROVIDED SEPCOR)
BT
#0001
V-A-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-B
ISIC TO ATG - TRAINING SUPPORT REQUEST
FM CCSG XX//N37//
TO APPROPRIATE AFLOAT TRAINING GROUP//N3/N80/N81/N82/N88//
COMNAVAIRFOR SAN DIEGO CA//N7//
APPROPRIATE TYPE COMMANDER
USS XXXXX XXXXXXXXX
BT
UNCLAS
MSGID/GENADMIN/CCSG-X SAN DIEGO CA//
SUBJ/TRAINING SUPPORT REQUEST FOR CVN XX//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
AMPN/REF A IS CARRIER TRAINING MANUAL.//
POC/xxxxx/N37/CCSG XX/LOC:XXXXXXXX XX/
TEL:XXX XXX-XXXX//
GENTEXT/REMARKS/1. PER REF A, REQUEST ATG TRAINING SUPPORT:
A. USS XXXXXX, CVN XX, FOR THE FOLLOWING EVENTS:
EVENT
DATE
SBTT
29 MAR-02 APR
CREW CERT PH II
TBD
CREW CERT PH III
TBD
CART II
24-28 MAY
TSTA INPT
14-18 JUN
TSTA I/II/III/FEP
TSTA/FEP 06-30 JUL
NSSMS CERT
TBD (PROVIDED SEPCOR)
2. REQUEST THE FOLLOWING RATES FOR EVENT SUPPORT:
A. FOR SBTT: TRAINING LIAISON OFFICER (1), ABF (1), ABH (1), ABE
(1), DC (2), QM(1), BM (1), OS (1), FC (1), HM(1).
B. FOR CREW CERT PHASE II: TRAINING LIAISON OFFICER (1), DC (1),
QM (1), BM (1), CTT (1), ET (1), IT (1), OS (1), FC (1), IS (1),
STG (1), HM (1).
C. FOR CREW CERT PHASE III: TRAINING LIAISON OFFICER (1), DC
(4), QM (1), BM (1), CTT (1), ET (1), IT (1), OS (1), FC (1), IS
(1), STG (1), HM (1).
D. FOR CART II: TRAINING LIAISON OFFICER (1) ABF (2), ABH (2),
ABE (1), DC (11), QM (1), BM (1), CTT (1), CTR OR CTO (1), ET
(1), IT (1) OS (2), FC (2), IS (1), STG (1) HM (1).
E. FOR TSTA I/P: TRAINING LIAISON OFFICER (1) ABF (2), ABH (2),
ABE (1), DC (11), QM (1), BM (1), CTT (1), CTR OR CTO (1), ET
(1), IT (1) OS (2), FC (2), IS (1), STG (1), HM (1).
F. FOR TSTA/FEP: TRAINING LIAISON OFFICER (1) ABF (2), ABH (2),
ABE (1), DC (11), QM (1), BM (1), CTT (1), CTR OR CTO (1), ET
(1), IT (1) OS (2), FC (2), IS (1), STG (1), HM (1).//
BT
V-B-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-B-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-C
ISIC TO TYCOM - CREW CERT PHASE I/II/III COMPLETION MESSAGE
RAAUZYUW 0007 2041621-UUUU--RHMCSUU.
ZNR UUUUU
R XXXXXXZ MAY 09 ZYB
FM COMCARSTRKGRU XX//N3//
TO COMNAVAIRFOR SAN DIEGO CA//N7//
COMNAVAIRLANT NORFOLK VA//N7A//
INFO (APPROPRIATE) AFLOAT TRAINING GROUP
BT
UNCLAS
MSGID/GENADMIN/CCSG XX//
SUBJ/CREW CERTIFICATION PHASE X ICO CVN XX//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
AMPN/REF A IS AIRCRAFT CARRIER TRAINING AND READINESS MANUAL.//
POC/XXXXXXXX/XXXXX/CCSG XX/LOC:XXXXXX, XX/
TEL:XXX XXX-XXXX//
GENTEXT/REMARKS/1. IAW REF A, CVN XX HAS SUCCESSFULLY COMPLETED
CREW CERTIFICATION PHASE X .
2. CVN XX HAS COMPLETED PHASE I/II MILESTONES IN THE AREA OF
TRAINING AND ADMINSTRATION AS OUTLINED IN REF A.
2A. CVN XX HAS COMPLETED PHASE III MILESTONES IN THE AREA OF
TRAINING AND ADMINSTRATION, AND SUCCESSFULLY DEMONSTRATED
SIMULATED UNDERWAY OPERATIONS AND EMERGENCY DRILLS AS OUTLINED
IN REF A.
3. (XX) RESTRICTIVE, (XX) MAJOR AND (XXX) MINOR DISCREPANCIES
WERE INDENTIFIED DURING THE CREW CERTIFICATION PHASE (X)
PROCESS. RESTRICTIVE AND MAJOR DISCREPANCIES INCLUDE:
RESTRICTIVE:
DISCREPANCY/ MITIGATION STEPS/ESTIMATED COMPLETION DATE.
MAJOR:
DISCREPANCY/MITIGATON STEPS/ ESTIMATED COMPLETION DATE.
4. ALL DISCREPANCIES HAVE BEEN DOCUMENTED ON THE CURRENT SHIP'S
DISCREPANCY LOG (CSDL). CCSG XX SHALL TRACK AND PROVIDE MIDMONTH UPDATES TO THE TYCOM CODE N7, UNTIL ALL NOTED
DISCREPANCIES HAVE BEEN RESOLVED OR UNTIL THE SHIP HAS BEEN
CERTIFIED MCO READY.
BT
V-C-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-C-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-D
ISIC TO TYCOM - CART II COMPLETION MESSAGE
RAAUZYUW
0007 2041621-UUUU--RHMCSUU.
ZNR UUUUU
R XXXXXXZ MAY 09 ZYB
FM COMCARSTRKGRU XX//N3//
TO COMNAVAIRFOR SAN DIEGO CA//N7//
APPROPRIATE NUMBERED FLEET COMMANDER
APPROPRIATE AIR WING COMMANDER
APPROPRIATE AFLOAT TRAINING GROUP
INFO USS SHIP (CVN XX)/
BT
UNCLAS
MSGID/GENADMIN/CCSG XX//
SUBJ/COMPLETION OF COMMAND ASSESSMENT OF READINESS AND TRAINING
(CART II) REQUIREMENTS FOR CVN XX//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
AMPN/REF A IS COMNAVAIRFOR AIRCRAFT CARRIER TRAINING AND
READINESS MANUAL. //
POC/XXXXXXXX/XXXXX/CCSG XX/LOC:XXXXXX, XX/
TEL:XXX XXX-XXXX//
GENTEXT/REMARKS/1. IAW REF A, CVN XX HAS SUCCESSFULLY COMPLETED
CART II AND IS READY TO PROCEED TO THE NEXT PHASE OF UNIT LEVEL
TRAINING.
2. ALL CART II EVENTS HAVE BEEN SATISFACTORILY COMPLETED WITH
THE FOLLOWING EXCEPTIONS/RESULTS:
(A) IDENTIFICATION OF CART II EVENTS NOT COMPLETED/TRAINING
CONCERNS. (TYPE/NAME/ REASON NOT COMPLETE /MITIGATION STEPS AS
REQUIRED /ESTIMATED COMPLETION DATE)
(B) NUMBER/TYPE DISCREPANCIES IDENTIFIED DURING CART II.
(NUMBER RESTRICTIVE, MAJOR, MINOR)
(C) ASSESSMENT OF SHIP'S ONGOING TRAINING PROGRAMS.
(D) ASSESSMENT OF INTEGRATED TRAINING TEAM (ITT) ORGANIZATION
ABILITY TO BRIEF, EXECUTE AND DEBRIEF COMPLEX DRILL SETS.
(E) ASSESSMENT OF TRAINING TEAM/WATCH STANDERS TRAINING LEVEL
OF PROFICIENCY BY WARFARE AREA.
(F) RECOMMENDATIONS REGARDING EMPHASIS/TAILORING FOR UPCOMING
UNIT LEVEL TRAINING AS APPROPRIATE.
(G) IDENTIFICATION OF RESOURCES REQUIRED TO COMPLETE BASIC
PHASE TRAINING EVENTS (COMMERCIAL AIR SERVICES, RANGE SERVICES,
NCEA)
3.
THE FOLLOWING IS A SCHEDULE FOR COMPLETING REMAINING BASIC
PHASE TRAINING EVENTS, INSPECTIONS, CERTIFICATIONS, ASSESSMENTS
AND OPTIONAL ASSIST VISITS (ICAVS), REQUIRED DURING THE BASIC
UNIT LEVEL PHASE OF TRAINING.
(BELOW ARE EXAMPLES AND NOT ALL INCLUSIVE)
V-D-1
COMNAVAIRFORINST 3500.20C
EVENT
DATE
TYCOM/ISIC/SHIP ULT PLANNING CONF
TBD
ATFP
TBD
SAR CERT
TBD
TSTA I/II/III/FEP
TBD
NSSMS CERT
TBD
4. ALL DISCREPANCIES NOTED DURING CART II HAVE BEEN ADDED TO
THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) AND ISICS SHALL TRACK
AND PROVIDE MID-MONTH UPDATES TO THE TYCOM UNTIL FINAL
RESOLUTION OF ALL NOTED DISCREPANCIES OR UNTIL THE SHIP HAS BEEN
CERTIFIED MCO READY.
BT
#0001
V-D-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-E
TYCOM TO FFC - MID-PHASE PROGRESS REPORT– BASIC PHASE ULT
FM COMNAVAIRFOR SAN DIEGO CA//N7//
TO COMUSFLTFORCOM NORFOLK VA//N01/N4/N7/N70/N71/N72/N73/N74//
COMPACFLT PEARL HARBOR HI//01/N3/N7/N70/N71//
INFO COMSECONDFLT/COMTHIRDFLT/COMSEVENTHFLT (AS APPROPRIATE)
TYCOMS (AS APPROPRIATE)
COMCARSTRIKEGRU XXXX
USS SHIP 1
BT
CLASSIFICATION //N03210//
MSGID /GENADMIN/COMNAVAIRFOR//
SUBJ/(U) MID-PHASE PROGRESS REPORT, BASIC PHASE ULT//
REF/A/DOC/CUSFF-CPF INSTRUCTION 3501.3B/20JUL2009//
REF/B/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
NARR/REF A IS THE FLEET TRAINING CONTINUUM. REF B IS THE
AIRCRAFT CARRIER TRAINING AND READINESS MANUAL.//
POC/NAME/CODE/TEL:
/EMAIL:
//
RMKS/1. IAW REF A AND REF B, UNIT/GROUP IS MIDWAY THROUGH THE
BASIC PHASE OF THE FRTP AND IS (AT RISK / NOT AT RISK) OF
COMPLETING THE BASIC PHASE AS SCHEDULED AND/OR (ATTAINING /
MAINTAINING) IURFT CERTIFICATION.
2. AREAS OF CONCERN WITH MITIGATION STEPS:
A. SCHEDULE CHANGE/TYPE OF SCHEDULE CHANGE (E.G., EXTENDED
MAINT PERIOD/FRTP EVENT CHANGE/OPERATIONAL TASKING)/TYPE OF
RISK/REASONS FOR CHANGE/MITIGATION STEPS AS REQUIRED/COMMENTS.
(BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE):
SCHEDULE CHANGE/EXTENDED MAINTENANCE PERIOD BY THREE WEEKS/RISK
TO COMPLETING THE BASIC PHASE CERTIFICATION ON SCHEDULE
/MAINTENANCE PERIOD EXTENDED TO MAKE EMERGENT REPAIRS TO HULL/
BASIC PHASE WILL BE COMPRESSED BY THREE WEEKS/ UNIT LEVEL
TRAINING MAY NOT BE COMPLETED BEFORE THE UNIT IS REQUIRED TO
PARTICIPATE IN THE C2X). THE UNIT MAY NOT HAVE THE BASIC SKILLS
NECESSARY TO ACTIVELY PARTICIPATE IN C2X).//
B. PERSONNEL ISSUES (NOTE PERSONNEL ISSUES/ REASONS/
MITIGATION STEPS).
(BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE):
PERSONNEL ISSUES/TWO OF TWO SEARCH AND RESCUE SWIMMERS TAD/ONE
SAR SWIMMER TAD TO HARPOON SCHOOL UNTIL MIDWAY THROUGH C2X, ONE
SAR SWIMMER DEPLOYED ON IA UNTIL AFTER COMPLETION OF DEPLOYMENT/
REQUESTING SAR SWIMMERS FROM OTHER UNITS IOT COMPLETE THE VBSS
CERTIFICATION.//
C. EQUIPMENT ISSUES/SYSTEM/ISSUES (DISCUSS ANY EQUIPMENT
DEFICIENCIES THAT AFFECT THE UNIT/GROUP’S ABILITY TO EXECUTE THE
FRTP)
(BELOW ARE EXAMPLES AND NOT ALL INCLUSIVE):
V-E-1
COMNAVAIRFORINST 3500.20C
MDS VERSION XX/SOFTWARE NOT INSTALLED/TOMAHAWK EXECUTION
DEGRADED UNTIL AFTER C2X/
GTM1A/ONE OF FOUR MAIN ENGINES OOC, CASREP XXXX REFERS/UNABLE TO
COMPLETE ULTRA-E AS SCHEDULED. BASIC PHASE TRAINING MAY NOT BE
COMPLETED BY (SCHEDULED DATE). THE UNIT MAY NOT BE ELIGIBLE FOR
INDEPENDENT TASKING AS SCHEDULED. UNIT LEVEL TRAINING MAY CARRY
INTO THE INTEGRATED PHASE.//
D. TRAINING ISSUES/ CERTIFICATION OR EVENT AFFECTED/
DATE/(SUMMARIZE THE UNIT’S FRTP, IDENTIFY SPECIFIC WARFARE AREAS
OF CONCERN AND ANY DEFICIENCIES WHICH AFFECT THE ABILITY TO
TRAIN).
(BELOW ARE EXAMPLES AND NOT ALL INCLUSIVE)
CMTQ/20NOV09/SECOND FAILURE/REMEDIAL TRAINING REQUIRED.
CERTIFICATION RESCHD 15DEC09//
ULTRA C/30NOV09/FAILED/THREE TSTAS SCHEDULED. THERE ARE LIMITED
PERSONNEL TO SUPPORT ASSIST VISITS PRIOR TO UNIT COMPLETING THE
FRTP BASIC PHASE. UNIT LEVEL TRAINING WILL CONTINUE DURING THE
INTEGRATED PHASE. RESCHD 15JAN10.//
E. SUPPLY ISSUES/(IDENTIFY SPECIFIC SUPPLY/MATERIEL SHORTFALLS WHICH AFFECT THE UNIT’S FRTP).
(BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE)
HELO PACKUP KIT UNAVAIL UNTIL 15DEC09/MAY DELAY HELO SUPPORT FOR
C2X.//
F. ORDNANCE ISSUES/(IDENTIFY SPECIFIC AMMUNITION/WEAPON
SHORT-FALLS). (BELOW IS AN EXAMPLE AND NOT ALL INCLUSIVE)
UNIT ALLOCATION FOR 5IN NCEA INSUFFICENT TO SUPPORT NGFS
CERTIFICATION/NCEA AUGMENTATION REQUEST SUBMITTED.//
3. CLOSING REMARKS.//
V-E-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-F
ISIC TO TYCOM - END OF PHASE REPORT - BASIC PHASE ULT
FM COMCARSTRKGRU XXXXXXX
TO APPROPRIATE TYCOM (COMNAVAIRPAC SAN DIEGO CA/COMNAVAIRLANT
NORFOLK VA//N00/N01/N7//)
INFO COMTHIRDFLT (Receiving Numbered Fleet Commander C2F/C3F)
COMSTRKFORTRAPAC/(LANT or PAC as appropriate)
COMAFLOATTRAGRUPAC/LANT(Appropriate Afloat Training Group)
USS XXXXXXXXX
BT
UNCLASS //N03210//
MSGID/GENADMIN/COMCARSTRKGRU XXXXXXXX//
SUBJ/BASIC PHASE UNIT LEVEL TRAINING COMPLETION REPORT (U)//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
AMPN/REF A IS AIRCRAFT CARRIER TRAINING AND READINESS MANUAL//
POC/XXX XXXXXX/CDR/CCSGXX/EMAIL:XXX.XXXXXX@NAVY.MIL//
RMKS/1. IAW REF A AND B, USS XXXXXX(CVN XX)HAS SUCCESSFULLY
COMPLETED THE BASIC PHASE AND IS READY FOR FOLLOW ON TRAINING.
2. ALL BASIC PHASE REQUIRED EXERCISES, SCHOOLS AND INSPECTIONS,
CERTIFICATIONS AND ASSESSMENTS HAVE BEEN SATISFACTORILY
COMPLETED WITH THE FOLLOWING EXCEPTIONS.
2A. TYPE/NAME/REASONS NOT COMPLETE/MITIGATION STEPS AS
REQUIRED/ESTIMATED COMPLETION DATE: (BELOW ARE EXAMPLES, BUT NOT
ALL INCLUSIVE)
A. TSTA REQUIRED FLEET EXERCISES:
AAW-11A-SF ANTI-SHIP MISSILE DEFENSE (STREAM RAID/LIVE
FIRING)/NOT COMPLETED DUE TO TARGET CONSTRAINTS RESULTING FROM
REQUIREMENT CONFLICTS/MITIGATION STEPS NOT REQUIRED/EXERCISE
WILL BE COMPLETED DURING C2X.
AW-21-SF PHALANX FIRING(ALL MOUNTS)/NOT APPLICABLE, NO CIWS
ONBOARD.
DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT
REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X.
B. FEP REQUIRED FLEET EXERCISES:
AW-20-SF PHALANX READINESS EVALUATION EXERCISE/NOT APPLICABLE,
NO CIWS ONBOARD.
SUW-12-SF VISUAL ID COUNTERING/OBSERVATION SHIP NOT AVAILABLE
DUE TO TIME, DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT
REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X.
C. BASIC PHASE REQUIRED INSPECTIONS, CERTIFICATIONS, ASSESSMENTS
AND OPTIONAL ASSIST VISITS (ICAV’S). (REPORT STATUS OF ALL
BASIC PHASE INDEPENDENT UNIT READY FOR TASKING (IURFT) REQUIRED
(ICAV’S) OUTLINED IN CHAPTER 5.
D. MANNING. (IDENTIFY MANNING SHORTFALLS THAT REQUIRE TYCOM
ATTENTION).
V-F-1
COMNAVAIRFORINST 3500.20C
3. AFLOAT TRAINING GROUP PAC/LANT (as appropriate) IDENTIFIED
ZERO RESTRICTIVE DISCREPANCIES DURING XXXXXX TSTA/FEP. ALL
MAJOR DISCREPANCIES IDENTIFIED HAVE BEEN SATISFACTORILY
CORRECTED WITH THE FOLLOWING EXCEPTIONS.
A. BATTLE FORCE TACTICAL TRAINER (BFTT)/SYSTEM DEGRADED/CATEGORY
II CASREP SUBMITTED XXXXXX/ESTIMATED COMPLETION DATE XXXXXXX.
B. DAMAGE CONTROL DISCREPANCIES/TOTAL NUMBER OF DAMAGE CONTROL
DISCREPANCIES CHALLENGES CREW’S ABILITY TO EFFECTIVELY SET
MATERIAL CONDITIONS OF READINESS/SHIP’S DC TEAMS AND CSGXX ARE
EXERCISING A FOCUSED EFFORT TO MITIGATE ALL OUTSTANDING
DISCREPANCIES. FULL TYCOM RESOURCE SUPPORT AND OVERSIGHT
PROVIDED/ESTIMATED COMPLETION DATE ONGOING.
4. ALL DISCREPANCIES NOTED DURING UNIT LEVEL TRAINING HAVE BEEN
ADDED TO THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) AND ISICS
SHALL TRACK AND PROVIDE MID-MONTH UPDATES TO THE TYCOM UNTIL
FINAL RESOLUTION OF ALL NOTED DISCREPANCIES OR UNTIL THE SHIP
HAS BEEN CERTIFIED MCO READY.
5. ORIG RECOMMENDS THAT USS XXXXX BE CERTIFIED INDEPENDENT UNIT
READY FOR TASKING.
BT//
V-F-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-G
TYCOM TO NUMBERED FLEET - END OF PHASE REPORT – BASIC PHASE ULT
FM COMNAVAIRFOR SAN DIEGO//N7//
TO COMTHIRDFLT (RECEIVING NUMBERED FLEET COMMANDER)
INFO COMPACFLT PEARL HARBOR HI//01/N4/N7/N70/N71//
COMUSFLTFORCOM NORFOLK VA//01/N4/7/N70/N71/N72/N73/N74//
COMSTRKFORTRAPAC/(LANT OR PAC AS APPROPRIATE)
COMCARSTRKGRU XXXXXXX (APPROPRIATE STRIKE GROUP COMMANDER)
USS XXXXXXXXX
BT
UNCLASS//N03210//
MSGID /GENADMIN/COMNAVAIRFOR//
UNCLASS//N03210//
MSGID/GENADMIN/CNAF//
SUBJ/BASIC PHASE UNIT LEVEL TRAINING COMPLETION REPORT//
REF/A/DOC/ CUSFF-CPF INSTRUCTION 3501.3B/20JUL2009//
REF/B/MSG/CCSG BASIC PHASE ULT CERTIFICATION MESSAGE/DATE//
NARR/REF A IS DRAFT COMUSFLTFORCOM/COMPACFLTINST3501.3B FLEET
TRAINING CONTINUUM INST. REF B IS CCSGXX UNIT-LEVEL TRAINING
PHASE CERTIFICATION MESSAGE FOR USS XXXXXX//
POC/XXX XXXXXX/CIV/CNAF/EMAIL:XXX.XXXXXX@NAVY.MIL//
RMKS/1. IAW REF A AND B, USS XXXXXX(CVN XX)HAS SUCCESSFULLY
COMPLETED THE BASIC PHASE AND IS READY FOR FOLLOW-ON TRAINING.
2. ALL BASIC PHASE REQUIRED EXERCISES, INSPECTIONS,
QUALIFICATIONS, CERTIFICATIONS, SCHOOLS, AND ASSESSMENTS HAVE
BEEN SATISFACTORILY COMPLETED WITH THE FOLLOWING EXCEPTIONS.
2A. TYPE/NAME/REASONS NOT COMPLETE/MITIGATION STEPS AS
REQUIRED/ESTIMATED COMPLETION DATE: (BELOW ARE EXAMPLES, BUT NOT
ALL INCLUSIVE)
A. TSTA REQUIRED FLEET EXERCISES:
AAW-11A-SF ANTI-SHIP MISSILE DEFENSE (STREAM RAID/LIVE
FIRING)/NOT COMPLETED DUE TO TARGET CONSTRAINTS RESULTING FROM
REQUIREMENT CONFLICTS/MITIGATION STEPS NOT REQUIRED/EXERCISE
WILL BE COMPLETED DURING C2X.
AW-21-SF PHALANX FIRING(ALL MOUNTS)/NOT APPLICABLE, NO CIWS
ONBOARD.
DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT
REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X.
B. FEP REQUIRED FLEET EXERCISES:
AW-20-SF PHALANX READINESS EVALUATION EXERCISE/NOT APPLICABLE,
NO CIWS ONBOARD.
SUW-12-SF VISUAL ID COUNTERING/OBSERVATION SHIP NOT AVAILABLE
DUE TO TIME, DISTANCE AND FUEL CONSTRAINTS/MITIGATION STEPS NOT
REQUIRED/EXERCISE WILL BE COMPLETED DURING C2X.
3. AFLOAT TRAINING GROUP PAC/LANT (AS APPROPRIATE) IDENTIFIED
ZERO RESTRICTIVE DISCREPANCIES DURING XXXXXX TSTA/FEP. ALL
V-G-1
COMNAVAIRFORINST 3500.20C
MAJOR DISCREPANCIES IDENTIFIED HAVE BEEN SATISFACTORILY
CORRECTED WITH THE FOLLOWING EXCEPTIONS.
A. BATTLE FORCE TACTICAL TRAINER (BFTT)/SYSTEM DEGRADED/CATEGORY
II CASREP SUBMITTED XXXXXX/ESTIMATED COMPLETION DATE XXXXXXX.
B. DAMAGE CONTROL DISCREPANCIES/TOTAL NUMBER OF DAMAGE CONTROL
DISCREPANCIES CHALLENGES CREW’S ABILITY TO EFFECTIVELY SET
MATERIAL CONDITIONS OF READINESS/SHIP’S DC TEAMS AND CSGXX ARE
EXERCISING A FOCUSED EFFORT TO MITIGATE ALL OUTSTANDING
DISCREPANCIES. FULL TYCOM RESOURCE SUPPORT AND OVERSIGHT
PROVIDED/ESTIMATED COMPLETION DATE ONGOING.
4. ALL DISCREPANCIES NOTED DURING BASIC PHASE ULT HAVE BEEN
ADDED TO THE CURRENT SHIP'S DISCREPANCY LOG (CSDL) AND ISICS
SHALL TRACK AND PROVIDE MID-MONTH UPDATES TO THE TYCOM UNTIL
FINAL RESOLUTION OF ALL NOTED DISCREPANCIES OR UNTIL THE SHIP
HAS BEEN CERTIFIED MCO READY.
5. NO INSTALLS OR TCD WAVIER SCHEDULED THAT AFFECT TRAINING OR
CERTIFICATION.
6. ORIG HAS CERTIFIED USS XXXXXX BASIC UNIT LEVEL PHASE OF
TRAINING IS COMPLETE AND IURFT.
BT//
V-G-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-H
SHIP MESSAGE NATO SEA SPARROW MISSILE CERTIFICATION
ZNR UUUUU ZUI
P (DTG) PSN XXXXXXX
FM USS (SHIP)
TO COMCARSTRKGRU XXX
INFO APPROPRIATE TYPE COMMANDER//N7//
COMSTRKFORTRALANT
COMSTRKFORTRAPAC
COMAFLOATRAGRULANT NORFOLK VA//00/N3/N88//
COMAFLOATRAGRUPAC SAN DIEGO CA//00/N3/N88//)
COMAFLOATRAGRU (MAYPORT, WESTPAC ETC.)//00/N3/N88//)
USS (SHIP) (SAME AS FROM LINE)
BT
UNCLAS //N03500//
MSGID/GENADMIN/USS (SHIP)/-/(MOS)//
SUBJ/NATO SEA SPARROW MISSILE CERTIFICATION//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
REF/B/DOC/COMNAVAIRFORINST 3600.1A/24AUG2006//
NARR/REF A IS CVTRAMAN, REF B IS NSSMS CERTIFICATION
INSTRUCTION//
POC/POINT OF CONTACT INFORMATION//
RMKS/1. IAW REF A, REQUEST NSSMS CERTIFICATION FOR USS (SHIP).
ALL REQUIREMENTS CONTAINED IN REF B WERE ACHIEVED. PHASE I AND
PHASE II COMPLETED (DATE). PHASE III COMPLETED (DATE).
2. EMBARKED ATG EVALUATORS CONCUR CERTIFICATION CRITERIA WAS
ATTAINED.//
BT
V-H-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-H-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-I
ISIC MESSAGE NATO SEA SPARROW MISSILE CERTIFICATION
P (DTG) PSN XXXXXXXX
FM COMCARSTRKGRU XXX
TO APPROPRIATE TYPE COMMANDER//N6/N7//
INFO COMSECONDFLT /(COMTHIRDFLT)
COMSTRKFORTRALANT
COMSTRKFORTRAPAC
COMAFLOATRAGRULANT NORFOLK VA//00/N3/N88//
COMAFLOATRAGRUPAC SAN DIEGO CA//00/N3/N88//)
USS (SHIP) (CVN XX)
USS (Other pertinent USS vessels which are part of CSG)
BT
UNCLAS //N03000//
MSGID/GENADMIN/CCSG-X//
SUBJ/USS (SHIP) NATO SEA SPARROW CERTIFICATION//
REF/A/DOC/COMNAVAIRFORINST 3500.20C/(01JAN2010)//
REF/B/DOC/COMNAVAIRFORINST 3600.1A/24AUG2006//
REF/C/MSG/USS (SHIP)/(DTG)/NOTAL//
NARR/REF A IS CVTRAMAN. REF B IS NSSMS CERTIFICATION INST. REF C
IS USS (SHIP) REQUEST FOR NSSM CERTIFICATION.//
RMKS/IAW REFS A-C, RECOMMEND NSSM CERTIFICATION FOR USS (SHIP).
ALL REQUIREMENTS CONTAINED IN REF B WERE MET. PHASE I COMPLETED
(DATE), PHASE II COMPLETED (DATE), AND PHASE III COMPLETED
(DATE).
2. ATG EVALUATORS CONCUR CERTIFICATION CRITERIA WAS ATTAINED.//
BT
V-I-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-I-2
COMNAVAIRFORINST 3500.20C
From:
To:
APPENDIX V-J
ATG TO ISIC CART II MEMO
Carrier Training Officer, AFLOAT TRAINING GROUP
LANT/PAC/PACNORWEST/WESTPAC
Commander, CARRIER STRIKE GROUP XXXXXX
Subj:
USS XXXXX (CVN XX) COMMAND ASSESSMENT OF READINESS AND
TRAINING (CART II)
Ref:
(a) COMNAVAIRFORINST 3500.20 series
(b) FXP 4, Rev. A
Encl:
(1)
(2)
(3)
(4)
(5)
(6)
Combat Systems End of Mission Report
Damage Control End of Mission Report
Seamanship End of Mission Report
Medical End of Mission Report
Navigation End of Mission Report
Aviation End of Mission Report
1. CART II was conducted on board USS XXXXX (CVN XX) XX-XX
January in port, and XX-XX January XX underway. The AFLOAT
TRAINING GROUP (LANT/PAC/Appropriate ATG) Carrier Training Team
assessed the administration, material, readiness and the Ship
Board Training Teams ability to brief, execute, and debrief
complex drill sets to establish a proficiency baseline for TSTA.
2. Detailed End of Mission Reports for each functional/warfare
area are provided in enclosures (1) through (6). Each enclosure
covers specifics on events/drills conducted, Administrative,
Personnel and Procedural Discrepancies, Material Discrepancies
and an overall summary that includes recommendations for further
training.
3.
Training Team Action Items:
a.
b.
c.
d.
e.
f.
g.
ITT
CSTT.
DCTT
SEA
MTT
NAV
ADTT
4. ATGXXXXX Summary of Discrepancies requiring attention prior
to commencing the next phase of training. (This list is not
all-inclusive, but does represent top concerns. Details and
additional discrepancies are addressed in enclosures (1)-(6):
V-J-1
COMNAVAIRFORINST 3500.20C
a. Combat Systems:
(Restrictive)
(Major)
b. Damage Control:
(Restrictive)
(Major)
c. Seamanship:
(Restrictive)
(Major)
d.
Medical:
(Restrictive)
(Major)
e.
NAV:
(Restrictive)
(Major)
f.
ADTT:
(Restrictive)
(Major)
5.
End of Mission Report total discrepancy count:
(Restrictive)
(Major)
(Minor)
6. ATGXX Training Liaison Officer (TLO) EOM summary and
recommendations to the Commanding Officer for further training:
7.
ATGXX TLO Recommendations to CSG XX:
8.
ATGXX TLO Recommendations to TYCOM
9. The ATGXX Carrier Team greatly appreciates the hospitality
and cooperation shown by the entire crew throughout CART II.
V-J-2
COMNAVAIRFORINST 3500.20C
Very Respectfully,
LT XXXXXXXXX
ATGXXX Carrier Liaison Officer
Copies to:
CNAL / CNAP , N7 (Appropriate TYCOM)
COMMANDING OFFICER, XXXXXX (CVN XX)
COMAFLOATRAGRU (Appropriate N00)
V-J-3
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-J-4
COMNAVAIRFORINST 3500.20C
APPENDIX V-K
ATG TO ISIC CART II MEMO – CS TEAM
From:
To:
OSC(SW/AW) XXXXXX,XXXX CS Team Lead, ATG XXXX
Carrier Training Officer, AFLOAT TRAINING GROUP XXXX
Subj:
CSTT
USS XXXXXX (CVN XX) CART II END OF MISSION REPORT FOR
Ref:
(a) COMNAVAIRFORINST 3500.20 Series,
(b) FXP 2,3,4
1. CART II was conducted on board USS XXXXX (CVN XX) (Date of
Event) (In port / Underway).
2. The following FXP exercises were conducted: (List all
exercises conducted during CART II).
AW-24-SF DTE (NON-FIRING)
MOB-D-25-SF MASS CONFLAGRATION
3. The following FXP exercises were not conducted:
(List all required exercises not complete during CART II).
Include: Name / Reason not complete / Mitigation plan /
Estimated Date of Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6. Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully
OSC XXXXX,XXXX (SW/AW) USN
V-K-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-K-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-L
ATG TO ISIC CART II MEMO – DAMAGE CONTROL TEAM
From:
To:
DCC(SW) XXXXX,XXXXX Damage Control Team Lead, ATG XXXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
DCTT
USS XXXXXX (CVN XX) CART II END OF MISSION REPORT FOR
Ref:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
(q)
(r)
(s)
COMNAVAIRFORINST 3500.20 Series,
NSTM 555 Volume 1 Surface Ship Firefighting
NTTP 3-20.31 Surface Ship Survivability
NSTM 074 V3 Gas Free Engineering
NSTM 079 V2 Practical Damage Control
NSTM 077 Personal Protection Equipment
NSTM 470 Shipboard BW/CW Defense and Countermeasures
NSTM 600 Watertight Closures
OPNAVINST 3120
OPNAVINST 3541 Series Surface Ship Survivability
Requirements
OPNAVINST 4790 Series Maintenance and Material
Management (3-M)
NAVEDTRA 43119 PQS Standards for Damage Control
COMNAVAIRFORINST 5400.27 Series Standard Repair Party
Manual
PMS MIP 5519 Series
PMS MIP 6641 Series
XXXXXINST 5400.2J EDORM
XXXXXINST 3541.4B DCTT Instruction
XXXXXINST 4790.9D DCPO Preventive and Corrective
Maintenance Program
XXXXXSORM 30010 XXXXXX Zone Inspection Program
1. CART II was conducted on board USS XXXXX (CVN XX) (Date of
Event) In port / Underway).
2. The following FXP exercises were conducted: (List all
exercises conducted during CART II).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during CART II). Include: Name
/
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
V-L-1
COMNAVAIRFORINST 3500.20C
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor:
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
DCC(SW) XXXX X, XXXX
V-L-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-M
ATG TO ISIC CART II MEMO - STT
From:
To:
BMC (SW/AW) XXXXXXX; STT, ATGXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
USS XXXXX (CVN XX) CART II END OF MISSION REPORT FOR STT
Training Team
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
1. CART II was conducted on board USS XXXXX (CVN XX) (Date of
Event) (In port / Underway).
2. The following FXP exercises were conducted: (List all
exercises conducted during CART II).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during CART II). Include: Name
/ Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
BMC (SW/AW) XXXXX,XXXX
V-M-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-M-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-N
ATG TO ISIC CART II MEMO – MEDICAL TEAM
From:
To:
HMC (SW/FMF/AW) XXXXXXX Medical Team Lead, ATG XXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
USS XXXXXX (CVN XX) CART II END OF MISSION REPORT FOR MTT
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
(b) COMNAVAIRFORINST 6000.11 Series
(c) FXP 4 (Rev A)
(d) OPNAVINST 4790.4D
1. CART II was conducted on board USSXXXXXX (CVN XX) (Date of
Event) (In port / Underway).
2. The following FXP exercises were conducted: (List all
exercises conducted during CART II).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during CART II). Include: Name
/ Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
HMC XXXXXX,XXX (SW/FMF/AW)
USN
V-N-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-N-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-O
ATG TO ISIC CART II MEMO - NTT
From:
To:
XXXXXXXXX, NTT, ATGSD
Carrier Training Officer, AFLOAT TRAINING GROUP XXXX
Subj:
USS XXXXX (CVN XX) CART II END OF MISSION REPORT FOR NTT
Training Team
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
1. CART II was conducted on board USS XXXXX (CVN XX) (Date of
Event) (In port / Underway).
2. The following FXP exercises were conducted: (List all
exercises conducted during CART II).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during CART II). Include: Name
/
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully
QMC XXXXXXXX (SW/AW) USN
V-O-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-O-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-P
ATG TO ISIC CART II MEMO - AVIATION TEAM
From:
To:
ABHCS (AW/SW) XXXXXXXX Aviation Team Lead, ATG XXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
ADTT
USS XXXXXXX (CVN XX) CART II END OF MISSION REPORT FOR
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
(b) FXP 4 (Rev A)
1. CART II was conducted on board USS XXXXXX (CVN XX) (Date of
Event) (In port / Underway)
2. The following FXP exercises were conducted: (List all
exercises conducted during CART II).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during (CART II). Include: Name
/
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
ABHCS XXXXX,XXXX (AW/SW) USN
V-P-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-P-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-Q
ATG TO ISIC FEP MEMO
From:
To:
Carrier Training Officer, AFLOAT TRAINING GROUP
LANT/PAC/PACNORWEST/WESTPAC
Commander, CARRIER STRIKE GROUP XXXXXX
Subj:
USS XXXXX (CVN XX) FINAL EVALUATION PERIOD (FEP) REPORT
Ref:
(a)
(b)
Encl:
(1)
(2)
(3)
(4)
(5)
(6)
COMNAVAIRFORINST 3500.20 series
FXP 4, Rev. A
Combat Systems End of Mission Report
Damage Control End of Mission Report
Seamanship End of Mission Report
Medical End of Mission Report
Navigation End of Mission Report
Aviation End of Mission Report
1. FEP was conducted on board USS XXXXX (CVN XX) (Date of
Event). The AFLOAT TRAINING GROUP (Appropriate ATG) Carrier
Training Team guided CVN XX crew through several complex Unit
Level Training Exercises, placing emphases on
the ship’s
Integrated Training Teams (ITT) while improving the ship’s watch
standing, war fighting and ship’s survival capabilities across
all required warfare areas.
2. Detailed End of Mission Reports for each functional/warfare
area are provided in enclosures (1) through (6). Each enclosure
covers specifics on events/drills conducted, Administrative,
Personnel and Procedural Discrepancies, Material Discrepancies
and an overall summary that includes recommendations for further
training.
3.
Training Team Action Items:
a. ITT
b. CSTT
c. DCTT
d. SEA
e. MTT
f. NAV
g. ADTT
4. ATGXXXXX Summary of Discrepancies requiring attention prior
to the commencing to the next phase of training.. (This list is
V-Q-1
COMNAVAIRFORINST 3500.20C
not all inclusive, but does represent top concerns. Details and
additional discrepancies are addressed in enclosures (1)-(6):
5.
a.
Combat Systems:
(Restrictive)
(Major)
b.
Damage Control:
(Restrictive)
(Major)
c.
Seamanship:
(Restrictive)
(Major)
d.
Medical:
(Restrictive)
(Major)
e.
NAV:
(Restrictive)
(Major)
f.
ADTT:
(Restrictive)
(Major)
End of Mission Report total discrepancy count:
(Restrictive)
(Major)
(Minor)
6. ATGXX Training Liaison Officer (TLO) EOM summary and
recommendations to the Commanding Officer for further training:
7.
ATGXX TLO Recommendations to CSG XX:
8.
ATGXX TLO Recommendations to TYCOM
9. The ATGXX Carrier Team greatly appreciates the hospitality
and cooperation by the entire crew throughout CART II.
Very Respectfully,
V-Q-2
COMNAVAIRFORINST 3500.20C
LT XXXXXXXXX
ATGXXX Carrier Liaison Officer
Copies to:
COMNAVAIRFORCE , N7
COMMANDING OFFICER, XXXXXX (CVN XX)
COMAFLOATRAGRU (Appropriate N00)
V-Q-3
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-Q-4
COMNAVAIRFORINST 3500.20C
APPENDIX V-R
ATG TO ISIC FEP MEMO - CS TEAM
From:
To:
OSC(SW/AW) XXXXXX,XXXX CS Team Lead, ATG XXXX
Carrier Training Officer, AFLOAT TRAINING GROUP XXXX
Subj:
USS XXXXXX (CVN XX) FEP END OF MISSION REPORT FOR CSTT
Ref:
(a) COMNAVAIRFORINST 3500.20 Series,
(b) FXP 2,3,4
1.
FEP was conducted on board USS XXXXX (CVN XX) (Date of
Event).
2. The following FXP exercises were conducted: (List all
exercises conducted during FEP).
AW-24-SF DTE (NON-FIRING)
MOB-D-25-SF MASS CONFLAGURATION
3. The following FXP exercises were not conducted: (List all
required exercises not complete during FEP). Include: Name /
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully
OSC XXXXX,XXXXl (SW/AW) USN
V-R-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-R-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-S
ATG TO ISIC FEP MEMO - DAMAGE CONTROL TEAM
From:
To:
DCC(SW) XXXXX,XXXXX Damage Control Team Lead, ATG XXXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
USS XXXXXX (CVN XX) FEP END OF MISSION REPORT FOR DCTT
Ref:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
(q)
(r)
(s)
1.
COMNAVAIRFORINST 3500.20 Series,
NSTM 555 Volume 1 Surface Ship Firefighting
NTTP 3-20.31 Surface Ship Survivability
NSTM 074 V3 Gas Free Engineering
NSTM 079 V2 Practical Damage Control
NSTM 077 Personal Protection Equipment
NSTM 470 Shipboard BW/CW Defense and Countermeasures
NSTM 600 Watertight Closures
OPNAVINST 3120
OPNAVINST 3541 Series Surface Ship Survivability
Requirements
OPNAVINST 4790 Series Maintenance and Material
Management (3-M)
NAVEDTRA 43119 PQS Standards for Damage Control
COMNAVAIRFORINST 5400.27 Series Standard Repair Party
Manual
PMS MIP 5519 Series
PMS MIP 6641 Series
XXXXX INST 5400.2J EDORM
XXXXX INST 3541.4B DCTT Instruction
XXXXX INST 4790.9D DCPO Preventive and Corrective
Maintenance Program
XXXXX SORM 30010 USS SHIP XX Zone Inspection Program
FEP was conducted on board USS XXXXX (CVN XX) (Date of
Event).
2. The following FXP exercises were conducted:
(List all exercises conducted during FEP).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during FEP). Include: Name /
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
Restrictive:
V-S-1
COMNAVAIRFORINST 3500.20C
b)
c)
5.
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
DCC(SW) XXXX X, XXXX
V-S-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-T
ATG TO ISIC FEP MEMO - STT
From:
To:
BMC (SW/AW) XXXXXXX; STT, ATGXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
USS XXXXX (CVN XX) FEP END OF MISSION REPORT FOR STT
Training Team
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
1. FEP was conducted on board USS XXXXX (CVN XX) (Date of
Event).
2. The following FXP exercises were conducted: (List all
exercises conducted during FEP).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during FEP). Include: Name /
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
BMC (SW/AW) XXXXX,XXXX
V-T-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-T-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-U
ATG TO ISIC FEP MEMO – MEDICAL TEAM
From:
To:
HMC (SW/FMF/AW) XXXXXXX Medical Team Lead, ATG XXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
USS XXXXXX (CVN XX) FEP END OF MISSION REPORT FOR MTT
Ref:
(a)
(b)
(c)
(d)
COMNAVAIRFORINST 3500.20 Series
COMNAVAIRFORINST 6000.11 Series
FXP 4 (Rev A)
OPNAVINST 4790.4D
1. FEP was conducted on board USS XXXXXX (CVN XX) (Date of
Event).
2. The following FXP exercises were conducted: (List all
exercises conducted during FEP).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during FEP). Include: Name /
Reason not complete / Mitigation plan / Estimated Date of
Completion.
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
HMC XXXXXX, XXX (SW/FMF/AW) USN
V-U-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-U-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-V
ATG TO ISIC FEP MEMO - NTT
From:
To:
XXXXXXXXX, NTT, ATGSD
Carrier Training Officer, AFLOAT TRAINING GROUP XXXX
Subj:
USS XXXXX (CVN XX) FEP END OF MISSION REPORT FOR NTT
Training Team
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
1. FEP was conducted on board USS XXXXX (CVN XX) (Date of
Event).
2. The following FXP exercises were conducted: (List all
exercises conducted during FEP).
3. The following FXP exercises were not conducted: (List all
required exercises not complete during FEP). Include: Name /
Reason not complete / Mitigation plan / Estimated Date of
Completion
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully
QMC XXXXXXXX (SW/AW) USN
V-V-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-V-2
COMNAVAIRFORINST 3500.20C
APPENDIX V-W
ATG TO ISIC FEP MEMO - AVIATION TEAM
From:
To:
ABHCS (AW/SW) XXXXXXXX Aviation Team Lead, ATG XXX
Carrier Training Officer, AFLOAT TRAINING GROUP
(Appropriate ATG)
Subj:
USS XXXXXXX (CVN XX) FEP END OF MISSION REPORT FOR
ADTT
Ref:
(a) COMNAVAIRFORINST 3500.20 Series
(b) FXP 4 (Rev A)
1. FEP was conducted on board USS XXXXXX (CVN XX) (Date of
Event).
2. The following FXP exercises were conducted: (List all
exercises conducted during FEP).
3. The following FXP exercises were not conducted: (List
all required exercises not complete during FEP). Include:
Name / Reason not complete / Mitigation plan / Estimated
Time of Completion
4.
Administrative, Personnel and Procedural Discrepancies:
a)
b)
c)
5.
Restrictive:
Major:
Minor:
Material Discrepancies:
a)
b)
c)
Restrictive:
Major:
Minor
6) Overall Assessment Summary / Recommendations:
(ATG provide comments / recommendations concerning Training Team
/ Watch Standers).
Very Respectfully,
ABHCS XXXXX,XXXX (AW/SW) USN
V-W-1
COMNAVAIRFORINST 3500.20C
(THIS PAGE INTENTIONALLY BLANK)
V-W-2