YOW 225 TUH WINDOW SYSTEM ThermaBond Plus YOW 225 TUH PERFORMANCE FEATURES
Transcription
YOW 225 TUH WINDOW SYSTEM ThermaBond Plus YOW 225 TUH PERFORMANCE FEATURES
YOW 225 TUH WINDOW SYSTEM ThermaBond Plus® Poured & Debridged Technology YOW 225 TUH SYSTEM DESCRIPTION YOW 225 TUH PERFORMANCE FEATURES • 2-1/4” Overall Depth • ThermaBond Plus® Poured & Debridged Thermal Break • Variations: Casement, Projected Vents, & Fixed Windows • 1-1/16” Glazing • Optional Screens • • • • • ANSI/AAMA 101-97 AW-65 Rating (Operable & Fixed) U Value = 0.45 BTU/HR/FT2/°F CRF of 60 Factory Assembled & Sealed Installation Manual 05-4005-01 | ©2014 YKK AP America Inc. is a subsidiary of YKK Corporation of America. YOW 225 TUH Window System TABLE OF CONTENTS Installation Notes ................................................................................. Page ii & iii INSTALLATION Determine Window Reference Point ................................................... Page 1 Ventilator Installation & Adjustment ..................................................... Page 1 Determine Type of Anchor Fastener To Be Used .............................. Page 1 Installation............................................................................................ Page 2 GLAZING Calculating Glass Sizes ....................................................................... Pages 3 & 4 Prep Casement Windows .................................................................... Page 5 Prep Fixed & Projected Windows ........................................................ Page 6 Large Missile Glazing .......................................................................... Page 7 Small Missile & Non-Impact Glazing ................................................... Page 8 INSTALLATION OPTIONS Install Stacking Mullions ...................................................................... Pages 9 to 12 HARDWARE OPTIONS Hardware Guide .................................................................................. Page 13 Anchoring Hardware ............................................................................ Page 14 Hinge & Support Hardware ................................................................. Page 14 Locking Hardware ................................................................................ Page 15 GLAZING ACCESSORIES Glazing Chart ....................................................................................... Page 16 Glass Stops ......................................................................................... Page 16 Backer Tape & Gaskets ...................................................................... Page 17 Effective Date: January 3, 2014 | 05-4005-01 Page-i YOW 225 TUH Window System INSTALLATION NOTES 1. Do not drop, roll or drag boxes of aluminum framing. Move and stack boxes with proper support to prevent distortion. If fork lifts are used, be especially careful about striking the boxes when lifting or moving. 2. Store in a dry, out of the way area. If rain exposure, condensation or any water contact is likely, then all packaging material should be removed. Wet packaging materials will discolor and may stain aluminum finishes and paints. 3. All materials should be checked for quantity and quality upon receipt, YKK AP must be notified immediately of any discrepancies in shipment. Check to make sure that you have the required shims, sealants, supplies, and tools necessary for the installation. 4. Carefully check the openings and surrounding conditions that will receive your material. Remember, if the construction is not per the construction documents, it is your responsibility to notify the general contractor in writing. Any discrepancies must be brought to the general contractor’s attention before you proceed with the installation. 5. Collect your shop drawings, materials, packing list, and this installation manual. Carefully review parts location, the sequence of installation, when you glaze it, and how you seal it. Installation instructions are of a general nature and may not cover every condition you will encounter. The shop drawings and/or installation manuals were prepared specifically for the product. 6. Any material substitutions must be of equal or greater quality. 7. Make certain that material samples have been sent for compatibility and adhesion testing for all manufacturer’s sealants involved. Make certain that sealants have been installed in strict accordance with the manufacturer’s recommendations and specifications. 8. Consult sealant manufacturer for proper sealant and backer rod selection. A. Large Missile: Use only Dow Corning 995 Structural Silicone 9. Remember to isolate, in an approved manner, all aluminum from uncured masonry or other incompatible materials. 10. System-to-structure fasteners are not supplied by YKK AP. Fasteners called out on shop drawings are to indicate minimum sizes for design loading. 11. If any questions arise concerning YKK AP products or their installation, contact YKK AP for clarification before proceeding. Page-ii 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System INSTALLATION NOTES 12. YKK AP window installation is typically completed before drywall, flooring and other products which may still be in process. Take the extra time to wrap and protect the installed material. 13. Cutting tolerances are plus or minus one thirty second of an inch (1/32”) unless otherwise specified. 14. YKK AP Model YOW 225 TUH windows are prefinished, prefabricated, and preassembled products, and must be protected against damage. 15. Concrete, mortar, plaster, muriatic acid and other alkaline and acid based construction and cleaning materials may be very harmful to window finishes and should be removed with water and mild soap immediately or permanent damage or staining of the finishes will occur. A spot test is recommended before any cleaning agent is used, and abrasive type cleaners must never be used. 16. Windows are never to be used as ladders, step stools, scaffolds or scaffold supports. 17. All work must start from and be referenced to benchmarks, offset lines and/or column centerlines established by the architectural drawings and the general contractor. 18. All windows must be installed plumb, square, and level, and in accordance with approved shop drawings and these installation instructions. 19. Glass and glazing building codes governing the design and use of products vary widely. YKK AP America Inc. does not control the selection of products, product configurations, operating hardware and function, or glazing materials, and YKK AP assumes no responsibility for these design considerations. It is the responsibility of the design professional, owner, architect, specifier, general contractor, and the installer to make these selections in strict accordance with all applicable codes. 20. For projects that require a Florida product approval compliance letter or installation drawings, refer to the floridabuilding.org website. Contact YKK’s Engineering Center for specific product approval numbers. 21. Check our website, www.ykkap.com, for the latest installation manual updates prior to commencing work. 8. Consult sealant manufacturer for proper sealant and backer rod selection. A. Small Missile: Dry Glaze interior, YKK AP approved structural silicone for exterior cap bead. B. Large Missile: Use only YKK AP approved structural silicone. Page 8, step 9 calls for Tremco Tremsil® 600 sealant or equal. Effective Date: January 3, 2014 | 05-4005-01 Page-iii YOW 225 TUH Window System INSTALLATION STEP 1 DETERMINE WINDOW REFERENCE POINT Establish the window reference lines or the exterior/interior plane of the windows to be installed using either bench marks, offset lines, or column centerlines provided by the general contractor and referenced on the shop drawings. Use the established reference points to determine the installation points for each window opening at the head, jambs, and sill. STEP 2 DETERMINE TYPE OF ANCHOR FASTENER TO BE USED -Fastener size and location to be determined by engineering calculations. -For Dade County installations refer to the table below for minimum anchoring requirements. Steel strap anchors are available and when used, must be installed: -A minimum of 3” from the corner of all frames. -At 15” on center. -A maximum of 3” on each side from the centerline of ventilator locking points. -A maximum of 3” from the edge of framing joints, or mullions. TABLE 1 – DADE COUNTY ANCHOR REQUIREMENTS 2 By Wood Frame 3/8” 1-1/2” #14 Wood Screw 1 By Wood Into Masonry 3/8” 1-1/4” 1/4” ITW Tapcon 1 By Wood Into Concrete 3/8” 1-1/4” 1/4” ITW Tapcon Directly Into Masonry or Concrete 3/8” 1-1/4” 1/4” ITW Tapcon Into Steel (18 Ga. Min.) 3/8” 3 threads 1/4-20 Self-Drilling Into 1/8” Thick Min. Alumium 3/8” 3 threads 1/4-20 Self-Drilling STEP 3 VENTILATOR INSTALLATION AND ADJUSTMENT All operating hardware and components must be checked for proper alignment, margins, and operation. -If necessary adjust the hinges, keepers, friction arms and pivots to ensure the proper operation of locking devices and the compression of the weather seal. -All hardware must be cleaned and lubricated as necessary to provide smooth operation. Effective Date: January 3, 2014 | 05-4005-01 Page-1 YOW 225 TUH Window System INSTALLATION STEP 4 INSTALLATION Install the window frame plumb, square, and level. -Shim at all anchor locations unless installing into steel or aluminum. -Seal the heads of perimeter anchor fasteners as shown. -Install backer rod and apply perimeter sealant. E9-4578 BE9-4577 1-1/4” [31.75mm] See Details 1 to 4 for typical anchoring conditions. DETAIL 2 DETAIL 1 DETAIL 3 Page-2 DETAIL 4 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System CALCULATING GLASS SIZES FW – 3 3/8” [85.7mm] FW – 3 3/8” [85.7mm] w1,w2 – 2 15/16 [74.6mm] FH – 3 3/8” [85.7mm] h1,h2 – 2 15/16 [74.6mm] FH – 3 3/8” [85.7mm] FW – 5 7/8” [149.2mm] FW – 5 7/8” [149.2mm] FW – 5 7/8” [149.2mm] FH – 5 7/8” [149.2mm] h1 – 5 7/16” [138.1mm] h2 – 5 7/16” [138.1mm] N/A FW – 3 3/8” [85.7mm] FW – 3 3/8” [85.7mm] N/A h2 – 2 3/8” [60.3mm] h1 – 2 3/8” [60.3mm] w2 w1 w1 w2 w3 w1 w2 w1 – 5 7/16” [138.1mm] w1,w3 – 5 7/16” [138.1mm] w1,w2 – 5 7/16” [138.1mm] FH – 5 7/8” [149.2mm] FH –5 7/8” [149.2mm] FH – 5 7/8” [149.2mm] w2 – 2 3/8” [60.3mm] w2 – 1 3/8” [34.9mm] N/A FH – 3 3/8” [85.7mm] N/A 3 FH – 3 /8” [85.7mm] NOTE: GLASS BITE = 1/2” Effective Date: January 3, 2014 | 05-4005-01 Page-3 YOW 225 TUH Window System CALCULATING GLASS SIZES (CONTINUED) w1 w2 FW – 5 7/8” [149.2mm] FW – 5 7/8” [149.2mm] w1,w2 – 5 7/16” [138.1mm] FH – 5 7/8” [149.2mm] h1 – 5 7/16” [138.1mm] h1 –5 7/16” [138.1mm] N/A FW – 3 3/8” [85.7mm] w1,w2 – 2 15/16” [74.6mm] N/A h2 – 2 3/8” [60.3mm] h2 – 2 3/8” [60.3mm] FW – 5 7/8” [149.2mm] FW – 5 7/8” [149.2mm] h2 – 5 7/16” [138.1mm] h1,h2 – 5 7/16” [138.1mm] FW – 3 3/8” [85.7mm] N/A h1 – 2 3/8” [60.3mm] N/A Stack Mullion w1 w2 w1,w2 – 6 1/4” [158.8mm] h1 – 5 7/16” [138.1mm] w1,w2 – 3 3/4” [95.3mm] h2 – 2 3/8” [60.3mm] Page-4 NOTE: GLASS BITE = 1/2” 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System GLAZING STEP 5 PREP CASEMENT WINDOWS 1/8” Casement windows require “Corner Blocking” for proper operation. E2-0670 Vent 1. Verify that the frame and vent are properly aligned with a 1/8” margin around the entire perimeter of the vent. 2. Remove the glazing beads and clean the exterior glazing leg with an approved cleaning agent using the “two cloth” cleaning method. 3. Install exterior glazing tape, E2-0670, on all four sides: -Leave a 1/8” gap between the edge of the tape and the edge of the ventilator. -Make certain that the corners of the tape do not overlap as this will prevent full contact around the perimeter of the glass. 4. Peel back the tape adhesive backing 3” to 4” at each corner and fold them towards the inside of the vent. 1/8” DETAIL 5 3 See Detail 5. 1” 4” 1” 4” 4 Hinge Side 1/16” ** 4” 1 Adhesive Backing 5. Install setting blocks at locations 1, 2, and 4. 6. If bench glazing, make sure that the casement is fully supported from underneath before pro ceeding. 7. Unlock ventilator lock and install a setting block at location 3. 8. Change setting blocks as required to square up the vent. 9. Raise up the vent’s locking rail 1/16” and shim so that as the setting blocks compress the locks will align properly. 1” See Detail 6. 1” 4” 2 Raise vent rail with head setting block Finish Glazing in accordance with glazing instructions in Steps 7 thru 9. ** Glass weight is transferred to bottom corner and hinge. Effective Date: January 3, 2014 | 05-4005-01 DETAIL 6 Page-5 YOW 225 TUH Window System GLAZING STEP 6 PREP FIXED AND PROJECTED WINDOWS 1/8” 1. Verify that the frame and vent are properly aligned with a 1/8” margin around the entire perimeter of the vent. 2. Clean the glazing leg that is to receive the glazing tape using the “two cloth” cleaning method and an approved cleaner. 3. Install exterior glazing tape, E2-0670, on all four sides: -Leave a 1/8” gap between the edge of the tape and the edge of the ventilator/frame. -Make certain that the corners of the tape do not overlap as this will prevent full contact around the perimeter of the glass. 4. Peel back the tape adhesive backing 3” to 4” at each corner and fold them towards the inside of the vent/window. E2-0670 Adhesive Backing 1/8” Vent See Detail 7. DETAIL 7 1/4 Pts. FIXED 1/8 Pts. (6” Min.) 1/8 Pts. (6” Min.) 5. Install setting/side blocks for fixed and projected windows as shown in Detail 8. Finish Glazing in accordance with glazing instructions in Steps 7 thru 9. 1/3 Pts. PROJECTED VENT 1/8 Pts. (6” Min.) 1/8 Pts. (6” Min.) DETAIL 8 Page-6 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System GLAZING STEP 7 LARGE MISSILE GLAZING 1. Center the glass and carefully set the unit down onto the setting blocks. 2. From the exterior of the window gently pull the folded adhesive backing ends to remove it and adhere the glass to glazing tape. 3. Press the glass firmly against the exterior glazing tape. 4. For Casement and Projected vents install a 1” piece of E2-0359 down into the small channel 3” from each end and then 10” on center. 5. Install the head and sill glass stops and attach them at 3” from each end and then 10” on center using PC-0808-SS fasteners for casements and projected vents and PC-1016-SS for fixed windows. Adhesive Back PC-0808-SS (Oper.) PC-1016-SS (Fixed) Glass Stop DETAIL 9 See Detail 9. 6. Snap on the interior glass stop trim members. 7. Install the glass stops for jambs and repeat steps 4 & 5. 8. Cut silicone spacer E2-0359 into 1” pieces. Install the pieces into the glazing pocket 3” from each end and then 10” on center to align with the fasteners. See Detail 10. 9. Make sure all silicone contact surfaces and joints have been cleaned in accordance with silicone manufacturer’s recommendations. 10. Apply masking tape to the window and glass as shown. 11. Apply an approved, ykk tested structural silicone into the cavity between the window and the glass. Use positive pressure so that the silicone sealant completely fills the cavity. 12. Using a nylon or teflon spatula or other non-scratching implement, tool the silicone sealant immediately after running the joint. Exert positive pressure while tooling to ensure that the silicone sealant makes complete contact with all surfaces.Be careful not to remove too much silicone. 13. Remove masking tape within ten minutes of tooling. DETAIL 10 See Detail 11. Caution: Do not permit the silicone sealant to skin over before it is tooled. Immediately remove masking tape after tooling silicone sealant.. Effective Date: January 3, 2014 | 05-4005-01 DETAIL 11 Page-7 YOW 225 TUH Window System GLAZING STEP 8 SMALL MISSILE & NON-IMPACT GLAZING 1. Center the glass and carefully set the unit down onto the setting blocks. 2. From the exterior of the window gently pull the folded adhesive backing ends to remove it and adhere the glass to glazing tape. 3. Press the glass firmly against the exterior glazing tape. See Detail 12. Side Block E2-0670 Adhesive Back DETAIL 12 4. Install the interior glass stops. 5. Cut interior wedge gasket to the day light opening dimension plus 1/8” per foot. 6. Install the wedge gasket, first install each end and then the center of the gasket; push in the remainder of the gasket, working from the center toward each end. Glass Stop Interior Wedge Gasket See Detail 13. DETAIL 13 STEP 9 APPLY CAP BEAD (FOR LARGE MISSILE, SMALL MISSILE, AND NON-IMPACT) 1. Apply Tremco Tremsil® 600 sealant or equal to the joint between the glass and glazing leg. When applying sealant vertically, start at the bottom and work your way up. Make sure the sealant completely fills the joint. 2. Using a non-scratching implement, tool the sealant immediately after running the bead. Exert positive pressure to ensure that the sealant makes complete contact with all surfaces. Be careful not to remove too much sealant. Applied Stop E9-4546 E9-4547 Cover DETAIL 14 Cap Bead See Detail 14. Page-8 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System INSTALLATION OPTIONS STEP 10 (Optional) INSTALL STACKING MULLION (65 PSF Maximum) HM-2516-W3 PC-1008-SS PC-1208-SS PC-1006-SS Exterior of Building 1. 2. 3. 4. 5. 6. 7. 8. 9. Anchor Clip As Req’d (See Florida Product Approvals for Design Pressure Limits for Clipped and Unclipped) DETAIL 15 Install the first window assembly into the opening according to the instructions on Pages 1 & 2. Cut two pieces of gasket, E2-0051, to stacking mullion height and install into the reglets. Install mullion end cap, E1-1536, to each end of the stacking mullion with a PC-1006-SS fastener. Attach anchor clips to what will be the open side of the stacking mullion: -Attach anchor clip, E1-1537, to the top and bottom of one side of the stacking mullion such that each clip extends 1/4” past the end of the mullion. -Attach anchor clips with two PC-1208-SS fasteners at each end (do not completely tighten yet). Install the stacking mullion into the opening according to Detail 15: -Slide each anchor clip tight against the masonry. -Attach each anchor clip to the masonry with two flat head fasteners. -Now completely tighten the PC-1208-SS fasteners used to attach the anchor clips to the mullion. Carefully slide the second window assembly in and anchor it to the masonry. To ensure a watertight seal run a bead of sealant up each interior frame jamb at the stacking mullion. Additionally, run a cap seal along the joint between the exterior frame jambs and the stacking mullion. If the exterior of the window is inaccessible, run a bead of sealant along the backside of each stacking mullion leg prior to installing the windows into the stacking mullion. Attach the pressure plate, AS-4231, to the stacking mullion: -Install HM-2516-W3 fasteners at 1-1/2” from each end maximum and then 9” on center. Pressure plates are pre-drilled; drill additional 0.281” diameter (#9/32) holes if necessary. -Start installing fasteners at the center of the pressure plate and work towards each end. -Torque each fastener to 50 inch pounds. Install PC-1008-SS fasteners, one on each side, through the pressure plate into the window frames: -(2) 6” below the top of the frame. -(2) 6” above the bottom of the frame. Effective Date: January 3, 2014 | 05-4005-01 Page-9 YOW 225 TUH Window System INSTALLATION OPTIONS STEP 10 (Continued, Optional) INSTALL STACKING MULLION (CONTINUED) 10. Install snap cover, E9-5111, starting from the bottom and work up the mullion. 11. Run a cap seal between the frame and receptor at the exterior. If the exterior of the window is inaccessible, run a bead of sealant along the backside of the receptor leg prior installing the windows. Page-10 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System INSTALLATION OPTIONS STEP 10a (Optional) INSTALL STACKING MULLION (80 PSF Maximum) E9-5111 HM-2516-W3 PC-1008-SS AS-4231 BE9-4502 #14-FC E1-1965 HM-2514-SS WS-2500-SS HM-2500-SS Sealant PC-1006-SS E9-4562 E1-1962 End Cap 1. 2. 3. 4. 5. 6. 7. 8. DETAIL 16 Install the first window assembly into the opening according to the instructions on Pages 1 & 2. Cut two pieces of gasket, E2-0051, to stacking mullion height and install into the reglets. Install mullion end cap, E1-1962, to each end of the stacking mullion with a PC-1006-SS fastener. Attach anchor clips to what will be the open side of the stacking mullion: -Attach anchor clip, E1-1965, to the top and bottom of one side of the stacking mullion such that each clip extends 1/4” past the end of the mullion. -Attach anchor clips with two HM-2514-SS bolts, two WS-2500-SS washers, and two HM-2500-SS nuts (do not completely tighten yet). Install the stacking mullion into the opening according to Detail 16: -Slide each anchor clip tight against the masonry. -Attach each anchor clip to the masonry with two flat head fasteners. -Now completely tighten the HM-2514-SS bolts used to attach the anchor clips to the mullion. Carefully slide the second window assembly in and anchor it to the masonry. To ensure a watertight seal run a bead of sealant up each interior frame jamb at the stacking mullion. Additionally, run a cap seal along the joint between the exterior frame jambs and the stacking mullion. If the exterior of the window is inaccessible, run a bead of sealant along the backside of each stacking mullion leg prior to installing the windows into the stacking mullion. Attach the pressure plate, AS-4231, to the stacking mullion: -Install HM-2516-W3 fasteners at 1-1/2” from each end maximum and then 9” on center. Pressure plates are pre-drilled; drill additional 0.281” diameter (#9/32) holes if necessary. -Start installing fasteners at the center of the pressure plate and work towards each end. -Torque each fastener to 50 inch pounds. Effective Date: January 3, 2014 | 05-4005-01 Page-11 YOW 225 TUH Window System INSTALLATION OPTIONS STEP 10A (Continued, Optional) INSTALL STACKING MULLION (80 PSF Maximum, CONTINUED) 9. Install PC-1008-SS fasteners, one on each side, through the pressure plate into the window frames: -(2) 6” below the top of the frame. -(2) 6” above the bottom of the frame. 10. Install snap cover, E9-5111, starting from the bottom and work up the mullion. 11. Run a cap seal between the frame and receptor at the exterior. If the exterior of the window is Page-12 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System YOW 225 TUH HARDWARE GUIDE STANDARD @ 65 PSF STANDARD HINGE & LIMIT STOP HARDWARE OPTIONAL @ 65 PSF, STANDARD @ 80 PSF or OVERSIZED STD. W/ MULTILOCK, OPTIONAL ELSEWHERE STANDARD w/ butt hinges 4-BAR HINGE & LIMIT STOP FRICTION ADJUSTERS Effective Date: January 3, 2014 | 05-4005-01 Page-13 YOW 225 TUH Window System ANCHORING HARDWARE STRAP ANCHOR E1-1760 CLIP ANCHOR E1-1922 4-1/2” length of BE9-4529, used at indicated locations to add strength at anchor points. ALUMINUM Clip anchor located as reqiuired. ALUMINUM HINGE & SUPPORT HARDWARE 4-bar hinges allow for efficient and durable operation of projected and casement vents. Limit stops allow vents to be opened to a preset maximum opening. (LH) (RH) Butt hinges are optional on casement outswing vents. Support arms hold casement outswing vents in the open position. Casement out roto-operators include E1-1592 (track), E1-1599 (handle), & E2-0656 (corner gasket) Roto-operators are available as an option to operate casement outswing and project out vents. Project out roto-operators include E1-9931 (track), E1-9932 (handle), & E2-9912 (corner gasket) Page-14 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System LOCKING HARDWARE White bronze cam handles for manual operation of vents. E1-1541/E1-1542 are standard on outswings. WHITE BRONZE Custodial locks are offered for maintenance operation. These type of locks are used in place of cam handles. WHITE BRONZE Multi-Lock handles are used to secure casement outswing vents. WHITE BRONZE White bronze pull handles are optional for casement outswing vents. WHITE BRONZE Push Bars are available as an option to open project out vents. ALUMINUM/ WHITE BRONZE Permits the window to be opened a maximum of 6” and return to the closed position without the use of a special tool or key. For maintenance or washing, key releases the window from the limit arm for reversal. When reversed, the window can be washed from the interior. Re-closing of window and reengagement of limit arm is accomplished without key. STAINLESS STEEL Not on Y-View Effective Date: January 3, 2014 | 05-4005-01 Page-15 YOW 225 TUH Window System GLAZING CHART GLASS/PANEL DEPTH GLASS OPENING EXTERIOR INTERIOR F.C. BACKER TAPE F.C. WEDGE GASKET 3/16” 1/8” E2-0670” 5/16” E2-0160” 1/4” 1/8” E2-0670” 1/4” E2-0512” 5/16” 1/8” E2-0670” 3/16” E2-0617” 3/8” 1/8” E2-0670” 1/8” E2-0630” 15/16” 1/8” E2-0670” 5/16” E2-0160” 1” 1/8” E2-0670” 1/4” E2-0512” 1 1/16” 1/8” E2-0670” 3/16” E2-0617” 1 1/8” 1/8” E2-0670” 1/8” E2-0630” 5/8” 1 3/8” GLASS STOPS 5/8” GLASS OPENING PART NUMBER DETAIL 1 3/8” GLASS OPENING PART NUMBER E9-4521 E9-4506 E9-4522 E9-4507 E9-4523 E9-4508 Page-16 DETAIL 05-4005-01 | Effective Date: January 3, 2014 YOW 225 TUH Window System BACKER TAPE & GASKETS FACE CLEARANCE DESCRIPTION 1/8” 3/16” 1/4” 5/16” E2-0670 E2-0670 E2-0670 E2-0670 E2-0630 E2-0617 E2-0512 E2-0160 BACKER TAPE WEDGE GASKET Effective Date: January 3, 2014 | 05-4005-01 Page-17 YKK AP America Inc. 270 Riverside Parkway Suite A Austell, Georgia 30168 www.ykkap.com