Key information for builders and cablers Supply internal and external conduit paths:

Transcription

Key information for builders and cablers Supply internal and external conduit paths:
Key information
for builders and cablers
Internal Conduit
Supply internal and
external conduit paths:
Notes
Internal Conduit
Min. 100mm radius bends
Min. 100mm radius bends
ALL CONDUIT FITTINGS
MUST BE GLUED.
ALL CONDUIT
FITTINGS
ORANGE
CONDUIT
MUST
MUST
NOT BE
BE GLUED.
USED.
1 x P23 Conduit
(builder to supply)
1 x P23 Conduit
(builder to supply)
ORANGE CONDUIT MUST
NOT BE USED.
GPO
GPO
Min. 300mm
Min. 300mm
Floor Slab
1. Use Rigid White P23 Communications
Conduit ONLY
2. Use no more than 3 x 90º bends
1. Use Rigid White P23 Communications
between draw points. The bend radius
Conduit ONLY
of each bend must be no less than
2. Use
no more
than 3 x 90º bends
300mm
or more.
between draw points. The bend radius
of each bend must be no less than
Quick
Acronyms
300mm
or more.
PCD - Premises Connection Device
NTD - Network Termination Device
Quick
Acronyms
PSU - Power
Supply Unit
PCD
Connection
FGL -- Premises
Finished Ground
LevelDevice
NTD - Network Termination Device
PSU - Power Supply Unit
FGL - Finished Ground Level
Notes
100mm - 140mm
horizontal separation
100mm - 140mm
horizontal separation
Min. 100mm
radius bend
Min. 100mm
radius
bend
1 x P23
Conduit
(builder to supply)
1 x P23 Conduit
(builder to supply)
Floor Slab
Min. 300mm set back
from building corner
Min. 300mm set back
from building corner Wall Cavity
Min. 410mm height from
finished ground level
Min. 410mm height from
Min.ground
300mmlevel
radius bend
finished
FGLradius bend
Min. 300mm
• Use rigid white P23 telecommunications conduits
(23mm Internal Diameter) in the trench and within
the house. Glue all joints using solvent cement
• Ensure the conduits run as straight as possible
• Install drawstrings in both conduits
• Fix all conduits securely using conduit saddles
ZOOM
SECTION
or similar
• Provide
a power point (GPO) within 1500mm
ZOOM
SECTION
of the Network Termination Device (NTD) location
Partradius
of 300mm
• Each bend
of the street conduit must
radius bend (<45º)
be no less
than
300mm
Part of 300mm
radius
bendof
(<45º)
• Each bend
radius
the internal conduit must
be no less than 100mm
• Use no more Full
than300mm
3 x 90º (max) bends between
draw points radius bend
Full 300mm
radius bend
NBN Co minimum Premises
Connection Device (PCD) separations:
FGL
Street
Conduit
Street Conduit
Minimum 250mm from services including:
•Electricity, gas or water meter enclosures
•Water taps or downpipes
Wall Cavity
Minimum 1.5m side clearance from gas cylinders*
*Check with your local Authorities for their separations
Notes
1. Use Rigid White P25 Communications
Conduit ONLY
Notes
2. Use
Use Rigid
no more
than
3 xCommunications
90º bends
1.
White
P25
betweenONLY
draw points. The bend radius
Conduit
of each bend must be no less than
2. Use no more than 3 x 90º bends
300mm or more.
between draw points. The bend radius
of each bend must be no less than
300mm
or more.
Quick
Acronyms
PCD - Premises Connection Device
NTD - Network Termination Device
Quick
Acronyms
PSU - Power Supply Unit
PCD - Premises Connection Device
FGL - Finished Ground Level
NTD - Network Termination Device
PSU - Power Supply Unit
FGL - Finished Ground Level
NTD Enclosure Ventilation Alert:
If the NTD is to be enclosed, then ventilation
is required. Refer to NBN Co Residential
Preparation and Installation Guide: SDUs and
MDUs for specifications.
PSU
PSU
ZOOM SECTION
NTD
ZOOM SECTION
NTD
NBN Co to supply:
PCD
PCD
Floor Slab
FGL
Floor Slab
• The service
cable to the PCD location
Partdrop
of 300mm
• The PCDradius bend (<45º)
Part of 300mm
• The internal
fibre
optic
cable from the PCD
radius
bend
(<45º)
to the NTD
• The NTD
Full 300mm
• The Power Supply
radius Unit
bend (PSU)
Full 300mm
• All the fibre optic
cables
radius
bend
FGL
Wall Cavity
Unmaintained copy. For most recent version, refer to: www.nbnco.com.au/assets/documents/key-information-for-builders-and-cablers.pdf
Wall Cavity
For more details and installation options refer to: NBN Co Residential Preparation and Installation Guide: SDUs and MDUs
www.nbnco.com.au/assets/documents/preparation-and-installation-guide-for-sdus-and-mdus.pdf
Bangers & Tash Pty Ltd
Job#: NBN463
Colours:
Trim size: 0000 (h) x 0000 (w) mm
NBN equipment installed within the home – wall space reservations
Premises Connection
Device (PCD)
565 mm
Network Termination Device (NTD)
Power Supply Unit (PSU)
SYSTEM
STATUS
BATTERY
POWER
REPLACE
BATTERY
ALARM
SILENCE
325 mm
ALARM
SILENCE
BATTERY
EMERGENCY
USE
Layout example only – for other
configurations refer to NBN Co
Residential Preparation and Installation
Guide: SDUs and MDUs
Outside Your Premises
Inside Your Premises
Preparing new developments for the NBN
It’s important that builders and cablers talk to new homeowners about the telecommunications services they may want
to access in their homes and provide guidance on where NBN equipment, phone and data outlets should be located.
Both fixed line internet and telephone services will be delivered over the NBN. The NBN Co equipment should be located
where it is convenient to connect telephone as well as computers and internet TV.
It’s important to remember that if customers want to utilise applications like IPTV via Smart TVs in their living room
and telework via HD video conferencing in their office they should consider fixed cabling in the home to connect
these devices.
Requesting equipment pre-installation
BEDROOM 1
To enable a smooth and efficient connection to the National Broadband
Network (NBN), builders should order a pre-installation of the in-home
equipment supporting NBN access.
Builders call 1800 OUR NBN or email newdevelopments@nbnco.com.au
to request ‘NBN equipment pre install’ and arrange an appointment date.
BATHROOM
Computer
FAMILY ROOM/
STUDY
LIVING
TV
The following is required:
• Development name
• Premises address/location
PHONE POINT
DATA POINT
POWER POINT
BEDROOM 2
DINING
KITCHEN
• Confirmation power will be available
LAUNDRY
• Number of premises
• Confirmation that the conduits are in place
• Preferred date for the NBN equipment pre installation
NBN Co will be in contact to confirm the date and time for the NBN
equipment pre installation.
NBN Equipment
BEDROOM 3
ENTRANCE
Internal Conduit
Path
GARAGE
PCD
For more information:
The diagram above is an
example only
Phone 1800 OUR NBN (1800 687 626)
Visit our website at: www.nbnco.com.au/newdevelopments
Email us at: newdevelopments@nbnco.com.au
This document is subject to copyright and must not be used except as permitted below or under the Copyright Act 1968 (Cth). You
must not reproduce or publish this document in whole or in part for commercial gain without the prior written consent of NBN Co.
You may reproduce and publish this document in whole or in part for educational or non-commercial purposes as approved by
NBN Co in writing.
This document is intended as an informational guide only. NBN Co does not warrant that the processes and information outlined
in this document comply with all (or any) applicable laws, codes of practice or standards. The recipient must exercise its own
judgement as to how best to perform the activities described in this document in a safe way, and so as to meet the requirements of
all applicable laws, codes of practice and standards. The contents of this document should not be relied upon as representing any
NBN Co’s final position on the subject matter of this document, except where stated otherwise.
NBN-NEWDV-BCA4-MAY13
www.nbnco.com.au