Mobiles - Helideck Certification Agency
Transcription
Mobiles - Helideck Certification Agency
HCA HLL Name D t PRH Wind Kts 27 November 2014 Mobile Non Compliances Limitation Acergy Viking 21.0 12.8 3 • Survey Vessel Nil limitation Aegir 28.5 15.6 1 Crane Barge • Table 1(T) if overflight of Fwd foam monitor platform is unavoidable Nil 150° 5:1 African Inspiration African Vision Aker Wayfarer 20.8 12.8 3 8 Offshore Construction Vesel - Prohibited Landing Sector : 004-017 deg rel to helideck heading. Sector marked. 20.9 12.8 3 MSV 20.9 12.8 3 20.8 15,6 3 8 Forward foam monitor platform infringes sector Bridge wings port and starboard sides Misc Emergency exit hatch located inside landing area Misc Helideck net not fitted • MSV • Operations in Norway restricted to max D-value 16.71m Nil Misc Amazon Warrior Elevator shaft housing 2.4m from sla Vent duct 2m from sla Dangerous Goods not to be shipped from this vessel no qualified person Seismic Vessel • 1,25 D helideck – Norwegian regulations • Approved for EH 101 outside Norway (LOS clearance for D23) Page 1 of 69 27 November 2014 14:11:37 HCA HLL Name Amundsen Spirit Apache II D t PRH 20.8 12.8 1 8 20.8 12.8 3 8 Wind Kts 27 November 2014 Mobile Non Compliances Limitation • Tanker with amidships helideck on port side • 2x150 degree Limited Obstacle sectorsTakeoffs & Landings permitted Port and Starboard • Table 1(T&L) to be applied when overflight of decking on starboard side of helideck is unavoidable Misc Pipe laying ship • Table 1 (T) if overflight of either access points unavoidable • Norway 1.25D Requirement, D = 20.88m 150° 5:1 19.5 9.3 3 Seismic Vessel • Offset aiming circle Approved for EC225 (11t) Artemis Athene 22.2 9,3 2 SSeismic Vessel • Seismic arrays deployed – Table 1(T&L) regardless of overflight Stowed – No limitation Whenever practical, avoid or minimize overflight of arrays. • Table 1(T) if overflight of aft corners and cable deployment wheel unavoidable • Approved for S92 (12.0t) and EC225 (11.0t) Asgard A 23 14 1 Helideck netting above 25mm adl Nil 5:1 Artemis Angler Port and starboard of helideck 210° Sig 5:1 Nil Port and starboard walk ways approx 5.3m from edge of SLA Flap dampers (400mm ADL) port and starboard side Seismic arrays when deployed. Aft corners of helideck and cable array deployment wheel FPSU • The ship is rotating around a turret-mooring system and will normally be heading into the wind. • Cold flaring may take place at any time. Execute approach with min. 150m horizontal distance to the flare stack. • Night operations: To improve visual references, the ship must be turned 30°-45 Degrees either side out of the wind direction. Page 2 of 69 27 November 2014 14:11:37 HCA HLL Name D t Asgard B 23 14 0 Atlantic Explorer 18.9 8.6 5 2 Atlantic Guardian 20.9 12.8 2 Seismic Vessel • Table 1(T) if overflight of ships bow is unavoidable Atlantic Rotterdam 21.4 12.8 0 • Jack-Up • Mandatory Radar Approach required unless rig is within 10nm of platform with compliant meteorological equipment • Stable deck conditions to apply whilst under tow i.e. 1 degree pitch & roll and 2m heave • Table 1(T) if overflight of 5:1 items unavoidable • Obstacle free sector reduced to 190° due to infringement of legs • No ground-power unit available. Shut-down at captains discretion Atlantis Dweller PRH 20.9 12.0 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Seismic Vessel • Table 1(T&L) if overflight of aft decking unavoidable • Seismic arrays deployed – Table 1(T&L) regardless of overflight. Whenever practical, avoid or minimize overflight of arrays • Prohibited landing sector due to only one access point • Possible turbulence from exhausts forward of helideck • MSV Sig 5:1 Aft decking Seismic arrays when deployed Sig 5:1 Bow and lightmast 5:1 Misc Outboard emergency access stairs and perimeter netting Non complaint meteorological equipment Comprehensive pitch, roll and heave measuring equipment not available Nil Page 3 of 69 27 November 2014 14:11:37 HCA HLL Name Audacia D t PRH Wind 22.2 12.8 1 315-045 Rel to bow Barbaros Hayreddin 21.0 12.0 2 Pasa BGP Pioneer 21 11.9 2 Kts 27 November 2014 Mobile Non Compliances Limitation Pipe Laying Vessel • Table 2 due to superstructure and funnel on starboard side • Table 1(T) if overflight of Taut wire unit unavoidable – unit protrudes out from below the helideck on the port side when lowered • Table 1(T) if overflight of aft foam monitor platform unavoidable • Offset aiming circle • Seismic vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - No limitation • Whenever practical, avoid or minimize overflight of arrays Seismic Ship • Seismic arrays - deployed - Table 1(T & L) regardless of overflight - stowed - Table 1 (T) stern mast Whenever practical, avoid or minimize overflight of arrays • Aiming Circle offset due to winches in LOS Sig 5:1 Misc 5:1 Taut wire unit on port side when lowered, Aft foam monitor platform 1.25D Helideck – Not applicable Seismic booms and cable arrays (when deployed) Misc No other significant infringements 150° Winches 1.2m adl 2.2m from SLA 5:1 Seismic cable arrays (when deployed) Stern mast (when lowered) BGP Prospector 22.8 15.6 3 Seismic Vessel • Nil • Norway – Maximum D value 18.7m Bibby Polaris 19.5 9.2 Ship • Cleared for EC225 (11.0t) Nil Bibby Sapphire 19.5 11.0 3 Ship Nil Nil 3 Sig 5:1 Misc Page 4 of 69 Nil Aiming circle offset 27 November 2014 14:11:37 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Bibby Topaz 20.8 12.8 3 8 DSV Nil Blackford Dolphin 22.2 9.3 • Semi Sub • Table 1(T) if overflight of 5:1 infringements unavoidable • Approved for EC 225 ( 11,0t ) and S92 ( 12,0t) 1 Boa Deep C 19.5 9.3 3 Boa Galatea 20,8 12,8 2 8 27 November 2014 Mobile Nil 5:1 Ship • Nil • Approved for EC225 (11.0t) Seismic vessel • Cable array sub surface Boa Sub C 20.8 11.9 3 m Multi Service Vessel • S92 limited to 11.9t Bold Tern 22.2 12.8 3 Jack up (Ship) Wind Turbine Construction Vessel. • Mandatory ARA required for all operations Page 5 of 69 Port access platform Forward access platform Lifeboat station and forward leg - stbd side Nil 210° Minor part of sector forward port side infringed by section of railing and vent pipes (40 cm adl) Misc 1.25D Helideck – Not applicable Misc Vessel may be fixed or floating. Be aware of Crane boom and luffing wires on Starboard side of Helideck which are on limit of OFS when in rest. Automated weather monitoring equipment not available on site 27 November 2014 14:11:37 HCA HLL Name Borgholm Dolphin Borgsten Dolphin D t 22.2 9.3 22.2 9.3 PRH Wind Kts 1 Non Compliances Limitation Flotel • Table 1 (t) if overflight of forward access platform or forward, starboard life boat station unavoidable • Approved for EC 225 ( 11,0t ) and S92 ( 12,0t) Offset aiming circle 1 300° - 350° 35 plus 27 November 2014 Mobile Semi Sub alongside Dunbar • Table 1 (T & L) if overflight of winch column assembly and lifeboats unavoidable • Table 2 (T & L) • Cleared for EC 225 (11.0t) and S92 (12.0t) Sig 5:1 Misc Flotel : check orientation and OFS in relation to adjacent installations 210° • Reduced to 184° by pilot house plus. • Winch column assembly 0.45m adl; lifeboats 0.38m adl; • VHF Aerial attached to windlass housing. Port forward and Port aft foam monitors 38cm adl. • Fwd lifeboat winch assembly 0.5m above deck level 5:1 Botnica 19.5 11.2 3 MSV – Ice Breaker • Nil Bourbon Peridot 20.8 12.8 3 8 • Multi Purpose Support Vessel • Operations in Norway restricted to D=16.7m Brave Tern 22.2 12.8 3 Jack up (Ship) Wind Turbine Construction Vessel. • Mandatory ARA required for all operations Bredford Dolphin 22.2 12.8 1 Winch column assembly (extends 16m) Lifeboats (fwd) Misc No Planned shutdowns due to lack of tie-down points in deck 150° CO2 wheeled unit in ramp 40 cm adl Misc Vessel may be fixed or floating. Be aware of Crane boom and luffing wires on Starboard side of Helideck which are on limit of OFS when in rest, request crane raised if possible. Fully automated weather monitoring equipment not available on site Semi Submersible Rig • No ground power – caution if shutting down Nil Misc Page 6 of 69 Forward access platform and forward starboard life boat station infringe sector 1.25D Helideck – Not applicable 27 November 2014 14:11:37 HCA HLL Name Bucentaur BW Athena Byford Dolphin D t 19.5 9.3 19.5 9.3 22.2 9.3 PRH 3 3 1 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Drill Ship • Table 1 (T) if overflight of ship's bow unavoidable Offset aiming circle FPSO • Table 1(T) if overflight of forward foam monitor platform is unavoidable Semi Sub • Table 1 (T) if overflight of foam monitors unavoidable • Cleared for EC 225 (11.0t) and S92 (12.0t) Sig 5:1 Misc 5:1 Castoro 7 22.2 9.3 1 • Pipe laying Ship • Table 1 (T) to be applied if overflight of the bow unavoidable on take off • Cleared for EC225 (11.0t) • Lay Barge • Table 1(T) if overflight of Sig 5:1 items unavoidable • Fwd port crane jib to be facing aft or starboard for helicopter operations • Fwd navigation light mast and handrails starboard side to be lowered for helicopter operations • Cleared for EC225 (11.0t) and S92 (12.0t) • Aiming circle offset inboard by 1m sufficient clearence exists Page 7 of 69 Forward foam monitor platform ( 2.5m from SLA) Cat 3 deck due to small size of vessel 210° Satdome Forward infringes sector Chevron to be swung to compensate 5:1 19.5 11.0 3 Only 5 tie downs points Misc Misc Calamity Jane Ships bow 5:1 Misc Sig 5:1 Misc Foam monitor platforms, forward and port Circle offset - to be moved to deck centre and deck painted green before next inspection. H to be swung due to obstruction in 210° sector forward Forward foam monitor platform and forward helideck support structure No other significant infringements Foam monitor platform forward Deck port & starboard Anchor chains when deployed No other significant infringements Aiming circle offset by 1m inboard not on center of D-value 27 November 2014 14:11:37 HCA HLL Name Castoro Sei D t PRH Wind Kts 22.2 10.0 1 0-15 Castorone CGG Alize 22.2 12.8 1 22.2 13.0 2 27 November 2014 Mobile Non Compliances Limitation Lay Barge Table 1 (T) if overflight of the aft foam monitor platform is unavoidable 5:1 Aft foam monitor platform Pipe Laying Vessel Table 1 (T) if overflight of forward access unavoidable 5:1 NDB Aerial outboard of forward access platform Seismic • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays 210° 5:1 Misc Constructor COSL Innovator 17.5 6.8 3 DSV Table 1(T) if overflight of forward access unavoidable 22.2 12.8 1 • 060-170 rel. To rig head COSL Pioneer 22.2 12.8 1 • • 120-170 Rel. to rig hdg • 20-30 • 31-40 • 31-40 • 41 plus 5:1 • Perimeter net supports 400mm above deck level • Emergency hatch covers in deck 30mm adl - highlighted yellow/black Seismic cable arrays (when deployed) Floodlights aft Circle Offset potential for infringements in LOS when cables stowed. Forward access point • Semi-submersible • All types- Table 2 use 35-45kts limitation • AS332 - Max helipad weight • Other types- Nil Landings • All types – Nil Landings • Turbulence reports by all types to be submitted No starting equipment available •Semi Submersible Drilling Rig • All types – Table 2(L&T), derrick structure • Caution if shutting down – No ground power available • 210⁰ OFS swung 10⁰ anti clockwise • Hazard light installed Page 8 of 69 Misc No ground power on site 27 November 2014 14:11:37 HCA HLL Name COSLPromoter D t PRH Wind 22.2 12.8 1 060-170 rel. to rig head DCV Balder Deep Blue Kts 22.2 9.3 22.2 9.3 20-30 31-40 31-40 41 plus 1 Non Compliances Limitation SemiSubmercible • All types- Table 2 use 35-45kts limitation • AS332 - Max helipad weight • Other types- Nil Landings • All types – Nil Landings Turbulence reports by all types to be submitted - No starting equipment available Crane Barge • Table 1(T) to be applied for all operations due to 5:1 infringements all round the deck • See HLL - Part E Annex 5 for other restrictions • Stable deck conditions to apply i.e. maximum of 1 pitch & roll and 2m heave • Cleared for EC225 & S92 1 0-15 27 November 2014 Mobile Ship Cleared for EC225 (11,000kgs) Overflight of forward foam monitor platform to be avoided on take-off • Mandatory ARA required due to inadequate weather reporting system Deep Cygnus 20.8 12.8 3 8 MSV •Nil limitation Deep Energy 20,8 12.8 3 8 Pipe layer • Nil Page 9 of 69 210° 5:1 Crane jibs x 2 when parked in rest. Port side - Main deck area, lifeboats and pipe loader (LSS) Starboard side - Deck area, sat' dome, swimming pool Misc No DG by Air to be shipped To/From this installation 150° Handrail aft of helideck 5:1 Foam monitor platforms Misc Full suite of Met Sensors missing. Aiming circle offset obstructions in LOS Helideck net approx 40mm adl No DGs to be received from vessel no shippers/ packers certificates seen Misc 1.25D Helideck - Norwegian regulations 27 November 2014 14:11:37 HCA HLL Name Deep Pioneer D t 19.5 9.3 PRH Wind 3 Kts 27 November 2014 Mobile Non Compliances Limitation Ship • Table 1 (T) if overflight of forward navigation mast is unavoidable Deep Vision 19.5 9.3 3 Offshore Construction Vessel • Offset aiming circle - Prohibited landing heading 10 deg each side of helideck heading. Area Marked - Approved for EC225 (11t) Deepsea Aberdeen 20.8 13t 8 1 Semi-Sub • Table 1(T) if overflight of fwd foam monitor platform is unavoidable 5:1 Forward navigation mast, when folded 3.4m from SLA 5:1 Fwd Fire Monitor Platform approx. 3.3m from edge of SLA Port and starboard foam monitor platforms approx. 4m from edge of SLA Various deck structures below helideck starboard side Port flare boom may infringe when deployed Misc Deepsea Atlantic 21.4 13 1 115-170º rel. to rig hdg. Deepsea Bergen 22.2 9.3 1 Semi submersible rig • Table 1(T) to be applied if overflight of forward fire monitor unavoidable • All types - Table 2 (L&T) – Derrick structure • No start unit on board, caution if shutting down Semi Submersible rig • Table 1(T) if overflight of fwd lifeboat station, port fwd anchor winch, fwd foam monitor platform unavoidable 5:1 Page 10 of 69 Forward foam monitor platform Misc •No start unit 210° Satellite dome on pilot house marginal infringement of sector starboard side. Crane marginal infringement of sector port side Sig 5:1 Fwd. lifeboat station, Port fwd anchor winch, fwd foam monitor platform • Caution if shutting down, no ground power available • Approved for S92 (11.9t), EC225 (11.0t) Offset Aiming Circle Misc No Ground Power available on site 27 November 2014 14:11:37 HCA HLL Name Deepwater Asgard D t 22.2 13t PRH 1 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Drillship • Table 1(T&L) if overflight of fwd foam monitor platform port side and starboard side is unavoidable • Mandatory ARA required due to inadequate weather reporting system 210° Foam monitor handles approx 300mm adl Telephone unit fwd access point approx 600mm adl 150° Possible infringement if center doom installed in second sector of LOS 5:1 Deepwater Discovery 22.8 15.0 1 Drill ship • Table 1(T) if overflight of forward 5:1 items unavoidable Misc Full suite of Met Sensors missing 150° Radar dome infringes second sector of LOS 5:1 Deepwater Invictus 22.2 13t 1 Drillship • Table 1(T&L) if overflight of fwd foam monitor platform port side and starboard side is unavoidable • Mandatory ARA required due to inadequate weather reporting system 22.8 14 1 Drill Ship • Mandatory Radar Approaches required • Prohibited Landing Heading Sector -340 to 020 (relative to ships heading) due to LOS obstruction • Table 1(T) if overflight of 5:1 obstructions unavoidable Page 11 of 69 Port, starboard & outboard foam monitor platforms Bridge wings Misc Aiming circle offset 210° Foam monitor handles when fitted approx 300mm adl Telephone unit fwd access point approx 600mm adl 150° Possible infringement if center doom installed in second sector of LOS 5:1 Deepwater Millennium Bridge wings port and starboard sides Various deck structuers Foam monitor platforms are :- Fwd approx 4m to Nav light from the SLA, Starboard access point approx 3.20m from SLA, Port access point approx 3.10 from SLA Bridge wings port and starboard sides Various deck structuers Foam monitor platforms are :- Fwd approx 3.4m to the SLA, Starboard access point approx 3.40m from SLA, Port access point approx 3.20 from SLA Misc Full suite of Met Sensors missing 150° Radome/antenna in second sector of LOS 5:1 Misc Foam monitor access platforms Non-compliant meteorological equipment No helideck net - approved friction surface 27 November 2014 14:11:37 HCA HLL Name Dixie Patriot Dong Fang Kan Tan (No1) D t 17.4 6.8 6 18 5.3 PRH 1 2 Wind Kts Non Compliances Limitation Jack-up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move • Mandatory ARA to be applied due to non-fitment of automated MET system • Seismic vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Edda Fauna 20.8 12.8 3 8 IMR (Inspection/Maintenance/Repair) • Table 1 (T) if overflight of bow section is unavoidable Offset aiming circle Edda Fjord 19.5 9.3 Multi Purpose Vessel • Prohibited landing heading sector +/- 22° relative to vessel heading due to handrail and wheelhouse 3 Edda Flora 20.8 12.8 3 8 • Multi Purpose Service Vessel Edda Fonn 19.5 9.3 Offshore Construction Vessel • Approved for EC 225 (11t) • Offset aiming circle 3 27 November 2014 Mobile Page 12 of 69 210° Forward Foam monitor approx 650mm adl 150° Forward foam monitor platorm Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times 210° Navigation mast at stern has to be lowered prior to helicopter operations Sig 5:1 Misc Sig 5:1 Cable arrays (When deployed) No Dangerous goods to be shipped or received no qualified personal Helideck net when fitted approx 50mm adl Bow section infringes sector 150° Handrail in front of wheelhouse and starboard side of wheelhouse superstructure 6m from SLA Misc Aiming circle offset due to handrail and wheelhouse 1.25D Helideck - Not applicable 27 November 2014 14:11:37 HCA HLL Name Eirik Raude Elisabeth Knutsen Energy Endeavour Ensco 100 Ensco 101 D t PRH 22.8 15.0 1 22.8 14.0 1 20.8 14.6 1 8 22.2 10.0 1 22.2 9.3 1 Wind Kts • • • 135-180 rel • 20-30 to rig hdg • 31-40 • 31-40 • 41 plus 27 November 2014 Mobile Non Compliances Limitation Semi Sub • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings All due to clad derrick. Turbulence report by all types must be submitted • Table 1(T) if overflight of foam monitor platforms. • Until such time as a compliant Status light is fitted a 1.25nm visibility limitation will be placed on this deck Tanker with amidships helideck on port side • Table 1(T) to be applied if overflight of decking starboard, forward and aft of helideck is unavoidable • 2 x 150° LOS 210° 5:1 Starboard crane when in rest Forward foam monitor platforms Lifeboat station starboard side below helideck Various deck structures port side below helideck Misc Numerous tie- downs on deck approx 40mm adl painted red 150° Fixed railings aft of helideck at 1.1m, 2m from helideck Sig 5:1 Decking starboard, forward and aft of helideck • Jack Up • Table 1(T) if overflight of emergency access outboard is unavoidable • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave 210° Marginal Infringement -Jack Housings on top of Fwd and Stbd legs Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Deck and Rig height varies due to nature of Jack up rig. No other significant infringements • Jack Up • Table 1(T) if overflight of forward access unavoidable • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) Misc Electronic pitch, roll and heave measuring equipment not available on site • Jack up • Stable deck conditions to apply whilst on tow i.e. maximum of 1deg pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) Misc Electronic pitch, roll and heave measuring equipment not available on site Page 13 of 69 5:1 Forward access 27 November 2014 14:11:37 HCA HLL Name Ensco 102 Ensco 109 Ensco 120 D t 22.2 9.3 22.2 9.3 PRH Wind Kts 1 Jack Up • Stable deck conditions to apply for operations whilst on tow ie maximum 1 pitch & roll and 2m heave. • Mandatory Radar Approaches required • Approved friction surface - No net 22.2 12.8 1 210° Clear 5:1 Clear Misc • Comprehensive electronic pitch, roll & heave measuring equipment not available on site. Misc Comprehensive electronic pitch, roll & heave measuring equipment not available on site. Non compliant met equipment Aiming circle offset 210° Handrail in forward access is 310mm adl Jack up • Table 2 due to superstructure 150° - 210° relative to heading Ensco 122 Non Compliances Limitation Jack Up • Stable deck conditions to apply for operations whilst on tow ie maximum 1 pitch & roll and 2m heave. • Cleared for EC225 (11.0t) & S92 (11.9t) 1 27 November 2014 Mobile • Jack-up • Table 1(T) is overflight of 5:1 obstructions unavoidable 22.2 12.8 1 5:1 Ensco 70 22.2 9.3 1 0-15 Jack Up - Helideck starboard side • Overflight of outboard foam monitor platform to be avoided on take-off • Stable deck conditions to apply whilst on tow i.e. maximum of 1 deg pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) • Caution if overflight of starboard leg (when lowered), zip wire from derrick. Page 14 of 69 Vessel structure Port and Starboard aft of the helideck infringe sector Misc TDPM lighting fitted to deck 210° • Foam monitor handles 350mm adl. Sig 5:1 Misc Outboard foam monitor platform Electronic pitch, roll and heave measuring equipment not available on site 27 November 2014 14:11:37 HCA HLL Name Ensco 80 Ensco 92 Ernest Shackleton D t 22.2 9.3 22.2 9.3 PRH 1 1 19.5 10.0 2 Far Saga 19.5 9.3 3 Faxian 6 22.8 15.6 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation • JackUp • Mandatory radar approach • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Aiming Circle offset due to LOS infringements • Cleared for EC225 (11.0t) & S92 (11.9t) • Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) • Only 1 ring of 4 tie-down points - 2.5m radius. Shutdown at pilots discretion • MSV • Daylight operations only • Port rescue boat to be swung outboard for helicopter operations • PLHS aft starboard corner of deck • Aiming circle offset Offshore Construction Vessel • Offset aiming circle Approved for EC225 (11t) Seismic Survey Vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Page 15 of 69 150° Guardrails and fire extinguishers infringe first sector of LOS Misc Cloud height and visibility sensors U/S Electronic pitch, roll and heave measuring equipment not available Insufficient tie down points Helideck net 35mm adl 150° Fuel hose and baggage storage cupboard 1.1m adl in first sector of LOS Misc Aiming circle offset Electronic pitch, roll and heave measuring equipment not available on site Aiming circle & "H" lighting fitted to deck 150° Aft davit arm and bosun store Misc Inadequate floodlights 210° • Nil 5:1 Seismic arrays when deployed 27 November 2014 14:11:38 HCA HLL Name D t PRH Wind Kts 22.2 12.8 3 Ice Breaker & MSV Floatel Victory 22.8 15.6 1 Floatel FPSO Aseng 21.0 12.8 1 10+ Fugro Saltire 22.2 12.8 3 Non Compliances Limitation Fennica 27 November 2014 Mobile • FPSO • Possible Turbulence & High temperatures over the deck from funnel. Turbulence reports requested. • MSV • Table 1 (t) if 5:1 items unavoidable 210° Net if fitted and tie down points (contoured) both 30mm above deck level. 150° Clear 5:1 Clear Misc 2 Large Satdomes on edge of 210° sector No Dangerous Goods by Air to be shipped to/from this Vessel Misc No other significant infringements 5:1 Misc Fugro Symphony 20.8 12.8 3 8 Offshore Construction Vessel • Table 1(T) if overflight of Nav mast unavoidable • According to Norwegian regulations – 1,25 D 21 12 3 Drillship • Exhaust stacks aft/port of helideck. Monitor and report Page 16 of 69 Aiming circle offset Nil 150° 5:1 Fugro Synergy Vessel structure Port and Starboard aft of helideck infringe sector Marginal infringement of vent housing painted in obstruction markings Nav mast when lowered approx 2.8m from edge of SLA Nil 27 November 2014 14:11:38 HCA HLL Name Geco Bluefin Geco Eagle Geco Emerald D t 19.5 9.3 PRH 3 22.2 12.8 3 18.9 9.3 5 3 Geco Topaz 18.9 9.3 5 3 Geco Triton 19.5 11.0 2 Geo Barents 19.5 9.3 3 Geo Caribbean 22.2 12.8 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation • Seismic vessel • Allow 15 mins to fold out helideck sections and lower forward mast before operations • Table 1(T) if overflight of forward monitor platform and lowered mast cannot be avoided on take off. Seismic vessel • Whenever practical, avoid or minimize overflight of arrays when deployed Seismic vessel • Folding helideck.- 45 min notice required Seismic vessel • Folding helideck - 45 minutes notice required • Table 1(T) if overflight of 5:1 items unavoidable Seismic vessel • 2 x 150 LOS - Take offs & Landings Port and Stbd • When practical, avoid or minimize overflight of arrays when deployed 5:1 Forward foam monitorplatform and lowered mast Misc Landing net not fitted Misc Bow navigation mast must be stowed before helicopter operation. Misc Aiming circle offset Sig 5:1 Misc Perimeter net panels aft of deck on port and stbd sides Navigation mast and safety rail around perimeter to be removed before helideck operation. Seismic • Offset aiming circle Seismic vessel • Table 1(T) if overflight of 5:1 items unavoidable 5:1 Misc Page 17 of 69 Port & starboard sides of vessel aft Foremast laid down on forward edge of helideck for heli-ops 27 November 2014 14:11:38 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Geo Caspian 20.8 12.8 3 8 Seismic • D=1.25 helideck (physical size 26.1m) Geo Celtic 22.2 12.8 3 Seismic • No limitation Geocean Protis 22.2 12.8 1 • Pipe laying vessel • Stable deck conditions to apply i.e. maximum 1° Pitch & Roll & 2m heave Geosund 20.9 12.8 3 Offshore Construction Vessel / ROV Vessel • Nil Giulio Verne 17.5 5.1 Cable Laying Vessel • Table 1(T) if overflight of forward access platform unavoidable • Daylight operations only 1 27 November 2014 Mobile Misc Not compliant HMS 210° Outer edge of perimeter net 15 cm adl Sig 5:1 Misc Global 1200 22.4 11.0 3 Pipe Layer Table 1 (T) if overflight of forward foam monitor platform unavoidable Approved for EC225 (11t) based on EC225 design and strength calculations GMS Endeavour 6102 19.5 9.3 • Self propelled Jack up • Crane must be raised for helicopter operations • Mandatory ARA required 1 Page 18 of 69 Sig 5:1 Misc Forward access platform Non compliant helideck lighting. No top lantern - red. Forward Foam Monitor platform Non compliant meteorology equpment fitted 27 November 2014 14:11:38 HCA HLL Name GMS Endurance 6101 Grena GSF Arctic III D t 19.5 9.3 22.8 15 22.2 9.3 PRH Wind Kts Non Compliances Limitation • Self propelled Jack up • Crane must be raised for helicopter operations • Mandatory ARA required (see below) 3 1 Tanker • Table 1 (T) to be applied when overflight of decking forward, aft and port side of helideck is unavoidable • 2 x 150° sector helideck • Amidships helideck starboard 1 155-185 Rel to rig head 27 November 2014 Mobile Nil Sig 5:1 Misc • Mandatory radar approach for all landings when the vessel is not within 10n/m of a platform that can provide a full meteorological service. 150° 5:1 aft sector - Port crane jib 3m adl, starboard crane tower 3m adl, windsock 6m adl Sig 5:1 1.25D Helideck – Not applicable • Semi-Sub • Table 2 due to turbulence from base of derrick 210° • Table 1 [T] if overflight of 5:1 obstructions unavoidable • Cleared for EC225 (11.0t) and S92 (12.0t) Reduced to 198° by bridge handrail stbd & crane pedestal port Port flare boom support wire when deployed Port fwd NDB ariel arm approx 350mm adl 150° Container aft of helideck approx 5m from edge of SLA and 3m adl GSF Galaxy 1 22.2 9.3 1 • Cleared for EC225 (11.0t) and S92 (12.0t) GSF Galaxy II 25.4 9.3 1 Jack Up • Cleared for EC225 (11.0t) and S92 (12.0t) 22.2 9.3 1 Main decking port, forward and aft of helideck Misc 5:1 GSF Galaxy III Main deck below Port and Starboard aft of helideck Jack Up • Cleared for EC225 (11.0t) and S92 (12.0t) • Possible turbulence from Buzzard flare Turbulence reports requested to assess above Page 19 of 69 Sig 5:1 Column (port fwd) and anchor windlass Port flare boom when deployed Fwd Foam monitor platform 150° Monitor Handles Misc Flare booms when operational 210° Sector infringed by Buzzard Flare boom and accommodation block 27 November 2014 14:11:38 HCA HLL Name GSF Monarch D t 23 12t PRH Wind Kts 1 • 240-305 Rel to rig hdg • 11 plus 27 November 2014 Mobile Non Compliances Limitation • Jack Up • Table 2 - Use 35-45Kts limitation EC155 - RTOLW subject to maximum 4500Kg • Table 1 (T) if overflight of 5:1 items unavoidable • Cleared for EC225 (11.0t) and S92 (12.0t) 210° Outboard fire monitors 380mm adl Top of starboard flare boom frame marginally infringes 210 sector 150° Inboard fire monitors 750mm adl in first sector of LOS 5:1 Misc GSP Falcon GSP Fortuna GSP Jupiter 22.2 9.3 20.8 9.3t 8 18.2 8.6 3 • Pipe Layer • Cleared for EC225 (11.0t) and S92 (12.0t) • Table 1(T) if overflight of 5:1 infringements unavoidable 1 1 Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Table 1 (T) to be applied if overflight of Fwd emergency exit unavoidable. • Mandatory ARA required for all operations • Possible turbulence from accommodation unit. Turbulence reports requested 5:1 Turbulence from porta-cabins at rear of deck. Port & Starboard access platforms 210° Clear 150° Clear 5:1 Clear 210° Floodlights 300mm adl OFS reduced to 197° by Rig Legs Marginal infringement of port leg NDB unit approx 600mm adl beside starboard leg NDB aerial cable port and starboard sides Access handrails port and starboard sides NDB aerial supports approx 330mm adl 150° Access handrails (port & Stbd) and main accommodation block Marginal infringement, aiming circle offset 5:1 Misc Page 20 of 69 Bow crane Burner boom (when attached) Forward foam monitor platform perimeter net and NDB Aerial Comprehensive electronic P/R/H measuring and Automated weather monitoring equipment not available on site. No Dangerous Goods by Air to be sent to/from this Installation. Marginal infringement of port leg due to incorrect marking on deck 27 November 2014 14:11:38 HCA HLL Name GSP Saturn D t 19 8.6 PRH Wind Kts 1 0 - 15 140 - 220 rel All to barge head GSP Uranus 21.3 9.3t 1 Hai Yang Shi You 718 19.5 9.3t 2 Hai Yang Shi You 719 19.5 9.3t 0 Hai Yang Shi You 720 22.2 12.8 3 All All 27 November 2014 Mobile Non Compliances Limitation Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Overflight of the forward monitor platform to be avoided on take off • Mandatory ARA required for all operations • Possible turbulence from accommodation unit. Turbulence reports requested Jack up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave 210° Reduced to 197°, Legs port & starboard 150° Access handrails (port & Stbd) - Marginal infringement, aiming circle offset 5:1 Forward foam monitor platform perimeter net and NDB Aerial Misc Comprehensive electronic P/R/H measuring and Automated weather monitoring equipment not available on site. Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site 210° Forward Navigation Mast if not folded Stable deck conditions - no HMS Table 1(T) if overflight of Towed arrays No Fire Monitors - No Certificate • Seismic vessel • Seismic arrays deployed – Table 1 (T&L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Table 1 (T) if overflight of either aft corner of the deck Page 21 of 69 5:1 Misc Port and Stbd aft corners of the Helideck Dangerous Goods not to be accepted for transport by Air. 27 November 2014 14:11:38 HCA HLL Name Hai Yang Shi You 721 D t PRH Wind Kts Non Compliances Limitation • Seismic vessel • Seismic arrays deployed – Table 1 (T&L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Table 1 (T) if overflight of either aft corner of the deck • Mandatory Airborne Radar Approaches to apply 22.2 12.8 3 Hanne Knutsen 22.8 14.3 1 Tanker • Table 1(T) to be applied if overflight of main deck forward, aft and starboard of helideck unavoidable • 2 x 150⁰ LOS • Amidships helideck, port forward Harkand Atlantis 22.2 12.0 3 DSV Harkand Da Vinci 22.2 12.0 2 27 November 2014 Mobile DSV 210° 5:1 Misc Sig 5:1 20.9 12.0 2 0-15 • Seismic vessel • Seismic arrays deployed – Table 1 (T&L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Overflight of either corner aft of deck to be avoided on takeoff Page 22 of 69 Port and Stbd aft corners of the Helideck Ensure Perimeter net securing posts removed - All around deck 90cm high if not. Dangerous Goods not to be accepted for transport by Air. Main deck forward, aft and starboard of helideck 210° Clear 5:1 Clear Misc No Dangerous Goods by Air to be shipped from this vessel 210° Clear 5:1 Clear Misc Harrier Explorer Forward Navigation Mast if not removed Sig 5:1 5:1 Misc No Dangerous goods by Air to be shipped to / from this Vessel Seismic arrays (when deployed) Port and starboard aft corner of underlying deck No other significant infringements 27 November 2014 14:11:38 HCA HLL Name Haven D t PRH 20.8 15.0 1 8 Kts Non Compliances Limitation JackUp Accomodation Rig • Table 1(T) to be used if overflight of access platform is unavoidable • Check height of helideck and height of rig for each new location • Check 210⁰ OFS for each new location, restrictions may apply Havila Phoenix 21.0 12 Havila Subsea 20.8 12.8 3 8 Offshore Construction Vessel Nil According to Norwegian regulations, 1,25 D 20.8 13 8 Rescue Recovery Vessel - RRV • Table 1(T&L) if overflight of aft decking unavoidable Havila Troll 3 Wind 2 27 November 2014 Mobile Subsea Construction Vessel • Table 1(T) if overflight of forward bow area outside SLA is unavoidable 150° Sig 5:1 Forward Access platform Sig 5:1 Forward bow area outside SLA 5:1 210° Sig 5:1 Misc Hermod 22.2 9.3 1 Crane Barge • Table 1(T) to be applied for all operations due to Sig 5:1 ifringements all round the deck See HLL - Part E Annex 5 for other restrictions • Cleared for S92 (12.02t) & EC 225 (11t) Hilda Knutsen 20.8 12.8 1 8 Tanker with amidships helideck on port side • Table 1(T) to be applied if overflight of decking starboard, forward and aft of helideck is unavoidable • 2 x 150° Limited Obstacle Sectors Heated helideck Page 23 of 69 Railings on top of Helideck Control Centre marginal infringement marked in obstruction colours Sig 5:1 5:1 Nil Perimeter net frames 30cm above helideck level Aft deck and structures 1.25D Helideck - Not applicable Port side - Office modules, deck area and life boats Starboard side - Deck area, satellite dome, swimming pool Main deck forward, aft and starboard of helideck 27 November 2014 14:11:38 HCA HLL Name HMS Protector HOS Achiever HOS Iron Horse Hugin Explorer Island Constructor D t 19.5 9.3 PRH 2 22.2 12.0 3 22.2 12.0 3 20.9 12.8 3 22.8 14.6 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Ship • Table 1(t) if overflight of 5:1 items unavoidable MSV • Bow Mounted Helideck • Aiming Circle Offset MSV • Nil • Seismic vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays MOU – Mobile Offshore Unit • Table 1(T) if overflight of forward access platform unavoidable • Possible turbulence from turbine exhaust • Avoid landing with tail rotor in or swinging the tail rotor through a sector of the LOS +/- 45 deg of centreline Page 24 of 69 210° Sig 5:1 • Nil Vessel structure Port and Starboard aft of helideck Misc Only 6 tie down points 210° CO2 unit approx 350mm adl Misc Dangerous goods not to be received from this location no qualified person Fuel system not commissioned 210° • Nil 150° Marginal infringement of SAT domes and whip aerials port and starboard sides Misc Aiming circle to remain offset Dangerous goods not to be shipped from this location 5:1 Seismic booms and cable arrays (when deployed) Misc No other significant obstructions 210° • Nil 150° Unconfirmed infringements by bulkhead, equipment, railings and structures Sig 5:1 Forward access platform 27 November 2014 14:11:38 HCA HLL Name Island Crown D t PRH Wind Kts 20.8 12.8 2 8 27 November 2014 Mobile Non Compliances Limitation Accomodation vessel - Helideck Midships • Bridge / gangway on the stern; when lifted off its rest, infringes the OFS. Therefore no helicopter operations permitted when gangway lifted/attached. When stowed in rest position, no restrictions 210° 5:1 Bridge / gangway on the stern; when lifted off its restbed. Main aft deck with bridge / gangway •Table 1(T) to be applied if overflight of main aft deck with bridge / gangway is unavoidable Island Enforcer 20.8 12.8 3 8 MSV with 1.25D deck Nil Island Frontier 22.2 12.8 3 MOU Mobile Offshore Unit • Table 1(T) to be used if overflight of forward access platform unavoidable Island Innovator 22.2 12.8 1 Semi submersible - Mobile Drilling Unit • Table 1(T) if overflight of port forward monitor platform unavoidable • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types to be submitted • No start unit, caution if shutting down 110-200° rel 20-30 to rig hdg 31-40 31-40 41 plus Misc Island Performer 20.8 12,8 3 8 Well Intervention Vessel - 1.25D helideck - Norwegian regulations - Table 1(T) if overflight of forward access platform and lower bow section unavoidable Island Pride 20.8 12,8 3 8 Offshore Construction Vessel • 1.25D helideck – Norwegian regulations Page 25 of 69 Sig 5:1 210° Sig 5:1 Misc Sig 5:1 210° D values undersized (60cm ht for Brazil) Forward access platform 3,5m Marginal infringement by forward lifeboat frame and aft ventilation duct Port forward monitor platform (1.25D helideck – Norwegian regulations) Forward access platform and lower bow section Dome antenna port side marginal infringement 27 November 2014 14:11:38 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Island Wellserver 22.2 12.8 3 Light Well Intervention Vessel • Table 1(T) to be used if overflight of forward access platform unavoidable Jascon 25 22.2 13.0 3 Pipe Layer • Aiming circle offset due to marginal infringement in LOS Jascon 31 22.2 13t m 3 • MSV Jascon 55 22.2 9.3 3 MSV JB 114 19.5 9.3t 1 Jack Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 degree. • No helicopter operations whilst on the move JB 115 JB 117 19.5 9.3 19.5 9.3 1 1 27 November 2014 Mobile • Jack Up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move • In the current position at the douglas platform Table 2 applies for both decks in all winds. TLN in place • Jack Up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move Page 26 of 69 Sig 5:1 Forward access platform 150° Handrails marginal infringement Misc Certifcate expires 13 December 2014 Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times No electronic P/R/H system fitted No helideck net fitted Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times No helideck net fitted No other significant infringements Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times 27 November 2014 14:11:38 HCA HLL Name JB 118 Joseph Plateau D t 19.5 9.3 PRH Wind Kts 22.8 14.6 1 Kommandor Subsea 19 9.3 Non Compliances Limitation • Jack Up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move F Dredger • Nil 2 26.1 12,8 3 Pipe layer - 1.25D helideck, Norwegian regulations - LOS clearance for D 26 Lay Vessel North Ocean 105 20.9 12.8 3 Offshore Construction Vessel • According to Norwegian regulations – D= 1.25 22.8 15 1 120-200 rel to rig hdg Lewek Connector 20.8 12.8 3 8 Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times Helideck net in excess of 25mm adl 210° • Nil 210° Clear 5:1 Clear MSV Winching Operations Only Lay Vessel 108 Leiv Eiriksson 27 November 2014 Mobile • 20-30 • 31-40 • 31-40 • 41 plus • Semi-sub • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted Offshore Construction Vessel • Table 1(T) if overflight of forward access platform unavoidable • 1.25D helideck – Norwegian regulations Page 27 of 69 Nil Sig 5:1 Forward access platform 27 November 2014 14:11:38 HCA HLL Name D t PRH Wind Kts Lewek Constellation 22.2 12.8 3 27 November 2014 Mobile Non Compliances Limitation Pipe Lating Vessel • Table 1(T) if overflight of 5:1 items unavoidable 5:1 Misc Lewek Express 22.2 9.3 3 Misc Lewek Inspector 20.8 12.8 3 8 Offshore Construction Vessel • Table 1(T) if overflight of forward access platform unavoidable Lorelay 22.2 13 • Pipe Laying Ship • Table 1 (T) if overflight Sig 5:1 items unavoidable 1 Maersk Deliverer 22.8 15.0 1 Semi Sub Maersk Discoverer 22.8 15.0 1 •Semi-Sub •Table 1(T) if overflight of port aft or forward access unavoidable on take off • No Landings due poor friction on Helideck unless a helideck net is fitted. All 22.8 15.6 1 Actual deck size 27.5m octagonal Pipe Layer 5:1 Maersk Reacher Port & Stbd rear access and bridge wings >30kts Jack Up (MODU) • Table 1(T) if overflight of forward access platform unavoidable • Stable deck criteria to apply for operation whilst under tow i.e. Pitch & Roll maximum 1°, Heave 2m • Status lights fitted Page 28 of 69 Sig 5:1 Fwd & starboard access platforms approx 4.70m from edge of SLA; Port approx 4m Access points including the NDB aerials No Qualified Dangerous Goods shipper/packer onboard - No Dangerous Goods by Air to be shipped to/from this vessel. Forward access platform 5:1 Forward access, bow and lay down platform aft port 5:1 Port aft and fwd access Misc Sig 5:1 Misc If No helideck net fitted beware low friction co-efficient on deck. Fuelling system out of commission Forward access platform Comprehensive electronic pitch, roll and heave measuring equipment not available on site 27 November 2014 14:11:38 HCA HLL Name Maersk Recorder Maersk Resilient D t 19.5 9.3 PRH 3 Wind Kts 0-15 22.8 15.6 1 0-15 27 November 2014 Mobile Non Compliances Limitation • Overflight of foam monitor platforms to be avoided on takeoff Jack Up • Avoid overflight of Forward foam monitor platform • Mandatory radar approach for all landings until temp and dew point sensors are serviceable 5:1 210° 5:1 Misc Maersk Resolute Maersk Resolve Maersk Responder Maersk Valiant Maersk Venturer 22.8 15.6 1 22.8 15.6 1 19.5 9.3 3 22.8 14.6 1 22.8 14.6 1 Jack Up (MODU) • Table 1(T) if overflight of forward monitor platform and antenna is unavoidable Jack Up (MODU) No limitations Cable Laying Vessel • Table 1(T) if overflight of Fwd Foam Monitor platform is unavoidable. Sig 5:1 Foam monitor platforms (Fwd & Port aft) Foam monitor handles and refuel hose reel bracket approx 400mm adl Port & Stbd Aft Foam Monitor Platforms extend 3.6m from SLA. Forward Foam Monitor Platform extends 3m from SLA out to NDB aerials. Port and starboard cranes when in rest No significant infringements Antenna fixtures on forward monitor platform 3m from SLA Misc Comprehensive suite of weather sensors not fitted. Misc Helideck net 45mm adl Sig 5:1 Misc Forward foam monitor platform Ensure Folding Satellite Mast on FWD Monitor platform is lowered before Heliops commence Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Page 29 of 69 27 November 2014 14:11:38 HCA HLL Name Maersk Viking Maersk Voyager D t PRH 22.8 14.6 1 22.8 14.6 0 Wind Kts Non Compliances Limitation Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Mermaid Endurer 20.8 12.8 3 8 • Diving Service Vessel Munin Explorer 19.5 9.6 Seismic • Seismic arrays deployed – Table 1 (T&L) regardless of over flight) stowed - no limitation Whenever practical, avoid or minimize over flight of arrays Nansen Spirit Navion Britannia 2 27 November 2014 Mobile 20.8 12.8 1 8 • Tanker with amidships helideck on port side • 2 x 150° Limited Obstacle Sectors - Take offs & Landings permitted Port and Starboard • Table 1 (T&L) to be applied when over flight of decking on starboard side of helideck is unavoidable • D=1.25 according to Norwegian Regulations 22.8 15.0 1 Tanker with amidships helideck on port side • Table 1(T) if overflight of decking unavoidable Page 30 of 69 Sig 5:1 Misc 5:1 150° Sig 5:1 Seismic booms and cable arrays (when deployed) No Dangerous Goods by Air to be shipped to or from this Vessel Decking forward, aft and starboard of helideck VOC module 3m adl, 12m aft of helideck Main deck forward, starboard and aft of helideck 27 November 2014 14:11:38 HCA HLL Name Navion Europa Navion Hispania Navion Oceania Navion Scandia Ndeavor D t 22.0 9.3 22.8 15 PRH 1 1 22.8 15.0 1 22.8 15.0 1 20 10 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Tanker with helideck on centreline • 2 x 150 degree Limited Obstacle Sectors - Take offs & Landings permitted Port and Stbd· • Table 1(T) to be applied if overflight of ships main deck is unavoidable • Approved for S92 at 11.86t and EC 225 (11t) • Mandatory radar approach required • Tanker with amidships helideck on port side· • Table 1(T) to be applied if overflight of decking forward, aft and starboard of helideck is unavoidable Sig 5:1 Non compliant met equipment 150° VOC housing 10m aft of helideck, 3.7m ADL Sig 5:1 Tanker with amidships helideck on port side • Table 1(T) to be applied if overflight of ships main deck is unavoidable. • Take off and landings restricted to port side only 210° Tanker with amidships helideck port side • Table 1(T) if overflight of main decking unavoidable • 2 x 150⁰ LOS • VOC unit marked with black-yellow stripes 150° Construction Support Vessel • Daylight Hours only - Helideck lights no on UPS •Table 1(T&L) to be used if overflight of bow sprit unavoidable Page 31 of 69 Main decking Port and Starboard of helideck Misc 5:1 Decking Forward , Aft and starboard of helideck Infringed by voc tank starboard side and bridge aft, floodlight mast, crane and high bow section forward Main decking forward and aft VOC housing 10m aft of helideck, 3.7m ADL Sig 5:1 Main decking forward, aft and starboard of helideck Sig 5:1 Bow sprit extending 10m forward of bow (temporary fitting) Misc Helideck lighting not on UPS supply Helideck net when fitted 35mm adl 27 November 2014 14:11:38 HCA HLL Name Neptune Naiad D t 16.0 5.3 Noble Bob Douglas Noble Hans Deul PRH Wind Kts 2 27 November 2014 Mobile Non Compliances Limitation Seismic • Table 1 (T) to be applied if overflight of aft decking is unavoidable. • Seismic arrays deployed – Table 1 (T&L) regardless of overflight) stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Offset aiming circle Sig 5:1 0 22.2 9.3 1 Aft (relative) All Noble Paul Romano 18.7 9.3 1 Jack Up • Table 1(T) if overflight of foam monitor platforms is unavoidable. • Table 2 due to wheelhouse and engine exhaust (use 35-45 kts limitations) Turbulence reports requested - Nil reports received. • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Cleared for EC 225 (11.0t) and S92 (12.0t) Semi Sub • Table 1(T) if overflight of 5:1 obstructions unavoidable. 150° Sig 5:1 Misc 5:1 Misc Noble Roger Lewis Seismic arrays (when deployed) Aft deck (main working deck) 22.2 1 Emergency generator room corner (marginal infringement) Aiming Circle offset to mitigate. Port & Starboard foam monitor platforms No Planned shutdowns only 6 tie down points available Forward column and crane Possible turbulance from exhausts behind and below deck Jack Up Page 32 of 69 27 November 2014 14:11:38 HCA HLL Name D t PRH Wind Kts 2 27 November 2014 Mobile Non Compliances Limitation Nordic Explorer 18.9 8.6 5 Seismic vessel • Table 1 (T)) to be applied when over flight of decking and cranes aft of helideck is unavoidable • Seismic arrays deployed, ,Table 1(T&L) regardless of overflight. Whenever practical, avoid or minimize overflight of arrays. • Area of helideck outside SLA marked by red lights • Offset aiming circle • Possible turbulence from exhausts Nordica 22.2 12.8 3 MSV • Nil Normand Baltic 20.8 12.8 3 8 PSV/ROV Survey Vessel Nil Sig 5:1 Nil Misc Normand Clipper 19.5 9.3 3 Normand Commander 20,9 12.8 3 Offshore Construction Vessel •Nil Normand Cutter 19.5 9.3 Ship • Nil Normand Fortress 20.9 12.8 3 Decking and cranes aft of helideck Seismic booms and cable arrays (when deployed) • Operations in Norway restricted to max D value 16,71m Ship • Nil 3 0-15 Nil 210° • DSV • Avoid overflight of either access port & starboard 5:1 Misc Page 33 of 69 • Nil Access platforms port and starboard When net fitted will exceed 25mm adl 27 November 2014 14:11:38 HCA HLL Name Normand Installer D t 19.5 9.3 PRH 3 Kts Non Compliances Limitation MSV Nil Normand Mermaid 19.5 9.3 Normand Oceanic 20.9 12.8 3 • Offshore Construction Vessel Normand Pioneer 22.2 9.3 • MSV • Table 1 (T) if overflight of forward Nav light approx 2.4m from edge of SLA Normand Progress Normand Prosper Normand Reach 22.2 9.3 3 Wind 3 3 20.9 12.8 3 20.8 16 8 3 27 November 2014 Mobile Ship • Nil MSV • Cleared for EC 225 (11.0t) and S92 (12.0t) MSV (ROV/Anchor handling) • Operations I Norway restricted to max D value 16,71m Offshore Construction Vessel - 1.25D helideck - Norwegian regulations - Table 1(T) if overflight of forward access platform unavoidable Page 34 of 69 210° Clear 5:1 Clear Misc No Dangerous Goods by Air to be shipped To/From this Vessel 210° • Nil 150° Very marginal infringement of Sat dome on the starboard side 5:1 Forward Nav light approx 2.4m from edge of SLA Misc No DG's to be shipped from this vessel no trained person onboard 150° Fire extinguisher minor infringement in 1st sector of LOS Radar Dome minor infringement in 2nd sector of LOS Misc Aiming circle offset by 1m outboard Misc Norwegian requirement is 1,25 “D” from 01January 2008 Sig 5:1 Forward access platform 27 November 2014 14:11:38 HCA HLL Name Normand Subsea Normand Tonjer D t PRH Wind Kts 22.2 12.8 3 19.5 9.3 Non Compliances Limitation MSV • Table 1 (T) if overflight of deck area at Port & Stbd aft corners of helideck is unavoidable. 3 DSV • Exhaust turbines aft of helideck. • Table 1(T) if overflight of port and starboard access unavoidable Normand Vision 20.8 15 8 3 Offshore Construction Vessel • LOS Clearance for “D” = 23 • 1.25D helideck – Norwegian regulations North Sea Atlantic 23 3 Offshore Construction Vessel - 1.25D helideck - Norwegian regulations - LOS clearance for D23 - Approved for EH101 outside Norway - Minor parts of floodlights inside landing area ( height 250mm) 15 North Sea Giant 20.8 12.8 3 8 Ocean Guardian 22.8 14.6 1 0 27 November 2014 Mobile 5:1 Deck area at Port & Stbd aft corners of helideck Nil 150° Sig 5:1 Misc Turbines marginally infringe sector Port and starboard access points Minor parts of floodlights Offshore Construction Vessel 1.25D helideck - Norwegian regulations • • 185-235 • rel rig hdg. • • 30-45 Semi Sub • Table 2 - derrick structure (use 35-45 kts limitations) Turbulence reports requested to assess above • Table 1 (T) if overflight of the anchor winch housing on starboard fwd leg or Forward liferafts is unavoidable • Helideck Starboard Forward corner Page 35 of 69 Sig 5:1 Anchor winch housing on starboard forward leg. Forward liferafts 27 November 2014 14:11:38 HCA HLL Name Ocean Nomad Ocean Patriot Ocean Pearl Ocean Princess D t PRH Wind 22.2 15.0 1 21 22.2 9.3 • Semi-Sub • Table 1(T) if overflight of 5:1 infringements unavoidable 2 Seismic vessel • Take-off and landings over telecom mast, satelite domes and windsock to be avoided • Table 1(T&L) if overflight of main deck area aft unavoidable • No NDB 1 120-170 rel rig hdg Ocean Rig Athena 22.2 12.8 1 Non Compliances Limitation Semi Sub • Table 1(T) If overflight of winch house/column and fwd lifeboats unavoidable 12.8 1 19.5 9.3 Kts 27 November 2014 Mobile 210° 5:1 Port forward winch housing and stabilization column (forward/port corner) Liferafts (forward/centre) Misc Aiming Circle offset due obstruction in LOS caused by Refuelling Cabinet. No Dangerous Goods by Air to be shipped to/from this Vessel 5:1 210° Sig 5:1 Starboard winch house and access platform Port side life-boat station Telecom mast, satellite domes , windsock 4m adl, 32m aft of helideck Main deck area aft of helideck Misc No NDB fitted 210° Reduced to 199º. Limited by the port crane and the stbd crane jib tip Semi Sub • Table 2 due to cladding at base of derrick • Table 1 (T) if overflight of forward lifeboats, accommodation module, stabilization column & monitor platform unavoidable Sig 5:1 Drillship •Table 1(T) if overflight of 5:1 infringement unavoidable 5:1 Misc Page 36 of 69 Reduced to 188° by port crane and vent stack starboard side between helideck and bridge Forward lifeboats Fwd port corner of accommodation module Port forward stabilzation column ( includes monitor platform) Rear foam monitor platforms and Bridge wings Forward foam monitor platform Approved friction surface - No net 27 November 2014 14:11:38 HCA HLL Name Ocean Vanguard Ocean Zephyr D t 21.0 9.3 19.5 9.3 PRH 1 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Semi Submersible Rig • Table 1(T) applicable if overflight of foam monitor platform unavoidable • 25.2 m helideck restricted to SLA containing D circle of 21m. Red demarkation lights inboard. • OFS restricted to 195° • Approved for S92 – 11.9t, EC225 – 11t MSV • Table 1(T) if overflight of 5:1 infringements unavoidable 210° Sig 5:1 Forward foam monitor platform Misc 1.25D helideck - Not applicable 150° Radar antenna in second sector of LOS 5:1 Oceanic Challenger 20.8 12 8 Oceanic Phoenix Oceanic Sirius 2 20.9 12.8 2 20,8 12,8 3 8 Restricted by dual agent unit and pipelines port side, and crane starboard side. OFS restricted to 195° Port & starboard aft access platform Misc Offset aiming circle • Seismic Vessel • Table 1(T&L) to be applied if overflight of aft deck and crane unavoidable • Seismic arrays: deployed - Table 1 (T) regardless of overflight stowed - Table 1 (T) aft deck and crane Whenever practical, avoid or minimize overflight of arrays • Aft crane to be facing aft for helicopter operations 210° Aft crane Seismic Vessel • Table 1 (T) to be applied if overflight of aft deck unavoidable. • Seismic arrays: Table 1 (T&L) regardless of overflight. Stowed : Table 1 (T) ( aft deck) Whenever practical, avoid or minimize overflight of arrays. 210° Seismic Vessel • D=1,25 According to Norwegian rules Page 37 of 69 5:1 Sig 5:1 Aft deck and crane Seismic booms & cable arrays (when deployed) Mast with windsock 1,5m adl, 25 m aft of helideck Aft deck area Seismic arrays when deployed Nil 27 November 2014 14:11:38 HCA HLL Name D t PRH Oceanic Vega 20.8 12.8 3 8 OIG Giant II 17.1 5.4t Wind Kts 27 November 2014 Mobile Non Compliances Limitation Seismic • Nil 0 210° Clear 150° Clear Sig 5:1 Misc Oleg Strashnov Olympic Ares 21 12.8 1 20.8 16 8 3 Olympic Boa 26.1 16 3 Olympic Challenger 20.9 12.8 3 • Crane barge • Mandatory radar approaches • Table 1(T) if overflight of Sig 5:1 items unavoidable • Possible turbulence from exhausts aft of helideck on port and starboard sides. Turbulence reports requested. Offshore Construction Vessel • Table 1 (T) if overflight of radar antenna in front of helideck is unavoidable • Approved for EH 101 D22.8 outside Norway, LOS clear Sig 5:1 Misc Sig 5:1 Misc Nil Deck is too small for most Helicopters and it is proposed to change it to a larger version. Port & starboard bridge wings and satellite domes Non compliant metrological equipment Aiming circle offset No other significant infringements Radar antenna forward, 2 m below helideck surface 1.25D Helideck - Norwegian regulations Offshore Construction Vessel • LOS Clearance for “D” = 26m • Norway – max D value 20.88m Offshore Construction Vessel • No restrictions Page 38 of 69 27 November 2014 14:11:38 HCA HLL Name Olympic Intervention IV Olympic Taurus D t PRH Wind Kts 22.2 12.8 0 Non Compliances Limitation Multi Purpose Vessel Nil Nil 20.8 12.8 3 8 Offshore Construction Vessel • Nil Olympic Triton 22.2 12.8 3 MSV • Table 1(T) if overflight of 5:1 items unavoidable Orelia 22.2 12.0 3 DSV - Bow deck When steaming ahead - Cat 3 When steaming astern - Cat 2 • Prohibited landing heading sector - 340-020 degree relative to ships bow & Aiming circle offset due to obstructions in LOS • Overflight of forward access to be avoided on take off • Possible turbulence due to;- Crane & mast structure aft of helideck & Turbine exhausts integral with mast, when steaming astern. 0-15 Osprey Explorer 20.8 12 8 2 0-15 27 November 2014 Mobile Seismic • Overflight of deck structure protrusion on aft port side to be avoided on take off • Seismic arrays deployed – Table 1 (T&L) regardless of overflight • Whenever practical, avoid or minimize overflight of arrays Page 39 of 69 150° Port and starboard walkways approx 2.9m from edge of SLA Misc Potential for NDB aerial port side to whip forward Helideck net if fitted approx 40mm adl Misc (Norway 1.25D Requirement, D = 17.76m) Sig 5:1 150° Port and Starboard access points Fire equipment cabinet, handrail & main mast, marginally infringes sector 5:1 Platform on forward edge 5:1 Seismic arrays when deployed Deck structure protrusion on aft port side 27 November 2014 14:11:38 HCA HLL Name Pacific Explorer Pacific Khamsin Pacific Orca Pacific Osprey Paragon B391 Paragon C20051 D t 19.5 9.3 22 PRH 2 12.8 1 22.2 12.8 1 22.2 12.8 1 19.5 9.3 1 22.2 12.8 1 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Seismic Vessel • Seismic arrays Deployed – Table 1(T&L) regardless of over flight Stowed – No limitation • Aft mast to be removed for all heliops Sig 5:1 • Drillship • Table 1(T) of overflight of 5:1 items unavoidable 5:1 Wind turbine Installation Vessel – Jack Up • Table 1(T) if overflight of forward foam monitor platform unavoidable • Check height of helideck and top of installation for each location Wind turbine Installation Vessel – Jack Up • Table 1(T) if overflight of forward foam monitor platform unavoidable • Check height of helideck and top of installation for each location • Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Red lights at rear of deck to highlight 150 degree obstructions • Jack Up • Table 1(T) if overflight of outboard foam monitor platform unavoidable • Stable deck conditions to apply whilst on tow i.e. maximum of 1° pitch & roll and 2m heave Page 40 of 69 210° Sig 5:1 Misc Sig 5:1 Mast aft on helideck Seismic arrays (when deployed) Fire & Access platforms Forward foam monitor platform (1.25D Helideck - Norway D = 17.76) Forward foam monitor platform Misc 1.25D helideck – Norway D=17.76m 150° Leg winch motor platforms either side of leg 0.5m overheight 5:1 Flare boom starboard side (when deployed) Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Aiming circle offset 210° Sector reduced to 197° due lifeboat gantry 5:1 Misc Outboard foam monitor platform Comprehensive electronic pitch, roll and heave measuring equipment not available on site Aiming Circle offset 27 November 2014 14:11:38 HCA HLL Name Paragon C20052 Paragon HZ1 Paragon MSS1 D t PRH Wind Kts • Jack-Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave 22.2 12.8 1 22.2 9.3 1 Semi Sub • Table 2 - due to turbulence from base of derrick Turbulence reports requested • Table 1(T) if overflight of fwd lifeboats is unavoidable. • Aiming Circle Offset due to size of name. • Cleared for EC 225 (11.0t) and S92 (12.0t) 120-150 rel to rig hdg Paul B Loyd Jnr 22.8 21.0 1 Peary Spirit 20.9 12.8 2 Non Compliances Limitation • Jack Up • Table 1(T) if overflight of outboard access is unavoidable • Stable deck conditions to apply whilst on tow. i.e. 1 degree pitch & roll and 2m heave 22.2 12.8 1 • • 160-205 • rel rig hdg • • 20-30 • 31-40 • 31-40 • 41 plus 27 November 2014 Mobile Semi Sub • All types - Table 2 (use 35-45 kts limitations) • AS332L - Max helipad weight Other types - Nil landings All types - Nil landings • Table 1(T) if overflight of accommodation modules unavoidable • Helideck forward centre Tanker with amidships helideck on port side •2 x 15 degree Limited Obstacle Sectors - Take offs & Landings permitted Port and Starboard •Table 1 (T&L) to be applied when over flight of decking on starboard side of helideck is unavoidable •D=1,25 according to Norwegian Regulations •Equipped with status lights for gas detection Page 41 of 69 210° 5:1 Aft starboard leg flare boom attachment frame slightly infringes sector Outboard access platform Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Aiming circle offset 210° Handrails on forward port & starboard legs slighty infringe sector 150° Second sector of LOS infringed by accommodation Misc Aiming circle offset Comprehensive electronic pitch, roll and heave measuring equipment not available on site 5:1 Fwd lifeboat & stowage Sig 5:1 Accommodation modules, starboard & port Sig 5:1 Decking forward, aft and starboard of helideck 27 November 2014 14:11:38 HCA HLL Name PGS Apollo Pharos Pieter Schelte Polar Duke Polar King D t PRH Wind Kts Non Compliances Limitation 20.8 12.8 2 8 • Seismic vessel • Table 1(T) if overflight of stern nav ligts unavoidable • Seismic arrays deployed – Table 1 ( T&L) regardless of overflight Stowed – No limitation. Whenever practical, avoid or minimize overflight of arrays. . 12 Ship • Port and starboard cranes to be extended aft for helicopter operations • Operations restricted to daylight only unless windsock illuminated • Pilots to be briefed by Bond Air Services before operating to this helideck 3.2 3 22.2 12.8 1 27 November 2014 Mobile Heavy Lift Vessel • Daylight Hours only due to lack of obstruction lights • Mandatory Radar approach due to lack of comprehensive Met Eqpt. • Table 1 (T&L) if overflight of Fwd Bows and other 5:1 infringements are unavoidable. 20.8 12.8 2 8 Seismic Vessel • Seismic arrays - Deployed – Table 1 (T&L) regardless of overflight - Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays 20.8 12.8 3 8 Construction vessel • Maximum D-value Norway – 16.71m Page 42 of 69 5:1 Stern navigation lights on outboard perimeter net frame 210° Port and starboard crane marginally infringe sector 150° Port and starboard crane Handrails near port crane Misc Floodlights and perimeter lights inboard of perimeter line all lights 200mm adl. Hinges for perimeter net up to 25cm high Approach line on starboard side for pilots reference 210° Foam Hose box & monitor s/w panel 300mm adl 5:1 Ships bows fwd / Control Boxes / Fwd Foam Monitor Platform 5:1 Seismic Arrays (when deployed ) 27 November 2014 14:11:38 HCA HLL Name D t PRH Polar Marquis 19.5 12.8 3 Polar Pioneer 27.1 22 6 Wind Kts Non Compliances Limitation Seismic vessel 1 130-185 • 20-30 rel to rig hdg • 31-40 • 31-40 • 41 plus Semi sub drilling rig • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted • Table 1 (T & L) to be used if overflight of Lifeboat station Shelter is unavoidable. Table 1(T) to be used if overflight of fwd monitor platform unavoidable. Polar Prince 19.5 10.0 3 MSV - Nil Polar Queen 20,8 12,8 3 8 Offshore Construction Vessel • Operations in Norway restricted to helicopters with max D value 16,71m Polarcus Alima 22.2 12.1 2 • Seismic vessel • Siesmic arrays deployed - Table 1(T & L) regardless of overflight stowed - No limitation • Whenever practical, avoid or minimize overflight of arrays Polarcus Amani 22.2 12.8 2 m 27 November 2014 Mobile Seismic Vessel • Seismic arrays deployed – Table 1 (T&L) . Stowed – no restrictions. Whenever practical, avoid or minimize overflight of arrays. - For operations in Norway max D value 17.76m Page 43 of 69 210° Sig 5:1 Misc 5:1 Misc Sig 5:1 Misc Port and forward foam monitors 90 cm adl Forward lifeboat station Shelter and forward foam monitor platform (1.25D helideck – not applicable) Seismic booms and cable arrays (when deployed) No other significant infringements Seismic arrays when deployed No other limitations 27 November 2014 14:11:38 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Polarcus Asima 22.2 12.1 2 Seismic • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Polarcus Nadia 22.2 12.1 2 • Seismic vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Polarcus Naila Posh Xanadu Ramform Atlas 22.2 12.1 2 22.2 12.8 1 26.1 16t 3 27 November 2014 Mobile • Seismic vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Flotel • Mandatory radar approach due to no cloud base, visibility or present weather sensors • Table 1(T) if overflight of access and deck structures below helideck port and starboard sides are unavoidable Seismic Vessel • Table 1 (T) if overflight of the 5:1 infringements unavoidable Page 44 of 69 Sig 5:1 Seismic booms and cable arrays (when deployed) 5:1 Seismic booms and cable arrays (when deployed) 5:1 Seismic booms and cable arrays (when deployed) Misc 5:1 Misc No other significant infringements Access platforms infringes sector. Various deck structures below helideck port and starboard sides Non compliant meteorological equipment 5:1 Bow section forward - Main deck port & starboard aft Misc Foremast to be lowered for all helicopter movements 27 November 2014 14:11:38 HCA HLL Name Ramform Challenger Ramform Explorer D t PRH 22.8 15.0 2 Wind Kts Non Compliances Limitation Seismic Vessel • Seismic arrays deployed: Table 1 (T&L) regardless of overflight Stowed: Table 1 (T) if overflight of main deck unavoidable. Whenever practible, avoid overflight of arrays. • Daylight operations only – no UPS • Satelite dome must be lowered for all helicopter operations 23.4 12.8 2 Seismic Vessel • Seismic arrays deployed – Table 1(T&L) regardless of overflight • Seismic arrays stowed – Table 1(T) if overflight of starboard decking unavoidable • W henever practical, avoid or minimize overflight of arrays • Reduced helideck SLA indicated by red lights Ramform Sovereign 26.2 14.6 2 Seismic Vessel • Table 1 (T) if overflight of Main decking and Dome antenna starboard side is unavoidable • Seismic arrays deployed – Table 1 (T&L) regardless of overflight. Stowed – no limitation. Whenever practical, avoid or minimize overflight of arrays. • Automatic Roll Compensated helideck fixed position – NOT operative Ramform Sterling 20.9 14.6 2 6 27 November 2014 Mobile Seismic Vessel • Table 1 (T) if overflight of Main decking and Dome antenna starboard side is unavoidable • Seismic arrays deployed – Table 1 (T&L) regardless of overflight. Stowed – no limitation. Whenever practical, avoid or minimize overflight of arrays. • Approved for EH101 (except Norway) – adequate clearance in LOS Page 45 of 69 210° Sig 5:1 Misc Satelite dome on starboard side of helideck Main deck starboard side Seismic arrays, when deployed Helideck lights and radios not on UPS Sig 5:1 Main deck (stbd) of helideck Seismic arrays (when deployed) Sig 5:1 Seismic arrays - when deployed Main decking starboard side Dome antenna starboard aft corner. ( This antenna is lowered below helideck level during helideck operations) Misc Sig 5:1 (1.25D Helideck - Norway D = 20.96) Seismic arrays - when deployed Main decking starboard side Dome antenna starboard aft corner. ( This antenna is lowered below helideck level during helideck operations) 27 November 2014 14:11:38 HCA HLL Name Ramform Titan Ramform Valiant D t 26.1 16 22.8 15 Ramform Vanguard 22.8 15 Ramform Viking Randgrid PRH 3 2 2 22.8 15.0 2 22.2 10.0 1 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Seismic Vessel • Table 1 (T) if overflight of the 5:1 infringements unavoidable Seismic Vessel • Seismic arrays deployed – Table 1 (T&L) regardless of over flight Seismic arrays stowed – Table 1 (T) if over flight of starboard main deck is unavoidable Whenever practical, avoid or minimize overflight of arrays • Table 1(T) if overflight of stowed paravans unavoidable Seismic Vessel • Seismic arrays deployed: Table 1 (T&L) regardless of overflight Stowed: Table 1 (T) if overflight of main deck unavoidable. Whenever practible, avoid overflight of arrays. • Satelite dome must be lowered for all helicopter operations Seismic Vessel • Seismic arrays deployed-Table 1(T&L) regardless of overflight Seismic arrays stowed- Table 1(T&L) if overflight of starboard main deck and dome antenna • Table 1(T) if overflight of stowed paravan-door on port side is unavoidable • W henever practical, avoid or minimize over flight of arrays • Daylight operation only (Company restriction) Tanker with midships helideck, centreline forward • Table 1 (T&L) to be applied for all operations • Approved for S92 (11,9t) and EC225 (11t) • Possible turbulence over bow structure Page 46 of 69 5:1 Bow section forward - Main deck port & starboard aft Misc Foremast to be lowered prior to helicopter operations Sig 5:1 Misc Sig 5:1 Misc Sig 5:1 Misc Sig 5:1 Main deck on starboard side of helideck Seismic arrays ( when deployed ) Paravans on port side when stowed Satellite dome to be retracted for flying operations Main deck starboard side Seismic arrays, when deployed Helideck lights and radios not on UPS Main deck on starboard side of helideck Seismic arrays ( when deployed ) Paravan-door on port side (if stowed) Satellite dome to be retracted below helideck for helicopter operations Main decking forward, aft, port and starboard of helideck 27 November 2014 14:11:38 HCA HLL Name Reef Despina D t PRH Wind Kts Non Compliances Limitation • Offshore Construction Vessel 20.9 12.8 3 Reef Larissa 21.0 12.8 3 • Offshore Construction Vessel • Nil Regalia 21.7 21.0 1 6 Semi submersible - Flotel alongside Montrose A • Bridge linked - Montrose weather to be used for all operations - Montrose deck closed except for SAR emergencies - Table 2 (T&L) due to Turbulence from the Montrose • Table 1 (T) if overflight of Port FWD monitor platform or tip of FWD crane cannot be avoided • 1.25D helideck 055-080 Regina Baltica 19.5 9.3t 1 27 November 2014 Mobile Nil 150° Nil 210° Fwd crane cable must be slackened before helicopter operations 5:1 Flotel Port fwd foam monitor platform and fwd crane tip Fwd starboard lifeboat station infringes sector Nil 5:1 Rem Etive 20.9 12.8 3 4 MSV Rem Forza 22.2 12.8 3 MSV Nil Rem Gambler 20.9 12.8 3 MSV • Operations Norway restricted to D-value 16.71 Clear Nil Page 47 of 69 Misc 1.25D Helideck - Norway D = 16,71m 27 November 2014 14:11:38 HCA HLL Name Rem Installer D t PRH Wind Kts 22.2 12,8 3 Non Compliances Limitation Offshore Construction Vessel • Max “D” value in Norwegian sector = 17,76m Rem Ocean 20.9 16.0 3 IMR ( Inspection / Maintenance / Repair ) Vessel • Table 1 (T) if overflight of forward access platform unavoidable’ • Heated helideck Rockwater 1 22.2 9.3 Ship • Cleared for EC225 and S92 • No Dangerous Goods to be uplifted from this vessel Rockwater 2 Rowan Gorilla V 3 • DSV • Cleared for EC225 (11.0t) • Mandatory radar approach for all landings dew point sensor unserviceable • Table 1 to be applied if overflight of 5:1 obstructions unavoidable. 22.2 11.0 3 22.8 21.0 1 0-15 Rowan Gorilla VI 21.7 21 0 27 November 2014 Mobile Jack Up • Overflight of forward foam monitor platform to be avoided on take off • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Caution when approaching from astern flare booms 85ft long either side of rig Jack Up - Table 1(T) if overflight of port or forward access platforms unavoidable - No HMS. Pitch & roll max 1 deg when afloat Page 48 of 69 Misc Sig 5:1 1.25D Helideck - Norway D = 17.76m Forward access platform Nil Misc Aiming circle offset Rail aft of helideck at 1.0m ad 150° Handrail and baggage cage. Foam monitor 2.1m from edge of SLA and approx. 800mm adl . Aiming cirle to remain offset 5:1 Misc 5:1 Misc Sig 5:1 Misc Main deck port and starboard side of helideck approx. 6.5m from edge of SLA Aiming circle offset Forward foam monitor platform Flare booms 85ft long fitted either side of aft legs Port and forward access platforms Comprehensive electronic pitch, roll and heave measuring equipment not available on site 27 November 2014 14:11:38 HCA HLL Name Rowan Gorilla VII Rowan Norway Rowan Stavanger Rowan Viking D t PRH Wind Kts 22.8 21.0 1 Jack Up (MODU). • Table 1 (T) if overflight of NDB aerial and monitor platform (Fwd) is unavoidable. 22.2 12.8 F Jack Up Drilling Rig • Overflight of foam monitor platform to be avoided on take off • D=1.25 according to Norwegian Regulations • Stable deck conditions to apply when afoat as no digital instruments for measurement of rig movement,1deg P/R and 1m Heave. 22.2 12.8 1 0-15 Safe Astoria Safe Bristolia 22.2 12.8 1 25.3 13 1 Non Compliances Limitation Jack Up • Table 1(T) if overflight of fwd foam monitor platform cannot be avoided on take off • Stable deck conditions to apply whilst on tow i.e. maximum of 1 deg pitch & roll and 2m heave 22.2 12.8 1 27 November 2014 Mobile Jack Up • Aiming circle offset due to baggage lift handrail • Overflight of Fwd foam monitor platform is to be avoided on take-off • No HMS stable deck conditions to apply when afloat. • Flotel • Approved Friction surface - No net. Flotel •Table 1(T) if overflight of foam monitor platform unavoidable •Check turbulence sector restrictions when hooked up to platform •1.25D Helideck – Not applicable Page 49 of 69 5:1 Forward foam monitor platform 5:1 NDB aerial and monitor platform (Fwd). Sig 5:1 Foam Monitor Platform Misc Deck is due to be repainted inside circle is green and outside grey. 150° Baggage lift platform handrail. 5:1 Fwd foam monitor platform and NDB aerial Misc No other significant infringements Misc No helideck net fitted Sig 5:1 Misc Starboard foam monitor platform Marginal infringement of 210° sector when gangway stowed on support 27 November 2014 14:11:39 HCA HLL Name Safe Caledonia Safe Esbjerg Safe Scandinavia D t PRH 22.8 15.0 1 Wind Kts 27 November 2014 Mobile Non Compliances Limitation • Flotel • Table 1(T) to be applied if overflight of 5:1 infringements unavoidable 5:1 Port & Stbd lifeboat gantries. Misc Circle appears to be offset inboard due to size of Helideck compared to size of D Circle LOS may be infringed by Helicopter if parked in run-off area. 210° Luffing wires on both cranes marginal infringement when tensioned 12.0 0 27.2 21.0 1 Flotel • Both cranes to be parked with slackened luffing wires for helicopter operations • Table 1(T) if overflight of Sig 5:1 infringements unavoidable • Check turbulence sector restrictions when hooked up to platform Saipem 7000 21.7 25.0 1 Crane Barge • Specific restrictions apply regarding turbulence, see Part E Annex 2 of the Helideck Limitations List Turbulence Reports requested • Table 1 (T) if overflight of Lifeboats or aft foam monitor platform is unavoidable Sanco Spirit 19.5 11.0 2 Seismic Vessel • Table 1 (T) to be applied if overflight of aft deck unavoidable • Seismic booms & arrays deployed: Table 1 (T) regardless of overflight Page 50 of 69 Sig 5:1 Misc Sig 5:1 210° Sig 5:1 Foam monitor platforms and superstructure port and stbd Lifeboats aft No other significant infringements Lifeboats (aft) Port & Stbd 79ft below deck level Aft Foam Monitor Platform Minor portion of railings both sides infringe sector. Sector reduced to 208◦ Aft deck Seismic booms & arrays ( When deployed) 27 November 2014 14:11:39 HCA HLL Name Sanco Star D t 19.5 11 PRH Wind Kts Non Compliances Limitation • Seismic vessel • Table 1 (T) to be applied if overflight of helideck aft corners & main deck aft is unavoidable. • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays 3 Sanco Swift 20.8 14.6 3 8 Seismic Vessel • Nil limitations Sanco Sword 20.8 12,8 3 8 Seismic Vessel • 1.25D helideck – Norwegian regulations • Approved for EH 101 outside Norway (adequate LOS clearance) Scarabeo 8 Scott Spirit 22,2 12,8 1 20.8 12.8 1 8 • • • 120-185 • Rel to rig head • • • 20-30 • 31-40 • 31-40 • 41plus 27 November 2014 Mobile Semi Submersible Rig • Table 1 (T) if overflight of forward foam monitor platform unavoidable • All types - Table 2 – use 35-45kt limitations AS332 - Max landing weight Other types - Nil landings All types - Nil landings Turbulence reports to be submitted for all types • Shutdown not recommended Tanker with amidships helideck on port side • 2x 150 degree Limited Obstacle Sectors - Take offs & Landings permitted Port and Starboard • Table 1 (T&L) to be applied when over flight of decking on starboard side of helideck is unavoidable • D=1,25 according to Norwegian Regulations • Equipped with status lights for gas detection Page 51 of 69 5:1 Aft corners of helideck & main deck aft. Seismic boom and cable arrays (when deployed) 210° Minor sections of railing each side aft of helideck infringe sector Misc Norway max D value 20.88, deck size 26.1m Sig 5:1 Misc Sig 5:1 Forward foam monitor and access platform with wave radar extends 4m from edge of helideck No starting equipment available Decking forward, aft and starboard of helideck 27 November 2014 14:11:39 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Sea Installer 22.2 12,8 1 Jack Up Installation Vessel • Check height of helideck and vessel for each new location Seafox 1 22.2 9.3 F • Jack Up • No helicopter operations whilst under tow due to deck being retracted • Approved friction surface - no net Seafox 4 22.2 9.3 1 • Jack Up • Landing prohibited unless crane boom/jib clear of the 210 OFS • Mandatory radar approaches required if not co-located with a metrological compliant equipped platform • Table 1 (T) if overflight of 5:1 obstructions unavoidable • Possible turbulence from legs or accommodation • No helicopter operations whilst under tow due to deck being retracted • Approved friction surface - no net Seafox 5 Seafox 7 22.8 14.6 1 19.5 9.3 1 27 November 2014 Mobile Jack Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 degree • Table 1(T) if overflight of forward access platform unavoidable • Operations prohibited whilst on the move Jack Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 OFS • Table 1(T) if overflight of 5:1 infringement unavoidable • Operations prohibited whilst on the move Page 52 of 69 210° Navigation light marginally infringes sector next to the port leg - 1.5m adl 150° Temporary crane boom rest infringes second sector of LOS 5:1 Misc 5:1 Forward access and platform structure to the rear of the helideck port and starboard sides Non compliant metrological equipment Aiming circle offset Forward emergency access platform Misc Crane jib may be at rest along starboard side of deck outside of notified helicopter flight times. 150° Corner of accommodation unit infringes first sector of LOS 5:1 Misc Starboard boom rest Crane boom/jib may be at rest along starboard side of deck outside of notified helicopter flight times. Aiming circle offset 27 November 2014 14:11:39 HCA HLL Name Seajacks Hydra Seajacks Kraken Seajacks Leviathan D t PRH 22.2 12,8 1 22.2 12.8 1 22.2 12.6 1 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Self Propelled Jack-up Vessel • Crane to be swung away from helideck for all helicopter operations Misc Helideck net >25mm adl •Jack-Up • Landing prohibited unless crane boom/jib is in the raised position clear f 210 degree Misc Crane boom/jib may be at rest on port side of deck outside of notified helicopter flight times Aiming circle offset No other significant infringements 4 Legged Jack-uo • Table one (T) if overflight of 5:1 obstructions unavoidable 5:1 Misc Seajacks Zaratan Seawell Sedco 702 22.2 12.8 1 22.2 12.8 3 22.2 9.4 1 Jack-Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 degree • Table 1 (T) if overflight of 5:1 item unavoidable • DSV Semi Sub • Mandatory Radar Approaches • Stable deck conditions to apply: i.e. maximum of 1 pitch & roll and 2m heave • Table 1(T) if overflight of 5:1 items unavoidable • Cleared for the use of S92 Helicopters 5:1 • No dangerous goods by air •No net fitted - approved friction surface Starboard crane platform Misc Crane boom/jib may be at rest on starboard side of deck outside of notified helicopter flight times 210° Clear 150° Clear Sig 5:1 Clear Misc Only 6 tie down points 210° Stbd crane cab marginal infringement 150° Crane boom and rest infringe second sector of LOS 5:1 Misc Page 53 of 69 •Vessel structure Port and Starboard aft of helideck infringe sector Fwd deck and lifeboat station Fwd stbd corner Stb foam monitor platform and deck structure Non compliant meteorological equipment No HMS fitted 27 November 2014 14:11:39 HCA HLL Name Sedco 704 Sedco 711 Sedco 712 D t 22.2 9.3 22.2 21 22.2 21 PRH 1 1 1 Wind • • 205-235 • rel rig hdg Kts • • 30-45 • • 0-15 • • • 205-235 • 30-45 relative to rig heading • • 205-235 • rel rig hdg. • • 30 plus • 27 November 2014 Mobile Non Compliances Limitation Semi Sub • Table 2 - derrick structure (use 35-45 kts limitations) Turbulence reports requested • Overflight of the anchor windlass & crane to be avoided on take off • Cleared for EC225 (11.0t) & S92 (12.0t) Semi Sub • Table 2 - derrick structure (use 35-45 kts limitation) Turbulence reports requested • Helideck starboard forward • Cleared for S92 (12.0t) • Table 1(T) if overflight of anchor windlass and crane and fwd lifeboat station cannot be avoided on take-off Semi Sub • Table 2 - derrick structure (nb reduced w/v) 5:1 Anchor windlass & crane Misc Aim circle to remain offset 210° Reduced to 203° by aerials (port side) and crane (stbd side) Various aerials fwd port side Cloud and Vis senspr until chevron repainted to correct angle of 203° 5:1 Misc 5:1 Anchor windlass & crane (stbd fwd) Fwd lifeboat station Main windsock not in clear air however windsocks available on port and stb cranes for referenceT Tie down points approx 50mm adl Anchor windlass and crane (stbd fwd) • Table 1(T) if overflight of anchor windlass and crane cannot be avoided on take-off Sedco 714 22.2 21 1 • • 205-235 • rel rig hdg. • • 30-45 • • 0-15 Semi Sub • Table 2 - derrick structure (use 35-45 kts) Turbulence reports requested • Overflight of anchor windlass and crane to be avoided on take off Page 54 of 69 210° 5:1 Reduced to 203° by handrails (port fwd) and crane ladder (stbd aft) Anchor windlass and crane (stbd fwd) 27 November 2014 14:11:39 HCA HLL Name Sedco Express D t PRH 22.2 11.8 1 Wind Kts Non Compliances Limitation Semi Sub • Possible turbulence from turbine exhaust on starboard side aft of helideck. • Table 1(T) if overflight of the fwd lifeboats or fwd foam monitor platform is unavoidable. • Stable deck conditions to apply. Max 1° pitch and roll and 2m heave • Mandatory Airborne Radar Approaches to apply Seven Atlantic 22.2 12.8 3 DSV • Nil Seven Borealis 22.2 12.8 1 Multi-Purpose Vessel - Heavy Lift Crane and Pipe layer • Table 1(T) if overflight of 5:1 obstructions is unavoidable • No DG by Air to be shipped to/from this vessel due to no trained staff. Seven Discovery 22.2 9.3 Seven Eagle 22.2 12.0 3 Seven Falcon 3 20.8 12.8 3 8 27 November 2014 Mobile Sig 5:1 Misc Non compliant PRH equipment Non compliant meteorological equipment 210° • Nil 5:1 • Ship • Cleared for EC225 (11.0t) and S92 (12.0t) • Diving / Construction vessel • Table 1 to be applied if overflight of 5:1 obstructions unavoidable. Fwd acess Platform and main deck port and stbd aft Nil 5:1 Diving Support Vessel ( DSV ) • Nil Ship Bow Lifeboats port and starboard aft of helideck Nil Misc Page 55 of 69 Fwd Lifeboat Station Fwd Foam monitor platform 1.25D Helideck - Norwegian regulations 27 November 2014 14:11:39 HCA HLL Name Seven Inagha Seven Navica D t PRH 17.4 6.4 0 1 19.5 9.3 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation • Jack-Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1° pitch & roll and 2m heave • Daylight operations only Misc • Electronic pitch, roll and heave measuring equipment not available on site • No floodlights Cable Layer 150° Handrails just aft of helideck Sat dome on port side nearest the helideck 5:1 Misc Seven Osprey Seven Pelican Seven Waves Siem Daya 1 22.2 9.3 19.5 9.3 3 3 22.2 12.8 3 20.8 12.8 3 8 • Ship • Table 1(T) if overflight of forward navigation mast unavoidable • Cleared for EC225 (11.0t) & S92 (12.0t) DSV • Table 1 (T) if overflight of deck area forward is unavoidable. • Forward mast must be down for helicopter operations • Cleared for EC225 (11.0t) Pipe-laying vessel • Table 1(T) if overflight of 5:1 infringements unavoidable Offshore Construction Vessel • Nil Page 56 of 69 5:1 Misc Forward radar on bow approx 2.5m from edge of SLA Offset Aiming Circle Dangerous goods not to be shipped from this location Whip aerials on port and starboard side of bridge potential to whip forward Forward navigation mast when folded No DG by Air to be shipped to or from Vessel unless confirmed that qualified staff are available onboard 5:1 Deck area forward of helideck 5:1 Main deck port & stbd aft Misc 1.25D Helideck – Norwegian regulations 27 November 2014 14:11:39 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Siem Daya 2 20.8 12.8 3 8 Offshore Construction Vessel • No limitations • 1.25D helideck – Norwegian regulations Siem Marlin 20.9 12.8 3 Multi Service Construction Vessel • Prohibited landing sector 22.5° either side of bow Siem Spearfish 20.8 12,8 3 8 Offshore Construction Vessel - "D" =1.25, according to Norwegian regulations - No limitations Siem Stingray 20.8 15 8 Offshore Construction Vessel - 1.25D helideck - Norwegian regulations Siem Stork 20.9 12.8 3 Simon Stevin Skandi Acergy 3 22.8 14.6 1 20.9 12 3 27 November 2014 Mobile • MSV • Table 1 (t) if 5:1 obstructions unavoidable Fall Pipe and Mining Vessel • Nil limitation • Possible turbulence from exhaust stacks aft of bridge structure Offshore Construction Vessel • Nil Page 57 of 69 150° Railings aft of helideck – at 1.9m, 0.6m above helideck level, 2 antennas on starboard railings 1.1m above helideck level Nil Sig 5:1 Port and Starboard access points aft of helideck infringe sector Misc Dangerous goods by air prohibited 210° Marginal infringement of port and starboard radar masts Misc Added to certificate - (1.25D helideck - Norway D=18.24m ) 210° • Nil 27 November 2014 14:11:39 HCA HLL Name Skandi Achiever D t PRH 20.9 12.8 3 Wind Kts 27 November 2014 Mobile Non Compliances Limitation DSV • Table 1(T) if overflight of Nav mast unavoidable 210° 5:1 Skandi Aker 20.9 12.0 3 Well intervention vessel • Nil Skandi Arctic 20.9 12.0 3 DSV No limitation Skandi Carla 19.5 9.3 Construction and Support Vessel • Offset aiming circle Skandi Constructor Skandi Seven Skandi Skansen 21 3 14.6 3 20.9 12.8 3 20.8 12.8 3 8 MSV • Nil Offshore Support and Construction Vessel • Nil • Nil Access platforms infringes sector. Approx 2.4m from edge of SLA Nil Nil 150° Nil Sig 5:1 Nil Misc 1.25D Helideck - Not applicable 210° • Nil 150° Satellite domes and superstructure Misc 1.25D Helideck - Not applicable Offshore Construction Vessel Operations in Norway restricted to max D value 16.71 Page 58 of 69 27 November 2014 14:11:39 HCA HLL Name Skandi Skolten Solitaire D t PRH Wind Kts 20.8 12.8 3 8 27.2 21.0 2 Non Compliances Limitation Anchor Handling and Construction Support Vessel • Operations in Norway restricted to max D value 16.71m • • • 20 either side of stern • • • • 0-10kts • 11-20kts • 21kts+ Pipe Laying Ship • Table 1 (T) if overflight of forward monitor platform unavoidable • Turbulence from bridge structure when wind is from the stern No restriction Table 2 No landings Turbulence reports requested to assess sector • Mandatory ARA to be applied due to non-fitment of full automated MET system Songa Dee 20.8 21.0 1 8 Semi Submersible Drilling Rig • Table 1(T) if overflight of forward access platform is unavoidable • No helicopter start unit – caution if shutting down Songa Trym 22.6 9.3 Semi Submersible Rig • Table 1(T) to be applied if overflight of forward foam monitor platform is unavoidable • All types – Table 2(L&T) – Derrick structure • Approved for S92 - 11.9t, EC225 - 11.0t • Caution: Night operations - Area of helideck outside Safe Landing Area marked with green perimeter lights 1 120-155 rel. To rig hdg. Stena Alexita 22.2 12.8 1 27 November 2014 Mobile Shuttle tanker with amidships helideck starboard • Table 1(T) to be applied if overflight of main decking port, forward and aft of helideck is unavoidable • 2 x 150⁰ LOS sectors Misc 5:1 Forward monitor platform infringes sector- 4.2m from edge of SLA Sig 5:1 Perimeter net outboard of forward access platform Sig 5:1 Forward foam monitor platform 150° Sig 5:1 Misc Page 59 of 69 1.25D Helideck - Norway D = 16,71m VOC tank, forward top section and railings (marked with black-yellow stripes) Main decking port, forward and aft of helideck 1.25D Helideck - Not applicable 27 November 2014 14:11:39 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Stena Carron 22.8 14.6 1 Drillship • Table 1 (T) to be applied if overflight of forward foam monitor platform is unavoidable • Beware of whip aerials Port side aft of helideck on approach/landing Stena Don 22.8 14,6 1 Semi submersible drilling rig • Table 1(T) if overflight of port and starboard monitor platforms unavoidable • Marginal infringements in 210° and 150° sectors painted in black and yellow obstruction colours • Helideck area outside SLA indicated by red lights • No External power, caution if shutting down Stena Drillmax Stena Forth 22.2 13.0 1 22.2 14.6 1 27 November 2014 Mobile • Drillship • Table 1 (T) if overflight of any access is unavoidable on take off Drillship • Table 1 (T) to be applied if overflight of foam monitor platforms is unavoidable Stena Icemax 22.8 14.6 1 Drillship • Table 1 (T) to be applied if overflight of foam monitor platforms and bridge wings port and starboard is unavoidable Stena Natalita 22.2 10.0 1 Tanker with amidships helideck on starboard side • Table 1 (T) to be applied if overflight of decking port side of helideck is unavoidable. • Approved for EC 225 (11,0t) and S-92 (11,9t) Page 60 of 69 Sig 5:1 Forward foam monitor platform 210° Marginal infringement by port crane railings, and railings outside wheelhouse starboard. 150° Wheelhouse structure 5m adl, 6.25m from SLA Sig 5:1 5:1 210° Sig 5:1 210° Sig 5:1 Port and starboard foam monitor platforms Port, starboard, forward access points & bridge wings All monitors and dry powder extinguishers approx 350mm adl Foam monitor platforms Bridge wings port and starboard sides Infringed by bridge aft, light mast and VOC tank starboard side aft of helideck and bow with mast forward Main deck Port, forward & aft side of helideck. 27 November 2014 14:11:39 HCA HLL Name D t PRH Stena Sirita 22.2 10 Stena Spey 22.2 13.0 1 Stingray 22.2 9.3 Kts 1 21 Stril Merkur 21.0 12.8 3 Non Compliances Limitation Tanker with amidships helideck • Table 1 (T) if overflight of decking forward and aft, port and starboard is unavoidable. • 2 x 150° LOS • Approved for EC225 (11,0t ) and S-92 ( 12,8t ) Semi Sub • Table 1(T) if overflight of anchor windlass and control cabin or lifeboat and stowage unavoidable • Cleared for EC225 (11.0t) & S92 (12.0t) 1 Stril Herkules Stril Poseidon Wind 27 November 2014 Mobile Sig 5:1 Main deck forward and aft, port and starboard of helideck 5:1 Anchor windlass & Control cabin (Starboard fwd) 8m from SLA, various deck structures starboard including starboard access point Access platforms infringes sector. Port side approx 3.8m from edge of SLA Misc 2 circles based on deck centre with radii of 2.5 and 5m for tie downs Flare boom port side maybe an infringement when deployed Misc Approved friction surface - No net Pipe Laying Barge 12.8 3 Field Support Vessel • Table 1 (T) to be applied if overflight of bow unavoidable • Folding helideck FSV – Field Support Vessel • Table 1(T) if overflight of forward bow section unavoidable • Port and starboard sides of helideck fold inwards • Approved for S92, EC225, Puma models 20.9 12.0 3 0-15 Rescue/Standby Vessel • Table 1(T) if overflight of bow section unavoidable Page 61 of 69 Sig 5:1 Bow area Sig 5:1 Forward bow section Misc Sig 5:1 Inward folding helideck Minor part of bow section infrijges sector 27 November 2014 14:11:39 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Stril Server 20.8 12.8 3 8 Offshore Construction - ROV Vessel -Helideck centreline displaced 2m towards starboard relative to vessel centreline - Max D value Norwegian sector 16.71m Subsea Viking 19.5 10.0 3 Ship - Cat 3 Surf Ranger 19.5 9.3 ROV Survey • Cleared for EC225 (11.0t) • Table 1 (T) to be applied if overflight access platorms unavoidable. Swift 10 Swordfish 3 19.5 11.0 1 20.9 12.8 3 27 November 2014 Mobile Nil Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1º pitch & roll and 2m heave • Crane boom/jib is to raised clear of 210 degree OFS before helicopter operations commence MSV • Table 1 (T) to be applied if overflight access platorms unavoidable. 5:1 Dangerous goods not to be shipped from this location no qualified person Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times Non compliant HMS system 150° Various items in both sectors - Funnels, windsock, Handrails. PHLS painted on deck 5:1 Thialf 27 21.0 1 • Crane Barge • Table 1 if overflight of 5:1 infringements unavoidable. Port and starboard access platforms Misc No DG's to be received from vessel Port aerial potential to whip forward 210° Stbd crane jib infringes 210° when in rest 5:1 Page 62 of 69 Various deck structures below helideck port and starboard aft sides Misc Lifeboats (Port & Stbd) Forward foam monitor platform 27 November 2014 14:11:39 HCA HLL Name D t PRH Wind Kts 27 November 2014 Mobile Non Compliances Limitation Tidewater Enabler 20.8 12.8 3 8 • Offshore Supply / ROV Vessel • No Dangerous Goods by Air to be shipped to or from this Vessel. Tog Mor 19.5 11.0 1 •Pipe Laying Vessel • Offset aiming circle • Height of installation with cranes in raised position 265 ft Toisa Conqueror 18.7 9.3 3 Toisa Perseus 19.5 9.2 3 MSV • Maximum allowable mass 9.2t (20.300lbs) Nil 150° Bridge railings marginal infringement at 6m, 3m above deck level Misc Aiming circle offset Toisa Pisces 17 5.3 3 Ship • Aiming circle offset due to Gyro compass in LOS 150° Gyro compass in LOS - TD/PM offset Toisa Proteus 19.5 9.3 3 MSV • Mandatory Radar Approach due to non-compliant Met system • Stable deck conditions - Maximum of 1° Pitch & Roll and 2m heave due to non-compliant HMS fitted • Aiming circle offset due to obstructions in the LOS 150° Foam tank pipeline 400mm adl 1.6m from SLA Misc Non compliant Met system HMS system offset Toisa Valiant 18.7 8.6 3 MSV • Table 1 (T) if overflight of either access points unavoidable • Forward navigation mast to be lowered for helicopter operations Page 63 of 69 210° 5:1 • Nil Both access points 27 November 2014 14:11:39 Non compliant Aiming circle HCA HLL Name Toisa Vigilant Toisa Voyager Toisa Wave TOP Coral do Atlantico D t 18.7 8.6 18.7 8.6 PRH Wind Kts Non Compliances Limitation • MSV • Table 1 (T) if overflight of either access points unavoidable • Forward navigation mast to be lowered for helicopter operations 3 • MSV • Table 1 (T) if overflight of either access points unavoidable • Forward navigation mast to be lowered for helicopter operations 3 • MPV • Table 1(T) if overflight of either access unavoidable on take off 19.5 12.8 3 22.2 12.8 3 27 November 2014 Mobile Pipe laying support vessel 5:1 Misc 105-180° rel. • 20-30 To rig head • 31-40 • 31-40 • 41 plus Semi Submersible Rig • All types - Table 2, use 35-45 kt limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted • Table 1(T) if overflight of foam monitor platforms port and starboard is unavoidable • Start unit not available, caution if shutting down Page 64 of 69 • No other significant infringements 5:1 Port and starboard aft access platforms 5:1 Aft access platforms on port and starboard sides 210° 5:1 Transocean Barents 22.8 14.6 1 Both access points Dry powder extinguishers approx 600mm adl Foam monitor platforms approx 3.1m from edge of SLA Misc Potential for whip aerials to infringe sector p/s bridge wings 210° Steam de-ice cabinet port side 50cm adl , port and starboard monitors 45cm adl 150° Foam monitor 65cm adl Sig 5:1 Foam monitor platforms port and starboard 27 November 2014 14:11:39 HCA HLL Name Transocean John Shaw Transocean Marianas Transocean Prospect D t 22.2 9.3 22.1 9.3 8 22.2 10 PRH Wind Kts 1 Semi-sub • Mandatory Radar Approaches required • Stable deck conditions to apply. i.e maximum of 1°pitch & roll and 2m heave • Table 1 (T) if overflight of 5:1 infringements unavoidable. 1 Semi Sub • Table 1(T) if overflight of the Forward & Starboard obstructions is unavoidable. • Table 2 due to cladding on and around derrick • Cleared for EC225 (11,.0t) & S92 (12.0t) 170 - 230 Rel Rig Hdg Transocean Spitsbergen Venturer 22.8 14.6 1 150-225 rel. To helideck hdg (150225 rel. To rig hdg) 16.6 9.3 6 2 Non Compliances Limitation Semi Sub • Table 1(T&L) if overflight of the modules on the Port & Starboard side of helideck is unavoidable. • Aiming Circle offset due to obstructions in the LOS • Cleared for EC225 and S92 1 • 20-30 • 31-40 • 31-40 • 41 plus 27 November 2014 Mobile Semi Submersible Rig • All types - Table 2, use 35-45 kt limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted • Table 1(T&L) if overflight of foam monitor platform port side and partly on starboard side is unavoidable • Start unit not available, caution if shutting down Seismic • Seismic arrays deployed - Table 1(T&L) regardless of overflight stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Page 65 of 69 150° Catwalk guardrails & GPU housing 1m from SLA 5:1 Access platform and associated structure either side of helideck 5:1 Lifeboat station Misc 5:1 Non compliant meteorological equipment Non compliant HMS system Approved friction surface - No helideck net Aiming circle offset Forward monitor platform perimeter net & lifeboat station; Starboard accommodation roof & winch housing. Misc Perimeter line and lights not co-incidental with D Circle on Aft side. 210º sector taken from chevron. 210° No significant infringements 150° No significant infringements Sig 5:1 Foam monitor platform port side and partly on starboard side infringes sector. Sig 5:1 Seismic Arrays when deployed 27 November 2014 14:11:39 HCA HLL Name Viking Poseidon Volstad Surveyor Vyacheslav Tikhonov D t PRH Wind Kts 20.8 12.8 3 8 Non Compliances Limitation Offshore Construction Vessel - Displaced aiming circle - Antenna infringes LOS 1.8m aft of deck edge, 1m adl - No limitations 20.8 12.8 3 8 ROV Survey Vessel • Nil 21 Seismic Vessel • Seismic arrays deployed - Table 1(T) regardless of overflight stowed - No limitation Whenever practical, avoid or minimize overflight of arrays • For all helicopter operations, check stern light mast and davits lowered • Table 1(T) if overflight of lowered stern mast unavoidable 12.0 2 Well Enhancer 22.2 12.0 3 MSV Nil Wellservicer 22.2 12.5 3 DSV • No limitations • Status lights installed • 6 tie down points only West Hercules 21.3 12.8 1 6 Semi-Submersible Rig • Table 1(T) if overflight of forward port fire monitor platform unavoidable • All types- Table 2 (L&T) – derrick and superstructure – Turbulence Reports requested to establish limitations • No start unit, caution if shutting down 085-185 rel. To rig hdg 27 November 2014 Mobile Nil 150° Sig 5:1 Antenna infringes sector Nil Misc 1.25D Helideck - Not applicable 210° Stern light mast 3.5m adl 150° Port and starboard davits infringe LOS, sector 2 Foam monitors marginal infringement LOS, sector 1 Sig 5:1 Stern light mast extends 3.5m from helideck edge when laid down Seismic booms and cable arrays (when deployed) Nil Page 66 of 69 150° Sig 5:1 Misc Bridge structure 6m high at 6m marked in obstruction colours Port forward fire monitor and access platform Helideck net 50mm adl 27 November 2014 14:11:39 HCA HLL Name West Navigator West Phoenix D t PRH Wind Kts 22.8 14.0 1 Semi Sub • Table 1(T) if overflight of forward exit/monitor platform is unavoidable • Table 2 due to turbulence from base of derrick 160 - 220 in relation to helideck heading West Venture 22.2 9.3 1 • 120-185 rel to rig Western Monarch Western Patriot 22.2 12.8 2 18.7 8.6 2 Non Compliances Limitation Drilling Ship • Table 1(T) to be used if overflight of forward foam monitor platform unavoidable 22.2 13.0 1 • 20-30 • 31-40 • 31-40 • 41 plus 27 November 2014 Mobile Seimi Submersible rig • All types - Table 2, use 35-45 kts limitations AS 332 - Max helipad weight Other types - NIL landings All types - NIL landings Turbulence reports by all types must be submitted • Table1(T) if overflight of forward foam monitor platform unavoidable • Approved for S92 ( 11,9t) and EC225 (11t) • Seismic Vessel • Table 1 (T & L) if overflight of Crane deck aft unavoidable • Seismic arrays: Deployed - Table 1 (T&L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays. • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays • Table 1(T) if overflight of aft edge of deck unavoidable Page 67 of 69 150° Dome antenna port side at 6.15m, marginal infringement Sig 5:1 Forward foam monitor platform Misc 1.25D helideck - Not applicable 5:1 Misc Forward exit/monitor platform No ground power available on site. Nil Sig 5:1 5:1 150° 5:1 Misc Fwd foam monitor platform Crane deck aft of helideck Seismic booms and cable arrays (when deployed) Cable spoolers and aft of crane pedestal (marked in obstruction colours) marginally infringe sector Seismic booms and cable arrays (When deployed) Deck aft of perimeter line Aiming circle offset due to obstructions in 2nd sector of LOS 27 November 2014 14:11:39 HCA HLL Name Western Regent Western Spirit D t PRH 22.2 12.8 2 22.2 12.8 2 Wind Kts Non Compliances Limitation Seismic Vessel • Table 1 (T) if overflight of aft main deck cannot be avoided • Minor smoke and hot emissions from funnels may occur over the helideck •Seismic Vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Table 1(T) if overflight of aft navigation light mast unavoidable • Offset aiming circle Western Trident 22.8 12.8 3 Seismic • Table 1 (T&L) to be applied when over flight of bow decking is unavoidable WG Amundsen 20.8 12.8 2 8 • Seismic vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays 20.8 12.8 2 8 • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays WG Cook WG Magellan 20.8 12.8 2 8 27 November 2014 Mobile • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Page 68 of 69 Sig 5:1 Main deck aft Misc 1.25D Helideck - Not applicable 150° Crane 6.7m from SLA, >4m Sig 5:1 Seismic arrays when deployed Aft navigation light mast Sig 5:1 Deck area fwd of SLA 150° Cable spooler overheight by 0.63m Sig 5:1 Seismic boom and cable arrays (when deployed) 150° Spool reels could be an infringement when fitted 5:1 Seismic boom and cable arrays (when deployed) Misc Sig 5:1 No other significant infringements Seismic boom and cable arrays (when deployed) 27 November 2014 14:11:39 HCA HLL Name WG Tasman WG Vespucci Wilhunter D t PRH 20.8 12.8 3 8 Wind Kts 27 November 2014 Mobile Non Compliances Limitation Seismic •Seismic array Deployed – Table 1 (T &L) regardless of overflight. Stowed – no limitations. Whenever practical, avoid or minimize overflight of arrays 20.8 12.8 2 8 • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays 22.2 12.8 1 • Semi-sub • Table 1(T) if overflight of Sig 5:1 obstructions is unavoidable 150° 5:1 Misc 5:1 Sig 5:1 Misc Wilphoenix 22.2 9.3 1 • Semi-sub • Table 1(T) if overflight of Sig 5:1 obstructions unavoidable • Cleared for S92 (12.0t) & EC225 (11.0t) 5:1 Misc Page 69 of 69 Spool reels on port side an infringement when fitted Seismic boom and cable arrays (when deployed) Nav mast to be removed prior to heli ops Seismic boom and cable arrays (when deployed) Platform structure on port and starboard side No other significant infringements Platform structure and lifeboat stanchions on port side, forward foam monitor and platform structure starboard No other significant infringements 27 November 2014 14:11:39