Consultant Announcements - Ohio Department of Transportation
Transcription
Consultant Announcements - Ohio Department of Transportation
01-16-15 Posting Date Revision to Programmatic Selection Group No. 01-12-15 1) The Department has determined that additional construction inspection/administration is required in District 4. Therefore, an additional agreement for selection has been added for a total of 2 for the project identified as follows: VAR-D04 Construction Inspection/Administration, PID No. 97696 Maximum prime compensation revised to $1,000,000.00 each agreement. Number and allocation of inspectors revised from 23 to 16 each agreement. The posted Scope of Services has been revised accordingly. 2) In addition, the number of inspectors required for the following project has been revised: MAH/TRU-80-4.50/0.00, Construction Inspection/Administration, PID No. 77260 Reallocation of 9 inspectors. The posted Scope of Services has been revised accordingly. *********************************************************************************************************** 01-14-15 Posting Date Updates to Programmatic Selection Group No. 01-12-15 1) VAR-D10 Culvert Replace/Rehab, PID No. 97323 Latitude/Longitude coordinates table has been added to Scope of Services site; Additional information available at the following site: ftp://ftp.dot.state.oh.us/pub/Districts/D10/97323_PHOTOS_PLANS/ 2) Due to concerns that the number of individuals currently prequalified for construction inspection and administration services is insufficient, the prequalification requirements for individuals will be eliminated for CI/CA projects. The Construction Management Firm and Unlimited Cost Accounting categories will remain where applicable. For the following agreements, prequalification in construction inspection/administration categories is not required, but actual prequalification of individuals and partial completion of the requirements will be considered in the selection rating. Refer to the Scope of Services document for the approximate number of personnel required for the various categories. Provide resumes for proposed staff including prequalification status, and if not prequalified, a summary of requirements partially or completely met. VAR-D03 Construction Inspection No. 2015-1 and 2015-2, PID Nos. 97781/97790 MAH/TRU-80-4.50/0.00, Construction Inspection/Administration, PID No. 77260 VAR-D04 Construction Inspection/Administration, PID No. 97696 Maximum prime compensation increased to $1,500,000.00 Number of inspectors reduced from 31 to 23. The posted Scope of Services has been revised accordingly. VAR-D11 Construction Inspection, PID No. 99050 ********************************************************************************************************** 01-12-15 Posting Date Submission of Letters of Interest Procedural Changes Please note the following procedural changes effective with the Programmatic Consultant Selection Group 01-12-14: Change in Submittal Deadline The Letter of Interest submission deadline has been revised to 2:30PM on the due date. Prequalification for Construction Inspection Please note that prequalification categories for Construction Inspection are included in this Programmatic Consultant Selection group. With the exception of the Construction Management Firm category, individuals are prequalified for all other Construction Inspection and Administration categories. Since the Letter of Interest System checks the prequalification of the prime consultant and named subconsultants to ensure that the project prequalification requirements have been met, prequalified individuals must be listed as subconsultants to meet the prequalification requirements. 01-12-15 Posting Date Opportunity Corridor Section 2 Matchmaker The Ohio Department of Transportation will be hosting a Matchmaker event designed to provide prime contractors/engineering consultants and subcontractors/sub-engineering consultants the chance to meet with the goal of establishing relationships for the upcoming design-build project, Opportunity Corridor Section 2. This event will allow for meaningful networking opportunities including one-on-one meetings. Date: February 10, 2015 Time: Noon to 5 p.m. Location: Bureau of Workers’ Compensation 4800 East 131st Street, Garfield Hts. To view a list of work types necessary for this project please visit: http://www.dot.state.oh.us/districts/D12/Deputy%20Director/Pages/Disadvantaged-BusinessEnterprise.aspx To register your company please visit: http://opportunitycorridorsection2.eventbrite.com Deadline for registration is Monday, February 2, 2015. Please contact Deborah Green at 216.584.2003 or Deborah.Green@dot.state.oh.us with any questions. 01-12-15 Posting Date FY 2016 Research Projects Request for Proposals Response Due Date: 03-06-15 The Research Section at the Ohio Department of Transportation is now accepting proposals for the following studies: RFP Solicitation # 2016-01 Project Title 2016-02 Assessment of Salt Procurement and Distribution Processes 2016-03 Crack Resistance and Durability of RAS Asphalt Mixtures 2016-04 2016-05 Effective and Efficient Roadside Ditch Cleaning Using BMP’s for Erosion and Sediment Control Evaluation of Roadway Subsurface Drainage on Rural Routes 2016-06 Evaluation of Technology for School Bus Stop Ahead Signs 2016-07 Evaluating the Particle Size Distribution of Ohio’s Stormwater Runoff 2016-08 Evaluation of Grade Crossing Hazard Ranking Models Evaluation of Safety Practices for Short Duration Work Zones Please read the requirements of each proposal section thoroughly. Changes have been made to our Proposal Formatting and Submission Guidelines. Highlighted changes include: The proposal and budget form will be submitted using Adobe Forms. You will complete general information on the form, then attach a PDF of the proposal and the Excel budget form. After you click submit, you will receive a confirmation email. Attachments are limited to 20 MB. Non-Ohio based organizations must include an Ohio based partner within the proposal. Questions regarding a RFP or submission process should be submitted using the RFP Inquiry Form. Noncompliance with the formatting and submission guidelines is cause for rejection of a submission. ODOT reserves the right to reject any and all submissions. Submissions must be received by 3:00 PM (ET) on March 6, 2015 in order to be considered. Absolutely no extensions will be granted to this deadline. Please make your submission in plenty of time to allow for servers to process your email. Additional information concerning submission requirements is available on the above listed site. All questions concerning the solicitation should be directed to Research at 614-644-8135 or Research@dot.state.oh.us. Clarifications will be posted to the Research RFP site as they become available, so please check back to this site for updates. Please feel free to forward this message to your colleagues. View the RFPs and obtain information on submission requirements at the following site: http://www.dot.state.oh.us/Divisions/Planning/SPR/Research/RFP/Pages/Strategic%20Researc h%20Plans.aspx Thank you for your interest in transportation research in Ohio. *********************************************************************************************************** 12-23-14 Posting Date Feedback on Consultant Fee Estimation Guidance The Department’s Consultant Fee Estimation Guidance, available on this website under the heading “Manuals & Contract Documents”, is actively being used on new agreements, modifications and task orders. This document was developed in a joint effort between the Department and the American Council of Engineering Companies of Ohio (ACEC). This guidance serves as a reference tool for ODOT Consultant Contract managers, project managers (both ODOT and Consultant) and other staff involved in estimation and negotiation of staff hours to effect a uniform and consistent process in Districts and Central Office. The Department is interested in receiving specific feedback on its use. In an effort to provide ongoing refinement of the guidance, the Department has established an e-mail address for users to post questions, comments or suggestions for improvement. Please reference a specific task line item or section of the guidance. The email address is: consultant.fee.guidance@dot.state.oh.us Questions and responses will be posted on the this website under the heading “Proposal & Fee Information”. Response time may vary based on the nature of the question, comment or suggestion. ************************************************************************************************************ 12-22-14 Posting Date Submission of Letters of Interest Change in Submission Time Limit Due to on-going issues with the current Letter of Interest submission deadline of 11:59 pm on the due date, the submission deadline for letters of interest will be revised to 2:30 pm on the due date, effective with the January 12, 2015 Programmatic Selection Group. This change will ensure that Office of Consultant Services and IT staff are available to answer questions and resolve problems prior to the deadline. *********************************************************************************************************** 12-15-14 Posting Date January 13, 2014 Programmatic Group Tentative DBE and EDGE Goals The projects listed for the 01-12-15 Programmatic Consultant Selection Group under the Future Consultant Program heading (shown below on this page of the web site) include a tentative listing of the projects assigned DBE and EDGE goals. Please note that this list is preliminary and may change in the actual posting. *********************************************************************************************************** 11-24-14 Posting Date Stormwater BMP Training The Office of Hydraulic Engineering has 10 seats left for this Stormwater BMP Training. We are opening these 10 spots to ODOT design consultants. Since there are so few spots, please do not RSVP if you do not currently work on the design of post construction BMPs on ODOT projects. We are also limiting this to one person per consulting firm. Please RSVP to Becky Humphreys at becky.humphreys@dot.state.oh.us if you would like to commit to attending this training. First-come, first-served. STORMWATER BMP TRAINING Date: Friday, December 12, 2014 Time: 8:00-4:30 Where: ODOT Central Office Auditorium Cost: No Cost RSVP: Required for Attendance Stormwater Training Dr. Bill Hunt and Ryan Winston from North Carolina State University will provide one day of training regarding stormwater practices appropriate to highway situations and conditions. It will describe stormwater management strategies that attempt to prevent, reduce and treat the impacts of changing land use on water quality as well as predictable adverse hydrologic and hydraulic changes. Case studies will describe practices applicable to Ohio based on case studies and experience in North Carolina’s transportation departments. An overview of the Low impact development (LID) approach (mimic the characteristics of runoff before development) will be given by as well as other practices descriptions, applicability, as well as design characteristics. The intent is to provide potential new tools for providing post-construction stormwater controls for Ohio practitioners. Ultimately this will result in improved planning and design processes for Ohio highways as well as improve compliance with state and federal stormwater permit requirements. Dr. Hunt is an Associate Professor and Extension Specialist in North Carolina State University's Department of Biological and Agricultural Engineering department. Dr. Hunt holds degrees in Civil Engineering (NCSU, B.S., 1994), Economics (NCSU, B.S., 1995), Biological & Agricultural Engineering (NCSU, M.S., 1997) and Agricultural & Biological Engineering, (Penn State, Ph.D., 2003) and is a registered PE in North Carolina. Since 2000, Hunt has assisted with the design, installation, and/or monitoring of over 90 stormwater best management practices (BMPs), including bioretention, stormwater wetlands, innovative wet ponds, green roofs, permeable pavement, water harvesting/cistern systems and level spreaders. He teaches 20-25 short courses and workshops each year on stormwater BMP design and function throughout NC and the US. Hunt is an active member of the American Society of Agricultural and Biological Engineers (ASABE), serving as NC Section President and as Past-Chair of the National ASABE Extension Committee. He is also a member of the American Society of Civil Engineers (ASCE), where he serves on the Urban Water Resources Research Council, the LID committee, and is co-chair of the Bioretention Task Committee. He was chair of the 2nd National LID Conference held in Wilmington, NC, in March 2007. Locally, he is a member of the Neuse Education Team, NC Watershed Education Network and the NC Association of Extension Specialists. Ryan Winston is an extension and research engineer in the Biological and Agricultural Engineering Department at North Carolina State University. He works under Dr. Bill Hunt studying the performance of innovative stormwater control measures. His primary research focuses are the performance of permeable pavement, bioretention, and highway stormwater practices in North Carolina and Ohio. He has designed, installed, and monitored BMPs in six U.S. states. Agenda 8:00 Registration 8:30 Introduction and LID Overview (45 min) 9:15 Transportation Specific Case Studies (part I - 1 hr) 10:15-10:30 break 10:30 Transportation Specific Case Studies (part II - 30 min) 11:00 Bioretention (45 min) 11:45 lunch on your own (45 min) 12:30 Full Depth Permeable Pavement (30 min) 1:00 Permeable Friction Course (45 min) 1:45 Filter Strip Design and Performance (30 min) 2:15 - 2:30 break 2:30 Swale Performance including Implementation of Check Dams in Swales (1 hr) 3:30 Decision-making process - how to select the right post-construction controls for the site (45 min) 4:15 - 4:30 Wrap-up and Questions ***This class will be limited to the first 40 people to RSVP. Please only rsvp if you are committed to attending.*** *********************************************************************************************************** 11-17-14 Posting Date Request for Letter of Interest VAR-STW-P3 Advisory Services PID No. 92818 On November 24, 2014, the Department will post a request for Letters of Interest for statewide strategic and financial advisory services to the Division of Innovative Delivery on a task order basis. A single team will be selected to provide these services. The services requested include: 1) Evaluation of potential public private partnerships, revenue generating projects or cost-saving opportunities. 2) Preparation of financial analysis, studies of commercial viability and feasibility of various projects, and strategic recommendations regarding revenue generating projects and cost-saving opportunities. 3) Development of documents for use in requesting statements of qualification, proposals or information from private sector partners. 4) Providing assistance to the Department in evaluating submittals received in response to requests for qualification or proposals received. 5) Providing strategic advice and assistance to the Department in developing contract documents to implement P3 agreements, revenue generating projects or cost-saving opportunities. 6) Market sounding for P3 Projects. 7) Other related services as requested. The maximum prime compensation will be $1,000,000.00 and the duration of the agreement will be 24 months from date of authorization to proceed. Selection Schedule Official Notification on Website Letters of Interest Due 11-24-14 12-15-14 The agreement will not include a Goal for DBE or EDGE participation. ************************************************************************************************************* 10-27-14 Posting Date Consultant Prequalification Training – Soils and Aggregate Inspector The NorthEast Transportation Training and Certification Program (NETTCP) and the Independent Laboratories Institute (ILI) have partnered to provide an ODOT accepted training and certification program for Soils and Aggregate Inspectors. NETTCP is an FHWA recognized agency currently providing transportation technician training and certification in seven Northeastern states, and will conduct the actual training and testing activities. ILI is the education and training foundation of the American Council of Independent Laboratories (ACIL), and will provide course logistics and coordination. Courses have been scheduled in the Cincinnati, Cleveland and Columbus areas during the first several months of 2015 and additional courses will be scheduled based upon demand. Class size is 14-20 candidates and the course includes 2 days of instruction in classroom and laboratory followed by a half day exam with both written and performance tests. The course has an approximate 75% historical pass rate. Fees are $635 for ACIL or NETTCP members and $865 for non-members. Passing candidates will receive a five year NETTCP certification that includes a photo ID. Inspector certification is a prerequisite to becoming an ODOT Prequalified Soil And Aggregate Inspector, which allows them to work as soil technicians on ODOT and federally funded LPA projects. This certification is also available through accepted programs provided by the National Institute for Certification in Engineering Technologies (NICET). Please contact Steve Bowser at sbowser@bowser-morner.com for additional information or visit the NETTCP website (www.nettcp.com) for information on the course schedule, course outline, exam, etc. On the NETTCP home page click on “Certification Courses” and you will find the “Soils and Aggregate Inspector Course”. ********************************************************************************************************** 10-13-14 Posting Date Consultant Prequalification Change Project Inspector (Structures) Category The requirements for prequalification as a Project Inspector (Structures) have been revised to accept ODOT HT Series training and certifications completed by former ODOT employees as an alternate to the Department’s Advanced Structures Test, as follows: Successful completion of the Department’s Advanced Structures Test. OR Successful completion of all three of the following ODOT HT Series training and certifications as a former ODOT employee: a. HT.110 Basic Structures b. HT.207 Advanced Structures c. HT Construction Structures Certification Test Complete information concerning the requirements to become prequalified is included in the Department’s Consultant Prequalification Requirements and Procedures, updated October 13, 2014. ************************************************************************************************************* 10-09-14 Posting Date Consultant Fee Estimation Guidance The Department’s Consultant Fee Estimation Guidance is now available on the Consultant Services page of ODOT’s website under the Manuals & Contract Documents section, under the Proposal Documents category. This document was developed in a joint effort between the Department and the American Council of Engineering Companies of Ohio (ACEC). Details of the October 16, 2014 Webcast Presentation are included in the 9-15-14 announcement shown below. This guidance will serve as a reference tool for ODOT Consultant Contract managers, project managers (both ODOT and Consultant) and other staff involved in estimation and negotiation of staff hours to effect a uniform and consistent process in Districts and Central Office. In this initial version of the Guidance, only Project Development Process activities are addressed. In the future, additional work types including real estate acquisition, bridge inspection and construction administration/inspection may be added. *********************************************************************************************************** 10-06-14 Posting Date Design-Build Program The Office of Consultant Services website has been updated to provide information regarding the Department’s Design-Build Program. A direct link to the Division of Construction Management is now available under the “Design-Build Program” Heading. *********************************************************************************************************** 09-22-14 Posting Date NOTICE: ERROR IN ELECTRONIC LOI SUBMISSION We have been notified by consultants that the following message is popping after attempting to save or submit under the Electronic Letter of Interest Submission system for the September 2014 Programmatic Selection Group: Prime consultant does not meet the prequalification requirement for Cost Accounting System – Unlimited. The Department’s Division of Information Technology has identified the problem and a fix will be deployed MONDAY SEPTEMBER 22nd at 1:00PM. We apologize for the inconvenience. 09-22-14 Posting Date Ohio Department of Transportation Consultant Fee Estimation Guide Webcast Presentation October 16, 2014 10:00 am to 11:30 am The October 16 webcast will be available at: http://media.dot.state.oh.us/DOTMediasite/Play/a28b445f8d974b1e927f4a32e2db088f1d ******************************************************************************************************* 09-15-14 Posting Date Ohio Department of Transportation Consultant Fee Estimation Guide Webcast Presentation October 16, 2014 10:00 am to 11:30 am The negotiation of equitable fees was included as a discussion topic on the agenda of the May 2012 ODOT/ACEC Ohio Partnering Conference, which led to the initiation of a joint effort between ODOT and ACEC Ohio to address the issue. The ODOT/ACEC Consultant Fee Committee first met on February 27, 2013 and proceeded to develop Steering and Oversight Committees, along with thirteen technical subcommittees. Myron Pakush, Deputy Director of ODOT’s District 12 Office, served as Chairperson for the overall effort. The initial effort to prepare comprehensive guidelines for estimation of fees is now complete. The Guide will be implemented for use in negotiating fees for projects included in the September 2014 Programmatic. An initial webcast presentation of the Guide will take place on Thursday October 16, 2014 from 10:00 am to 11:30 am as part of the ACEC Transportation Committee Meeting. The webcast will include an introduction of the Guide and presentations by each subcommittee. Additional training webcasts are being scheduled for later in October. A link to the October 16 webcast will be provided prior to that date. The October 16 webcast will be available at: http://media.dot.state.oh.us/DOTMediasite/Play/a28b445f8d974b1e927f4a32e2db088f1d 09-15-14 Posting Date Construction Inspection and Administration New Scope of Services Document and Consultant Prequalification Implementation Implementation for Local Public Agency Projects The Department has now implemented a new scope of services document for use on Local Public Agency (LPA) projects. This Scope of Services document is based on incorporation of the Department’s Construction Administration Manual of Procedures, and recently implemented prequalification categories for Construction Inspection and Administration services. The new Scope can be edited for use on projects that include either construction contract administration or inspection, or both. The document includes instructions for editing to suit specific situations, and a listing of the approximate number of personnel required for the various inspection/construction engineer categories. This scope of services document must be used on all Federal-aid projects that utilize consultant inspection and/or administration. The new document can be found on the Consultant Services page of ODOT’s website under the heading “Local Government Project Notifications”, at the following address: http://www.dot.state.oh.us/divisions/Engineering/consultant/Pages/default.aspx For detailed definitions and requirements for the various prequalification categories, refer to the Department’s “Consultant Prequalification Requirements and Procedures”, located under the heading Prequalification Information on the Consultant Services page of the Department’s website, address as follows: http://www.dot.state.oh.us/divisions/Engineering/consultant/Pages/default.aspx The sample project announcements available on the Consultant Services page of ODOT’s website have been updated to include the new categories. ********************************************************************************************************* 09-11-14 Posting Date Programmatic Selection Group No. 09-08-14 VAR-D09 Cons Insp/Cons Admin LPA Proj, PID No. 97351: After re-assessing the needs of the District, the above referenced project has been removed from September 2014 programmatic selection group. ********************************************************************************************************** 08-25-14 Posting Date Updates to Consultant Prequalification Manual The Department's Consultant Prequalification Requirements and Procedures has been updated effective this date as follows: Section 1.08 For clarification of the name listed on the W-9, we have added language for the certificate issued by the Ohio Secretary of State for non-engineering firms: The name listed in the W-9 must be the same as that listed on the Certification of Authorization issued by the State Board of Registration for Engineers and Surveyors, or State Board of Landscape Architect Examiners for Landscape Architecture firms, or the certificate issued by the Ohio Secretary of State indicating that your firm is authorized to do business in Ohio. Section 2.15(B)(2)(a) The ODOT Load Rating with Hand Calculations Course is no longer offered and has been eliminated as a requirement. Section 2.53(B)(3) The language “or Degrees requirements” has been added. Section 2.54(B)(4) The following requirement has been added as an alternate to NICET Highway Construction Level III with Structures Work Elements: that exceed these "OR Prequalified as a Construction Engineer Level 1 with six months of experience in inspection of highway bridges and other highway structures. The experience requirement may be met concurrently with experience requirements for other prequalification categories." Section 3.01 The language has been corrected to state that financial package must be submitted annually to the Office of External Audits, no later than six (6) months after the close of the Consultant’s fiscal year. ********************************************************************************************************** 08-18-14 Posting Date September 8, 2014 Programmatic Group Tentative DBE and EDGE Goals The projects listed for the 09-08-14 Programmatic Consultant Selection Group under the Future Consultant Program heading (shown below on this page of the web site) include a tentative listing of the projects assigned DBE and EDGE goals. Please note that this list is preliminary and may change in the actual posting. ************************************************************************************************************* 08-04-14 Posting Date Consultant Prequalification - Construction Inspection and Administration September 2014 Programmatic Group Procedures for Selection Due to insufficient numbers of prequalified individuals, the Department has elected to delay complete implementation of prequalification requirements for the September 2014 Programmatic Group. However, prequalification and partial completion of the requirements will be used as “subfactors” in the selection process. The Scope of Services for each Construction Inspection/Administration agreement will include a listing of the approximate number of personnel required for the various inspection/construction engineer categories, similar to the following: ODOT Prequalification Category Approximate Number Required Project Inspector Structures Inspector Coatings Inspector Traffic & Electrical Inspector Soils & Aggregate Inspector Construction Engineer Level 1 Construction Engineer Level 2 Non-Prequalified Personnel Documentation Clerk Other (Describe) Approximate Number Required Although not required, the Department will consider actual prequalification of individuals and partial completion of the requirements in the selection rating. Submittal of resumes of proposed staff members will be required. If construction administration activities are included in the agreement (Construction Engineer categories required), the prime consultant must have a current Certificate of Authorization from the State Board of Registration for Professional Engineers and Surveyors in accordance with ORC 4733.16. Please note that updated Scope of Services documents based on incorporation of the Department’s Construction Administration Manual of Procedures will be used. Standard documents have been developed for: 1) General Inspection Services; 2) General Administration and Inspection Services; 3) Project Specific Administration and Inspection Services. ********************************************************************************************************* 07-28-14 Posting Date Consultant Prequalification - Construction Inspection and Administration Prequalification List Now Posted to Website Please note that the Prequalification Information section of the Consultant Services page has been updated to include a list of individuals currently prequalified in Construction Inspection/Administration categories, and firms prequalified in the “Construction Management Firm” category. Prequalified firms are listed with the “Prequalified Engineering Consultants” list. These new prequalification categories will be used for selection in the September, 2014 Programmatic selection. ******************************************************************************************************** 07-14-14 Posting Date Consultant Evaluation System Scoring System Changes 2014 Effective July 14, 2014, the change to a 1-10 rating scale for the Department’s Consultant Evaluation System (CES) will be implemented, along with changes to login procedures for ODOT users. All agreements that have a “Consultant Evaluation Complete” date prior to 07/14/14 will retain the existing 10-8-5-1 rating scale. Agreements that do not have a “Consultant Evaluation Complete” date entered on the implementation date will use the new 110 rating scale. A complete summary of the changes is available on the Consultant Services page of ODOT’s website under the heading “CES Scoring Update 2014”, or the following address: http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/CES%20110%20Summary%202014.pdf ********************************************************************************************************** 07-01-14 Posting Date Request for Letter of Interest HAM-Elmore to Central Parkway Connector PID No. 98109 The Department is not in a position to request Letters of Interest at this time. The Official Notification on the Website for this project is being delayed from 07-07-14. No new date has been established. 06-30-14 Posting Date Request for Letter of Interest HAM-Elmore to Central Parkway Connector PID No. 98109 On July 7, 2014, the Department will post a request for Letters of Interest for environmental documentation and preparation of construction contract plans for a new urban collector from Elmore Street to Central Parkway in the City of Cincinnati. The new bridge will span Spring Grove Avenue, Mill Creek, active rail lines, and Interstate Route 75. The work will be a continuation of the completed Conceptual Alternative Study and Bridge Type Study previously completed. These documents can be viewed at the following location: ftp://ftp.dot.state.oh.us/Pub/Districts/D08/HAM-98109/ Following is a tentative schedule of the consultant selection activities: Official Notification on Website Letters of Interest Due Scope of Services Meeting Authorize Consultant 07-07-14 07-28-14 08-12-14 10-31-14 The agreement will include a DBE Goal of 10%. 06-30-14 Posting Date Revised Rates for Calculation of Net Fee The revised average overhead rate for net fee calculation will be 152.06%, with a separate rate of 167.44% for geotechnical work. These rates were calculated based on a weighted average with the weighting based on funds encumbered from FY 2010 through FY 2014 (as of 03-3114). Sixty (60) firms were included in calculations for the overall rate, and ten (10) firms were included in the geotechnical rate. The revised rates will apply to proposals for agreements and modifications received in Consultant Services on or after July 7, 2014, and similarly for task order proposals (for existing agreements) received in District or other offices. The revised average overhead rates are permanently posted under the heading General Information. Questions should be directed to Dan Krajcovic, Mat Mauger, Jim Prosch, or John Ray in the Office of Consultant Services. 06-30-14 Posting Date Office of Materials Management Training Sessions The Office of Materials Management is pleased to announce the following sessions of the Work Type 57 Concrete Sealer Training: August 21, 2014; October 24, 2014; November 21, 2014; February 19, 2015 For each course date, there are two options for participating: (1) by attending in-person at the ODOT Office of Materials Management facility in Columbus, or (2) by attending a live Webcast of the training at the ODOT District 7 Office (Sidney), District 8 Office (Lebanon), or District 12 Office (Garfield Heights). LTAP is managing the registration process for these sessions. Details and registration information are available online at: http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/LTAP/FlyersJuly09/Work_Type_5 7_-_Concrete_Sealer_Training.pdf 06-30-14 Posting Date Notice from the Division of Construction Management and the Office of Consultant Services Re: Opportunity for Training for SiteManager Usage SiteManager Training for External Consultants: Regional training in SiteManager data entry and SiteManager usage is being offered by ODOT’s Division of Construction Management and Office of Consultant Services. SiteManager is the ODOT database platform used to manage daily project reporting, contractor payment determination, and material control for an ODOT construction project. SiteManager data entry will be a requirement for the Consultants who will be performing construction project management duties for the Department. This training is being provided so attendees will gain a basic understanding of the SiteManager application and documentation requirements for utilizing SiteManager. This training is not providing inspection methodology, nor is this training a prerequisite to become prequalified. It is being offered in response to recent inquiries on training opportunities of SiteManager usage. Topics covered will be entry of daily work reports (DWR), entry of materials, estimate generation, change order processing, and reports. The cost for attendance is $150 / per attendee for the 6hr training. Payments can be mailed via check or made in cash to the ODOT front counter (1980 West Broad Street, Columbus OH – Contracts). User guides will be provided for the training. Checks should be made payable to Treasurer, State of Ohio. Mailed to Ohio Department of Transportation, 1980 West Broad St., Columbus, Ohio 43223 – Mail Stop #4110. Please include the purpose of the payment if mailed. Interested parties should contact Janet Treadway, SiteManager Administrator at 614-4667514 or janet.treadway@dot.state.oh.us to register for session(s). You will need to have the following information ready to register; name and email of person attending and session location / time. Please note we will have a 20 person limit per session and will be on a first come, first serve basis. Please register at least 3 days in advance of training. Preliminary Dates and Locations: Thursday, July 31, 2014 ODOT District 6 400 East William Street Delaware, Ohio 43015 8:00am - 3:00pm Thursday, August 7, 2014 ODOT District 8 505 South State Route 741 Lebanon, Ohio 45036 8:00am – 3:00pm Thursday, August 14, 2014 ODOT District 4 2088 South Arlington Road Akron, Ohio 44306 8:00am – 3:00pm Thursday, August 28, 2014 ODOT District 2 317 East Poe Rd. Bowling Green, Ohio 43402 8:00am – 3:00pm These locations and proposed dates may be revised upon reviewing interested responses. Respectfully, P. Brad Jones, P.E. Deputy Director, Division of Construction Management ************************************************************************************************************ 06-16-14 Posting Date Prequalification Training List The Office of Consultant Services has posted to the website a comprehensive list of prequalification training information including links to outside sources as defined by the current prequalification categories, under the "Prequalification Information" heading. 06-16-14 Posting Date Consultant Evaluation System Scoring System Changes 2014 The Office of Consultant Services has posted to the website a copy of the Powerpoint Presentation and Video of the June 11, 2014 Implementation Meeting, under the CES Scoring Update 12014 heading. *********************************************************************************************************** 06-09-14 Posting Date Construction Testing Dates Dates for Flexible Pavement Test, Advanced Structures Test, Certification for Compaction Test and additional sign-up information is available at the following site: http://www.dot.state.oh.us/Divisions/ConstructionMgt/Documents/Announcement-for-Testing.pdf ************************************************************************************************************ 06-02-14 Posting Date Consultant Prequalification - Construction Inspection and Administration NICET Central Office Test Location Test Date: Saturday August 23, 2014 Room GA Time: Candidates must report by 7:00 AM Exam start time: 8:00 AM Additional details concerning registration for the NICET testing opportunity in ODOT Central Office (1980 West Broad Street, Columbus, Ohio 43223) are now available as follows. The test location is listed as a “Public Site” on the NICET website, test center code: OH904. Additional testing information is also included. To apply for testing, applicants must register for online access and create an account with NICET. Instructions are provided below. Use the following link to register: https://candidate.nicet.org/register.aspx If the candidate has never tested before, register as New to NICET and follow the prompts to continue through the process. If the candidate has tested before, register as an Existing Customer. Provide: o Last name o SSN(without spaces) and/or Gov’t ID (without spaces) o Primary zip code (home or business) as included in the current NICET database record. Once this process is completed, NICET will send an email with a temporary password. Log back in using the NICET ID Number and temporary password, then hit Log In. After accepting the Agreement, the system will direct applicants to a new screen: WELCOME TO THE NICET ONLINE PORTAL. On the left hand side near the bottom of the screen, look for the Exam Application link and click on it. Navigate through the system, make test selections, and complete the registration by paying with a credit card. NICET accepts Visa, MasterCard, Discover, and American Express credit cards. Once the exam application and payment is received, candidates will receive their test confirmation notices the next day via email. ********************************************************************************************************* 05-26-14 Posting Date Consultant Prequalification - Construction Inspection and Administration NICET Webinar and Central Office Test Location In order to provide information and assistance to those individuals interested in becoming prequalified in categories that require National Institute for Certification in Engineering Technologies (NICET) certification, NICET will host a webinar, and provide a testing opportunity in ODOT’s Central Office, scheduled as follows: June 26, 2014 10:00 am Webinar Please use the following link to sign up for the webinar: http://www.nicet.org/ohiodotwebinar/ Registration is required. Instructions for accessing the webinar will be provided to registrants. Saturday August 23, 2014 Test opportunity in ODOT Central Office Room GA Up to 34 work elements may be selected. Additional details and registration instructions will be provided in the near future. *********************************************************************************************************** 05-12-14 Posting Date Consultant Evaluation System Scoring System Changes 2014 In response to a certain level of dissatisfaction with the current 10-8-5-1 rating scale used in the Department’s Consultant Evaluation System (CES), a change to a 1-10 rating scale is now ready to be implemented, along with changes to login procedures for ODOT users. The new 110 rating scale will be implemented by setting a fixed implementation date in the CES system. All agreements that have a “Consultant Evaluation Complete” date prior to the implementation date will retain the existing 10-8-5-1 rating scale. Agreements that do not have a “Consultant Evaluation Complete” date entered on the implementation date will use the new 1-10 rating scale. A meeting to explain the new system and implementation plan will be held on June 11, 2014 as noted below. A complete summary of the changes is available on the Consultant Services page of ODOT’s website under the heading “CES Scoring Update 2014”, or the following address: http://www.dot.state.oh.us/Divisions/Engineering/Consultant/Consultant/CES%20110%20Summary%202014.pdf 05/12/2014 Announce CES Changes and Distribute Summary 06/11/2014 Implementation Meeting and Webcast Location: ODOT Central Office Auditorium Time: 1:00 pm - 2:30 pm Webcast Link: http://media.dot.state.oh.us/DOTMediasite/Play/a94daad5a3a84d4bb40c0e425ae618771d E-mail Address for Questions: John.Curry@dot.state.oh.us (For those not in direct attendance, send questions to this address during the webcast) 07/11/2014 Last day for ODOT staff to Complete Ratings in Current 10-8-5-1 System 07/14/2014 Implementation Date *********************************************************************************************************** 05-05-14 Posting Date District 3 Planning & Engineering Administrator District 3 would like to announce the appointment of Robert A. Hochevar as the new Planning & Engineering Administrator. Bob’s career has encompassed over 31 years in the transportation industry. He has held various positions in the industry at the global, regional and local levels. Bob holds a Bachelor of Science in Civil Engineering (1982) from the University of Akron and a Master of Science in Engineering (1987) from Youngstown State University. Bob is a licensed Professional Engineer in the states of Ohio, Michigan, North Carolina and Virginia. Bob and his wife, Cathy, reside in Fairlawn and have three adult children. Please welcome Bob to District 3! 05-05-14 Posting Date Consultant Prequalification Change Project Inspector Category The requirements for prequalification as a Project Inspector have been revised to temporarily include previous employment as an ODOT HT3, HT4 or TM3 with five construction seasons (of 8 months per season) of construction project technical experience as a substitute for an Associate Degree or NICET certification. After November 15, 2016 this temporary provision will be eliminated and individuals prequalified under it will be required to meet the requirement for an Associate Degree or NICET Certification. Complete information concerning the requirements to become prequalified is included in the Department’s Consultant Prequalification Requirements and Procedures, updated May 5, 2014. A simplified prequalification request for Project Inspector has been added under the Prequalification heading of the Consultant Services page of ODOT’s website: http://www.dot.state.oh.us/divisions/Engineering/consultant/Pages/default.aspx The new Construction Inspection categories will be used for selection beginning in September, 2014. Additionally, the requirements for Project Inspector Section 2.53 (B)(2)(b) have been corrected to read Flexible Pavement Test. *********************************************************************************************************** 04-28-14 Posting Date Office of Estimating The Department will upgrade to Estimator 2.12a-1 on May 1, 2014. The sales department for the program vendor will contact consulting firms regarding rollout of this upgrade. *********************************************************************************************************** 04-21-14 Posting Date Geosynthetic Reinforced Soil Integrated Bridge System Workshop - May 5th In order to provide more information on innovative bridge replacement techniques the Ohio LTAP Center in coordination with ODOT's Office of Local Programs and the Federal Highway Administration are pleased to present this half day seminar on "Geosynthetic Reinforced Soil Integrated Bridge Systems". Registration is available for in-person or webinar attendance. Instead of conventional bridge support technology, Geosynthetic Reinforced Soil (GRS) Integrated Bridge System (IBS) technology uses alternating layers of compacted granular fill material and geosynthetic reinforcement to provide support for the bridge. GRS provides a smooth transition from the bridge onto the roadway, and alleviates the "bump at the bridge" problem caused by uneven settlement between the bridge and approaching roadway. Please complete the form at the link below to register for the upcoming training event. Space is limited, so register today! https://adobeformscentral.com/?f=EZN4BRJ26422PAq21G3lcQ 04-21-14 Posting Date Upcoming Training Sessions June 3-5 – NHI-Culvert Inspection This NHI 3-day intermediate level Culvert Design course provides participants with an in-depth, hands-on understanding of how to hydraulically size and design a highway culvert. June 10-12 – NHI-Urban Drainage This NHI 3-day course provides a detailed introduction to urban roadway drainage design. Detailed course information and registration forms are available on the ODOT LTAP website: http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/LTAP/Pages/default.aspx ************************************************************************************************************ 04-14-14 Posting Date Prequalification of Subconsultants The Department has recently noted instances in which a non-prequalified geotechnical drilling firm (Geotechnical Field Exploration Services) was added to a project and performed services without the knowledge of the Department. Section 2.31 of the Specifications for Consulting Services (Delegation of Services) requires that subconsultants be prequalified, and any change or addition of subconsultants to a project must be approved in writing by the Department. 04-14-14 Posting Date AASHTO Subcommittee on Bridges and Structures Meeting The 2014 AASHTO Subcommittee on Bridges and Structures (SCOBS) annual meeting is being held in Columbus, Ohio. The meeting is from June 22 through June 26, 2014 and will be at the Hyatt Regency downtown Columbus. This is the first time that Ohio is hosting the SCOBS annual meeting. Registration is now open. Early bird registration ends May 1, 2014. Below is the link for all the meeting information, including registration. We hope to see you there. http://www.dot.state.oh.us/groups/scobs2014/pages/registration.aspx ************************************************************************************************************ 04-07-14 Posting Date May 12, 2014 Programmatic Group Tentative DBE and EDGE Goals The projects listed for the 05-12-14 Programmatic Consultant Selection Group under the Future Consultant Program heading (shown below on this page of the web site) include a tentative listing of the projects assigned DBE and EDGE goals. Please note that this list is preliminary and may change in the actual posting. ************************************************************************************************************* 03-10-14 Posting Date New SMS Launch Date Structure Management System (SMS) stakeholders: After discussions with the developers and ODOT staff, ODOT has made the decision to launch the new SMS in production mode “GO LIVE” the week of May 12, 2014. The current Bridge Management System (BMS) will be switched to ‘read-only’ mode on April 3, 2014. Therefore data in the BMS will not get updated after switching to read-only mode. Any unapproved inspection reports or changes to inspection or inventory data must be submitted or made prior to April 2, 2014 in the current BMS or wait until after the new SMS goes live. SMS Training: The Office of Structural Engineering will continue to provide open labs and will make video tutorials available. Manuals, in development, will be imbedded into the SMS. Future Bridge Inspection Training, also in development, will incorporate changes associated with SMS and Element Level Inspections. For further information regarding the SMS transition, logging into the test-site, software & hardware requirements, URL of SMS in production mode and any future announcements, please refer to the following web page: http://www.dot.state.oh.us/Divisions/Engineering/Structures/Pages/Structure-ManagementSystem.aspx I want to thank all those that helped in the design, development, and testing of the new SMS system. This truly has been a team effort. Thank you for your patience during the development of ODOT SMS. Tim Keller Administrator Office of Structural Engineering ******************************************************************************************************** 03-03-14 Posting Date ODOT Research Projects Response Due Date: 03-31-14 On behalf of Ohio’s Research Initiative for Locals (ORIL), the Ohio DOT’s Research Section is currently accepting proposals for the following projects: 2015-ORIL1: Evaluation and Design of a MASH TL-3 Bridge Guardrail System Mounted to Steel Fascia Beams 2015-ORIL3: Investigation of In-Situ Strength of Various Construction/Widening Methods Utilized on Local Roads 2015-ORIL4: Analysis of Ground Tire Rubber (GTR) in Mix Design on Local Roadways in Ohio 2015-ORIL5: Assessment of IRP Truck Registration for Ohio Counties 2015-ORIL6: Protocols for Alternate Load Paths Within Non-Redundant Steel Structures 2015-ORIL7: Stormwater Best Management Practices for Local Roadways Individual RFPs and submission instructions are available at the following link: http://www.dot.state.oh.us/Divisions/Planning/SPR/Research/RFP/Pages/ORIL-RFP.aspx Please note that the proposal formatting requirements and submission instructions for ORIL projects are somewhat different from ODOT’s guidelines, so please review them carefully to ensure you are responding correctly. Noncompliance with formatting and submission guidelines is cause for rejection of a proposal. Submissions must be received by 3:00PM(ET) on the response due date listed above in order to be considered. Absolutely no extension will be granted to this deadline. All questions should be directed to ORIL@dot.state.oh.us or 614-387-2710. Clarifications will be posted to the ORIL RFP site as they become available. The ORIL research program is open to the entire transportation research community, including consultants and public and private universities. ORIL does not prequalify researchers and accepts submissions from out-of-state organizations. The ORIL Board and the ODOT Research Section reserves the right to reject any and all proposals. We thank you for your interest in transportation research in Ohio and look forward to receiving your submission. ****************************************************************************************************** 02-10-14 Posting Date January 13, 2014 Programmatic Projects to be Re-Posted for Letters of Interest Due to the reasons cited below, a new request for letters of interest will be posted for the following projects: VAR-D02-General Eng Servs No. 2014-3 The selection subfactors have been revised to place more importance on local knowledge/experience in public relations/communications, and a provision for short interviews with shortlisted firms has been added MUS-040-09.40 No Letters of Interest were received. The prequalification requirement for Complex Roadway Design has been reduced to NonComplex The request for Letters of Interest will be posted 02/10/14, with responses due 02/24/14. *********************************************************************************************************** 01-27-14 Posting Date CUY-Innerbelt CCG3 Consultant Selection PID No. 82380 Tentative DBE Goal CUY-Innerbelt CCG3 under the Future Consultant Program heading for February 10, 2014, (shown below on this page of the web site) includes a tentative assigned DBE goal. Please note that goal is preliminary and may change in the actual posting. *********************************************************************************************************** 01-20-14 Posting Date Consultant Prequalification Requirements and Procedures – 2014 Updated Manual The Department’s prequalification manual has been updated and re-issued to reflect additional prequalification categories and other miscellaneous changes. A summary of the revisions follows: Section 1.01 1.11 Description of Change Actions Required for Currently Prequalified Firms Language has been added to clarify that cost accounting information must be submitted on an annual basis. None Language and requirements concerning Homeland Security/DMA forms has been deleted. Language has been added to require that certifications and/or training approvals be currently in force at the time of prequalification approval. None For bridge inspection, the category names have been revised to: Level 1 Bridge Inspection; Level 2 Bridge Inspection; 2.14 Underwater Dive Bridge Inspection. 2.15 The language has been updated to reflect 2.16 more specific references to National and State 2.17 standards, training courses and certifications. All categories of bridge inspection prequalification now require successful completion of an ODOT approved bridge 2.15(B)(2) inspection refresher training every 5-years (in 2.16(B)(2) the event the Comprehensive course was 2.17(B)(2) attended more than five years previous). AASHTO Test Designation T 87 has been revised to R 58 2.19 2.34 2.45 2.46 2.47 2.50 2.51 2.52 ASTM D7012 Compressive Strength of Rock Core Specimens, Method C has been added as a laboratory test requirement The requirement for preparation of applications for projects resulting in a formally approved Section 404 Individual Permit from the USACE and a Section 401 Water Quality Certification from Ohio EPA has been reduced from three (3) to two (2). In section B.1. the term “ODOT’s procedures” has been changed to “ODOT’s Real Estate Manual, 5100 Section”. In the definition of Value Analysis, the upper limit for fair market value has been revised from $5,000 to $10,000. A requirement has been added to complete ODOT Appraisal 105 - Appraisal Review Introductory Course. “As a real estate appraiser” has been added to section B.2. to clarify the licensure requirement. In section B. the term “ODOT policy” has been replaced with “Real Estate Manual sections”. Section B.1. has been revised to require experience on both residential and nonresidential parcels. Section B.2. has been revised to require experience on both residential and nonresidential parcels. Eight new prequalification categories have been added in Construction Inspection and Administration. 2.53 thru 2.60 A paragraph has been added to further None Submit documentation of completion of the refresher training with the next scheduled Prequalification Renewal Request. Submit the AMRL certification for ASTM D7012 with the first Renewal submittal after the firm’s next scheduled AMRL review. None None New applicants and those currently prequalified must complete ODOT Appraisal 105 by July 1, 2016 None None None None The new categories become effective for selections in September, 2014. Prequalification requests may be submitted at this time. 3.01 3.02 General explain cost accounting requirements including prequalification. References to “Limited” and “Not Applicable” have been deleted. All registration requirements for professional engineers and surveyors have been clarified to require registration with the Ohio State Board of Registration for Professional Engineers and Surveyors. None None Key staff not registered in Ohio must complete Ohio registration by December 31, 2014. ************************************************************************************************************* 01-13-14 Posting Date New Course Dates for ODOT Soil and Rock Classification Based on the high level of interest indicated for this topic, two additional course dates have been added for the 1-day ODOT Soil and Rock Classification course: March 6 and March 7, 2014 ODOT Office of Materials Management (Test Lab) 1600 W. Broad St. (43223) A copy of the updated training announcement is available online at: http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/LTAP/FlyersJuly09/ODOT_Soil_a nd_Rock_Classification_-_2014.pdf Please Note: If you were unable to enroll in the earlier course dates (February 20 and March 4, which quickly filled to capacity) and were placed on a wait list, you will need to submit a new registration using this updated form if you would like to enroll for the March 6 or March 7 session. Registrations will be accepted on a first-come, first-serve basis while seats are still available. After these March sessions, this course will probably not be available again until the second half of 2014 (tentatively September or October). 01-13-14 Posting Date Notice of Soils And Aggregate Inspectors Certification Programs The Department has added the NorthEast Transportation Technician Certification Program’s (NETTCP) Soils And Aggregate Inspector Certification to be an acceptable credential for nuclear density gauge operators (Supplement 1121). This certification is an alternative to the currently accepted certifications provided by the National Institute for Certification in Engineering Technologies (NICET). Certification is a prerequisite to becoming an ODOT Prequalified Soil And Aggregate Inspector which allows them to work as soils technicians on ODOT and federally funded LPA projects. The NETTCP and the Independent Laboratories Institute (ILI) have partnered to provide an ODOT accepted training and certification program for Soils and Aggregate Inspectors. NETTCP is an FHWA recognized agency currently providing transportation technician training and certification in seven Northeastern states, and will conduct the actual training and testing activities in Ohio. ILI is the education and training foundation of the American Council of Independent Laboratories (ACIL), and will provide course logistics and coordination. Courses are planned in the Cincinnati, Cleveland, Columbus, and Toledo areas during the first several months of 2014 and will be scheduled based upon response to this announcement. The course includes 2 days of instruction followed by a half day exam with both written and performance tests, and has an approximate 75% historical pass rate. Fees are $635 for ACIL members and $865 for non-members. A host laboratory is needed for the performance exam, which will receive one courtesy registration for their assistance. Passing candidates will receive a five year certification that includes a photo ID. Please contact Steve Bowser at sbowser@bowser-morner.com for details or to provide an estimated number of registrants for each location. Courses will be scheduled after receipt of a minimum 8 candidate commitments per location. Information on the course (outline, exam, etc.) can be found on the NETTCP website (www.nettcp.com) . On the home page click on “Certification Courses” and you will find the “Soils and Aggregate Inspector Course”. 01-13-14 Posting Date Request for Proposals Office of Statewide Planning & Research Response Due Date: 03-07-14 The Research Section at the Ohio Department of Transportation is now accepting proposals for the following studies: RFP Solicitation # 2015-01 2015-02 2015-03 2015-04 2015-05 2015-06 2015-07 2015-08 2015-09 2015-10 2015-11 2015-12 2015-13 Project Title Evaluation and Analysis of Liquid Deicers for Winter Maintenance Effectiveness of Wildlife Mitigation Treatments on the Nelsonville Bypass Performance Comparison of Structural Steel Coating Systems Evaluation of Cost Effective Protective Coatings for ODOT Snow & Ice Equipment Performance Comparison of Abutment and Retaining Wall Drainage Systems Forensic Study of Early Failures with Unbonded Concrete Overlays Tack Coat Performance and Materials Study Airborne Sensors for Transportation: Incident Management, Infrastructure Assessment and Inventory Bridge Trough Maintenance Evaluation on Finger Joint Bridges Extended Life Concrete Bridge Decks Utilizing Improved Internal Curing to Reduce Cracking Earthen Berm Noise Reduction Analysis Hydraulic Engineering Research On-Call Services (ROC) Geotechnical Engineering Research On-Call Services (ROC) Please read the requirements of each proposal section thoroughly. Changes have been made to our Proposal Formatting and Submission Guidelines. Highlighted changes include: · · Each attachments in your submission is limited to 20 MB. Required use of our modified Budget Form is to be completed and submitted in Excel format (separate from the proposal), and should also be referenced in the proposal as an Appendix. · The submission process has changed. The proposal and budget form will be submitted using Adobe Forms. You will complete general information on the form, then attach the proposal and budget form. After you click submit, you will receive a confirmation email. Noncompliance with the formatting and submission guidelines is cause for rejection of a submission. ODOT reserves the right to reject any and all submissions. Submissions must be received by 3:00 PM (ET) on March 7, 2014 in order to be considered. Absolutely no extensions will be granted to this deadline. Please make your submission in plenty of time to allow for servers to process your email. Additional information concerning submission requirements is available on the above listed site. All questions concerning the solicitation should be directed to Research at 614-644-8135 or Research@dot.state.oh.us. Clarifications will be posted to the Research RFP site as they become available, so please check back to this site for updates. Please feel free to forward this message to your colleagues. To view the RFPs and obtain information on submission requirements: http://www.dot.state.oh.us/Divisions/Planning/SPR/Research/RFP/Pages/Strategic%20Researc h%20Plans.aspx ******************************************************************************************************** 01-06-13 Posting Date AASHTO Audit Guide Courses AASHTO Audit Guide courses are being held in Columbus for "Development of A/E Consultant Indirect Cost Rates" and "Auditing and Oversight of A/E Consultant Indirect Cost Rates". Additional information is available at the following website, subheading Current Training Course Flyers and On-line Enrollment: http://www.dot.state.oh.us/Divisions/Planning/LocalPrograms/LTAP/Pages/default.aspx = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = = = End of ODOT Web Page Announcements
Similar documents
Study MBBS in Georgia: Study Abroad Consultant
Find the international student placement consultant that delivers the right direction to study MBBS in Georgia at studyabroadconsultant.net. Call us at +1-9713044961 for any query! Get information to study in abroad! Visit Us: http://www.studyabroadconsultant.net/
More information