Seminar On “Managing Low Delta T Syndrome in HVAC System” Mr

Transcription

Seminar On “Managing Low Delta T Syndrome in HVAC System” Mr
Seminar On “Managing Low Delta T Syndrome in HVAC System”
Studies show that Low Delta T Syndrome in HVAC system exists in many buildings.
Cause of low delta T syndrome could be many but the end effect is always the same
which is energy wastage. Engineers and building managers understand that managing
low delta T syndrome is essential for reducing energy wastage and maintaining
sustainability. Often they tend to solve it by upgrading efficiency of chillers and pumps;
or adding more measurement device into BMS system to enhance the chiller plant
sequencing programme. The questions, how effective and how much the investment
and running cost of these solutions are? Can these solutions be implemented and
completed within days?
This presentation aims to share with the participants a new approach of managing low
delta T syndrome: advanced pressure independent control valve. This approach is
probably the best solution in terms of investment cost, implementation, impact to existing
building operation and maintenance in long run.
Duration of Talk: 2 hours
Mr. Dennis Ho
Regional Application Consultant, AP
Belimo Actuators Ltd
Dennis Ho is the Regional Application Consultant in Belimo Actuators Ltd, daughtercompany of BELIMO Automation AG, Switzerland. Dennis is from Hong Kong and his
role is to support and keep the Asia Pacific market abreast with the technology from
Belimo.
Dennis has more than 25 years working experience. He started with Johnson Controls
for almost 16 years. He later moved to BYME Engineering Ltd, one of the leading MEP
contractors in Hong Kong. BYME is a subsidiary of Dragages Construction Ltd. Since
then he had involved in many design-and-build projects in Hong Kong and Macau. He
gained site experience in design coordination, installation, testing and commissioning
through the time he was resident on site. Dennis currently holds two bachelor degrees in
management and engineering, and a Master Degree in Intelligent Building Technology
and Management from The Hong Kong University of Science and Technology.
Registration Form – Seminar on “Managing Low Delta T Syndrome in HVAC System”
Date: 3 March 2015 (Tuesday)
Time: 6.30pm – 9.00pm
(Registration starts 6.00pm)
Fee for early registration by 27 Feb 2015:
Free for ASHRAE Singapore Chapter (ASC) members
Free for ASC student members
S$15 for ASHRAE / IES / IFMA members
S$30 per participant (non members)
Fee for late registration after 27 Feb 2015:
S$30 for ASC members
S$50 for non ASC members
*All fees above are GST inclusive.
Venue:
Singapore Polytechnic Graduates’ Guild (SPGG)
Ballroom, level 3, 1010 Dover Road
Singapore 139658 (Singapore Poly gate No.4)
(Buffet Dinner will be provided)
Register by email to elta.ascsecretariat@gmail.com by 27 Feb 2015, with the required Registration Details below.
Please make the payment by issuing a cheque to ASHRAE Singapore Chapter, c/o 159 Sin Ming Road,
AMTECH Building, Lobby 2 #07-02, Singapore 575625. Alternatively, you can pay by cash on 03 Mar 2015 at the
registration counter.
Professional Engineers Board (PDU) points: Pending
For enquires on program and registration matters please contact:
Dr. Poh Hee Joo [Email: pohhj@ihpc.a-star.edu.sg], ASC