Information on Tappan Zee Bridge Deck Panel Reuse

Transcription

Information on Tappan Zee Bridge Deck Panel Reuse
Tappan Zee Bridge Deck Panel Reuse
From the Tappan Zee Contract:
“Precast concrete deck panel substructure units: A total of 150 units shall be salvaged. The units shall be
from the 2005 and 2010 contracts (by others) undertaken at the existing bridge and shall be located on
the tangent section of the existing causeway between spans 70 and 165. Units that have bump-outs for
light standards shall not be included. Twenty units shall be from existing lanes 1 and 7, with 10 units
being taken from each lane, and these units shall be retained with the existing steel traffic barrier
remaining attached. One hundred and thirty units shall be from existing lanes 1, 4 and 7 (without
barrier). The Authority’s Project Manager shall provide to the Design-Builder a list of the available units
after existing traffic has been removed from relevant lanes. Ten units with the barrier and 60 units
without barrier shall be removed and delivered by the Design-Builder to a designated location in
Syracuse, NY. Ten units with the barrier and 70 units without barrier shall be removed and delivered by
the Design-Builder to a designated location in Albany, NY. All 150 units shall be removed, transported,
delivered and unloaded by the Design-Builder without introduction of further defects (cracks, chips,
spalls) that would reduce the service life or adversely affect the immediate in-service use of the precast
concrete deck panel units, unless such further defects are repaired such that the service life or immediate
in-service use is not adversely affected. Any damaged units that are not repaired by the Design-Builder
shall be replaced by other units that conform to the requirements herein;
In addition to the barrier for salvage with deck panels, a total of 15,000 feet of steel barrier and
associated hardware and appurtenances installed on precast deck panels shall be removed from the
panels and salvaged. The Authority’s Project Manager shall provide to the Design-Builder a list of the
available steel barrier sections for salvage after existing traffic has been removed from relevant lanes.
Following removal by the Design-Builder of the steel barrier system, the Design-Builder shall deliver it as
follows: 10,000 feet shall be delivered to a designated location in Albany, NY area; 2,500 feet shall be
delivered to a designated location in the Syracuse, NY area; and 2,500 feet shall be delivered to a
designated location in the Buffalo, NY area. All lengths of barrier and associated hardware and
appurtenances shall be removed, transported, delivered and unloaded by the Design-Builder without
introduction of further defects (bending, denting, cracking, chipping) that would reduce the service life or
adversely affect the immediate in-service use of the barrier systems, unless such further defects are
repaired such that the service life or immediate in-service use is not adversely affected. Any damaged
barrier and barrier appurtenances that are not repaired by the Design-Builder shall be replaced by
barrier and barrier appurtenances that conform to the requirements herein;”
Tappan Zee Bridge Deck Panel Reuse
Existing Tappan Zee Bridge Information: The proposed contract calls for removal and storage of
superstructure units from the existing Tappan Zee Bridge. These units are located on the tangent
causeway section west of the Main Span. These units will come from Lanes 1 and 7 as fascia units and
Lane 4, an interior unit.
Lane 1 and 7 units consist of 2 galvanized rolled beams approximately 50 feet in length with an 8 ¼ inch
monolithic HP concrete deck. Longitudinal grooving is installed on the surface. The fascia rolled beam is
a W27x102 with the interior beam a W27x94. The units were fabricated between 2007-2008 and have
been in service for about 5-7 years. These prefabricated units have a deck areas that typically measures
approximately 12’-7” W x 50’ L. The expansion end consists of the steel beam welded to an elastomeric
bearing. The fixed end consists of a concrete footer that sits on a neoprene pad. The existing anchor
bolts were used/extended and grouted. The estimated weight of each unit is approximately 75500lbs,
not including the steel barrier.
Lane 4 units consists of 3 galvanized rolled beams approximately 50 feet in length with an 8 ¼ inch
monolithic HP concrete deck. Longitudinal grooving is installed on the surface. The rolled beams are
W27x114. The units were fabricated between 2011-2012 and have been in service for about 2-4 years.
These prefabricated units have a deck areas that typically measures approximately 13-3” W x 50’ L. The
expansion end consists of the steel beam welded to an elastomeric bearing. The fixed end consists of a
concrete footer that sits on a neoprene pad. The existing anchor bolts were used/extended and grouted.
The estimated weight of each unit is approximately 86500lbs.
Existing Superstructure Drawings:
Typical Bridge Cross Section
Lane 4 Units - Deck Panel Detail Spans 82 -165
Lane 4 Units - Deck Panel Detail Span 166
Lane 4 Units - Superstructure Details
Lane 1 and 7 Units - Deck Panel Detail Spans 2 -166
Lane 1 and 7 Units - Superstructure Details
Lane 1 and 7 Units – Expansion Bent Details
Lane 1 and 7 Units – Fix Bent Details
Lane 1 and 7 Units - Deck Panel Fixed end Details
Steel Bridge Railing Details 1
Steel Bridge Railing Details 2
Traffic is scheduled to be removed from the existing bridge late 2016. Based on the current demolition
schedule, these panels could become available Summer of 2017. If you would like to receive more
information when it becomes available or are interested in deck panels for reuse, please feel free to
contact me.
Christopher Millington, PE
Major Projects Structural Engineer
Federal Highway Administration, NY Division
11A Clinton Ave, Suite 719
Albany, NY 12207
Phones: 518-431-8853
e-mail: chris.millington@dot.gov
12176m
1It'-M :l.U:I..1:1.U4· -:I.::', Kt.MUVt.
t.X1~I\Nti ~UI"'="'''v';IUKt.
llillIS
27.737m
3.4BOm
NB TRAFFIC lANE
3.556m
NB TRAFfiC lANE
3.632m
NB TRAFFIC lANE
1.067
®~
76-:1~H...........-_""",<;>~ CD
::~
3.657m
REVERSIBLE TRAFFIC lANE
@~
~
r
EXISTING DECK SUPPORT
AT END DIAPHRAGMS
TO REMAIN (TYP)
~
1:321
DIAPHRAGM
i,
(TYP.)
'\
m
IIII
r:= LJ
r"I
@
n
~
::-'-'-IMOVABLE
210
II
~
.l.
r
]1
"
I
II
®
® I--
I
R~
EXIST./pRO
STRINGER
I
D~
1/.1
/
I
t<-..
\
(TYP.)
rMOVABLE
\
BARRIER
(PM HOURS)
1.524m
r:-76
I
13.843m
"ci
1.473m l7.
~~ ~..
,
~~~
~
"'"' I
h
(TYP.)
.
I.
r
!;Z ~
I
III '
i\~ ~ @
€0
JWI '
REFER TO DWGS SlU-l0 TO SlU-15 FOR
PRE-FABRICATED OECK OErAlLS.
3. REFER TO DWGS. DTL-l TO DTL-7 FOR BEARING AND
PEDESTAl DErAILS.
4.
MOVABLE BARRIER IS POSmONED BY "THE AUlHORIlY TO
"THE A.M. AND P.M. PEAK TRAFFIC HOURS lOCATION. FOR
MOVABLE BARRIER LOCATION DURING CONSTRUCTION. SEE
TCP DWGS.
5.
CONTRACTOR SHAll TAKE, CARE NOT TO DAMAGE EXISTING
EDGE BEAM.
6.
PROVIDE TEMPORARY SUPPORT FOR UTlLmES WHICH ARE
TO REMAIN. SEE UTlLl1Y PlANS.
ill I
@
1.829m
AND 565.2022
8~
851
1.829m
~ ITEMS ,202..,200,525. 582.0632--25. 565.1922
r=;=-,
!."I
l
602
1.98
EXISTING 5kV AND COMMUNICATION
CONDUITS TO BE REMOVED
13.843m
1.702m
(5
1.676m
REMOVE AND DISPOSE OF EXISTING ABER OPTIC
UNES AND CONDUITS AFTER NEW ABER OPTIC
UNE INSTAllATION AND COMMISSIONING BY OTHERS
AXED - EVEN BENTS
EXPANSION - ODD BENTS
SCALE:: I : 50
i
~
II
III
1.981m
EXISTING
PIERS 81 - 166
I
2.
TRAFFIC BARRIER
EXISTING EDGE
BEAM TO REMAIN
(
~ ~\ L
,::
-
-1---"'--25'
1.56'-=
' - - - - V ------: \
"
REFER TO DWGS. CS-2. CS-3 FOR SUGGESTED
CONSTRUCTION SEQUENCE AND mU-l FOR TEMPORARY
SUPPORTS.
LEGEND
III I
~~
~
1.524m
w
..
A
1J'£>.~--~
SAWCUT E X I ! \
SlAB FUll
BRIOGE:-
@
®
1.9Blm
1.981m
r
III
~~
~ ~,.473m I~ ~
1.B29m
I
BARRIER
.I
(AM HOURS~
\
1111
1111
~~
1
1.829m
1.702m
1.676ril
1.56'-=
' 1m I
85~
B51
I
y
li!
8
~
o
®tlt
1.
1.067m
UGHTlNG~
~
(TYP.)
.
~I---'
(TYP.)
TRAFFIC BARRIER
"z
3.632m
SB TRAFFIC lANE
SAWCUT EXIST
SLAB FUll DEP"TH
Ir--~ I "'"'
AND CONDUITS
3.556m
SB TRAFFlC lANE
®tlt
0~
I
, (TYP.)
3.4BOm
SB TRAFFIC lANE
ROADWAY
26-l-l-i-
LmLl1Y HANGERS-
610
II
I
i
12176m
I
III:.M bti4.1UtlZ· -2b. IN~IAI.L
BIN 5516340
Ut.(';K t'ANIoUi
II:'U
27.737m
1.067
3.4BDm
3.556m
NB TRAFFIC lANE
3.632m
3.657m
REVERSIBLE TRAFFIC lANE
610
3.4BOm .
SB TRAFFIC LANE
0S
®~
3.556m
SB TRAFFIC lANE
®tlt
3.632m
SB TRAFFIC lANE
1.067m
o tlt£>.
®tlt
-:11-76
~~,...,
ROADWAY UGHTlNG---...... """
(TYP.)
L
CROWN
26-tt--I-
I
~~I TRAFFI~:)RIER
l
NEW CONDUIT AND
-~
I
Ul
'f
iii
0
0::
m
II
~ II
I /7" ....
V ISl
--./
r---
SUPPORT
TO BE INSTAlLED
BY
CONTRACTOR.
NEW
ABER OPTIC UNE TO BE
INSTAlLED BY,O"THERS.
::>
,
210
~
I
.
It
BRIDGE
,,~-rt:::'rf I
\
SS~P~
~
-" ~ /~:e:'t
I
Vf-~~·ra
DIAPHRAGM
r~ISTlNG
TRA~~srRIER ~-B'
I
EDGE
-1---'''-25
'BfEAMiE=(nP=='=)===liI~::~=i!E======jj::~~~~~
~~~f;~~~r:=====:Hl~~~IAP~~~AA~GjMil\El~====;TIff;~~~~~~~_=':'5~6~~=;li~;;~=lI~Ii!(~AM==H=O=U~RS~~==~li/~I~I~~(P~M;;HO~U~R~S~~'~=6=~~:;ii!~~~/~
®
UTlUTY HANGERS
AND CONDUITS
(TYP.)
tVoGtP~~~~~~ORT-'
III
II
@
I
III
@
l.
-III
r
1
IL
1,/1
II"
f
[%;:
~
!
;;zjl.473m
0.11
~
::+/ EXlST./pR,~ ~ STRINGER
III
II
~~
®
III
~~
r0 ~L
(:!)
@
II
IIII \
1.473m."Jr
~
~~
p.: ~I
.~@ ~
Jj
r II
r II
I
-
v
TO BE INCLUDED IN ITEMS 202.12001525, 582.0632--25
AND 565.1922. AXED BEARINGS FOR SPAN
166 PAID UNDER ITEM 565.2022. (TYP.)
13.843m
\ 1.9Blm
I" I
--y -
1.981m
1.524m
r= ~
BY
SYV.
§
§
602
1.524m
II
1.981m
1.9Blm
I "
--y -
1.829m
1.B29m,
_ NEW 4BOV CONDUIT
NOTICE: THIS DOCUMENT CONTAINS SENSITIVE AND/OR
CONADENlIAI. INfORMATION THAT MAY ONLY BE USED
FOR THE SOLE PURPOSE OF PREPARING A 810 FOR
THIS PROJECT. ANY OTHER USE IS STRICTLY
PROHIBITED. IF YOU HAVE RECEIVED THIS DOCUMENT
IN ERROR OR ARE NOT lIjE INTENDED RECIPIENT. BE
ADVISED THAT ANY USE. 0lSSEMlNAll0N OR COPYING
OF THIS DOCUMENT IS STRICTLY PROHIBITED AND YOU
MUST DESTROY IT ,IMMEDlAffiY.
,,~
Iml
r=;=-,
8
1.702m
fiR
~
@
1.676m
---
NEW YORK STAlE THRUWAY AUTHORITY
DEPARIiIENT OF ENGINEERING SERVICES
2DO SOUlHERN BLW. ~. N.Y. 12209
v--
lTTLE OF' PROJECT
TAPPAN ZEE BRIDGE
REPAIR PROJECT
13.843m
PROPOSED
PIERS 81 - 166
SCALE:: 1 : 50
lOCATlON OF PROJECT
TAPPAN ZEE BRIDGE
lAP 14.67:1:
lTllE oF' DRAWING:
AXED - EVEN BENTS
EXPANSION - 000 BENTS
CAUSEWAY
TYPICAL SECTION
PIERS 81- 166
ci
.i!!
0;;
TANY 10-9B
i
i:!i
DESCRIPTION
I
I~1~.3=2~li~~~~1:·6~7~6~m~~~,~.7~0~2~m~i.;;;~1.~B~29~m~;i.:;~~~;;==~~~==~~::::====::~~~==~~~==::~::~====::~~~~~~::==~::::====::====:±::::::==:±::::==~~~
L, f\..c.L... THE COST OF AlL BEARING AND PEDESTAl MODIACATIONS
I
'\_
~ _
1.B29m
DAlE
REVISIONS
I
NEW PREFABRICATED
DECK PANEl (TYP.)
--
NOTE:
12/22/09
ALL DIMENSIONS ARE SHOWN IN M1UUMEIERS
UNlESS OTHERWISE N01EO.
TSU-1
,
Ii
Il
Il
2S~~----------------~~~~~~~~~~~------------------~r-2S
i /
<i<. GIRDER
SYMMETRICAL ABOUT <i<.
0w
'"w
j'.!:
e
0
0
I
I
I
I,
.,I
I,
I
~
~~
00
zo
g:I:
I
<0
go'"
E -
III
....
I
til
~
ID
li,
I
I
3-,'6 BARS AT
150 EQ. SPA.
,'9 TRANSVERSE
STAGGER
TOP '" BOT. MATS
I
lDDmm UFnNG· HOLE
wrrn B
TOP AND
BOrr. 610 MIN.
LENGTH (lYP.)
,'9
1
'"
~
I
,
I
I
1
I
I
I
I
I
1
,
,
,
I
I.
,
,
,
,
,
z
n.
0
0
0
:I:
w
<
0
g
....
0
0
w
a
(!)
-'
E ~
0
III
~
i1'.
0
til
..J
W
~
-'
('j
n.
~
100mm UFlING
HOLE LOCAnON
,
I
<D
z
9
<
E
0
'"
...:
<D
!
I
I
I
I
I
I
I
I
I,
I
I
I
I
I
I
I
I
,
NQlES;.
1.
AlL DIMENSIONS MEASURED ARE HORIZONTAL
AClUAL DIMENSIONS SHALL BE PROVIDED BY THE
CONTRACTOR AFTER SURVEY· AND DETERMINING CROSS
SLOPE AND LONGITUDINAL SLOPE.
2.
SEE PRECAST SUPERSTRUCTURE NOTES (G-3) FOR
TOP SURFACE REQUIREMENTS.
3.
SEE G-4 FOR GROUTING REQUIREMENTS.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4. FOR. EDGE BEAM REINFORCEMENT SEE DWG. DPU-3.
5.
FOR END BEAM REINFORCEMENT.· SEE DWG DTL-2.
::--EDGE OF
:
PANEL
I
I
I
I
I
I
I
I
I
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
i
•
I
I
I
I
I
I
I
I
I
·1
I
I
o
Ul
I
I
I
I
I
I
1
I
I
I
~5t:Q.~~~
I
I
I
I
I
I
1
I
I
I
I
1
I
I
I
I
I
1
I
I
I
I
1
I
I
I
I
1
I
I
1
1
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
Ii
I
I
1.
til
l'.~
li,
<>
L50
0
<>'
,
300
<>'tIl
z
,
,
,
,
200
I!!
z
m;!;
1E
m
(TiP;)
,
,
w
w (!)
0
a aw
1E
m
0
I
I
I
)
-'
w
a:
m
)i
-'
~
til
;;;;,
::l;
<
w
m
0
'"
t:i
I
I
I
I
I
I
I
I
1
1
I
I
I
<
-'
,.:
<
n.
"a
~
400 EDGE BEAM --+---11
en
n.
z
0
I,.
I,
I,
I
I
n.
g
14-'29T&B
I
OF EDGE BEAM
I
ID
~
I
I
<>'tIl
n.
m
I
I
35?:
§
I
I
afil
::l;
I
!
I
I
1
I
I
I
I
1
I
I
I
I
I
I
1
1
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
1
1
1
I
I
I
1
1
1
I
I
I
I
1
1
I
I
I
I
SYMMETRICAL ABOUT
. <i<. GIRDER
I
-EDGE OF
PANEL
ID
/
<i<. GIRDER
<i<. PANEL"
I
I
I
I
I
I
I
I
I
I
I
I
I
JOINT
(SEE DETAIL "A"
DWG. OTL-B)
25-;r-_________~~·4~.0~0~4~m~~~O~N~GITU~D~INAL~~GR~O~0~VI~N~G~_---------*--25
4.011 m LONGITuDINAL GROOVING
<i<. GIRDER
~3j/
Il
JOINT
(SEE DETAIL "A"
DWG. DTL-B)
JOINT
(SEE DETAIL "A"
DWG. DTL-B)
JOINT
(SEE DETAIL "A"
DWG. DTL-B)
ATlti
I
.
3-,'6 BARS AT
150 EQ. SPA.
,'9 TRANSVERSE
STAGGER
TOP & BOT. MATS
BIN 5516340
o
z
I
I
I
!
I
I
~
:
I
(I)
I
DATE
I~~!
1.47Bm
1.9Blm
I
~5~0~C~O~V~.__~_____-..~~~~~~~~~3~.~96~'~m~~~~~~~~~~_ _ _ _-rr-SO CO~
fl16 BARS LONG. 0 150 - 27 BARS TOP/Borr. (STAGGERED)
4.061m
DECK REINFORCEMENT PANEL PLAN - LANE 3
(LANE 5, PANEL OPPOSITE HAND)
SCALE: 1 : 20
NOTICE: THIS DOCUMENI CONlA1NS SENSITNE AND/OR
CONFlOEllTlAL INFORWITION THAT WlY ONLY BE USED
FOR THE SOLE PURPOSE OF PREPARING A BID FOR
nils PROJECT. ANY OTHER USE IS STRICTLY
PROHIBI1£D. IF YOU HAVE RECEIVED THIS DOCUMENI
IN ERROR OR ARE NOT THE INIENDED RECIP1ENI. BE
ADVISED THAT ANY USE. DISSEMINATION OR COPYING
OF THIS DOCUUENI IS STRICTLY PROHIBI1£D AND YOU
MUST DESTROY IT IUUEDIATaY.
t:1il
100mm UFnNG HOLE
wrrn B fl19 TOP AND
BOrr. 610 MIN.
LENGTH (lYP.)
I
I
SYM.
/lEYISIONS
-100inm UFlING
HOLE LOCAnON
(TiP.)
~
ARCHITECT & ENGtNEER. P.e.
,-"sw.~.1'10~,,­
"...:t:Ull_~!II.T.lml'
HR
NEW YORK STATE THRUWAY AUTHORIlY
DEP.IRIIIENI Of ENGINEERING SEIMCfS
2DO SOUTHERN BlVD.. NllNIY. N.Y. 12209
I
cov.
l.Soom
L'50
-~r-
llTlE
L5D COV.
or
PROJECT
TAPPAN ZEE BRIDGE
REPAIR PROJECT
LOCATION OF' PROJECT
~
602
OESCRIPTlON
503
1.524m
1.524m
503
SPANS 82-165
PREFABRICATED DECK
PANEL DETAILS
~5~0_C~0~V~'__+r_____~~~~~~~~~_3~.~95~4~m~~~~~~~~==~_____-H__-50 CO~
fl16 BARS LONG. 0 150 - 27 BARS TOP/Borr. (STAGGERED)
CONTRACT NUldBER:
TANY 10-98
4.0S4m
DECK REINFORCEMENT PANEL PLAN SCALE: ! : 20
TAPPAN ZEE BRIDGE
UP 14.67±
lTTl.£ OF DRAWING
LANE 4
NOTE:
All DIMENSIONS ARE SHOWN IN f..tlWf..tETERS
UNLESS O1HERWISE NOTED.
12/22/09
DRAWING NUMBER:
DPU-l
~ JOINT
(SEE DETAIL "B"
owe. OlL-B)
~ JOINT
(SEE DETAIL "B"
owe. DlL-B)
~ JOINT
(SEE DETAIL "B"
DWG. DlL-B)
2S~~------------------4~.0~1~I~m~L~0~NG~ITU~0~INAL~~G~RO~0~~~N~G~--------------------~-2M~~~~~~
I
EDGE
TERMINATES
BEAM 76
FROM END OF
nANEL (TYP)
ADDITIONAL /116 LONG. BARS, 930 LENGTH, AT ISO , Jr.-GIRDER
~ GIRDER -5'0 C O V . . . .
r..
I
26 TOP
/~SLAB
CANllLEVERED
' 4 6 3 (SEE
I__Lr~.-~N~O~~~~~T
, •
~ JOINT
(SEE DETAIL "B"
owe. DlL-B)
4.004m LONGITUDINAL GROO~NG
EDGE
BEAM~~
~RMINATES
76
FROM END OF
PANEL (TYP.)
ADDITIONAL #16 LONG. BARS, 930 LENGTH, AT ISO -
J
r.-
... GIRDER
r50 COV.
26 TOP
~ GIRDER
mm II
V
I
MMEE
T MODULAR
JOINT
HEADER
2S-;t--'------------..2::=:!!!..=====....::=~~-----------tl_2S
~ GIRDER
/~~~LEVERED
1'1
*1m
463 (SEE
NO~ 2)
V
----"-r-/----.---==r=--r
,
I,
I
I,
I,
I,
I,
,I
I,
I,
I,
I
(
\
~
I. All DIMENSIONS MEASURED ARE HORIZONTAL
ACTUAL DIMENSIONS SHAll BE' PRO~DED BY
THE CONTRACTOR AFTER SURVEY AND
DETERMINING CROSS SLOPE AND LONGITUDINAL
SLOPE.
2. GROUT HOLES ARE REOUIRED AT THE PORllON OF
THE STRINGER SLAB THAT RESTS ON THE EXISllNG .
STEEL STRINGER ENDS. SEE DWG. JTW-2FOR
DETAILS.
3. FOR EDGE BEAM REINFORCEMENT SEE DWG. DPU-3
4. FOR END BEAM REINFORCEMENT SEE DWG. DlL-2.
I
EDGE OF
PANEL
I
o
I
I
I
I
I
I
,I·
I,
I,
I,
I,
I,
I
I
I
I
I
I
I
. I
I
I
I
I
w
I
I
(!)
IX:
8
I
I
I
I
I
I
I
(!)
ci
I
I
i
\
\
\
o
to
~
o
1
400 EDGE BEAM
--+',, ----!JI
~w
..J
(!)
W
Cl
Z
«
a.
1i!
...
CD
"
(!)
,
,,
!
!
I,
I,
I,
I,
I
(!)
z
~
4
/J29T"'B~:
I, OF
EDGE BEAM .
:
AND 2 ADo'lL
:
/122
AT
BOTTOM
I•
,,: .
I /
I,
I
/J19 TRANSVERSE--. ,
3-/J16 BARS AT
STAGGER
,
ISO EO. SPA.
TOP '" BOT.
I
~ -tl::l:±:Jil
,~il
1\1
v:100
HOLEmm
WITHUFllNG
B /J19
,
!~
I
.
~
·E
!:;
~
,
Iii
I,
I
I
I,
I
,I
I
I
i ~=
i ~
I
I
I
I
I
I
o
IJ)
~
i
i
i
..J
~
§
CD
o
!
I,
I
I,
I,
'"u:i
'"
u:i
I
I
I
I
B~TT.
TOP. AND
610 MIN.
LENGTH (TYP.)
o
i
i~
MATS
I,
<II
~
z
EDGE OF
PANEL
3-/116 BARS AT
150 EO. SPA.
/119 TRANSVERSE
STAGGER
TOP '" BOT. MATS
(
II- 100mm UFllNG
100 mm UFllNG
HOLE WITH B /J19
TOP AND BOTT.
610 MIN.
LENGTH (TYP.)
!
I,
,I
I,
I
I,
I,
I
BIN 5516340
3-/116 BARS AT
150 EO. SPA.
'
I-.....,r------r----....-I I'.
.!
~
i
~
I
I
I
I
DATE
DESCRIPTION
BY
SYI.I.
REY1SIDNS
-IOOmm UFllNG
HOLE LOCAnON
I
HOLE LOCAnON
(TYP.)
~TYP.)
NOnCE: THIS DOCUMENT CONTAINS SENSIlNE AND/OR
CONflDENllAL INFORMAll0N THAT MAY ONLY BE USED
FOR lliE SOLE PURPOSE OF PREPARING A BID FOR
llilS PROJECT. ANY OlliER USE IS STRICTLY
PROHIBITED. IF YOU HAVE RECIlVEO THIS DOCUMENT
IN ERROR OR ARE NOT THE INTENDED RECIPIENT, BE
ADVISED THAT ANY USE, OlSSEMlNAll0N OR COP'llNG
OF llilS OOCUMENT 15 STRICTLY PROHIBITED AND YOU
MUST DESTROY IT IMMEOIAmy.
.'~.
,
I
HR
i
L
NEW YORK STATE THRUWAY AUTHORITY
~
EXP.
.
I
BEARINGS
I.SOOm
(TYP.)
602
50 COV.
I
J
'ISO
200!
I 300
EXP.BEARINGS
LS~
I
3.961m
27 BARS TOP/BOTT. (STAGGERED)
4.061m
DECK REINFORCEMENT PANEL PLAN - LANE 3
.
(LANE 5 PANEL OPPOSITE HAND)
I
I
DEPARIIIENT Of ENGINEERING SEJMCES
200 9lIIrHERN BLVD.. AlBNff. N.Y. 12209
I
COV.
l.S00m
150~
J
(TYP.).
~
1.9Blm
f/16BARS LONG. 0 ISO -
~
I
~
Lso
llTLE OF PROJECT
cov.
.
TAPPAN ZEE BRIDGE
REPAIR PROJECT
LOCATION OF PROJECT
TAPPAN ZEE BRIDGE
lAP 14.67:1:
503
50 COV.
1.524m
50 COV.
/J16 BARS LONG. C ISO
1.S24m
llTLE OF DRAWING
503
I
3.954m
27 BARS TOP/BOTT. (STAGGERED)
SPAN 166
PREF'ABRICATED DECK
PANEL DETAILS
50 COV.
TANY 10-9B
4.0S4m
DECK REINFORCEMENT PANEL PLAN SCN.E: 1 : 20
LANE 4
NOTE:
12/22/09
AlL OIMENSIONS ARE SHOWN IN MIWMETERS
UNLESS OlliERWISE NOlED.
DPU-2
(
~
~
JOINT
JOINT
CROWN
,I
"
4.064m
200
100
146
187
4
200
-
#13 BARS 0 250
.1 87
200
4 -
200
187
50 (lYP.)-t ISEE DETAIL 'B'
DWG DTLMATCH TO
LANE 3
PANEL
t
T-
,
{l19s 0
l
. . . .
'1) •
V
e;;
:;:]
..
\.
. .
.
..
.
_D
57~o-
.-
,
Mtr-
!"j / I
~/f !I
,
.
I
178
EXIST. ANCHOR
BOLT
ci
. 508
I
,
I
:
178
-r
0
n
ii I;
,
63
IBENTS
/"#13
(lYP.)
.
-.
~
6
~I
~50 MIN.
I,
200
-.
,
.I:l.QIfS;.
50 (lYP.)
I
I--MATCH TO
LANE 5
PANEL
'-- I-lEVa
2-122 BARS
'
fll!
JlI
"'
I
,.
"
t- 1-50.
r57
!"!
THE CONTRACTOR SHALL REDUCE DEPTH OF
THE CONCRETE BELOW FLANGE TO MAKE
ElEVATION ADJUSTMENT.
3.
AFTER INSTALLATION OF CONCRETE
SUPERSTRUCTURE, THE CONTRACTOR SHALL
GROUT ANCHOR BOLTS. SEE G-4 FOR
GROUT GENERAL NOTES.
4.
BEARINGS ON TOP OF DIAPHRAGMS ARE
SIMIlAR TO BEARINGS AT GIRDERS. SIKAOUR
31 EPOXY SHALL BE USED TO ATTACH
ELASTOMERIC PAD TO THE STEEL DIAPHRAGM.
5.
STEEL LAMINATED BEARINGS ON TOP OF
DIAPHRAGMS TO BE PAID UNDER 565.1921.
.. ,1111
III,
.
!
it
VARIES
!- (SEE NOTE 2)
63
I,
I,
I
-:
1.524m
2.
r--
;JJ1
1111
SEE DWGS. DPU-l, DTL-2 AND DTL-3 FOR
ADDmONAL DETAILS.
.....
-
!II
1.
e;;
340
(SPACED EVEN)
j
1.524m
400
508
~
STRINGER 9
~
STRINGER 8
~
STRINGER 7
100
690-
I,
I
82 THRU 166
146
. . . .
v
,I
~
EXIST.
ANCHOR
BOLT
fur-
I
! !
iiri
f-
I,
I,
I
~
2-/113 lYPE (26)
VARIES (SEE NOTE 2)
iili!
il,ll
,
/
ii;ii
'-lEVa
l- t~501
57
187
-
_~
n
I
LEVEL..-'
DTL-2
200
\~
•
- ~)
v~ommlll
SLEEVE
~d CiT'
'"
lYPE (Tl)
IIII!
I
I
340
:-t--
0
2-113
t-
340 •
6
~
I
~99
1-113 lYPE (T',)
VB\
~d Ii
lEVa- t--"'
C)
•
r50mmlll
340
--
~
•
-•
210
r690
.....
VARIES
(SEE NOTE 2)----......
o
1501
#13 BARS 0 250
#160 150
TOP <Ie BOTTOM~
STAGGERED
I
360.180x25 STEEL LAMINATED
ELASTOMERIC BEARING lYPE E.L
WITH ONE 3mm INTERNAL STEEL
PLATE AND TWO LAYERS OF l1mm
THICK ELASTOMER (SEE NOTE 4
AND 5)
PRECAST PANEL ELEVATION
LANE 4 AT FIXED END
V
N.T.5o
BIN 5516340
1====:d;]~~~=1
85X13 SllFF. I(
SIDE OF WEB
8
DESCRIPTION
TIGHT FIT
BY
SYN.
REVISIONS
W 410 X 85 DIAPHRAGM
/""3
(lYP.)
~
1--..
5
~
~
.m
ci
~
:=
~
l!i
N!
7
D-
2-#13 lYPE (26)
.
I
LEVEL./'
2-#13
J
0;--.,
~
/
~
~
'"
/ J
L. 50
IJ.
~f+~ri!'iitl'H-II#:h{-/~,.._-tI':::j:::HtiliH:,t':+
178
VARIES (SEE NOTE
EXI~~5T.
ANCHOR
602 BOLT
I'
,
BENTS 82 THRU 166
EXTsT.
ANCHOR
BOLT
400
EDGE BEAM BEARING DETAIL
N.T.5o
CONCRETE EDGE BEAM
HR
ill
t-
!
I
r;r-'
1
2)~
63
178
J
V.50mmlll PVC.
SLEEVE 'rtP)
MIN.
Lr~H~!,i'.~iY~~/~'____i~',~oi~
I
if-
2-,22 BARS J ~ 50(SPACED E V E N ) y 5~
lYPE (Tl)
~/f iI
1-#13 lYPE ( T l ) - - l - - - - . , J
40
0
-'---lllEVaEVELl?
..... '=O'T"llU2~9~9I--Ul1-
VARIES
(SEE NOTE 2)
340
NOTICE: THIS DOCUMENT CONTAINS SENSITIVE mO/OR
CONFIDENTIAL INFORMATION lIlA! MAY ONLY BE USED
FOR THE SOLE PURPOSE OF PREPARING A BIO FOR
. THIS PROJECT. ANY OTHER USE IS STR/C1l.Y
PROHIBITED. IF YOU HAVE RECEIVED THIS DOCUMENT
IN ERROR OR ARE NOT THE INTENDED RECIPIENT. BE
AOVlSED lIlAT ANY USE. DISSEMINATION OR COPYlNG
OF THIS DOCUMENT IS STRIC1l.Y PROHIBITED mo YOU
MUST OESTROY IT IMMEDIATELY.
ill
I
l
Jlli
!
I,
,I
n
I
I
1.981m
<t
360.,80.25 STEEL
LAMINATED ELASTOMERIC
BEARING lYPE E.L WITH
ONE 3mm INTERNAL
STEEL PLATE AND TWO
LAYERS OF llmm THICK
ELASTOMER (SEE NOTE 4
AND 5) .
PRECAST PANEL ELEVATION - LANE 3
(LANE 5 PANEL OPPOSITE HAND)
N.T.S.
DEPARlIIENT Of ENGINEERING SfIMC£S
200 SOU1HERH BlW. AIIlNfr. N.Y. 12209
TITLE
or
PROJECT
TAPPAN ZEE BRIDGE
REPAIR PROJECT
LOCATION OF PROJECT.
TAPPAN ZEE BRIDGE
UP 14.67±
l1ll..E OF DRAWINC
SPANS 82-165
SUPERSTRUCTURE DETAILS
FIXED END
1.473m
~
STRINGER 6 OR 10
STRINGER 5 OR 11
NEW YORK STATE THRUWAY AUTHORITY
CONTRACT NUMBER:
TANY 10-9B
W410 X 85
DIAPHRAGM
NOTE:
@~!.iCTION
All DIMENSIONS ARE SHOWN IN MIWMEIERS
UNlESS OTHERWISE NOTED.
12/22/09
DRAWING NUMBER:
DPU-3