installation guide ACTIV-1

Transcription

installation guide ACTIV-1
installation guide
ACTIV-1
Base foot
x 2 columns - right & left
1. Leg
Motor unit
2. Work surface supporting bracket (Cantilever) x 2
Control3.box
Base foot x 2
Handset
Phase
1
Materials and Tools
4.
Motor unit
Hardware
&
tools
5. Control box
6. Handset
7. Hardware & tools
ACTIV-1 Installation Guide
Motor unit
Control box
Hardware & Tools
(socket screws, open end
wrench, and allen key)
Leg Columns –
Right and Left
ox 2
. Horizontal beam (stretcher bar)
. Hex gear-rod
Box 2
1. Horizontal beam (stretcher bar)
2. HexHex
gear-rod
gear-rod
Worksurface
supporting
bracket
(Cantilever) x2
LED control unit
Base foot x2
Horizontal beam
(stretcher bar)
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P2
Phase 1
1
Base Frame Assembly
Correct
orientation
Secure the stretcher bar to the
columns using 8 screws.
(For correct leg direction, note the
orientation shown in image.)
Note: Do NOT remove the
pre-installed screws from the
leg columns. Orient the leg
so the side without screws is
used to mount the stretcher bar.
2
ACTIV-1 Installation Guide
1
.
sure that the sides
* Make
with the single holes are
Attach the footer to the column base.
(The foot direction will be determined
by the orientation of the column in the
image.) Secure with 4 screws. [X2]
facing toward each other.
This is where the gear rod
will be inserted.
2
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P3
Phase 2
Base Frame Assembly
ACTIV-1 Installation Guide
Phase 2
1. mount motor unit
2. insert hex rods
3. mount cantilevers
1
Insert motor into stretcher bar.
The motor will be mounted to the
concave side of the stretcher bar.
Secure with 3 screws.
2
Insert the hex rod through the
outside of the column leg into the
motor. Aligning the hex rod may into
the motor case may require using a
6mm wrench.
3
Install the top mount bracket
(cantilever) to the post column.
Align the impressions for correct fit.
Secure with 4 screws. [x2]
1
Impression alignments
2
3
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P4
Phase 3
Installing Worksurface to Base Frame
1
Lay worksurface down on the floor with
the top down.
2
Lay the base assembly upside down on
top of the worksurface.
3
Double check to ensure that the base is
properly positioned on the underside of
the worksurface.
4
Attach the base to the worksurface
using wood screws.
ACTIV-1 Installation Guide
Note: Wood screws are not provided
with the ACTIV-1 base, but are
provided with AMQ worksurfaces.
5
6
Attach the control box to the underside
of the desktop using wood screws
towards the back side of the work
surface.
Note: The back side will be the side
where the motor sticks out.
5
Attach the LED display unit using
wood screws flush to the left or right
of the front edge of the worksurface.
3
recommend that
* We
you center the base
on the worksurface.
4
6
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P5
Phase 4
Cable Connections and First-time Set-Up
1
Connect the cables as per the diagram below.
2
Turn the assembled desk right-side up and adjust
the leveling glides on the feet as needed.
3
Plug the power cord into a standard 110v outlet.
ACTIV-1 Installation Guide
Note: Use the adhesive-backed cable clips to
secure the cables and hand set cables.
For permanent attachment, drill down tie-traps
with wood screws to surface.
Your ACTIV-1 table is now ready to use.
sure all cords are appropriate
* Make
length for unit heights.
that no obstacles are
* Ensure
in the unit’s path and the unit
is not touching any walls.
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P6
Phase 5
Program Height Memory Presets
1
To Program Up to 3 Presets: Use the up/
down arrows to find desired height, then
press “M” followed by the number 1, 2, or 3.
2
To Test Programmed Height: Use the up/
down arrows to adjust the table to a height
other than the preset height. Then push and
hold the number you programmed to see
if it auto­matically adjusts to the height
programmed in Step 1.
ACTIV-1 Installation Guide
Note: If it does not adjust to the
programmed height, repeat Step 1
followed by Step 2.
1
1
2
2
3
M
Caution: Once the preset number is
pushed, the base will automatically
moved to the programmed height.
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P7
!
Troubleshooting Guide
ACTIV-1 Installation Guide
ASR/RST Error Code
1
Reset the Base by holding the down arrow for 10-15 seconds until
it reaches its lowest point and numbers appear on the handset.
No Power
1
If there is no power in the Base, the Control Box may be damaged –
contact us at cc@amqsolutions.com to order your replacement.
E07/E08 Error Code: Legs Not Moving Uniformly
1
2
If the legs are not moving uniformly, or the Base goes up when the down arrow is pressed,
reset the Base by holding the down arrow for 10-15 seconds until it reaches its lowest point
and numbers appear on the handset.
If the issue persists, swap the legs. (The legs with the pre-assembled screws should
be facing the user.)
If your issue persists, please contact AMQ Customer Care
at cc@amqsolutions.com or (877) 801-0370.
....................................................................................................................................................................................................................................................
Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P8
AMQ Solutions, LLC
915 Walsh Ave
Santa Clara, CA 95050
(877) 801-0370
sales@amqsolutions.com
www.amqsolutions.com