installation guide ACTIV-1
Transcription
installation guide ACTIV-1
installation guide ACTIV-1 Base foot x 2 columns - right & left 1. Leg Motor unit 2. Work surface supporting bracket (Cantilever) x 2 Control3.box Base foot x 2 Handset Phase 1 Materials and Tools 4. Motor unit Hardware & tools 5. Control box 6. Handset 7. Hardware & tools ACTIV-1 Installation Guide Motor unit Control box Hardware & Tools (socket screws, open end wrench, and allen key) Leg Columns – Right and Left ox 2 . Horizontal beam (stretcher bar) . Hex gear-rod Box 2 1. Horizontal beam (stretcher bar) 2. HexHex gear-rod gear-rod Worksurface supporting bracket (Cantilever) x2 LED control unit Base foot x2 Horizontal beam (stretcher bar) .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P2 Phase 1 1 Base Frame Assembly Correct orientation Secure the stretcher bar to the columns using 8 screws. (For correct leg direction, note the orientation shown in image.) Note: Do NOT remove the pre-installed screws from the leg columns. Orient the leg so the side without screws is used to mount the stretcher bar. 2 ACTIV-1 Installation Guide 1 . sure that the sides * Make with the single holes are Attach the footer to the column base. (The foot direction will be determined by the orientation of the column in the image.) Secure with 4 screws. [X2] facing toward each other. This is where the gear rod will be inserted. 2 .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P3 Phase 2 Base Frame Assembly ACTIV-1 Installation Guide Phase 2 1. mount motor unit 2. insert hex rods 3. mount cantilevers 1 Insert motor into stretcher bar. The motor will be mounted to the concave side of the stretcher bar. Secure with 3 screws. 2 Insert the hex rod through the outside of the column leg into the motor. Aligning the hex rod may into the motor case may require using a 6mm wrench. 3 Install the top mount bracket (cantilever) to the post column. Align the impressions for correct fit. Secure with 4 screws. [x2] 1 Impression alignments 2 3 .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P4 Phase 3 Installing Worksurface to Base Frame 1 Lay worksurface down on the floor with the top down. 2 Lay the base assembly upside down on top of the worksurface. 3 Double check to ensure that the base is properly positioned on the underside of the worksurface. 4 Attach the base to the worksurface using wood screws. ACTIV-1 Installation Guide Note: Wood screws are not provided with the ACTIV-1 base, but are provided with AMQ worksurfaces. 5 6 Attach the control box to the underside of the desktop using wood screws towards the back side of the work surface. Note: The back side will be the side where the motor sticks out. 5 Attach the LED display unit using wood screws flush to the left or right of the front edge of the worksurface. 3 recommend that * We you center the base on the worksurface. 4 6 .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P5 Phase 4 Cable Connections and First-time Set-Up 1 Connect the cables as per the diagram below. 2 Turn the assembled desk right-side up and adjust the leveling glides on the feet as needed. 3 Plug the power cord into a standard 110v outlet. ACTIV-1 Installation Guide Note: Use the adhesive-backed cable clips to secure the cables and hand set cables. For permanent attachment, drill down tie-traps with wood screws to surface. Your ACTIV-1 table is now ready to use. sure all cords are appropriate * Make length for unit heights. that no obstacles are * Ensure in the unit’s path and the unit is not touching any walls. .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P6 Phase 5 Program Height Memory Presets 1 To Program Up to 3 Presets: Use the up/ down arrows to find desired height, then press “M” followed by the number 1, 2, or 3. 2 To Test Programmed Height: Use the up/ down arrows to adjust the table to a height other than the preset height. Then push and hold the number you programmed to see if it automatically adjusts to the height programmed in Step 1. ACTIV-1 Installation Guide Note: If it does not adjust to the programmed height, repeat Step 1 followed by Step 2. 1 1 2 2 3 M Caution: Once the preset number is pushed, the base will automatically moved to the programmed height. .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P7 ! Troubleshooting Guide ACTIV-1 Installation Guide ASR/RST Error Code 1 Reset the Base by holding the down arrow for 10-15 seconds until it reaches its lowest point and numbers appear on the handset. No Power 1 If there is no power in the Base, the Control Box may be damaged – contact us at cc@amqsolutions.com to order your replacement. E07/E08 Error Code: Legs Not Moving Uniformly 1 2 If the legs are not moving uniformly, or the Base goes up when the down arrow is pressed, reset the Base by holding the down arrow for 10-15 seconds until it reaches its lowest point and numbers appear on the handset. If the issue persists, swap the legs. (The legs with the pre-assembled screws should be facing the user.) If your issue persists, please contact AMQ Customer Care at cc@amqsolutions.com or (877) 801-0370. .................................................................................................................................................................................................................................................... Please contact support@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions. P8 AMQ Solutions, LLC 915 Walsh Ave Santa Clara, CA 95050 (877) 801-0370 sales@amqsolutions.com www.amqsolutions.com