Icon Benching Single Run Installation Guide

Transcription

Icon Benching Single Run Installation Guide
Icon Benching Single Run Installation Guide
installation guide
ICON
Phase 1
1
Frame Assembly
Screw the outer-to-inner horizontal
beams (H-bar) to the top of each
outside leg (O-Leg) using the
M8*25 screws. Then screw the
outer-to-inner H-bars to the bottom
of each O-Leg using the M6*20
screws.
2
3
Icon Benching Single Run Installation Guide
Adjust the glides to level the
frame as needed. We suggest
using a leveling glide for best
accuracy.
2
Rest the outer-to-inner H-bars on
the top of the inner legs (U-Leg).
Then rest the inner-to-inner H-bars
on top the U-legs. Screw the
horizontal beam connectors and
H-bars to the frame using the
M6*20 screws.
3
1
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P2
Phase 2
Assembling Worksurfaces and Electrical
1
Lay the worksurfaces face down in a row.
2
Screw the troughs onto all the worksurfaces
using lath screws.Troughs should be placed in
the center 5” inches from the back edge of the
worksurface.
3
Snap 2 duplexes into each of the double ½
junction blocks. Clip 2 H-brackets to each of
the double ½ junction blocks.
4
Then snap the double ½ blocks into each of
the trough cut outs.
5
Screw the H-brackets directly into the troughs
and worksurfaces usings self-tappers.
Place in center,
5” from the back edge
of the worksurface.
Icon Benching Single Run Installation Guide
3
2
4
1
5
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P3
Phase 3
Installing Worksurfaces to the Frame
1
Rest the completed worksurfaces on
top of the frame, starting from the
outer worksurfaces working towards
the center.
2
Use a clamp to temporarily hold the
worksurfaces together until they are
ready to be permanently screwed to
the frame.
3
If needed, adjust the frame width to
open or close the gap between the
worksurfaces using a rubber mallet.
4
Once everything is properly aligned,
screw the outer worksurfaces to
the frame using the counter-sunk
screws.
5
Screw all worksurfaces to the H-bars along
the center of the frame using counter-sunck
screws.
6
Screw the worksurfaces together using a
mending plate using counter-sunk screws.
Icon Benching Single Run Installation Guide
1
3
2
1
6
2
Make sure worksurfaces
are evenly flush to the frame.
3
5
4
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P4
Phase 4
1
Installing Optional Accessories
Axil Monument Box: Take the Axil
Monument Box and place it on the
desired location on the back edge
of the worksurface. Secure to worksurface using tightening bolt.
2
Icon Benching Single Run Installation Guide
Monitor Arm Installation: We recommend to install a
monitor arm equipped with clamp mount along the back
edge of the worksurface. Please follow the recommended
manufacturer instructions provided with your monitor arm.
1
2
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P5
Phase 5
STOP
Installing Screens
Icon Benching Single Run Installation Guide
If you are installing a glass screen skip
Step 1 and continue on to Step 2.
1
Take the fabric screens and measure the desired
location of the screen clips and tighten using tightening
screws. Be sure to use leveling guide to make sure the
clips are leveled on each side. Make adjustments as
needed. Skip Step 2 and continue on to Step 3.
2
Insert glass fit-sleeve into the screen clips. Attach the
clips to the glass screen with the tightening screws.
3
Slide the screen clips onto the worksurface.Tighten to
the worksurface using the hand-knob screw.
* Clip kit includes
fit-sleeve for glass
screen.
2
Glass
Screen
Fabric
Screen
1
2
3
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P6
Phase 6
1
Installing Jumpers
Connect double ½ junction blocks
to jumpers.
STOP
2
Icon Benching Single Run Installation Guide
Screw conduit mounting brackets to the worksurfaces
using the counter-sunk screws
The remaining installation of electrical must be installed by a
professional electrician.
If you are installing a Power Pole continue on to Phase 7.
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P7
Phase 7
Installing a Power Pole
Icon Benching Single Run Installation Guide
Make sure ceiling is prepped for the power pole location. You can use the ceilng cover as a guide to
determine how big a cut out you need.
1
Screw the power pole (pp) brackets to the top
and bottom of the O-leg using self-tappers.
4
Lift the pp up and screw into pp brackets.
2
Lay your pp on the floor and feed the ceiling
feed through the bottom cutout of the pp.
Loose wires should be at the top.
5
Connect jumper to ceiling feed.
3
Place the ceiling cover on the top of the pp.
5
Use the ceiling cover to secure pp to the
ceiling.
STOP
The remaining installation of electrical must
be installed by a professional electrician.
* Use ceiling cover to secure
pole to the ceiling.
* Use self-tapping screw for
attaching pole to leg beams.
....................................................................................................................................................................................................................................................
Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.
P8
Icon Benching Single Run Installation Guide
AMQ Solutions, LLC
915 Walsh Ave
Santa Clara, CA 95050
(877) 801-0370
sales@amqsolutions.com
www.amqsolutions.com