CENTRE FOR EARTH SCIENCE STUDIES

Transcription

CENTRE FOR EARTH SCIENCE STUDIES
NATIONALCENTRE FOR EARTH SCIENCE STUDIES
P.B. No. 7250, MEDICAL COLLEGE P.O., AKKULAM, THIRUVANANTHAPURAM-695 011, INDIA
Tel: 91-471-2511531
Fax: 91-471-2442280
e-mail: cesspurchase@gmail.com / purchase.ncess@nic.in
CORRIGENDUM
dt 06/04/2015
Tender No. & Date
: NCESS/PUR/5489/14 Dt.16/03/2015.
Description of stores
: Request for proposal for setting up of the Modular Data Centre at NCESS.
Sl.
No
1
2
3
4
Page
No. in
RFP
Section No in the
RFP
Existing Clause
Modified Requirement
39, 60
1. Integrated
inbuilt Rack
Infrastructure
6.2.1 Integrated
inbuilt Rack
Infrastructure
include internal
redundant power supply
environmental controls
(e.g., precision air
conditioning, fire
suppression (as per NFPA
guidelines), smoke
detection, Water leak
detection, motion sensor,
humidity sensor)security
devices etc.
include internal redundant power
supply environmental controls (e.g.,
precision air conditioning, fire
suppression (as per NFPA guidelines),
smoke detection, Water leak
detection,Cooling Sensor, motion
sensor, humidity sensor)security
devices etc.
40, 60
1. Integrated
inbuilt Rack
Infrastructure
6.2.1 Integrated
inbuilt Rack
Infrastructure
Precision air conditioner
with variable capacity
digital scroll compressor,
heater and humidifier
Precision air conditioner with variable
capacity digital scroll compressor,
heater and humidifier.(Dual unit model
with External chiller)
40, 61
1.Rack server 1
6.2.2 Rack Server
1
6Gbps RAID Controller
with 1GB NV cache
support 0,1,5,6,10
support Online Capacity
Expansion and Online
RAID Level Migration
12Gbps RAID Controller with 1GB NV
cache support 0,1,5,6,10 support Online
Capacity Expansion and Online RAID
Level Migration
40, 61
1.Rack server 1
6.2.2 Rack Server
1
Up to 16 x 2.5” HDD:
SAS, SATA, nearline SAS
SSD: SAS (or) up to 8 x
3.5” HDD: SAS, SATA,
nearline SAS SSD: SAS
6Gbps RAID Controller
with 1GB NV cache
support 0,1,5,6,10
support Online Capacity
Expansion and Online
RAID Level Migration
12Gbps RAID Controller with 1GB NV
cache support 0,1,5,6,10 support Online
Capacity Expansion and Online RAID
Level Migration
Minimum 16 x 2.5” HDD: SAS, SATA,
nearline SAS SSD: SAS (or) Minimum
8 x 3.5” HDD: SAS, SATA, nearline
SAS SSD: SAS
5
41, 62
2.Rack server 2
6.2.3 Rack Server
2
6
41, 62
2.Rack server 2
6.2.3 Rack Server
2
Form Factor- Rack 1U
Form Factor- Rack 1U or 2U
41, 62
2.Rack server 2
6.2.3 Rack Server
2
Up to 8 x 2.5” HDD: SAS,
SATA, nearline SAS SSD:
SAS (or) up to 4 x 3.5”
HDD: SAS, nearline SAS
SSD: SAS
Minimum 8 x 2.5” HDD: SAS, SATA,
nearline SAS SSD: SAS (or) Minimum
4 x 3.5” HDD: SAS, nearline SAS SSD:
SAS
7
8
42, 63
9
42, 63
10
48, 66
11
12
48, 66,
67
48, 67
3.San Storage
6.2.4 San Storage
3.San Storage
6.2.4 San Storage
8. On-Line Double
Conversion UPS
System - 15 KVA
6.2.10 15 KVA OnLine Double
Conversion UPS
System
The system should have a
minimum of 48 GB of
memory across dual
controller. Array should
support cache destage to
disk in order to avoid any
data loss due to extended
power outage. Array
should support mirroring
of write operation across
controller
Array should support
minimum 4x10 Gbps IP
port per controller for
iSCSI and NAS
Connectivity. The offered
storage should also have 4
nos of 8G FC ports for
block protocol.
8. On-Line Double
Conversion UPS System 15 KVA
6.2.10 15
KVA On-Line Double
Conversion UPS System
Capacity: 15 KVA
Supply, install, test and
commissioning of one
number true online,
double conversion, high
efficiency, high power
factor Uninterruptible
Power Systems (UPS)
rated at 10 KVA with
independent battery
backup support for 10
minutes on full load. The
backup batteries should
be supplied with the
necessary arrangements
to mount inside a cabinet
The system should have a minimum of
48 GB of (R/W Cache) memory across
dual controller. Array should support
cache destage to disk in order to avoid
any data loss due to extended power
outage. Array should support mirroring
of write operation across controller
Array should support minimum 2x10
Gbps IP port per controller for iSCSI and
NAS Connectivity. The offered storage
should also have 4 nos of 8G FC ports
for block protocol.
On-Line Double Conversion UPS System
- 20 KVA
6.2.10 20 KVA OnLine Double Conversion UPS System
Capacity: 20 KVA
Supply, install, test and commissioning
of one number true online, double
conversion, high efficiency, high power
factor Uninterruptible Power Systems
(UPS) rated at 20 KVA with
independent battery backup support for
30 minutes on full load. The backup
batteries should be supplied with the
necessary arrangements to mount
inside a cabinet
8. On-Line Double
Conversion UPS
System - 15 KVA
6.2.10 15 KVA OnLine Double
Conversion UPS
System
8. On-Line Double
Conversion UPS
System - 15 KVA
6.2.10 15 KVA OnLine Double
Conversion UPS
System
8. On-Line Double
Conversion UPS
System - 15 KVA
6.2.10 15 KVA OnLine Double
Conversion UPS
System
Back backup time: Having
2 Battery set in parallel
with minimum 13000VAH
(6500VAH x2) for
recommended for 20-30
min at 15KVA load
Back backup time: Having 2 Battery set
in parallel with minimum 13000VAH
(6500VAH x2) for recommended for 2030 min at 20KVA load
UPS Architecture: Modular
based UPS using minimum
two or more similar power
modules
UPS Architecture: Modular based UPS
using minimum two or more similar
power modules. (has to be installed in
a separate room allotted for UPS)
Battery make:
Amarraja/Panasonic/Num
eric
JISC Certified Batteries
13
48, 67
14
49, 68
15
49, 69
9.Tape Library
6.2.11 Tape Drive
Number of tape drives - 1
Number of tape drives - 2
16
49, 69
9.Tape Library
6.2.11 Tape Drive
Number of tape cartridges
-1
Number of tape cartridges - 10
17
51
18
51
19
51
20
51
21
51, 66
22
51, 66
23
24
51, 66
26
ANNEXURE 8
BILL OF
MATERIALS
Hardware
ANNEXURE 8
BILL OF
MATERIALS
Hardware
ANNEXURE 8
BILL OF
MATERIALS
Hardware
ANNEXURE 8
BILL OF
MATERIALS
Hardware
ANNEXURE 8
BILL OF
MATERIALS
Software
6.2.9 Software
ANNEXURE 8
BILL OF
MATERIALS
Software
6.2.9 Software
4. LTO Tape Drive,
Quantity 1
4. LTO Tape Drive, Quantity 2
5. San Switch, Quantity 1
5. San Switch, Quantity 2
9. 15 Kva On-Line Double
Conversion UPS System
9. 20 Kva On-Line Double Conversion
UPS System
10. SMF Battery for 10
minute hour backup for
UPS
10. SMF Battery for 30 minute backup
for UPS
1. VMware vSphere 5
Enterprise Plus
1. VMware vSphere 5.5 Enterprise Plus
2. VMware vCenter Site
Recovery Manager 5
Standard (25 VM Pack)
2. Vmware Vcenter 5.5 Standard
ANNEXURE 8
BILL OF
MATERIALS
Software
6.2.9 Software
4. Windows Server
standard 2012R2SNGL OLP
NL 2Proc,
Quantity 8
4. Windows Server standard
2012R2SNGL OLP NL 2Proc,
Quantity
4
4.3.1 Penalties
(c) In case of delay
beyond 2 weeks,50% of
total value of the
contract will be charged
as penalty
(c) In case of delay beyond 2 weeks,
0.5% of total value of the contract will
be charged as penalty
The bidder shall plan
various activities and
submit the execution
schedule within one week
of award of the work. The
execution schedule should
clearly indicate all
activities and the time
required for completion
of each activity taking the
delivery time as 1 month.
Delivery of all items shall
be made within 1 months
of award of order, failing
which penalty clause will
be invoked.
The bidder shall plan various activities
and submit the execution schedule
within one week of award of the work.
The execution schedule should clearly
indicate all activities and the time
required for completion of each activity
taking the delivery time as 1 month.
Delivery of all items shall be made
within 2 months of award of order,
failing which penalty clause will be
invoked.
25
29
4.9 Delivery
Schedule &
Monitoring
26
51
New Addition in
ANNEXURE 8
Software
6. IP based Monitoring Tool for All
Components in the RACK - Optional
Yours sincerely,
Sd/Chief Manager