15th April 2015
Foundation and Turbine installation Vessel
Please be advised that GeoSea foundation and turbine installation vessel Neptune, on behalf
of Vattenfall, will be carrying out foundation and turbine installation works on the Kentish Flats
Extension Offshore Wind Farm, approximately 8.5 to 13 KM north of Herne Bay and
Whitstable in Kent.
The foundation and Turbine installation will take place from 1st May on commencement of
favourable sea conditions and will continue until the end of August, weather permitting.
Vessel: NEPTUNE
Neptune has a length of 60m and breadth of 38m and is a Jackup vessel. Leg length of 80m
and leg Diameter of 3.5m. Neptune will have 2 Tug vessels working with her.
Tugs Boat:
Norne
Sea Echo
NORNE
SEA ECHO
COORDINATES OF SITE AREA:
Latitude
Longitude
51°27.9827'N
51°28.1100'N
51°26.8200'N
51°27.1400'N
51°26.8089'N
51°26.7384'N
51°26.5159'N
51°22.5786'N
51°22.3434'N
51°22.3302'N
51°22.3320'N
51°22.5614'N
51°26.4380'N
51°26.2914'N
51°26.3619'N
51°26.8253'N
51°27.9827'N
01°01.9648'E
01°03.2300'E
01°04.8500'E
01°08.0400'E
01°08.4554'E
01°08.5439'E
01°06.3250'E
01°06.2214'E
01°05.9802'E
01°05.9802'E
01°05.9376'E
01°05.4451'E
01°05.5475'E
01°04.0895'E
01°04.0010'E
01°03.4192'E
01°01.9648'E
Enquiries regarding this notice should be directed to the Marine Coordinator :
Kentish Flats Extension