Untitled - Southwest Florida International Airport
Transcription
Untitled - Southwest Florida International Airport
THIS DAY IN AVIATION HISTORY Convair B-58A Hustler Fifty-three years ago this month, a United States Air Force (USAF) Convair B-58A Hustler from the 43rd Bomb Wing at Carswell AFB, Texas set a trio of transcontinental speed records in a round trip from Los Angeles to New York and back. This historic feat was accomplished as part of Operation Heat Rise. The USAF/Convair B-58A Hustler holds the distinction of being the world’s first supersonic bomber. A product of the 1950′s, the deltawinged aircraft measured 96.8 feet in length and had a wing span of 56.8 feet. Power was provided by a quartet of General Electric™ 79 turbojets which produced 62,000 lbs of sea level thrust in afterburner. The Hustler’s performance was impressive then and now. With a maximum speed of 1,325 mph, the aircraft had a service ceiling of 64,800 feet and a combat radius of 1,520 nm. The Hustler’s mission range could be markedly increased via aerial refueling. The B-58′s three man air crew sat in tandem in the order of pilot, navigator and Defensive Systems Officer (DSO). Each man occupied a separate flight station which was equipped with an ejection pod for protection during high speed egress. The Hustler was part of Strategic Air Command. It’s primary mission was delivery of nuclear weapons. The aircraft served in the air force’s operational inventory for a period of just 10 years (1960 to 1970). A total of 116 airframes were produced. On Monday, March 5,1962, the crew of Major Robert G. Sowers (pilot), Captain Robert MacDonald (navigator) and Captain John T. Walton (DSO) departed Carswell AFB, Texas in B-58A S/N 59-2458. After refueling out over the Pacific Ocean, the aircraft started its coast-to-coast speed run at Mach 2 over Los Angeles, California. Incredibly, the critical ground station monitoring the start time did not record passage of the aircraft overhead. Thus, airplane and crew were called back for a restart! This meant another trip to the tanker out over the Pacific to top off the Hustler’s fuel tanks prior to the second try. Once officially underway, the trip from overhead Los Angeles to overhead New York took 2 hours and 58.71 seconds for an average speed of 1,214.65 mph. The aircraft was refueled over Kansas on its way east. Once out over the Atlantic Ocean, the Hustler reversed course and returned to the tanker again. The return trip from overhead New York to overhead Los Angeles was flown in 2 hours, 15 minutes and 50.08 seconds. As on the eastbound leg, the Hustler took on a load of gas over Kansas. The entire round trip required 4 hours, 41 minutes and 14.98 seconds inclusive of refueling. Each of the aforementioned trip times established new performance records. An interesting aspect of the return leg to Los Angeles was that the Hustler flew faster than the rotational movement of the earth. Thus, the aircraft and its crew arrived in California roughly 41 minutes earlier than the sun! In recognition of their accomplishments, each man received the USAF Distinguished Flying Cross at the hand of USAF General Thomas S. Power, Chief of Staff. Finally, for their impressive performance during Operation Heat Rise, crew and aircraft were the recipients of both the 1962 MacKay and Bendix Trophies. This marked the last time that the latter was ever awarded. Today, the record-setting, trophy-winning airplane, Convair B-58A-10-CF 59-2458, the Cowtown Hustler, is on display at the National Museum of the United States Air Force, WrightPatterson Air Force Base, Ohio. March 17, 2015 Mr. Randy Krise Airports Special Management Committee Lee County Port Authority 11000 Terminal Access Road, Suite 8671 Fort Myers, Florida 33913 Dear Mr. Krise: Attached is the Southwest Florida International Airport and Page Field Airport Monthly Project Summary for the month of March 2015. This report is prepared by the Lee County Port Authority Development Division each month and reflects the current status of work efforts, schedules and budgets for ongoing projects. If you have any questions regarding any of the attached information, please do not hesitate to contact me. Respectfully, LEE COUNTY PORT AUTHORITY Emily M. Underhill Emily M. Underhill, P.E., A.A.E. Division Director, Development EMU/rrt cc: Airports Special Management Committee Bob Ball, A.A.E., Executive Director Mark R. Fisher, A.A.E., Deputy Executive Director - Development RSW Projects • Air Traffic Control Tower………………………...……………………………… 1 FMY Projects • Page Field Runway Rehabilitation………………………...………16 • Baggage Handling System (BHS) Recap & Optimization…………………… 3 • Closed-Circuit Television (CCTV) System…………………………………… 4 • Flight Information Display System (FIDS) Replacement………………………5 • Florida Power & Light (FP&L) Transmission Line Relocation……………… 6 • Parallel Runway ……………………………….………………………..……… 7 • Public Address System Upgrades ……………………………….…………… 8 • Remediation of Hazardous Wildlife - Phase II………………….………………9 • Skyplex Boulevard………………...……………...……..……………………… 10 • Skyplex Rezoning Amendment……………………...……..……………………11 • Terminal Access Road (TAR) Six-Lane Expansion ………………………..…12 RSW Tenant Improvement Projects • FDOT Interstate 75 Connector Roadway ……………………………..………13 • Hertz Car Rental Area Upgrades ………………………………………..…… 15 FMY Tenant Improvement Projects RSW Air Traffic Control Tower (ATCT) Consultant: AECOM Technical Services, Inc. Start Date: 2/11/2013 Completion Date: 3/31/2016 (Design Only) Project Description: This project provides for design services, environmental permitting and mitigation for a new Air Traffic Control Tower (ATCT) and Terminal Radar Control Center (TRACON) located midfield between existing runway and the future parallel runway. Project Status: COSTS / BUDGET Federal Aviation Administration (FAA) sent formal floor plan comments and a revised budget to LCPA staff in early February 2015. Last update from Joe Glowacki (AECOM): Mon, Mar 2, 2015 at 2:35 PM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $49,935,116.00 $2,624,480.00 Remaining Balance to Finish: $47,310,636.00 FAA Grants: $0.00 FDOT Grants: $1,312,240.00 LCPA Funds: $1,312,240.00 Other Funds: $0.00 RSW Air Traffic Control Tower (ATCT) 1 RSW Air Traffic Control Tower (ATCT) Project Status (continuation): A meeting with Federal Aviation Administration (FAA) staff at the FAA Airway Facilities Tower Integration Laboratory (AFTIL lab) determined that the ATCT location needs to shift 50 feet away from the existing taxiways in order to protect views of future airfield pavement expansion. The cab also needs to be rotated 45 degrees clockwise to improve views to the approach ends of the existing runway. The consultant made adjustments to the site layout to reflect these changes and will proceed towards the 10% design milestone. The consultant has begun researching foundation design options that would be compatible with local geophysical conditions. Development Division - March 2015 RSW Air Traffic Control Tower (ATCT) 2 RSW Baggage Handling System (BHS) Recapitalization And Optimization Consultant: Parsons Transportation Group Contractor: Five Star Airport Alliance Start Date: 3/28/2014 Completion Date: 1/26/2017 Project Description: Upgrades are required to keep up with the rapidly evolving Baggage Handling System (BHS) technological advances and efficiencies. Through the Transportation Security Administration (TSA) Recapitalization initiatives, the 7 TSA-owned Explosive Detection System (EDS) machines currently installed will be replaced with newer machines capable of processing bags at higher rates. TSA has defined an optimization program that will improve system performance and enhance safety for the BHS. The project is funded 100% by TSA and will be a 2-phase construction project during the off seasons of 2014 and 2015. Project Status: COSTS / BUDGET Final testing has concluded for Phase I of the project and the new Explosive Detection System (EDS) machines are in service. Contingencies are still in place, however, to support the legacy machines during the next few months of season. Last Updated By David Morris: 2/23/2015 4:08:47 PM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $7,725,535.00 $6,519,040.00 Remaining Balance to Finish: $1,206,495.00 FAA Grants: $0.00 FDOT Grants: $0.00 LCPA Funds: $148,647.00 Other Funds: $6,370,393.00 RSW Baggage Handling System (BHS) Recapitalization And Optimization 3 RSW Closed-Circuit Television (CCTV) System Upgrade Consultant: Kimley-Horn & Associates CM/Contractor: Owen-Ames-Kimball, Co. Start Date: 12/2/2012 Completion Date: 4/20/2015 Project Description: The upgrade of existing Closed-Circuit Television (CCTV) system includes the installation of 125 cameras and related infrastructure at the three (3) security checkpoints located on Concourses B, C, and D, as well as areas in the ticketing lobby, sterile areas in the concourses and baggage claim spaces. The infrastructure upgrade will improve the existing security system, provide adequate storage capacity to accept all of the additional new camera views, improve the viewing capabilities at both the Transportation Security Administration (TSA) Coordination Center plus the Port Authority's Airport Communications facility and provide the integration of the aforementioned systems. Project Status: COSTS / BUDGET The exterior and interior cable installations are nearing completion with terminations in the appropriate electrical rooms. The cameras in the ticketing area are being installed. The new server for the access control system will be delivered in early March. Secured access has been coordinated with Lee County Port Authority Information Technologies staff. Last Update By Adam Nguyen: 2/26/2015 9:04:00 AM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $8,440,824.00 $7,222,115.00 Remaining Balance to Finish: $1,218,709.00 FAA Grants: $0.00 FDOT Grants: $3,215,898.00 LCPA Funds: $769,748.00 Other Funds: $3,236,469.00 RSW Closed-Circuit Television (CCTV) System Upgrade 4 RSW Flight Information Display System Replacement Consultant: Faith Group, LLC CM/Contractor: Owen-Ames-Kimball, Inc. Start Date: 1/4/2012 Completion Date: 6/29/2015 Project Description: Replace the current airline Flight Information Display System (FIDS) in the terminal with surface mounted flat screen displays. In order to provide convenience and enhance the passengers overall traveling experience at Southwest Florida International Airport (RSW) upgrades to the terminal directories and replacement of unused phone banks with charging stations have been included as part of this project. Project Status: COSTS / BUDGET The Baggage Information Display System (BIDS) monitors' height adjustment is still in progress. The installation of the power cables for the Uninterrupted Power Supply (UPS) within the main terminal area has been completed. The cable installation within the concourse areas is under way. The consultant is currently reviewing the Flight Information Display System (FIDS) anchors. Last Update By Adam Nguyen: 2/26/2015 9:04:40 AM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $5,826,771.00 $5,809,884.00 Remaining Balance to Finish: $16,887.00 FAA Grants: $3,228,358.00 FDOT Grants: $1,201,130.00 LCPA Funds: $1,380,396.00 Other Funds: $0.00 RSW Flight Information Display System Replacement 5 RSW Florida Power & Light (FP&L) Relocation Consultant: AECOM Technical Services, Inc. Start Date: 7/12/2012 Completion Date: 8/31/2016 Project Description: The project will include the Florida Power & Light (FP&L) transmission line relocation, embankment, stormwater drainage system, permitting, and mitigation design. Project Status: The consultant is preparing a detailed scope and fee for additional coordination as a result from the meeting with the Florida Communities Trust (FCT) regarding the relocation alignment through Wild Turkey Strand Preserve (WTSP). Concurrently, their staff is preparing for the Conservation 20/20 Land Acquisition and Stewardship Advisory Committee (CLASAC) and its subcommittee meetings. Engineering efforts will resume once the realignment route is approved by all parties. The consultant has developed a detailed schedule identifying key FP&L relocation activities, and how they overlap with other activities taking place within the overall Parallel Runway project. Email update fr Joe Glowacki:Mon, Mar 2, 2015 at 2:35 PM Development Division - March 2015 COSTS / BUDGET Total Estimated Cost: Total Authorized To Date: $26,575,337.00 $1,889,902.00 Remaining Balance to Finish: $24,685,435.00 FAA Grants: $0.00 FDOT Grants: $944,951.00 LCPA Funds: $944,951.00 Other Funds: $0.00 RSW Florida Power & Light (FP&L) Relocation 6 RSW Parallel Runway Site Preparation Consultant: AECOM Technical Services, Inc. Start Date: 7/12/2012 Completion Date: 8/31/2016 (Design Only) Project Description: The project will include design of a 9,100 ft parallel runway, storm drainage system, environmental permitting and mitigation design. Project Status: The consultant finalized the archeological survey report and completed the tree cavity survey draft requested by the US Army Corps of Engineers (USACOE). Both of these will be transmitted to the USACOE. A meeting was held on February 18 to present the results of these reports and to prepare for the scheduled meetings with the South Florida Water Management District (SFWMD). The consultant is waiting for the results of the tree obstruction survey analysis for the runway approach and departure surfaces, as well as the ATCT line-of-sight. The analysis will help finalize primary and secondary impact limits for coordination with the permitting agencies. Email fr Joe Glowacki: Mon Mar 2 2015 at 2:35 PM Development Division - March 2015 COSTS / BUDGET Total Estimated Cost: Total Authorized To Date: $258,860,638.00 $5,363,099.00 Remaining Balance to Finish: $253,497,539.00 FAA Grants: $0.00 FDOT Grants: $2,681,549.00 LCPA Funds: $2,681,550.00 Other Funds: $0.00 RSW Parallel Runway Site Preparation 7 RSW Public Address System Upgrades Consultant: Kimley-Horn and Associate Manhattan Construction (Florida), Inc. Start Date: 12/11/2014 Completion Date: 7/10/2015 (Design Only) Project Description: Upgrade existing analog system to a digital system, to include microphone stations for public announcements, interface with fire alarm system, mute voice commands by zone, trigger strobes, and zone specific pre-recorded messages. Project Status: The design is in progress and the 30% drawing submittal is anticipated to be delivered by the first week of March. Development Division - March 2015 COSTS / BUDGET Total Estimated Cost: $1,001,286.00 Total Authorized To Date: $107,069.00 Remaining Balance to Finish: $894,217.00 FAA Grants: $61,196.00 FDOT Grants: $10,199.00 LCPA Funds: Other Funds: $35,674.00 $0.00 RSW Public Address System Upgrades 8 RSW Remediation of Hazardous Wildlife - Phase II Consultant: Johnson Engineering Start Date: 12/22/2014 Completion Date: 10/20/2017 Project Description: The Federal Aviation Administration (FAA) requested that all airports conduct an updated Wildlife Hazard Assessment (WHA). The completed WHA identified areas of concern near the runway and other RSW property near aircraft approach and departure flight paths that serve as attractants to hazardous birds and other wildlife. Remediation has been accomplished in the Runway 6 approach area. Phase II remediation of hazardous wildlife involves remediation in areas along the north and south sides of Runway 6, as well as previously permitted habitat areas along existing service roads. Project Status: COSTS / BUDGET The consultant is going through the required Port Authority security badge process and the movement area driving training prior to starting field work. Last Updated By Scott Shedek: 2/2/2015 4:12:33 PM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $15,344,200.00 $510,240.00 Remaining Balance to Finish: $14,833,960.00 FAA Grants: $0.00 FDOT Grants: $255,120.00 LCPA Funds: $255,120.00 Other Funds: $0.00 RSW Remediation of Hazardous Wildlife - Phase II 9 RSW Skyplex Boulevard Consultant: David Douglas Associates, Inc. Start Date: 4/11/2012 Completion Date: 5/1/2015 (Design Only) Project Description: This project will include permitting and environmental approval, roadway, drainage, utility, landscaping, signage, marking and lighting design for Skyplex Boulevard between Daniels Parkway and Chamberlin Parkway. Project Status: COSTS / BUDGET A revised draft Focus Environmental Assessment form was provided to Lee County Port Authority for review on February 13, 2015. The consultant is completing the construction phasing plans for the 90% design. The 90% working group meeting is scheduled for February 27, 2015. Last Updated By Scott Shedek: 2/26/2015 11:24:39 AM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $5,160,092.00 $748,246.00 Remaining Balance to Finish: $4,411,846.00 FAA Grants: $0.00 FDOT Grants: $374,123.00 LCPA Funds: $374,123.00 Other Funds: $0.00 RSW Skyplex Boulevard 10 RSW Skyplex Rezoning Amendment Consultant: Johnson Engineering, Inc. Start Date: 3/15/2011 Completion Date: 3/15/2015 Project Description: This task is to prepare data/mapping and rezoning application to amend the current RSW zoning to add 200 acres of development in the non-aviation lands in Skyplex area north of Runway 6/24. This amendment will refine the allowable uses and conceptual plan for the additional 200 acres of potential development through 2030. Project Status: COSTS / BUDGET The Board of County Commissioners (BOCC) public hearing was held on February 18, 2015. The RSW Airport Operations Plan Development (AOPD) Zoning Amendment passed unanimously. The approved Zoning Resolution Z-015-030 will be finalized by Lee County staff and will be available for distribution in early March. Last Updated By Ellen Lindblad: 2/23/2015 3:39:20 PM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $222,350.00 $222,350.00 Remaining Balance to Finish: $0.00 FAA Grants: $0.00 FDOT Grants: $0.00 LCPA Funds: $222,350.00 Other Funds: $0.00 RSW Skyplex Rezoning Amendment 11 RSW Terminal Access Road (TAR) Six-Lane Expansion Consultant: David Douglas Associates, Inc. Start Date: 7/12/2012 Completion Date: 4/30/2015 (Design Only) Project Description: The project consists of widening the Terminal Access Road (TAR) to six lanes from Interstate 75 connector to Air Cargo Lane. It will include added curbing, signage and markings, lighting, landscaping, permitting and Federal Aviation Administration (FAA) approvals. Project Status: COSTS / BUDGET The consultant will be meeting with Lee County Development on March 4, 2015 to discuss the desired roadway cross-section. The consultant continues to review existing utility easement documentation and coordinate with utility companies that may be impacted by the road widening. The consultant began surveying Air Cargo Lane and terminal return loop road to determine if curbing can be added without affecting the existing drainage. Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $4,073,866.00 $819,462.00 Remaining Balance to Finish: $3,254,404.00 FAA Grants: $505,400.00 FDOT Grants: $235,546.00 LCPA Funds: $78,516.00 Other Funds: $0.00 RSW Terminal Access Road (TAR) Six-Lane Expansion 12 RSW Florida Department of Transportation (FDOT) Interstate 75 Connector Roadway Consultant: C3TS/Stantec Contractor: Prince Contra Start Date: 10/24/2012 Completion Date: 4/1/2015 Project Description: The Florida Department of Transportation (FDOT) is constructing a new limited access collector-distributor roadway system to provide Interstate 75 northbound and southbound travelers direct access to and from the Southwest Florida International Airport (RSW). Project Status: The first layer of asphalt (structural) on Terminal Access Road (TAR) has been placed. The second layer of asphalt (friction course) is scheduled for installation. All roadway lighting along TAR has been installed. All curb tie-ins have been completed. The east and west gateway sign structure panels are scheduled to be installed in early March. All bridge barrier wall work is in place and is being painted. Florida Department of Transportation (FDOT) and the contractor have agreed that the collector-distributor roadway will be open to traffic on March 6, 2015. Last Update By Doug Swank 2/24/2015 10:34:52 AM Development Division - March 2015 RSW Florida Department of Transportation (FDOT) Interstate 75 Connector Roadway 13 RSW Florida Department of Transportation (FDOT) Interstate 75 Connector Roadway Development Division - March 2015 RSW Florida Department of Transportation (FDOT) Interstate 75 Connector Roadway 14 RSW Hertz Car Rental Area Upgrades Consultant: Stantec Start Date: 3/23/2014 Completion Date: 5/29/2015 Project Description: Hertz is doing several projects to upgrade their leased space at RSW. This includes updating their Gold booth, adding security cameras, upgrading the fuel pumps and other miscellaneous items. Project Status: Hertz corporate office has not issued a Notice To Proceed (NTP) for the fuel dispenser upgrade project. This project is on hold until further notice. Last Updated By Debbie Zemaitis: 2/17/2015 1:22:03 PM Development Division - March 2015 RSW Hertz Car Rental Area Upgrades 15 Page Field Runway Rehabilitation Consultant: Hole Montes CM/ Contractor: Owen-Ames-Kimball, Inc. Start Date: 12/1/2014 Completion Date: 12/15/2015 (Design Only) Project Description: The project is to provide design services for portions of the airfield pavement rehabilitation project at Page Field (FMY). The design services also include the evaluation of alternatives for any improvements necessary for completion of the project: an analysis of the pavement rehabilitation options, a planning level analysis of the taxiway system associated with Runway 5/23 and 13/31, drainage improvements, replacement of culverts under the runway, replacement of runway edge and threshold lights, signage and the installation of new Precision Approach Path Indicators (PAPI) and Runway End Identification Lights (REIL) for each approach. Taxiway A Realignment Project Status: COSTS / BUDGET A design working group meeting was held on February 18, 2015. The consultant has completed a majority of the data collection for the runways and taxiways at Page Field. A brief project status update, as well as the Taxiway E redesignation was presented at the Page Field Runway Safety Action Team meeting on January 23, 2016. The consultant is preparing a presentation for the Federal Aviation Administration (FAA) Airports District Office (ADO) staff anticipated for the end of March 2015. Last Updated By Scott Shedek: 2/26/2015 11:21:14 AM Development Division - March 2015 Total Estimated Cost: Total Authorized To Date: $30,772,103.00 $2,576,813.00 Remaining Balance to Finish: $28,195,290.00 FAA Grants: $1,594,043.00 FDOT Grants: $784,655.00 LCPA Funds: $198,115.00 Other Funds: $0.00 Page Field Runway Rehabilitation 16
Similar documents
Study MBBS in Georgia: Study Abroad Consultant
Find the international student placement consultant that delivers the right direction to study MBBS in Georgia at studyabroadconsultant.net. Call us at +1-9713044961 for any query! Get information to study in abroad! Visit Us: http://www.studyabroadconsultant.net/
More information