CONSTRUCTION PROJECT STATUS REPORT
Transcription
CONSTRUCTION PROJECT STATUS REPORT
575 Alderman Road Charlottesville, VA 22903-2476 434-982-4621 FAX 434-982-4628 http://fmweb.virginia.edu/fpc F AC I L I TI E S M A N A G E M E N T Facilities Planning and Construction Department DATE: June 12, 2015 REPORT NO.: 09 CONSTRUCTION PROJECT STATUS REPORT ROTUNDA RENOVATIONS CURRENT STATUS Construction: 39% complete Substantial Completion: July 1, 2016 Early Capitals Package and packages 1, 2, 3 & 4 issued; 1 package (landscape) remaining to be issued Landscape Contract Documents reviewed by UBO, currently being bid by CM Wings & Classrooms Redesign bulletin reviewed by UBO, currently being bid by CM FF&E Preliminary Design presented 5/6; CD’s anticipated early August Current Construction Alerts: CA#3 (north utility work); CA #11 (crane on Lawn); CA #12 (SW passage closed for utility work) CURRENT ACTIVITIES Continue installing storm water, sanitary sewer & water lines in area between Rotunda and University Avenue Installing manhole and piping at storm water utility connected to 1850’s underground brick tunnel Installing equipment and MEP trunk lines in north & east courtyard mechanical rooms At west elevation, repairing brackets & frame supporting ornamental sheet metal cornices Demoing terrace paving at south wings At south portico, removing shoring system and completing brick repairs at needle beam holes At north portico, completing shoring & capitals conveyance system at north portico, begin replacing capitals next week NEAR FUTURE ACTIVITIES Continue north & west utilities; complete storm water utility at 1850’s brick tunnel; remove fencing & restore grass lawn Continue installing MEP equipment, trunk lines & rough-ins in mechanical rooms & main drum Complete paving demolition at south terraces & install waterproofing Complete removal of shoring at south portico; move fence back to sidewalk by end of June Replace marble capitals at north portico Continue removing sheet metal cornices at west elevation of drum & begin at east elevation Begin installation of metal frame at dome room ceiling for acoustical plaster ceiling REPORT PREPARED BY: Jody Lahendro, Senior Project Manager, FP&C, jdl7d@virginia.edu, o 434.982.5840, c 434.906.2583. Construction Administration Manager: Steve Ratliff, FP&C, spr@virginia.edu, o 434.982-5393, c 434.962.4736. Project Managers: James Zehmer, FP&C, jdz5e@virginia.edu, c 434.566.7294; Sarita Herman, FP&C, smh2ne@virginia.edu, c 434.982.5713