AFGHANISTAN Flood risk (est.) for the period 30/04/2015
Transcription
AFGHANISTAN Flood risk (est.) for the period 30/04/2015
AFGHANISTAN Flood risk (est.) for the period 30/04/2015 to 06/05/2015 This map is compiled by iMMAP. Date created: 04/05/2015. Administrative boundaries, settlements: AIMS. Snow water equivalent data: FEWSNET (http://earlywarning.usgs.gov/fews/) Datum/Projection: WGS-84/Geographic. iMMAP in Afghanistan is funded by the United States Agency for International Development (USAID) / Office of U.S. Foreign Disaster Assistance (OFDA). The data, boundaries, names and the designations used on this map do not imply official endorsement or acceptance by iMMAP and/or USAID/OFDA. All information is the best available at the time this map was produced. For information on methodology or copies: Afghanistan@immap.org , www.immap.org Climate Prediction Center’s Central Asia Hazards Outlook April 30 – May 6, 2015 Legend Es.t settlements exposed to low flood risk Est. settlements exposed to medium flood risk Est. settlements exposed to no flood risk NOHRSC est. water level in hydrological basins for the period 30/04 to 06/05 – current level compared to historical average