There is a modified 2015 schedule for operation of spray parks due

Transcription

There is a modified 2015 schedule for operation of spray parks due
There is a modified 2015 schedule for operation of spray parks due to drought restrictions.
Water features will be operating May 2 through May 28, 2015* with hours of operation as shown
below. After that date, there will be a reassessment and, dependent upon state mandates and
weather, changes may be made. Also, NOR will possibly shut half of sites down August 1 st (as was
done last year) and modify hours of remaining sites.
*May 28, 2015 is the last day of school.
PARK
Emerald Cove Park
4303 Patton Way
93308
Madison Grove Park
10115 Norris Road
93312
North Meadows Park
3300 McCray 93308
Polo Community Park
11801 Noriega Road
93312
Riverview Park
401 Willow Drive 93308
San Lauren Park
4101 Mohawk St 93308
Sears Park
444 Norris Road
93308
Silver Oak Park
15855 Opus One Dr
93314
WATER AMENITIES
1-Arch
1-Top Spray
1-Side Spray
1-Umbrella Spray
1-One Half Arch Spray
Floor Sprays
Waist High Sprays
2-Spray Posts
1-Arch
3-One-Half Arch Sprays
1-Gooseneck Spray
2-Umbrellas
1-Floor Spray
1-Waist High Spray
1-Shower Spray
2-Arches
2-Side Sprays
1-Arch
2-Side Sprays
3-Arches
2 Umbrella Sprays
Water Cannons
Floor Sprays
Waist High Sprays
1-Umbrella
1-One Half Arch Spray
1-Double Floor Spray
1-Waist High Spray
OPERATION
Push & Hold
HOURS OF OPERATION
12 p.m. to 7 p.m.
Push – Timed to run
30 seconds to 1
minute
3 p.m. to 7 p.m.
Push & Hold
12 p.m. to 7 p.m.
Push – Timed to run
30 seconds to 1
minute
12 p.m. to 7 p.m.
Push & Hold
3 p.m. to 7 p.m.
Push & Hold
3 p.m. to 7 p.m.
Push – Timed to run
30 seconds to 1
minute.
12 p.m. to 7 p.m.
Push-Timed to run 30
seconds
3 p.m. to 7 p.m.