Addition Clarifications for PEB Tender

Transcription

Addition Clarifications for PEB Tender
CLARIFICATIONS ON PEB TENDER
DOCUMENTS
Venue:
Date:
Time:
Tenders
:
:
:
:
Received Vide Email
10th April 2015
______Hrs onwards
1. Pre Engineered Building (PEB)
TENDER FOR PRE ENGINEERED BUILDINGS
Sr. No.
1
2
3
4
5
6
Query Raised
Reply / Clarification
All
buildings
shall
follow
STANDING SEAM ROOF sheeting
specification, with 10 years leak proof
No Standing Seam Roofing.
warranty. Whether the Roof slope can
Roof Slope as per Drawings.
be changed to 1:20, which is
sometimes economical for Standing
Seam roofing system.
WAREHOUSE
For the mezzanine area, the Finish
Load is given as 2 Kn/Sqm. Please
confirm whether this is included in the
No, Not included in the Dead Load
Dead Load: 4 Kn/Sqm, Live Load: 5
Kn/Sqm.
Please provide the load of Allu. Wall
panel on Mezzanine, if not included in
Included in the Above Loads
the above loads.
Also provide us the thickness of
concrete over the deck sheet.
The throat of Ridge Ventilator as
measured from the drawing is 600mm.
Please confirm
F&V Building
The drawing shows that the False
ceiling load has to be considered
completely except for GRADING &
SORTING HALL. Please clarify
whether we have to consider in IQF
and ASCEPTIC Packing Line Areas
too.
150 mm thk
Confirmed. As per Drawing.
No False Ceiling in IQF & Asceptic Line
1
Sr. No.
7
8
9
10
11
12
13
Query Raised
The Entire Roof sheeting shall be
Standing Seam Roof with insulation.
Reply / Clarification
Please refer to clarification shared on
Website as per Pre Bid meeting 6.04.2015
In Pre Bid meeting, it has been
confirmed that the building height
changes from grid 6 instead of grid 5a,
for racking system area. The same has
Confirmed.
not been updated in the drawing /
mentioned
in
the
Tended
Clarifications. Please confirm
Also please confirm whether we have
to consider the PLANT ROOM ( Grid
Yes in PEB Scope
A / Grid 3 to 12) in PEB scope.
MSME Sheds
The technical specification shows that
Insulation has to be provided for Roof
whereas the drawing shows that
insulation has to be considered only in Do Not Consider Insulation in Roof or Wall
wall. Please clarify whether we should Cladding.
consider insulation in both Roof &
Wall.
In the round Floor Plan along Grid C,
the brick wall height is mentioned as
These are two different levels of walls.
1.5m & 2m. Also Louver height is
One is toilet wall where wall height is 2m
mentioned as 2m & 1.5m. Please
and louvers above it of 1.5m high.
clarify what has to be followed.
Please confirm whether false ceiling
load on the COLUMNS at locations Please consider 25kg/Sq.m.
shown in the drawing.
We are not considering the internal
Partition walls, supporting columns F&V- Internal Partitions not in PEB Scope
and girts in PEB scope (similar to Warehouse & MSME Sheds in PEB Scope
other buildings). Please confirm.
2