Addition Clarifications for PEB Tender
Transcription
Addition Clarifications for PEB Tender
CLARIFICATIONS ON PEB TENDER DOCUMENTS Venue: Date: Time: Tenders : : : : Received Vide Email 10th April 2015 ______Hrs onwards 1. Pre Engineered Building (PEB) TENDER FOR PRE ENGINEERED BUILDINGS Sr. No. 1 2 3 4 5 6 Query Raised Reply / Clarification All buildings shall follow STANDING SEAM ROOF sheeting specification, with 10 years leak proof No Standing Seam Roofing. warranty. Whether the Roof slope can Roof Slope as per Drawings. be changed to 1:20, which is sometimes economical for Standing Seam roofing system. WAREHOUSE For the mezzanine area, the Finish Load is given as 2 Kn/Sqm. Please confirm whether this is included in the No, Not included in the Dead Load Dead Load: 4 Kn/Sqm, Live Load: 5 Kn/Sqm. Please provide the load of Allu. Wall panel on Mezzanine, if not included in Included in the Above Loads the above loads. Also provide us the thickness of concrete over the deck sheet. The throat of Ridge Ventilator as measured from the drawing is 600mm. Please confirm F&V Building The drawing shows that the False ceiling load has to be considered completely except for GRADING & SORTING HALL. Please clarify whether we have to consider in IQF and ASCEPTIC Packing Line Areas too. 150 mm thk Confirmed. As per Drawing. No False Ceiling in IQF & Asceptic Line 1 Sr. No. 7 8 9 10 11 12 13 Query Raised The Entire Roof sheeting shall be Standing Seam Roof with insulation. Reply / Clarification Please refer to clarification shared on Website as per Pre Bid meeting 6.04.2015 In Pre Bid meeting, it has been confirmed that the building height changes from grid 6 instead of grid 5a, for racking system area. The same has Confirmed. not been updated in the drawing / mentioned in the Tended Clarifications. Please confirm Also please confirm whether we have to consider the PLANT ROOM ( Grid Yes in PEB Scope A / Grid 3 to 12) in PEB scope. MSME Sheds The technical specification shows that Insulation has to be provided for Roof whereas the drawing shows that insulation has to be considered only in Do Not Consider Insulation in Roof or Wall wall. Please clarify whether we should Cladding. consider insulation in both Roof & Wall. In the round Floor Plan along Grid C, the brick wall height is mentioned as These are two different levels of walls. 1.5m & 2m. Also Louver height is One is toilet wall where wall height is 2m mentioned as 2m & 1.5m. Please and louvers above it of 1.5m high. clarify what has to be followed. Please confirm whether false ceiling load on the COLUMNS at locations Please consider 25kg/Sq.m. shown in the drawing. We are not considering the internal Partition walls, supporting columns F&V- Internal Partitions not in PEB Scope and girts in PEB scope (similar to Warehouse & MSME Sheds in PEB Scope other buildings). Please confirm. 2
Similar documents
Roof Maintenance & Repair Services in Melbourne
Welcome to Roof Makeover Specialist! We offer top quality roof maintenance & repair services in Melbourne at affordable prices. Call today at 04818 12124 for a free quote! Visit Us: http://www.roofmakeoverspecialist.com/
More information