LCC status Lyn Evans
Transcription
LCC status Lyn Evans
LCC status Lyn Evans 1 April 18, 2015 PAC Orsay ILC in Linear Collider Collaboration ICFA FALC Chair: J Mnich Chair: J. Wormseley To prepare for the ILC project realization ・Detailed design study ・Cost-effective project realization Program Adv. Committee PAC – Chair: N. Holtkamp Linear Collider Board LCB – Chair: S. Komamiya Linear Collider Collab. LCC Directorate Regional Directors - KEK KEK LC Project Office - A. Yamamoto Acc. Tech. Board Tech. S. Phys. & Detector 2 to LCC-Phys To be linked B. Foster (EU) H. Weerts (AMs) A. Yamamoto (AS) – H. Murayama - Director: L. Evans ILC CLIC – M. Harrison – S. Stapnes - (Deputy) H. Hayano Acc. Design & Integration (ADI) Deputy (Physics) Physics & Detectors – H. Yamamoto Technical Support April 18, 2015 PAC Orsay Charge to the PAC 1. 2. 3. 4. 5. 6. 7. 8. 3 Assess the level of resources needed to keep the Project viable until a Japanese decision is made. Given the finite resources available, are the LCC’s priorities appropriate? Are the conventional facilities design and other site specific issues for the Japanese preferred site progressing satisfactorily? Are there adequate test facilities available to answer outstanding technical questions? Is the planning for the detectors proceeding satisfactorily to produce viable designs? Is there an appropriate amount of synergy between ILC and CLIC activities? Comment on the technical viability of the various proposed ILC running scenarios. Does the PAC have any comments on LCC’s proposed ILC governance plan? April 18, 2015 PAC Orsay MEXT’s Organization for Studying ILC SCJ Recommendation in 2013 MEXT ILC Taskforce formed in 2013 Academic Experts Committee formed in 2014 Particle & Nuclear Phys. Working Group TDR Validation Working Group formed in 2014 formed in 2014 April 18, 2015 PAC Orsay 4 140913 Progress in MEXT Academic Expert Committee for the ILC http://www.mext.go.jp/b_menu/shingi/chousa/shinkou/038/attach/1353571.htm Particle and Nuclear Physics WG TDR Verification WG (* closed mtg) 1st Academic Expert Committee (14/05/08) 1st : 6/24 Status and Prospect for Particle Physics ILC Project and the Physics 1st: 6/30 2nd : 7/29 Strategies at EU and Ams 2nd : 7/28* SRF and the cost 3rd : 8/27 Cosmic-ray and astrophysics ILC Science Objectives 3rd: 9/8* SRF and the cost (continued) CFS 4th : 9/22 Flavor and Neutrion Physics IILC Science Objectives 4th: 11/4* ILC construction cost 5th : 10/21 Summary discussion for a report TDR and the cost, generally reported 2nd Academic Expert Committee (14/11/14) 6th : 1/8 Experience from SSC ILC Science Objectives 5th:1/26* ILC Accelerator and human resources 7th : 2/17 Science Objectives per 6th :3/2* Summary discussions 8th : 3/30 Summary discussion for a report 3rd Academic Expert Committee (15/4/21) April 18, 2015 PAC Orsay 5 6 April 18, 2015 PAC Orsay Test Facilities around the world 7 Test facility Used by Purpose Facet-SLAC CLIC Beam-based alignment CTF-CERN CLIC Two beam acceleration ATF2-KEK ILC/CLIC Low emittance, final focus STF-KEK ILC High gradient acceleration FLASH-DESY ILC High gradient, high current NML ILC Complete cryomodules CesrTA ILC Electron cloud April 18, 2015 PAC Orsay Production facilities Production Facilities 8 Cavities and cryomodules KEK Cavity R&D Cavities DESY 24 cavities from XFEL production Cavities JLAB High-gradient cavities XFEL DESY Industrial production April 18, 2015 PAC Orsay Common working groups • • • • • • 9 Damping rings Sources Beam delivery system Conventional facilities Power couplers Tuners April 18, 2015 PAC Orsay