Diapositiva 1
Transcription
Diapositiva 1
Panamá Geothermal Development in Panama Aileen LEE National Energy Secretariat (SNE) Página 1 General Information Size: 75 416,60 km2. Climate: Tropical. Inhabitants: 3 787 511. GDP/per capita: 6 800 USD (constant price – base: 1996). Unemployment: 4,5 %. Economic data: Canal, Logistics, Commerce, Banking, Construction. Currency: USD. Capital: Panama (approx. 1 MM Inhabitants). Borders: Costa Rica and Colombia. Observation: 10 % Avg. GDP annual increase rate for last 5 years. Panamá Página 2 Energy Sector Gross generation: • Hydro: • LFO+HFO: • Coal: • Biomass: 8,606 GWh 00 5,391 GWh / 62,6 % 2,523 GWh / 29,3 % 0 668 GWh / 07,8 % 24 GWh / 00,3 % 34 Local generating companies. Annual consumption: 7 170,3 GWh. Increase of consumption: 6 % per year. Electrification rate: 90 %. Distribution losses: 11,4 %. Monomial energy prices: 92 – 166 USD/MWh. High potential for renewable energies: Small hydro, solar, wind, biomass and geothermal energy. Panamá Página 3 Energy Sector Important stakeholders: Panamá SNE: Energy policy maker under the Ministry of Presidency. ASEP: Regulatory entity. ANAM: Environmental protection entity. CND : Grid operator. ETESA: Grid owner and PPA Bid Acts organizer. EDEMET,EDECHI,ENSA: Distribution companies. Centram Geothermal: Private company developing a geo-power plant. Highlights of actual energy policy: Diversification of energy matrix. Energy efficiency. Electricity coverage. Regional integration. Distributed generation. Página 4 Electric Energy Generation Energy generated (8 606 GWh) 3% Installed capacity (2 421,7 MW) Thermal 39% 8% HYDRO 26% 63% BUNKER DIESEL Hydro 61% COAL Dispatch Source: SNE 2012 Panamá Thermal Hydro Geotérmica Página 5 Actual Geothermal Development Up to now, geothermal energy has only been used in the tourist sector. Natural thermal baths are very famous in El Valle de Antón! Panamá Some preliminary studies: Stakeholders: SNE: ASEP: ETESA: Energy policy maker: - National energy plan, laws, technical cooperation. Regulatory entity: - Resolutions. - Energy generation, transmission and distribution concessions. Grid owner and PPA Bid Acts organizer: - Study maker (energy potential). Actual projects in development: Geothermal concession in Barú-Colorado. Since 2012. 5MW – 33 621MWh/year of electricity to the grid. Página 6 Actual Geothermal Development Actual projects in development: 129 square kilometers - uninhabited area. 60 000 Inhabitants. Private Investment. Replace 19 000 CO2tones/year (aprox.). Potential reservoir temperature 195 – 234 °C. Binary cycle for generation with temperatures between 90° to 140°C. Other projects in development: There’s no other energy projects in development, only for the tourist sector. Panamá Future Geothermal Potential Potential: Approx. unknown potential: - 100MW (IGA, 1999). - 360 MW (GEA, 1998). - 450 MW (L. Battocletti & B. Lawrence, 1999). Geothermal Potential of Panama (according to West JEC). Barú-Colorado Area 24 MW Surface Geoscientific Studies. El Valle de Antón Area 18 MW Surface Geoscientific Studies. Chitra Calobre Area - Surface Geoscientific Studies. Isla de Coiba Area - Tonosí Area - Total 42 MW Panamá Future Geothermal Potential Panamá Geothermal Potential Map Barú-Colorado Location Future Geothermal Potential Panamá Former Project “El Valle de Antón”. Hot Water Emanations “Chitra-Calobre”. Special Fields of Interest Panama is looking for: Panamá New technologies for exploration and drilling. New technology application for high and low enthalpy resources. Investment and financing of geothermal projects. Risk assessment for exploration drilling. Geothermal potential assessments and Map of Country’s Geothermal Potential Pre-feasibility studies. Data update and organization. Página 11 Panamá Contact Aileen Lee alee@energia.gob.pa Secretaria de Energía Página 12