Deepwater Horizon oppfølging OLF/NOFO > DNV
Transcription
Deepwater Horizon oppfølging OLF/NOFO > DNV
Deepwater Horizon oppfølging OLF/NOFO > DNV : Forskjeller mellom Norsk og Amerikansk petroleums regelverk Joint Industry/OLF/NOFO : Utvikle ’’verktøy ’’ som kan PÅGÅR forhindre at tilsvarende storulykke skjer på norsk sokkel FULLFØRT NOFO : Analyse for vurdering av behov for oljevernkapasitet VEDTATT IGANGSATT ’Deepwater Horizon follow-up’- anbefalte tiltak fra OLF gruppen basert på BP rapport og møter Tiltak relevant for oljevern GAP- analyse : • Kompetanse og kapasitet i forhold til eksisterende beredskapsplaner • Kapasitet /robusthet i forhold til 60 dagers hendelse Dispergering : • Videre læring fra GoM • Operasjonalisere i planene • Injeksjon ved brønnhodet Brenning : • Er dette en metode for NCS ? Yrkeshygiene : • Hvilke krav skal vi ha til innsats i HC området ? Unified Command : • Er dette en modell vi kan bruke i Norge ? Internasjonalt samarbeid ? Deepwater Horizon Follow-up -OLF Project Group Summary of Recommendations 7. Oil Spill Response Recommendation 7.1 - Perform gap–analysis of NOFO competencies and capacities related to existing E&P emergency preparedness plans for all four barriers, and an oil spill lasting for 60 days anywhere on the NCS. Proposed Action NOFO initiate Phase 1 in 1Q - 2011. Recommend scope of work for Phase 2 based on Phase 1 findings and related studies on strategies and methodologies within oil companies and authorities. Timeframe and Responsible Party Timeframe for Phase 1: Gap analysis should be completed within 3Q – 2011. Timeframe for Phase 2: Recommendation for Phase 2 within 2012. Responsible Party: Sjur W Knudsen 7.2 – Develop a cooperative agreement between North Sea oil producing countries for Oil Spill Response. Assess the potential for expanding cooperation with Oil Spill Response and NOFO, and recommend further actions. Monitor Coastal Administration and EMSA activities. Timeframe: 2011 Status report by 2Q - 2011, with activities continuing through 2011. Responsible Party: Sjur W Knudsen Deepwater Horizon Follow-up -OLF Project Group Summary of Recommendations 7. Recommendation Oil Spill Response Proposed Action 7.3 - Evaluate burning of oil as a supplementary method of cleanup for Norway. Prepare a scope of work for a study in Phase 2. 7.4 - Follow up the development for the use of dispersants subsea as part of the OGP Global Capping and Containment Project. Monitor progress and inform the Project Group of key developments. Timeframe and Responsible Party Timeframe: 2011 Responsible Party: Oddbjørg V. Greiner Timeframe: 2011-2012 Responsible OLF Manager: Olav Skotheim