STI
Transcription
STI
STI - Standardization Initiative Felles, omforente krav vil bidra til reduserte og effektiviserte leveranser av dokumentasjon og informasjon fra leverandør til prosjekt og videre til drift. Bjørn Berli Exploration & Production Information Management EPIM Members www.epim.no 3 EPIM – Exploration & Production Information Management Association www.epim.no 4 About EPIM • EPIM (Exploration & Production Information Management Association) is a non-profit membership organization established in November 2007. • EPIM is governed by the operators on the NCS. • Norsk olje & gass approved the establishment of EPIM, an organization that would provide the industry with effective management of common information and communication technology (ICT) solutions. www.epim.no 5 STI - Standardization Initiative Unified Requirements STI Steering Committee Meeting STI Reference Group • Aibel • Anita Lindtner BP Norge • Frode Dyrdal Centrica Energy E&P Norway • Arild Toft ConocoPhillips • Per Valheim Eni Norge • Atle Severson ExxonMobil • Tor Ove Holsen GDF Suez E&P Norge • Ivar Miljeteig LOTOS Exploration & Production Norge • Kjell Tore Vinningland Premier Oil • Jan Helge Petersen Repsol • Ingrid Sternhoff Shell • Per-Arne Røstadsand Statoil • Petroleum Bjørn Thomas Bache (Observer) Safety Authority • Wenche Havn Total E&P Norge • Merten Becker Wintershall Norge • From EPIM Project Owner Ove Ryland • Ove Ryland EPIM • From EPIM Project Manager Bjørn Berli • Marit Bjordal EPIM • Bjørn Berli EPIM Jan Ståle Skår, EVP Modifications • Aker Solutions Jann Slettebakk, VP Methods • BP Norge Bertrand Barouti, Quality & IMDC Team Leader • ConocoPhillips Robert Skrede, Manager Engineering and Asset Integrity • Repsol Agnes Jorunn Høie, IM Team Leader • Statoil Terese Kvinge, SVP Modifications • Wintershall Sigbjørn Pedersen, Chief Enterprise Architect www.epim.no 7 Standard information and documentation be delivered with the physical equipment T R A N S M I T T E R V A L V E www.epim.no 8 Reducing manhours and costs through common focus on industry standardization (Unified Requirements) www.epim.no 9 Engineering and Procurement in parallel with Preparations for Operation Preparations for Operations and Operations: -MA (incl. spare parts evaluation) -RMM (Regularity & Maintenance Management) -Operations -Correct and sufficient availability of information and documentation Common Industry Focus • Unified Requirements • Based on national and international standards • Standard documentation in the industry Engineering, Procurement, Construction, Commissioning, Handover, Modifications: -Large number of contractors, projects and resources, and a large number of PO’s towards suppliers. -Project execution methods to ensure efficient projects, applying company knowledge, systems and structure across a large number of projects and organisations. -Avoid re-punching of information. www.epim.no • Covering all phases, including projects and operations • Cost reduction for the industry • Industry participation 10 Standard Information and Documentation for Projects and Operations Common Industry Focus Preparations for Operations and Operations Common Industry HUB for Supplier Equipment (Based on STI) www.epim.no • Unified Requirements • Based on national and international standards • Standard documentation in the industry Engineering, Procurement, Construction, Commissioning, Handover, Modifications • Covering all phases, including projects and operations • Cost reduction for the industry • Industry participation 11 STI - Information and documentation for Equipment Cost efficient: Supplier delivers information once to the industry Less cost efficient: Additional supplier work for each PO delivery to each Operator Eng. Contr. 1 Oil&Gas 1 Supplier 1 Industry HUB for Supplier Equipment Supplier 2 Supplier 1 Oil&Gas 1 Eng. Contr. 3 Oil&Gas 2 Supplier 2 Oil&Gas 2 Supplier 3 Oil&Gas 3 Oil&Gas 3 Supplier 3 Eng. Contr. 2 Slightly different contractor requirements may cause different PO requirements for the same field development project. Page 10 www.epim.no 12 Cost reduction through Industry Initiatives (Unified Requirements) STI Requirements Management Info Exchange Other Initiatives From: PTIL Dokumentasjonsprosjekt www.epim.no 13 Standard information and documentation be delivered with the physical equipment T R A N S M I T T E R V A L V E www.epim.no 15 STI Concept Working Groups for each discipline with representatives from operators, contractors and suppliers will identify unified requirements for each equipment type within the STI Scope of Work. Establishing the required attributes and documents for each equipment type requires participants from: suppliers, contractors and operations. www.epim.no Each attribute/document will also have an extra attribute indicating the primary phase(s) for use through engineering, construction, operations, modifications, demolition. 16 Use and reference to NORSOK standards from many operators on the NCS has decreased in the same period www.epim.no 17 Common terminology and Unified requirements Overall Plan for the Industry PSA and NPD Norsk olje og gass Norsk Industri EPIM Operators Instrument Equipment Types Electro Bulk & Field Equipment Valves Contractors Suppliers Unified requirements through common terminology, based on use of international standards I-001 Z-001 Z-018 www.epim.no NORSOK ISO IEC, etc. 18 Simplified work process with clearly defined equipment types for Equipment deliveries STI Concept #3 Work Processes Requirements Commissioning Operations Strategy As Database Deliver information and documentation for Equipment Use information and documentation for Equipment PO Design/ Fabrication FAT Handover 1: Information and documentation for Equipment deliveries from Supplier to Standard Information and Documentation Hub 2: Standard Information and Documentation for Equipment available during Study phase, FEED and Main project 3: PO based on Standard Information and Documentation available in the Hub 4: Standard Information and Documentation for Equipment used during engineering and fabrication 5: Standard Information and Documentation for Equipment available for FAT 6: Engineering and fabrication Information and documentation in Contractor systems 7: Standard Information and Documentation for Equipment referred to or imported to Project systems before handover 8: Acceptance from Operations 9: One Hub for Information and Documentation, here duplicated for illustration purposes Acceptance 8 7 or as Documents 6 2 Supplier Engineering Strategy Hub for Standard Information and Documentation 5 6 3 5 1 www.epim.no 4 9 9 Hub for Standard Information9and Documentation 9for Equipments 9 9 21