Doing Yet-To-Find Resources

Transcription

Doing Yet-To-Find Resources
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
DRAFT/3JULY09 STD GeoX 5.8
Doing Yet-To-Find Resources
A GeoX Play Assessment Primer
1
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Thunes vei 2 • 0274 OSLO, Norway
Tel: +47-22941120 • Fax: +47-22941121
A Primer on Play Assessment with GeoX
Copyright © 1992 - 2009 GeoKnowledge AS
All Rights Reserved.
No part of this software or documentation may be copied, photocopied,
reproduced, translated, or reduced to any electronic medium or machinereadable form without prior written consent from GeoKnowledge AS.
The information in this document is subject to change without notice and
should therefore not be construed as a commitment by GeoKnowledge AS.
GeoKnowledge AS assumes no responsibility for any consequences
resulting from errors that may appear in this document.
The software described in this document is furnished under license and
may be used or copied only in accordance with the terms of such license.
Oslo, July 2009
ii
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Table of Contents
INTRODUCTION.................................................................................. 1
OVERVIEW OF GEOX ........................................................................ 2
LOGGING ON TO GEOX .................................................................... 4
THE GEOXPLORER ............................................................................ 5
THE BASIC PLAY ASSESSMENT WORKFLOW ............................ 7
THE RIFT MARGIN CARBONATE PLAY ........................................ 9
CREATING A PLAY AND A PLAY ANALYSIS ...............................10
THE PLAY ANALYSIS NOTEBOOK ................................................12
DOCUMENTING A PLAY ANALYSIS ..............................................15
THE PLAY ANALYSIS SET-UP .........................................................17
SAVING THE PLAY ANALYSIS .......................................................18
OVERALL PARAMETERS ................................................................20
SHARED PLAY RISKS .......................................................................21
DEFINING THE POSTULATED FEATURES...................................22
POSTULATED SETUP ........................................................................24
POSTULATED VOLUME INPUTS ....................................................25
CONDITIONAL RISKS .......................................................................27
CALCULATING YTF RESOURCES .................................................28
REVIEWING AND INTERPRETING RESULTS..............................29
YET-TO-FIND RECOVERABLE RESOURCES.............................................30
ABOVE SCREENING THRESHOLD YTF ...................................................33
SIZE-BY-RANK TABLE AND DIAGRAM ....................................................34
PERCENT YTF VOLUME-BY-SIZE DIAGRAM ...........................................35
APPENDIX A: PLAY ANAYSIS INPUTS ..........................................37
ABOUT SETUP ANALYSIS......................................................................38
ABOUT DEFINITION: ENROLMENT .........................................................40
ABOUT DEFINITION: DISCOVERY HISTORY CHART ................................42
ABOUT THE OVERALL PARAMETERS .....................................................43
ABOUT CORRELATION (OVERALL)........................................................45
ABOUT SETUP HC FLUIDS MODELLING (POSTULATED) ...........................47
ABOUT THE VOLUME SETUP (POSTULATED) ..........................................48
ABOUT VOLUME WITH AREA, THICKNESS & GF (POSTULATED) ............50
ABOUT VOLUME W. AREA-THICKNESS_IN_TABLE (POSTULATED)..........52
ABOUT THE FLUIDS SETUP (POSTULATED) ............................................54
ABOUT FLUIDS PARAMETERS USING DIRECT ENTRY (POSTULATED) .......55
ABOUT FLUIDS PARAMETERS USING EQUATIONS (POSTULATED .............57
APPENDIX B: GLOSSARY................................................................59
iii
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
iv
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Introduction
This is a short Primer1 on doing the play assessment with GeoX. It
focuses the basics of doing assessment of single (part) plays and
complements the GeoX Primer on assessment of segment risks and
resources.
The rest of the Primer is organized as follows. The next section provides a
short overview of GeoX with the key elements that support your risk and
resource assessment workflow. The following sections take you through
the basics of getting started with GeoX in terms of what we call the
housekeeping tasks of creating a play folder, creating a play analysis and
documenting the assumptions and context of the analysis. Thereafter we
go through the basics of entering the necessary input parameter estimates
for doing an assessment of the Yet-To-Find potential in a part play with
postulated features. We review in detail the main input context, the overall
play parameters, the field size distribution, the fluid, and the risk input
estimates. The last sections review the results.
Appendix A reviews in more detail the main input of the GeoX play
analysis tool.
The Primer complements the one-day course on "Doing Play Fairway
Assessment with GeoX". It is meant to be a reference that you can consult
after the course. However, it alternatively can also provide an introduction
to doing assessments with GeoX for someone that has not taken the
course.
1
prim·er1 [ pr m r ] n.
1.
A book that covers the basic elements of a subject.
1
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Overview of GeoX
GeoX is a collection of assessment tools designed to support and promote
high quality exploration decisions. It focuses the critical integrative,
judgement-intensive exploration decisions that rely on the assessment of
resources, risks and full cycle economics. It provides a complete
framework for consistent, best practice evaluation of exploration
opportunities.
The GeoX workbench has 3 main tools:
gPlayR for the play-level
evaluation of Yet-To-Find resources, gSegmentR for the evaluation of
risks and resources at the level of single container exploration targets, and
gFullCycle for the evaluation of after-tax economics of exploration
ventures. Additional tools are available for aggregating analyses,
classifying resources and assessing exploration portfolios. The gPlaySum
tool for the analysis of risks and resources in a play fairway that consists of
multiple part plays complements the gPlayR tool.
that supports industry-standard database
systems such as Oracle or SQL Server. The database is used to store,
access and link analyses organized in a basin-play-segment framework.
The database supports integrative application of the family of tools. The
database also facilitates sharing and exchanging data with colleagues,
other applications and other systems.
GeoX has a relational database
Analyses are the primary work unit. There is a different type of analysis
for each GeoX tool. Tools are launched according to the type of analysis
that is accessed in the GeoX database. For example, gPlayR is launched
when you access (or create a new) a play analysis. Analyses are viewed,
edited and estimated in a notebook-format interface with a uniform and
consistent syntax across all GeoX tools.
In this primer we will refer to the GeoX tools by referencing the type of
analysis that is associated with the tool. In other words, when we refer to a
play analysis, we either are referring to the analysis of specific play or the
gPlayR tool in general.
By enabling you to maintain multiple analyses of an exploration target, the
system supports a process where you can consider systematically
alternative hypotheses and scenarios. Analyses are Test, Approved or
Historical, where both the Approved and all Historical analyses are readonly from the database. This status categorization and administration
2
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
enables you to maintain a systematic record of how ideas, data and
understanding evolve through the exploration life cycle.
The focus of this Primer is the gPlayR tool for analysis of the YTF potential
of a play. However, all GeoX tools share a common notebook format with
the same set of functions for accessing, editing, calculating, storing,
printing and exchanging analyses. Once you master the mechanics of
using gPlayR you are also well positioned to do the other tools in the
workbench.
The segment is the basic assessment building block in GeoX. It is the
smallest definable assessment unit2. Examples of segments include
individual reservoir units and fault compartments. A segment must be
within a single play or sub-play
is a family of postulated potential accumulations, mapped potential
accumulations, assessed potential accumulations & discoveries that have
the same geological controls on gross reservoir, hydrocarbon source & top
seal. The play (part-play) is the basic assessment unit (BAU) in play
assessment with GeoX.
A play
is a collection of segments. It can for example be a series of
stacked reservoirs, or a group of fault compartments, or combinations of
reservoir units and fault blocks. A prospect can span multiple plays as it
can contain segments that are located in different plays.
A prospect
Consider the Alpha prospect (schematic cross-section below). Alpha
includes 4 segments (A, B, C and D). There are three reservoir units (C, D
and A-B) where unconformity separates the C and D units from the A-B
unit. The two segments (C&D) above the non-conformity are in the “U”
(upper) play while the A and B segments below the non-conformity are in
the “L” (lower) play. The A and B fault compartments are in the same
reservoir unit. Alpha spans two plays: Play U and Play L.
2
As we will see, one might also consider the play analysis as a separate assessment unit.
However, plays are assessed as composed of postulated potential accumulations that can
be viewed as segments. In GeoX 5.8.0 the postulated potential accumulation is defined
separately from the play analysis and the smallest assessment unit is then clearly the
segment.
3
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Logging on to GeoX
GeoX is typically installed as a Citrix-application. This means that you
access GeoX via Citrix.
Once you have accessed GeoX, the system will first open the GeoX splash
screen and then immediately after that it will display the GeoX loginpanel.
In order to be able to use GeoX you need a username and a password.
Please consult your GeoX coordinator for your username and password.
Enter your username and your password and click OK. The system will
close the login-panel and open the GeoXplorer (see next page).
Problem Note – logging on:
You might not be able to log on to GeoX for a number of reasons:
1\ You entered an incorrect username.
2\ You entered an incorrect password.
3\ All your GeoX licenses are in use.
For the two first reasons you will be asked if you want to retry. Retry, but this time
with the correct username and password. If all licenses are in use, the system will
show the name of the users that are active.
4
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The GeoXplorer
The GeoXplorer is your window to the GeoX database. It gives you access
to assessments, lets you engage the GeoX tools and supports reporting
across analyses in the database. The GeoXplorer is also used to export and
import analyses.
The GeoX data is organized in a hierarchical basin-play-segment structure.
Basins can be divided into sub-basins and plays can be divided into partplays.
Oracle database
Basin
Play
Analysis in the A1 CB Segment folder.
Part-Play
Segment
Prospect
Folders
Analyses
Exploration
“targets" that
contain analyses
Alternate assessments of the
segment, prospect or play.
As noted earlier, the segment is the smallest assessment unit. Segments
are located within a play or part-play. Prospects, on the other hand, can
span multiple plays as prospects are defined as a collection of one or more
segments. Prospects can therefore also be located at either the basin or
the play level.
The GeoXplorer Assessment tab has two main panes: a left (“Folder”)
pane with a hierarchical tree and a right-pane with a list of the contents of
the selected elements in the left pane.
Analyses are the lowest level of the GeoX database hierarchy, and are only
shown in the right pane of the GeoXplorer. Analyses can be opened with a
double click or by entering the GeoXplorer File menu - Open command.
There are different icons for the different type of analyses in the GeoX
database. “ ” is the icon for segment folders and segment analyses.
“ ” is the icon for play folders and play analyses. There can be multiple
analyses in a folder.
5
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Detail - Versioning:
Analyses are in one of three states: Test, Approved or Historical.
There can be multiple analyses in the Test state, only one in the
Approved state and multiple in the Historical. Approved and
Historical analyses are read-only. When a new analysis is
approved, then the existing Approved analysis becomes Historical.
The version of the analysis is indicated on the analysis icon.
Security permissions define what part of the database you can see and
what you can do with the data that you see. Permission to create a new
basin or rename existing basins is always limited to one person or a small
group of persons.
6
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The basic play assessment workflow
The play assessment workflow with GeoX can be divided into substantive
activities such as entering input estimates or reviewing results and
“housekeeping” activities such as creating and saving the play analysis.
The main housekeeping activities involve either accessing an analysis in
the database or creating a new analysis. The analysis is attached to a play
(part-play) folder. You need to create the play folder in the appropriate
location in the basin-play hierarchy if this has not already been done.
Play analyses must be saved explicitly as nothing is automatically saved.
Once the play analysis tool (gPlayR) has been launched and the system has
opened a play analysis, you are ready to start doing your analysis of the
Yet-To-Find (YTF) resources in the play.
The Calculation activity is more or less instantaneous. It involves having
the play analysis tool do the Monte Carlo simulation to produce
probabilistic estimates of number of accumulations in the play, in-place
and recoverable YTF, discovered and ultimate resources based on your
estimates of the relevant input variables.
There are seven overall play assessment input activities:
•
•
•
•
•
•
•
Document:
Editing documentation of the context, main attributes of
the play, and issues that have been considered or need to be reviewed.
Most of the documentation inputs have no direct impact on the
assessment results. However, documentation facilitates sharing,
maintenance and reuse of the analysis.
Setup: Establishing global settings for the play analysis. These
settings involve what hydrocarbon phases are active, the limits (large
field minimum, resource minimum, etc) to be used, number of trials
and seed for the Monte Carlo simulation.
Definition: Defining the model used to calculate the size and success
rate of postulated and mapped potential accumulation. Definition is
also used to enrol assessed prospects and discoveries in the play.
Overall: Defining the estimated number of postulated and mapped
potential accumulations in the play in addition to some play-level
inputs such as areal extent of the play and the discovered resources in
the play.
Risks: Entering estimates of the shared chance of adequacy of the
different factors that control the success of the play.
Postulated & Mapped Features: Entering the volumetric and
conditional risk estimates for postulated and mapped features. The
features are assumed to have the same field size distribution and
conditional risks.
Correlation: Entering estimates of the relevant across-features
correlation groups and correlations at the overall level of the play.
7
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
There is a separate notebook tab for doing the Setup, Volume, Fluids,
Risks and Correlation inputs for the postulated (and mapped) features.
The input pages on this tab are identical to the pages for the corresponding
segment analysis notebook. The only exception is that there is only one
tab on the Analysis Setup page for the HC fluids.
Once the analysis has been calculated, you review the resulting estimates
of chance of success, in-place and YTF recoverable resources. Additional
results such as intermediate and yield estimates as well as the size-by-rank,
rosy future, variance diagram and resource diagram are used to reality
check (RC) and interpret the results: Do the results make sense? How do I
make sense of the results?
8
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The Rift Margin Carbonate Play
The review of the basic play assessment workflow considers a couple of
part plays (B and E) in the West Sea rift margin carbonate play. The
primary assessment targets are an Early Cretaceous platform carbonate
reservoir that was deposited during the post-rift phase. The play is
unproven and the boundaries are defined by the limits of reservoir facies.
A recent seismic survey has enabled the delineation of six prospects (A1,
A2, A3, B1, B2 and B3) with segments in both the carbonate E part-play
as well as in an overlaying clastic reservoir play. The segments have been
assessed (see Table).
The only shared play risks in the Carbonate E (CB-E) part-play are
reservoir quality (0.9) and source and migration (0.8). We are confident
of both reservoir presence as well as the trap with sealing at the play level.
Segment
A1 CB
A2 CB
A3 CB
B1 CB
B2 CB
B3 CB
P(Discovery) Oil Rec. Resources
Analysis
[%]
Mean [million STB]
Oil Only
25.9
105.3
Oil Only
19.4
124.1
Oil Only
32.4
140.3
Oil Only
15.1
241
Oil Only
20.2
189
Oil Only
21.6
135.8
Table 1. Assessed segments in part play “CB-E”
Source and migration (0.8) is the only shared play risk in the Carbonate B
(CB-B)part-play. We will start the assessment with the CB-B part-play.
9
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Creating a play and a play analysis
In order to create an analysis of thus part-play, you first need to create a
part-play folder for the part-play. The folder needs to be located correctly
in the basin-play structure of the GeoX database, in this case the East Sea
basin and the cret-cb play.
Basins are typically pre-defined as part of the process of setting up the
GeoX database. Permissions for creating new basins are limited. In our
case, the West Sea basin has already been defined. In order to create a
folder for the Carbonate B part-play:
1 Select the “cret cb” play and right click the mouse.
2 Select New part play.
3 Enter “CB-B” in the Add part play dialog box and click OK. The CB B
play has been added to the cret cb play.
4
You are now ready to create a play analysis of the CB B part-play.
GeoX supports the use of alternative templates for new analyses. A
template is an analysis that has been populated with pre-defined content in
terms of both analysis setup and data. Templates can have default values
for inputs with statistical distribution that match company best practice
workflows. Templates can have default correlations that are generally
valid. The template is selected when you create a new analysis
Your GeoX installation can have templates3 for doing play assessment.
Here we will use the GeoX default template.
1 Select the “CB B” part play and right click the mouse.
3
Templates are created in the GeoXplorer in the section under the Templates tab. They
can refer to any analysis under the Assessments tab of the GeoXplorer.
10
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
2 Select New play analysis. The system opens the New play analysis
dialog box.
3 Select the “GeoX default values” public template.
4 Replace the default name of the analysis with the label “Postulated w.
Direct FSD” and click OK. The system opens a play analysis notebook
using the selected template.
Advice – play analysis names:
The name of the play analysis should be brief, but descriptive. What differentiates this analysis from other
analyses in the play folder? For a first analysis, it is often useful to name the analysis according to the type of
volume modelling option that has been used – for example “Direct FSD OE”.
Do not include part-play name, basin name, your initials, or the date. This information is defined by the name
of the play folder that the analysis is attached to as well as the location of play in the basin-play hierarchy.
GeoX provides a default analysis name (“Play analysis N”). The analysis name can always be changed later
11
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The play analysis notebook
Once you have created a new play analysis the system opens the play analysis
notebook for the “Postulated w Direct FSD” analysis of the CB-B part play -as indicated in the title bar of the notebook.
The notebook has a set of Input pages and a set of Results pages. You “write”
the Input pages with your input data and then “read” the Results once you
have gotten GeoX to calculate the results.
To write or read the pages, you browse the left hand page list. Some pages
have multiple tabs that give you access to the sub-pages. The Results are
organized in separate sections for In-Place results and Recoverable results.
You can browse directly to any page in the notebook, enter data in whatever
sequence you want. However, we recommend that you follow the workflow
implied by the structure of the input page sequencing.
12
Copyright © 2009 GeoKnowledge
DRAFT
GeoX Play Assessment Primer
The play analysis notebook menu bar consists of two parts: The command
menus and the toolbar with a message field.
COMMAND MENU
TOOLBAR
Edit
parameter
Save
Analysis
Analysis
status
Toggle
percent/decimal
View
distribution
Calculate
Toggle
units
The toolbar gives rapid access to frequently used functions: Saving analyses,
printing analyses, viewing distributions, entering input parameter estimates,
calculating, setting the units, setting the presentation format and selecting the
currency. Using the Units toggle on the toolbar, you can instantly change
between Field Units and SI (Standard International) units. Changing units can
also be done using the View>Units from the Command menu.
Note
•
Units can be set separately for Inputs and Results. Results units apply to
hydrocarbon volumes. The Units toggle sequences through the following
four alternatives:
Toggle
SI
Field
SI/Field
Field/SI
Inputs
SI
Field
SI
Field
Results
SI
Field
Field
SI
You also use the toolbar buttons to switch between percent and decimal
representation of parameters (such as porosity, HC saturation, risks, etc) that
vary between 0 and 1.
The stoplight (Analysis status) indicator is green when analysis inputs and
analysis results are consistent (i.e. you have done a Calc after the most recent
input estimate edit).
13
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The Messages section gives feedback on verification issues that the program
has identified in terms of your analysis.
There are two main types of messages: WARNINGS (indicate by the yellow
warning icon) and ERRORS (indicated by the red error icon). Errors have to
be corrected in order to proceed with calculation (or other operation
involved); warnings are just that: the system is telling you that there is an
input that is unusual, but does not necessarily imply that something is wrong.
When you created the “Postulated w Direct FSD” analysis using sample
values, you get one error message. It is informing you that you need to define
a resource analysis – either a postulated or by enrolling an assessed
prospect/segment or by enrolling one or more discoveries. Double click on
the message in order to review the message text.
14
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Documenting a play analysis
We recommend that you first enter a short documentation of your analysis.
The Summary tab of the Description page can be used for free-text
documentation. Typically you might want to include a brief overview of
the play and the play analysis. Examples of entries might be key
assumptions and critical uncertainties, key issues that need to be looked at
in more detail, etc.
Documentation is obviously important. It facilitates use, reuse and sharing
of analyses. A good analysis name can do a lot.
15
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The Properties sub-page covers the structured attributes that are used to
document the analysis. The properties complement the free-format
documentation that can be entered on the Summary sub-page.
Consider the case of the “Location” property (the properties available on
your installation will most certainly be different from the ones shown
here):
1
2
3
4
Select the property
Click Edit
Select the appropriate value from the list of Alternatives
Click OK
16
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The play analysis set-up
The Setup page controls the stochastic (Monte Carlo) simulation and the
limits for the estimations done by the simulation. We will revisit these
attributes when we get to calculation.
WE WILL LOOK AT RESOURCE LIMITS
AFTER ENTERING ESTIMATES FOR
POSTULATED PROSPECTS
.
17
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Saving the play analysis
Play analyses are not automatically saved. We therefore recommend that
you do a save of your analysis at regular intervals in the workflow.
Start by saving your analysis once you have completed the set-up and your
initial documentation.
To save, click the Save button on the toolbar.
The system opens the Save analysis dialog box. The first time you save an
analysis you can edit the name of the analysis. You can also enter a
description of the main changes in the analysis relative to the previous
change. The system uses this information to provide a log of the changes.
The first time you save the analysis, the system enters automatically a text
that documents that the analysis was created in the database with this save.
In the case the analysis is based on a template, the change documentation
also includes the id of the template.
18
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
After the save, you will see the new play analysis in the right-hand
window of the GeoXplorer.
19
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Overall Parameters
We are now ready to start editing the estimates of the input parameters that
are attributes of the play as a whole. These estimates are entered on the
Overall, Risk and Correlation pages of the Main play analysis notebook
tab.
We start with the estimates that are entered on the Overall input page. The
most important is the estimates of the number of postulated features (there
are no mapped features in CB-B). We also enter an estimate of the areal
extent of the CB-B part-play. This latter estimate is used to calculate key
play performance indicators (such as yield and feature counts per square
km or 1000 acres).
Enter the area of CB-B (2000 km2) and an estimate of the number of
postulated features [stretched beta, 28, 40, 75].
We have opened a distribution viewer on the number of postulated
features. It shows that the distribution for the number of postulated
features is an integer distribution.
20
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Shared Play Risks
The GeoX risk model can be customized to fit your company best practice.
Here we use the current default GeoX risk model with four risk factors.
The shared play risks are entered on the Risk page of the Main play
analysis notebook while the conditional risks are defined with the
postulated or in the enrolled assessed prospects.
For the CB-B part-play, the only shared play risks are associated is with
source and migration. The resulting overall chance of success of the play
(the marginal play probability) is 80%.
We are now ready to define the attributes of the postulated features.
Note
•
If there are discoveries enrolled in the play analysis then the play risks
need to be set to 1.0.
21
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Defining the postulated features
We are now ready to define the postulated potential features in the play.
To do this we need to create a template for the potential accumulations.
The template also applies to the mapped features. However, there are no
mapped features for the CB-B part-play.
The template is created on the Template tab of the Definition page.
1 Click Add on the Template tab of the Definition page.
2 Select the “New segment analysis...” to add a segment analysis
template. The system opens the “New postulated reservoir template”
selector.
3 Enter “Direct FSD” as the template name
4 Select the “Sample values” template values and click OK.
The system creates a new notebook tab for the postulated features labelled
“Direct FSD”.
Note
•
Notice that once you have created the postulated feature tab, the error
message in the Message section (“no resource analysis defined”) is no
longer active.
22
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The postulated feature inputs are identical to the Inputs of a segment
analysis. The only exception is that there is no setup page for the Monte
Carlo simulation with limits. This is here defined on the Main tab of the
play analysis notebook.
23
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Postulated Setup
We now are ready to enter the inputs that define the postulated potential
accumulation. We start with Setup where the postulated is defined as an
oil accumulation – i.e., as set by default.
24
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Postulated Volume Inputs
Browse to the Setup tab of the Volume page and select the “Direct
estimation of total volume” volume modelling option.
Select the Volume Parameters tab of the Volume page and enter an
estimate of the total volume (in OE) as a lognormal distribution with mean
of 56 MM STB OE, a standard deviation of 23 MM STB OE, and a low
end truncation at 10 MMSTB OE.
25
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Similarly, enter an estimate of the GOR for the postulated on the Fluids
page (a uniform distribution with a minimum of 600 scf/STB and a
maximum of 900 scf/STB).
26
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Conditional risks
Enter estimates of the conditional segment risks on the Risk page. The
conditional risks are the probability that the geologic controls are adequate
for the individual postulated features – given that all the play controls are
OK.
For the postulated features of the CB-B part-play, we estimate that the
chance of adequacy of trap and seal is 60%, the chance of adequacy of
reservoir presence is 50%, the chance of adequacy of reservoir quality is
80% and the chance of adequacy of source and migration is 90%.
We see that the resulting overall conditional chance of success of a feature
(or what is labelled the conditional segment probability) is 21.6%. This
conditional chance is often also referred to as the Future Success Rate
(FSR) for the postulated features in the part-play (play).
27
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Calculating YTF resources
Having completed the inputs, you are now ready to have GeoX calculate
the corresponding estimates of chance of success, in-place resources and
recoverable resources for drilling out all the postulated features in the play.
On the Setup page set the Number of trials to 1000. The system will
simulate 1000 success cases where success is defined as when the play
works (in other words the shared geological controls work).
We set an economic screening threshold at 70 MM STB. The system will
report success volumes and risked YTF volumes above this threshold.
28
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Reviewing and interpreting results
The Results pages provide both the main results in terms of chance of
success as well as estimates of in-place and recoverable resources. In
order to further support verification and interpretation of results the system
shows a number of other reports and diagrams that we will review after an
initial review of the Recoverable Resources results.
29
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Yet-To-Find Recoverable resources
The Yet-To-Find (YTF) resources table in the Recoverable section is a key
result report.
.
The variables reported on are:
Number of postulated accumulations [integer] is the conditional number of
accumulations from postulated features assuming that the marginal play
probability is 1.
Number of mapped accumulations [integer] is the conditional number of
accumulations from mapped features assuming that the marginal play
probability is 1.
Number of enrolled accumulations [integer] is the conditional number of
accumulations from enrolled prospects (segments) assuming that the
marginal play probability is 1.
Number of accumulations [integer] is the conditional total number of
accumulations assuming that the marginal play probability is 1.
Note
•
The "MC (N)-r" distribution type is a risked Monte Carlo distribution.
Unconditional number of accumulations [integer] is the risked total
number of accumulations.
Accumulation size [1e6 m3 OE or 1 e6 bbl OE] is the success amount of
recoverable hydrocarbons in an accumulation assuming that the marginal
play probability is 1.
30
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Conditional prospect potential [1e6 m3 OE or 1 e6 bbl OE] is the risked
amount of recoverable hydrocarbon in an accumulation under the
assumption that the marginal play probability is 1.
Conditional B play YTF potential [1e6 m3 OE or 1 e6 bbl OE] is the YTF
amount of recoverable hydrocarbon expected to be found in the play under
the assumption that the marginal play probability is 1, that there exists at
least one undrilled accumulation in the play, and that all features are
drilled out. This success case estimate of the YTF play potential therefore
ignores that there are a finite number of targets available for drilling.
Conditional A play YTF potential [1e6 m3 OE or 1 e6 bbl OE] is the YTF
amount of recoverable hydrocarbon expected to be found in the play under
the assumption that the marginal play probability is 1 and that all features
are drilled out. This estimate of the success case YTF play potential should
be close to the B potential when there are a large number of features in the
play.
Unconditional play YTF potential [1e6 m3 OE or 1 e6 bbl OE] is the
risked YTF amount of recoverable hydrocarbons in the play if all features
in the play are drilled. If the marginal play probability is 1 then the
unconditional play potential and the conditional play potential are
identical.
Note
•
The conditional play potential is the success volumes for the play, i.e.,
the Yet-To-Find volumes to be found given that the play works. The
unconditional play potential is the risked Yet-To-Find volumes in the
play – i.e., the conditional volumes risked by the chance of success of
the play.
Double clicking on the appropriate notebook cell opens a graphical display
and table of the output variable distribution.
31
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Let us look at the distribution of the success case total number of
accumulations (in this case the same as the success case number of oil
accumulations).
We see that we are sure that there are at least 3 accumulations if the play
succeeds. There will not be more than 20 accumulations. The expected
number of accumulations is close to 10 (9.79). This is consistent with a
mean estimated 44.4 features and a conditional chance of success
(conditional segment probability or FSR) of 21.6% (44.4 * 0216 = 9.6
success case discoveries).
Let us now look at the estimated success YTF volumes (conditional A
potential) and risked YTF volumes (unconditional potential) in the play.
The mean success YTF volume is 551 MM STB OE. The risked YTF
volume is 441 MM STB OE. The difference reflects that there is a 20%
chance that the play does not work.
32
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Above Screening Threshold YTF
The Yet-To-Find (YTF) resources above the screening threshold are
shown in the Above Screening Threshold section. As the screening
threshold was defined as 70 MM STB oil, we need to look at the oil
results.
We see that the accumulation size is truncated at 70 MM STB. The results
indicate that only 1.49 accumulation above 70 MM STB. We also see that
there is a 23% chance that there are no accumulations above 70 MM STB.
The success case YTF potential above 70 MMSTB is approximately 128
MM STB.
33
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Size-by-rank table and diagram
The size-by-rank table and diagram provides an estimate of the size
distribution of the postulated accumulations in the play. The size-by-rank
distribution is based on the ranked size distribution of the accumulations in
the play obtained on a trial-by-trial basis. The output is the distribution
together with the mean and 90% confidence interval of the ranked
accumulation sizes.
We see that in CB-B part-play we expect that the largest accumulation has
mean resources of 100 MM STBOE. The P05 value for this largest
expected accumulation is 140 MM STBOE while the P95 value is
approximately 65 MM STBOE (the upper and lower values of the stick
plot).
34
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Percent YTF volume-by-size diagram
This diagram shows percent of the part-play YTF potential as a function of
size of accumulations in a log-probit format. The curve (in red) is the
percent of total YTF potential in accumulations that are larger than the
accumulation size indicated on the x-axis.
The blue curve is the inverse cumulative probability distribution for the
size of the YTF accumulations in the play.
From the diagram we can for example read that 10% of the total YTF
resources in the CB-B part-play are in accumulations with 100 MM
STBOE or larger.
35
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
More Functionality
This Primer has covered the basics of the GeoX functionality for assessing
the YTF resources in a play. There is a significant additional functionality
that we have not covered because it would take us beyond the scope of the
Primer. The most important elements not covered are:
•
•
•
•
•
Enrolling discoveries and assessed features. This functionality lets
you estimate the YTF potential as the sum of the potential in
postulated, mapped and assessed features. By including discoveries
you can get a complete picture of the ultimate recoverable potential in
the play.
Small fields. The estimates that we have considered cover large fields
– fields that have been explicitly counted, sized and risked. The play
tool also has a facility for projecting the number and size of fields in
the lower end of the field size distribution.
Additional volume and fluids modelling options. As shown in the
simple example covered, the play tool makes use of the full range of
volume and fluids options available for modelling segments.
Trial browsing. The trial browsing option enables you to inspect and
analyze all your Monte Carlo trials. This is useful when you want to
both verify and interpret your play assessment.
Multiple scenarios. The gScenarioPlay tool enables you to do a
probabilistic aggregation of multiple alternative scenarios for your
play.
For situations where you want to consider play fairways with multiple
part-plays or when you want to estimate the YTF potential in areas of
interest with stacked plays, gPlaySum is the tool you need to consider.
This tool lets you do aggregation of plays while honouring all risk and
volume dependencies.
36
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
APPENDIX A: Play Analysis Inputs
This appendix documents the play analysis notebook input pages.
The review does not cover input pages for all alternative volume and fluids
modelling options. However, the main input variables are covered.
37
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About Setup Analysis
The Analysis tab of the Setup page is used to set up the play assessment
method to be used for estimating YTF resources in the play. It is also used
to limits on resources and for defining the basis for estimating the small
field fraction potential in the play.
Sample size [selection list or integer number] defines the number of trials
to be included in the Monte Carlo simulation.
Initial seed number box [integer] defines the initial seed used when use
initial check box has been checked.
Use initial see check box [check] determines if the Monte Carlo simulation
is to use the seed defined in the initial seed number box.
Note
•
Using the same initial seed assures that simulation runs have the same
series of random numbers.
Resource limits control low-end and high-end truncation as well as
estimation of resources above a screening threshold and potential
resources in small fields:
•
•
•
•
Resource base minimum defines the minimum field size that is
considered when calculating the small field fraction.
Large field minimum defines the minimum size of an accumulation
considered a success in the estimate of mapped and postulated features.
Large field maximum defines a maximum field size that is considered
realistic given the exploration maturity of the play.
Screening threshold defines the minimum economic volume required
in an accumulation.
38
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The resource base minimum is used to estimate the small field fraction
YTF resources in the play. The small field fraction is the fraction of
resources in estimated accumulations below the large field minimum but
larger than the resource base minimum.
Small field extrapolation [Lognormal; Pareto; Exponential] is used to
choose the method for extrapolating small fields. Lognormal is the most
conservative (gives the least number of small fields) estimator while pareto
and exponential imply a "J" shaped field size distribution with potentially a
large number of small fields.
Notes
•
•
Different limits will apply to oil (with associated gas) and gas (with
associated condensate) accumulations. Multiphase accumulations will
be classified as either oil or gas depending on the relative amounts of
oil and free gas in the accumulation.
Estimation of small field fraction requires that you check both the
Resource base minimum and the Large field minimum.
Risk Model Template gives the label of the risk model template that has
been used with the analysis. Segment analyses that are enrolled in the play
analysis need to have the same risk model template if they are to be
aggregated in a prospect analysis.
39
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About Definition: Enrolment4
Used to define the set of assessed discoveries and assessed prospects
(segments) that are enrolled in the play analysis.
The enrolment selector only permits enrolment of analyses of discoveries
and prospects (segments) in the play (part-play) that the play analysis is
attached to. You can only enrol a single analysis from each discovery or
prospect (segment).
The enrolment table shows the discovery date for the enrolled discoveries
as well as the estimated total OE resources in the discovery and the unrisked OE resources in a prospect (segment). Discoveries are sorted
according to discovery date.
Prospects that have segments in the play can be enrolled. The play
analysis tool will use the play fractional estimates from the prospect that
are in the play.
Note
•
Verification warnings will indicate whether enrolled segments and
prospects do not belong to the play (part play) that the analysis is
attached to. The enrolment selector supports enrolment across plays
and basins; enrolment errors are not caught before you try to calculate
the play analysis.
Analyses are enrolled by clicking the Add button. The system opens a data
base selector that is used to select the analyses to be enrolled.
Enrolled segments and prospects can be removed with a standard MS
Windows syntax: To remove all, select all by clicking on the first in the
4
Definition page is a part of the Advanced FSD option on the play analysis tool.
40
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
enrolment set, keeping down the CAPS key and then selecting the last in
the set. For removal of multiple analyses that are not contiguous, use hold
down the CTRL key.
41
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About Definition: Discovery History Chart5
The chart shows the cumulative discovered OE resources as a function of
discovery sequence. With less than 10 discoveries each discovery is timestamped on the chart; with more than 10 discoveries, main intervals of
discovery dates are shown on the upper horizontal scale.
5
Definition page is a part of the Advanced FSD option on the play analysis tool.
42
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About the Overall Parameters
Together with the tab used to define the postulated and mapped features,
the inputs on the Overall page primarily define the inputs for the
calculation of total resources and Yet-To-Find resources in the play for
postulated and mapped potential features. Some overall input parameters
are used solely for estimating yield factors or other indicators of play
prospectivity.
Area of assessment unit [km2 or 1000 acres] is the areal extent of the play.
This parameter is only used to calculate resource and feature density
estimates.
Number of mapped prospects [integer] is the number of mapped potential
accumulations in the play that would be considered for drilling if the play
were to be fully explored.
Number of postulated prospects [integer] is the number of postulated
(speculative) potential accumulations in the play that would be considered
for drilling if the play were to be fully explored.
Note
•
The distinction between mapped and postulated features is only used to
distinguish the basis for the estimates of number of potential
accumulations. In estimating the Yet-To-Find resources the mapped
and postulated prospects are lumped together and share a common
postulated template.
Conditional segment probability uncertainty multiplier is a factor that is
used to modify the estimated conditional segment probability estimate on a
play analysis trial basis.
43
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Note
•
In a single play analysis trial – where all prospects are drilled out, the
system uses the same value of the conditional segment probability
uncertainty multiplier. The mean of the uncertainty multiplier should
be 1.0 or else the multiplier will change the expected value of the
estimated conditional segment probability.
If Area Yield assessment method has been selected:
Area of assessment unit [km2 or 1000 acres] is the areal extent of the play.
Area yield [1e6 m3 OE/km2 or 1e6 STB OE/1000 acres] is the richness of
the play in terms of recoverable hydrocarbons per unit of area.
Feature density [number/km2 or number/1000 acres] is the number of
features that are potential accumulations per unit of area. This parameter
is used to generate an estimated number of prospects in the play.
Discovered resources [1e6 m3 OE or 1 e6 bbl OE OR 1e9 m3 GE or 1e9
scf GE ] is the discovered resources in OE (or GE) that have been
discovered in the play.
YTF threshold for effective assessment [1e6 m3 OE or 1 e6 bbl OE OR
1e9 m3 GE or 1e9 scf GE] is the YTF resources in the play that will define
a minimum amount of risked resources ( in OE or GE) that makes the play
an effective exploration opportunity.
Exploration efficiency [decimal or %] is a measure of the extent to which
the largest fields have been (or will be) discovered first. A discovery
sequence of ever decreasing field sizes represents 100% efficiency.
Random selection of prospects would result in an efficiency of 0%. A
discovery sequence where the smallest fields are discovered first has –
100% efficiency.
Note
•
Exploration efficiency is currently not used in the play assessment. It
will be used to generate discovery sequences for predicting creaming
curves.
44
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About Correlation (Postulated & Overall)
The correlation page for the postulated internal FSD parameters is used to
specify how two or more input parameters that are used to define the size
of postulated potential accumulations are correlated.
Across Feature correlations are defined for individual parameters. They
are prefixed with “PLAY GROUP”.
45
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
The Play level sub-page is used to specify play level correlations in terms
of two or more overall play parameters and/or Play Group parameters that
have Across Feature correlations.
A statistically defined correlation varies between –1 and +1, where 0 is the
no correlation value (default). The intensity of statistical correlation is
indicated using a 9-point scale: Max negative, high negative, medium
negative, low negative, zero, low positive, medium positive, high positive
and max postive correlation. These intervals correspond to correlation
scores of –1.0, –0.9, -0.6, -0.3, 0.0, 0.3, 0.6, 0.9 and 1.0.
46
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
About Setup HC fluids modelling (postulated)
The HC fluids tab of the Setup page of the postulated template is s used to
indicate what HC phases for the postulated. The choice of HC phase
defines the relevant subset of input parameters that are active on the
Volume and Fluid Input pages. Together with the volume set-up and the
fluid set-up, these setups define the ACTIVE PARAMETER SET in the
postulated template.
The "oil, gas, OR multiple phase" option defines a case where mutually
exclusive alternative HC phase scenarios are active. If the HC phase
risking option is active in the risk model, then you enter the relative
probability of the different phase outcomes on the HC phase risking subpage of the Risk Input page.
47
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
About the Volume Setup (postulated)
This setup page is used to select among alternative approaches to
modelling rock volumes and hydrocarbon pore volumes in postulated
potential accumulations.
There are two alternative approaches for direct entry of hydrocarbon
volumes:
1) Direct entry of Field Size Distribution (FSD) estimate of hydrocarbon
volumes for each active phase
2) Direct entry of Field Size Distribution (FSD) estimate of OE (Oil
Equivalent) hydrocarbon volumes. With this alternative you also need
to enter an estimate of GOR and condensate yield on the Fluid page.
The alternative approaches for modelling hydrocarbon pore volume are:
3) Direct entry of net rock volume estimate.
4) Direct entry of gross rock volume estimate and an estimate of the netto-gross ratio.
5) Direct entry of estimates of area of closure, reservoir thickness, a
geometric factor and the net-to-gross ratio.
6) Direct entry of estimates of area of closure, reservoir thickness, column
height, closure length-to-width ratio, closure flat-top ratio and net-togross ratio. The system computes a geometric factor on a trial-by-trial
basis.
7) Direct entry of estimates of the net-to-gross ratio and a function that
describes the relationship between the height of the hydrocarbon
column height and gross rock volume
48
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
8) Direct entry of estimates of the net-to-gross ratio and a function that
describes the relationship between height of hydrocarbon column,
closure area at top of reservoir and reservoir thickness
In addition to the estimate of net rock volume under closure, there is a
need to indicate how much of this volume is filled with hydrocarbons in
order to calculate the hydrocarbon pore volume. In the 3 first approaches,
you enter directly an estimate of the percentage of the net rock volume
under closure that is filled with hydrocarbons (trap fill). When modelling
rock volumes as a function of depth and as a function of hydrocarbon
column, area and thickness (alternatives 7 & 8), you also need to enter the
HC water contact (OWC or GWC) column as well as the column height to
the closure’s spill point.
In cases with multiple HC phases, you also need to indicate either the
share of HC pore volume that is free gas (alternatives 3, 4, 5 and 6) or the
gas oil contact (GOC) column (alternatives 7 & 8).
49
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About Volume with Area, Thickness & GF
(postulated)
The volume page defines the main inputs for hydrocarbon pore volume
estimation for postulated potential accumulations using a depthindependent representation. With this option, you enter area of closure,
reservoir thickness and geometric factor (GF) as a basis for calculating the
gross rock volume.
Area of closure [km2 or 1000 acres] is the area within a trap above the
spill point. A minimum threshold value is required.
Reservoir Thickness [m or ft] is the possible range for the thickness of the
reservoir, or the amount of vertical closure in a situation where structural
amplitude is less than individual reservoir thickness.
Geometric factor [fraction or %] is a correction factor that accounts for the
thinning of a full hydrocarbon column at the edge.
Note
•
If you do not have an estimate of the geometric factor, consider using
the modelling option where you enter estimates of thickness, column,
Length-Width and Flat Top fraction of the structure.
Net/Gross Ratio [fraction or %] is the proportion of the reservoir thickness
made up of sand.
Porosity [fraction or %] is the amount of interconnected void space in the
reservoir rock.
Trap Fill [fraction or %] is the trapped hydrocarbon volume as a
percentage of the porous volume under closure.
50
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Gas Fraction [fraction or %] is the relative proportion of the filled net rock
volume (NRV x Trap Fill) that is made up of gas.
Oil Saturation [fraction or %] is the oil saturation.
Gas Saturation [fraction or %] is the gas saturation.
51
GeoX Play Assessment Primer
DRAFT
Copyright © 2009 GeoKnowledge
About Volume w. Area-thickness_in_Table
(postulated)
The volume page defines the main inputs for hydrocarbon pore volume
estimation for postulated potential accumulations using a depth-dependent
representation. The inputs are entered on two sub-pages labelled "Depth
vs Area table" and "Other Volume Parameters". Depth is here column
height.
The Depth vs Volume diagram tab provides a graphical representation of
the GRV as input in the Depth vs Area table. The Trap Geometry Graph
tab provides a graphical representation of how area and thickness vary
with column height.
Gas Oil Contact [meters or feet] is the height the gas column in a
multiphase potential accumulation.
HC Water Contact [meters or feet] is the height the hydrocarbon column. .
Spill Point Depth [meters or feet] is the height of the column from crest to
spill point of the closure.
Notes
•
Sampling of HC column height between the column intervals in the
Area and Thickness = f(column height) table is done by interpolation.
For columns larger than the largest in the table, the last value is used.
Depth [meters or feet] is the column height of the corresponding area
estimate. The crest of the closure is when the column has a height = zero.
52
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Area [km2 or 1000 acres] is the estimated area of the structure at the given
column .
Thickness [meters or feet] is the isochore reservoir thickness at the specific
column.
In the Monte Carlo simulation, volume realizations are derived from
interpolation between the input columns. There are three choices of
interpolation:
•
•
•
AREA: Linear interpolation of areas. Implies that area changes
linearly between heights in table. Does not have any shape
assumptions.
RADIUS: Linear interpolation of radius in areas as if the areas were
circular, hence assuming that the radius is changing linearly between
the column heights in the table. The method does not assume a strictly
circular shape of structure, but it does assume that the shape of the
structure does not change between column height intervals.
COMBINED: A combination of Area and Radius. The method
assumes the shape of a running field (two semi-circles attached to the
short sides of a rectangle). A new input parameter, Length-Width
Ratio, describes the shape of the area. A higher Length-Width Ratio
results in a more oblong shape. Length-Width Ratio equal to one gives
a circular shape.
The interpolation method affects the area at a column height between two
input column height intervals, and the total volume. The chosen method
may impact the estimated GRV significantly.
53
About the Fluids Setup (postulated)
The entries on the Set-up tab of the Fluids page is used to select among the
alternative representations of the parameters that define surface condition
HC resources: Either formation volume factors or gas expansion/ oil
shrinkage factors; Either direct entry of wet gas shrinkage factor or
indirect entry via a proportionality factor between condensate yield. In
addition there is an option to input functions that define the formation
volume factors as well as secondary phase yields as a function of reservoir
depth. The fluids page is also used to define recovery factors.
Reservoir parameters can be modelled either by direct entry of the
parameter values or indirectly using equations that define how the
reservoir parameters vary with reservoir depth.
For direct entry of reservoir parameters:
Formation factors. Used to select among the alternative representations of
the parameters that define surface condition HC resources:
EITHER as formation volume factors
OR as gas expansion/ oil shrinkage factors
Wet Gas Shrinkage. Used to select between direct entry of a wet gas
shrinkage factor or indirect entry via a factor that models wet gas
shrinkage as proportional to condensate yield.
54
About Fluids parameters using Direct Entry
(postulated)
The Fluids page defines, together with the volume page, the main inputs
for estimation resources at surface conditions. The active fluids
parameters are defined on the Fluids Setup page.
Oil Form. Factor (Bo) [m3/Sm3 or bbl/STB] is the oil formation volume
factor. This is a number greater than 1.0
Oil Shrink. Factor (1/Bo) [Sm3/m3 or STB/bbl] is the oil shrinkage factor.
This is a number less than 1.0.
Gas Oil Ratio [Sm3/Sm3 or scf/STB] is the ratio of associated gas to oil.
Gas Form. Factor (Bg) [m3/million Sm3 or cf/million scf] is the gas
formation volume factor. This is a number less than 1.0
Gas Expans. Factor (1/Bg) [Sm3/m3 or scf/cf] is the gas expansion factor.
This is a number greater than 1.0
Wet Gas Shrinkage Factor [decimal or %] defines how much of the dry
gas remains after removal of the condensate liquids phase (100% means no
shrinkage).
Condensate Extraction Factor [Sm3/million Sm3 or STB/million scf]
defines the relationship between condensate yield and the wet gas
shrinkage.
Note
•
With the option to enter wet gas shrinkage indirectly by entering the
Condensate Extraction Factor (CE), then the wet gas shrinkage is
55
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
computed = (1 – (Condensate Yield/ CE)). The default value for CE
(1666) is a good empirical estimator of the relationship between
condensate yield and wet gas shrinkage.
Condensate Yield [Sm3/million Sm3 or STB/million scf] is the yield of
condensate from wet gas.
Recovery Factor Oil [fraction or %] is the amount of oil in-place that can
be recovered.
Recovery Factor Assoc. Gas [fraction or %] is the amount of associated
gas in-place that can be recovered.
Recovery Factor Gas [fraction or %] is the amount of in-place nonassociated gas that can be recovered.
Recovery Factor Condensate [fraction or %] is the amount of condensate
in-place that can be recovered.
56
About Fluids parameters using Equations
(Postulated
The Fluids page with the Setup for reservoir parameters as a function of
reservoir depth is used to define the depth dependent reservoir parameter
functions.
The fluids equations define Oil Formation Volume Factor (Bo), Gas
Formation Volume Factor (Bg), the Gas Oil Ratio (GOR) and the
Condensate yield (CGR) distributions as a function of reservoir depth.
Reservoir depth is defined as stochastic estimate.
There are 6 depth related fluid parameters:
•
•
•
•
•
•
Original reservoir pressure (Pe) [bars or psi]
Reservoir temperature (T) [Deg K or R]
Gas-Oil Ratio (Rs) [ sm3/sm3or scf/STB]
Oil Formation Factor (Bo) [sm3/sm3or bbl/STB]
Gas Compressability (Z) [real]
Condensate Yied ( C) [sm3/1000 sm3or STB/1000 scf]
These variables are modelled as a function of depth using one of four
different functional forms: Zoned linear, exponential, power and
logarithmic. Each function is expressed using two parameters A and B that
describe the depth gradient (A) and a constant (B). In the zoned linear
there is a depth parameter in addition to the A and B parameters for each
zone.
57
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Depth floor [m or feet] is an estimate of at what depth oil cracks into gas.
It is used to estimate the probability that the depth of reservoirs are below
the depth floor. This latter estimate affects the relative probability of oil
and gas accumulations.
58
APPENDIX B: GLOSSARY
This is a short glossary of key terms used in the GeoX play assessment
tools (unique GeoX terms labelled with a GeoX reference).
Assessment unit
The basic building block for assessment of the YTF hydrocarbon resource
potential in an area of interest (AOI). In play assessment, the basic
assessment unit is either a play or a part-play. The YTF potential in the
area of interest is the aggregate of the potential in all the assessment units.
See also Play; Part-play.
Accumulation
An individual body of naturally occurring petroleum in a reservoir. Also a
connected hydrocarbon reservoir. See also Feature.
Conditional Play Potential (GeoX)
Estimated success case YTF hydrocarbon resources in a play. The
condition is that all shared geological controls at the play-level are
adequate. See also Conditional A Play Potential; Conditional B Play
Potential.
Conditional A Play Potential (GeoX)
The success case YTF potential in the play that includes outcomes where
the play succeeds, but where none of the counted or assessed features
succeed (in other words when one or more of the conditional geological
controls are not adequate).
Conditional B Play Potential (GeoX)
The success case YTF potential in the play that only includes outcomes
where there is at least one accumulation (discovery). The conditional A
and the conditional B potential are the same in cases where there are a
large number of postulated, mapped and assessed features or where the
conditional segment probability (FSR) is relatively high.
Conditional segment probability (GeoX)
Probability that a potential accumulation succeeds. For postulated
features, this is the same as the Future Success Rate. See also Future
Success Rate.
Exploration efficiency
A measure of the extent to which the largest fields have been (will be)
discovered first. A discovery sequence of ever decreasing field sizes
represents 100% exploration efficiency. Random selection of prospects
would result in 0% efficiency. A sequence where the smallest fields are
discovered first implies a negative exploration efficiency.
Feature
A lead, prospect, field, discovery, dry test that all have in common that
they represent a discrete and distinct configuration of geology that has
been predicted or proven to be suitable for containing hydrocarbons. See
also postulated feature; mapped feature.
59
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
Feature-based approach
Feature-based approach to assessment of the success case YTF resource
potential in a play is based on estimating the number of potential features,
their independent chance of success (FSR) and their size (the size of the
corresponding field). For frontier plays with limited information, we use
analogs to postulate both the number of potential accumulations and their
size. In mature plays, the YTF potential is the sum of the resources in
each of the assessed prospects in the play – if we assume that we have
been able to map and assess all the prospects. See also Discovery process
approach; Area yield approach; Postulated feature.
FSR
Future Success Rate.
Future Success Rate
Chance of success of a postulated or mapped feature in a play (part-play)
given that the play works (all the shared geological controls are adequate).
See also conditional segment probability.
Large field (GeoX)
Field that is counted, risked, and seized explicitly. Distinguished from
small field where the count and seizing is projected from the estimates for
the large fields. See also Small field; Small field fraction.
Large field maximum (GeoX)
No future discoveries larger than this maximum are expected in the play.
The count of postulated and mapped features is for fields less than the
large field maximum and larger than the large field minimum. See also
Large field; Large field minimum; Feature based approach.
Large field minimum (GeoX)
Size of smallest large field that is counted and risked. When using
estimates of count from calibration area, then large field minimum is size
for which no future discoveries larger than this minimum are expected in
the calibration area.
Mapped feature
A feature that has been located, but that has not necessarily been assessed.
See also Postulated feature; Prospect; Feature.
Marginal play probability (GeoX)
Probability that all the shared play controls are adequate. This probability
is estimated by the product of the probability that each of the shared
controls are adequate. Failure of one or more shared geologic controls
means that the play does not work. A play with one or more discoveries
has a marginal play probability of 1.0.
Part-play (GeoX)
A sub-division of a play that is given a separate folder in GeoX. Partplays can be further sub-divided into part-plays. If the play folder
represents a play fairway, then the part-play can represent a common play
60
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
element where all the shared play risks are identical. See Play; Play
fairway.
Play
A play is a delineated area containing a collection of potential
accumulations (postulated as well as mapped and assessed exploration
targets), accumulations (fields) and dry tests with shared regional geologic
controls on source, migration, reservoir and trap.
Play fairway
A play fairway defines an area with similar shared geologic controls on the
occurrence of hydrocarbons. A play has identical shared geologic controls.
The play fairway therefore is broken down into plays or part-plays that
capture the regional spatial variability in shared geologic controls.
Postulated features
Features that have not been located (mapped), but that are assumed to be in
the play. Sometimes called conceptual features. Typically we get
estimates of the postulated features in a play by using a relevant analog as
a basis. Alternatively we might have an area within the play with good
data. The estimate from this calibration area is projected to the whole area
of the play. See also Mapped feature.
Resource minimum (GeoX)
Smallest field of potential interest.
Size-by-rank diagram (GeoX)
Provides an estimate of the size distribution of the largest, next to laregest,
etc predicted fields in the play. The size-by-rank distribution is based on
the ranked size distribution of the accumulations in the play obtained on a
trial-by-trial basis. The size-by-rank is generated for the postulated and
mapped features that succeed.
Small field (GeoX)
A field smaller than Large Field Minimum and larger than Resource
Minimum. Small fields are projected from the estimates of the number
and size of the large fields. GeoX offers three different algorithms for the
projection. They reflect different assumptions concerning the distribution
that best describes the overall field size distribution: lognormal, Pareto
and exponential. See also Large field; Large Field Minimum; Resource
minimum
Small field fraction (GeoX)
The fraction of the total Yet-To-Find resources in the play that are
estimated to be in small fields (fields with a size greater than the Resource
minimum and larger than the Large field minimum).
Unconditional play potential (GeoX)
The risked Yet-To-Find resource potential in the play. The unconditional
estimate also includes the outcomes where the play fails and the outcomes
where there are no discoveries event though the all the shared geological
61
GeoX Play Assessment Primer
Copyright © 2009 GeoKnowledge
DRAFT
controls in the play are adequate. For a proven play the conditional and
unconditional play YTF potential are identical. See also Conditional play
YTF potential.
Yet-To-Find resources
Undiscovered resources in the play or other area of interest. Denotes the
resources that might be discovered if all the features in the play are drilled
out.
YTF resources
Yet-To-Find resources in play or larger assessment unit.
%YTF volume-by-size diagram (GeoX)
Diagram that shows the percent of the Yet-To-Find resources in the play as
a function of the size of the YTF accumulations.
62