orissa - Dhenkanal
Transcription
orissa - Dhenkanal
District Plan Report(2009-2010), DHENKANAL District, ORISSA District Plan Report 2009-2010 _________________________________________________________________ District : DHENKANAL ORISSA CHAPTER – I INTRODUCTION The process of decentralized planning commenced with the first Five Year Plan to achieve the desired targets of economic growth and a balanced regional development. However, the district planning process that is currently being undertaken is different from the earlier efforts because of the present emphasis on decentralized planning which is based on participation and involvement of all stakeholders is every step of the process like preparation, implementation and monitoring as well as approval of the plan from the Gram Panchayat level to Zilla Parishad level. The process aims at beneficiaries planning as well as outcomes through their own action plan design. As spelt out in the recommendations by the Expert Group set up by Planning Commission, there are Eight ‘sutras’ of District Planning: • Identifying goals – deciding where to go- Building a District Vision, • Ascertaining the sources of funding and the availability of resources, • Identifying needs that have to be addressed to reach each goal, • Prioritising the identified needs, • Linking available resources to the identified needs, • Consolidation and integration with other plans prepared by other bodies, • Implementation according to the plan, • Checking whether the goals set have been reached. The preliminary step towards formulation of Comprehensive District Plan has been started with the development of vision document for each district. Each district will develop its own vision for “development” before entering into the process of plan formulation. A combination of consultative process with the key stakeholders of the district & desk review of the secondary 1 District Plan Report Page 1 of 160 data available on the different sectors has to be done in preparing the same through facilitative process which helps to realize the vision of the years. Based on the SWOT analysis of the district, the primary thrust of preparation of the ‘Comprehensive District Plan’ had been focussed on the livelihood aspiration of people particularly the majority of the population who are marginalized due to various socio economic factors. However, the broad framework of the Comprehensive District Plan for Dhenkanal District needs to address both the ‘Structural Effectiveness’ and ‘Holistic Development Approach’. 2 District Plan Report Page 2 of 160 Priority has been given to the Panchayat Raj Institutions. In view of the growing importance of Panchayati Raj Institutions (PRIs) and the Urban Local Bodies (ULBs) `as institutions of self-government’ facilitating local area development and social justice, the State Finance Commission (SFC) felt it necessary to prepare database for each level of local bodies with a view to collect certain key and basic information relating to their sources of income and the respective importance of such sources, economic activities in which they are engaged, network of roads, provision of drinking water and sanitation facilities, waste disposal, treatment of sewerage, development of social sector and social justice, etc. The SFC felt it necessary to get information regarding their projections of future income and expenditure for the next five years. The SFC is of the opinion that local bodies, particularly at the village level are institutions needed for more than growth. They have to deal with problems relating to agriculture, industry, infrastructure, and environment and to an extent with sustainable development. They have to create employment opportunities, help designing programmes and implement them for different class groups, and help in evolving a new social fabric based on trust and equity. PRIs and ULBs as democratic institutions have to look after the interests of all the stakeholders and solve social conflicts through their credible commitments and performance. The Commission believes that local bodies in Orissa, particularly the PRIs starting with the GPs have to initiate appropriate measures based on surveys and feasibility studies for diversified growth of the rural economy and at the same time ensure sharing of benefits, always keeping the poor, downtrodden and vulnerable sections of population at the centre stage of local development programmes. Long-term redistribution of growth strategy apart the PRIs and ULBs have to bring short-term redistribution benefits to these sections of the society, create confidence in the society for sustainable development and social justice. This naturally invites for creation of opportunities for the households in low-income category. Thus the local bodies have a constitutional responsibility at par their level to reduce poverty, to expand education, reduce IMR, improve sanitation, improve life expectancy, and provide relief and assistance to artisans as well as social groups like the weavers in developing their skill, activities and trade. In fact, both the PRIs and ULBs aim at improving living standards of the people. 3 District Plan Report Page 3 of 160 Information relating to agriculture has to be added with supplementary information regarding development of allied sector activities like animal husbandry, goatery, poultry and pisciculture, etc. Pisciculture has always been an integral part of village life. Its development not only provides the households with access to higher income but also with increased nutrition. Fish constitutes almost a part of daily menu for people in both rural and urban Orissa. 4 District Plan Report Page 4 of 160 Actualization of development goals in agriculture, industry, poverty alleviation, income enhancement and creation of new jobs with additional job opportunities and efficient utilization of resource endowments like land, water, minerals would be possible only, when financial institutions like the commercial banks provide finance and fulfill their social commitment apart from all these activities. A long-standing allegation against the commercial banks in Orissa is their failure to provide adequate credit to the priority sector and for their implementation of target oriented development programmes. This point has been raised both in official and non-official forums. The Commission felt it imperative to collect relevant information about the lending operations of commercial banks and co-operatives at the G.P. level. An important idea that has always been with the Commission from the very beginning of its work is to build up Data Bank, based on collection and processing of data from the Gram Panchayats, Panchayat Samities, Zilla Parishads, Municipal Corporations, Municipalities and Notified Area Councils. Development of Data Bank would prove immensely useful not only for this Commission but also for subsequent State Finance Commissions in formulation of sound policies both for the rural bodies and urban institutions. Accordingly prepared questionnaires both in Oriya and English were sent to all the 6234 Gram Panchayats, 314 Panchayat Samities, 30 Zilla Parishads and 2 Municipal Corporations, 32 Municipalities and 69 NACs. Because of number of constraints including shortage of time the Commission took the decision to process and analyse the questionnaires received from 4771 G.Ps. Questionnaires received from Panchayat Samities and Zilla Parishads and other government functionaries at the district and state level could not be processed. Due importance has been attached to the functioning of ‘District Planning Committee (DPC)’. The renewed effort towards activating the decentralized planning process in the country through DPCs is visible in the Planning Commission’s instructions for district planning under the Eleventh Plan and guidelines for access to Backward Regions Grant Fund. In the light of these developments, many studies by various credible organizations have been undertaken in Orissa. The current study to check the status of the DPCs which have been so far formed across the districts in Orissa, the key findings that have emerged from the study are as follows: 5 District Plan Report Page 5 of 160 • • • • • • • • DPCs are not functional in most of the districts in Orissa. In most districts they are constituted but not in constitutionally desired ways (Minister as Chairperson or all members nominated by State Government). This severely hampers the participative nature of the planning process in the DPC. DPCs have not been able to effectively enable rural-urban linkages. Coordinated planning is not taking place, and any joint project planning has not necessarily being resulted in integrated project implementation. Block level integration of rural and urban plans was not being achieved which may be important especially in the case of small tribal district like Dhenkanal which have strong links with the rural and tribal hinterland. Inter-sector coordination was not realized and often resisted on account of being inconvenient. The DPCs need to be given adequate financial support, permanent office and secretariat in order to enable them to perform their tasks effectively. There is need for capacity building of members on the role and functions of DPC and on the tenets of integrated planning for social and economic development. A campaign approach can be adopted for orienting people towards participatory planning. Alongside the local bodies also need to be trained and equipped to implement the decentralized plans so prepared. The Rural and Urban Local Bodies also need to be oriented to adopt an integrated approach to planning. Both local bodies have to keep in mind the medium and long term vision and goals for the district. While preparing of annual plans Objectives Broad objective The broad objective of district planning is to arrive at an integrated, participatory coordinated idea of development of a local area. The comprehensive district plan will integrate multiple programmess that are operational in the concerned district and therefore address backwardness through a combination of resources that flow to the district. Specific objective 6 District Plan Report Page 6 of 160 • • • • • • • To initiate a common perspective among the diverse stakeholders. To initiate a decentralized process of outcome oriented planning for a holistic development of the district. To work out a strategy for optimal and balanced utilization of resources. Basing on the national and state development goals and objectives, help the stakeholders of the district in preparing more realistic, objective oriented, achievable and monitorable five year and annual plan. To stimulate the growth of development in an inclusive manner by attracting private-public participation (PPP). To fulfil the livelihood aspirations of the people particularly the marginalized and vulnerable sections of the society. To develop an ownership of the process among the stakeholders for achieving vision in a participatory manner. DISTRICT PLAN FORMULATION Process Adopted in Dhenkanal District PROCESS DETAILS Programme District Meeting Dates Consultation 11.7.08 Activities Convened by Mr. Jamil Ahmed Khan, IAS, Collector & District Magistrate, Dhenkanal. The Planning Officer briefed the participants on the One Day Inception Workshop on Formulation of District Plans organized by the Planning & Coordination Department, Govt. of Orissa held at Remark Formal Orientation Meeting. Held at the Conference Hall, Collectorate. Attended by Line Department Officials, BDOs (about 100 participants) A set of input formats developed by the TSI for the purpose were 7 District Plan Report Page 7 of 160 Crown Hotel, distributed to Bhubaneswar on the respective May 24, 2008. officials. Prof. T. Datta, Team Leader, TSI for Dhenkanal district made an elaborate presentation on Formulation of District Plan, particularly the recommendations of the expert group formed by the Planning Commission, Govt. of India. Block-wise orientation meeting dates were finalized at the meeting and communicated to all concerned. Mr. Gobinda Dalai, Project Coordinator, TSI made a presentation on the proposed road map for formulation of the district plan of Dhenkanal. The participants shared their past experience in planning. The Collector urged the participants to extend their cooperation to the TSI. The PD, DRDA, also requested the BDOs, to take up the matter on an urgent basis. Block Level Workshop - 17.7.08 Sadar Sarpanch/ Executive Officers from the following As proposed by the Sadar BDO, a day long orientation workshop on District Block Level Line Department Official also attended. 8 District Plan Report Page 8 of 160 GPs attended along with other officers: Bhapur,Sogarpasi,Nadiali, Sankulei, Bhaliabolkateni, Saptasajya,Balyamba,Kaku dibhag, Tarava, Sankarpur,Mangalpur, Dhirapatna,Barada,Chaulia, Banasingh,Kankadahad, Chandrasekhar Prasad,Manipur, Baladiabandha,Gobindapur, Madhusudanpatana, Kankadapal,Talbarkot,Beltik iri,Gengutia, Nagiapasi,Kaimati of Dhenkanal Sadar Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Doubts and confusions whatsoever regarding the proposed new approach of Discussion were planning were held with the GP clarified/ clear. level representatives on Different the following issues- formats for a. A village wise GP Village/Gram level database Panchayat/Block creation as per Level data were prestructured tools presented by b. Assessment of the TSI. infrastructure gap. c. Pallisabha/gram A tentative sabha resolution for schedule for filling up of the gap. data sharing by d. Panchayat level different officials planning – issues at the Block and and strategies down the line The plan for GP wise was prepared. field data collection Block Level by the TSI taskforce coordinators for was prepared. the TSI were introduced to the Block Level Officials. The Block Level Coordinators were responsible for Block-wise data collection (planning inputs from Village level to Block Level). A dedicated 24X7 helpline has been created by the 9 District Plan Report Page 9 of 160 Block Level Workshop - 17.7.08 Odapada Sarpanch/ Executive Officers from the following GPs attended along with other officers: Indipur, Khuntujhari, Siminai, Balaramprasad,Nimidiha, Sadasibpur,Mangalpur,Kha dag Prasad, Gobindaprasad, Balarampur, Kandabindha, Gundichapada, Odapda, Bangarsingh, Nadhara, Badalo, Bido, Kuspanga, Ghatipir, Kottam, Gadasila, Gunadei, Kalanga, Nayabhagirathipur and Motanga of Odapada block As proposed by the Odapada BDO, a day long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. TSI for the special purpose. The details of which was made available to all present. Mr. Gobind Dalai, Project Coordinator, TSI is the In-Charge of the helpline. Block Level Line Department Official also attended. Doubts and confusions whatsoever regarding the proposed new approach of Discussion were planning were held with the GP clarified/ clear. level representatives on Different the following issues- formats for a. A village wise GP Village/Gram level database Panchayat/Block creation as per Level data were prestructured tools presented by b. Assessment of the TSI. infrastructure gap. c. Pallisabha/gram A tentative sabha resolution for schedule for filling up of the gap. data sharing by d. Panchayat level different officials planning – issues at the Block and and strategies down the line The plan for GP wise was prepared. field data collection Block Level by the TSI taskforce coordinators for was prepared. the TSI were introduced to the Block Level Officials. The 10 District Plan Report Page 10 of 160 Block Level Coordinators were responsible for Block-wise data collection (planning inputs from Village level to Block Level). Block Level Workshop - 18.7.08 Hindol Sarpanch/ Executive Officers from the following GPs attended along with other officers: Sanjapada, Nijigada, Chitalpur, Ranjagola, Khaliborei,Buhalipal ,Thokar, Kadala, Hatura, Rasol, Nuabaga, Galapada, Nabakishorpur,Bampa,Kara nda, Giridharaprasad, Kalinga, Kukuta,Gundanali,Gulahi, Kantamila,Kutunia,Asarada, Kantimili, Nuagaon, Dandiri A dedicated 24X7 helpline has been created by the TSI for the special purpose. The details of which was made available to all present. Mr. Gobind Dalai, Project Coordinator, TSI is the In-Charge of the helpline. As proposed by the As above. Hindol BDO, a day long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Discussion were held with the GP level representatives on the following issuesa. A village wise GP level database creation as per prestructured tools 11 District Plan Report Page 11 of 160 Patala, Bounsphokhari, Babondha, Mahalunda, Kunuan, Kanasara, Dudurakote, Madhapur, Jarada, Paikpurunakote of Hindol block Block Level Workshop - 18.7.08 Bhuban Sarpanch/ Executive Officers from the following GPs attended along with other officers: Gada Nrushingh Prasad, Mathakargola, Dhalapada, Marthapur, Bhusala, Murdanga Mahulpal, Balibo, Baruaan, Surapratappur, Jirala, Arakhapal Dayanabili, Kuninda, Jamunakota, Dighi, Ektali of Bhuban block Block Level Workshop - 19.7.08 Gondia b. Assessment of infrastructure gap. c. Pallisabha/gram sabha resolution for filling up of the gap. d. Panchayat level planning – issues and strategies The plan for GP wise field data collection by the TSI taskforce was prepared. As proposed by the As Above Bhuban BDO, a day long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Discussion were held with the GP level representatives on the following issuesa. A village wise GP level database creation as per prestructured tools b. Assessment of infrastructure gap. c. Pallisabha/gram sabha resolution for filling up of the gap. d. Panchayat level planning – issues and strategies The plan for GP wise field data collection by the TSI taskforce was prepared. As proposed by the As above. Gondia BDO, a day 12 District Plan Report Page 12 of 160 Sarpanch/ Executive Officers from the following GPs attended along with other officers: Joranda, Bainsia,Dasamantapatana ,Mandar, Pingua,Lethaka, Digambarpur,Santhapur,So risiapada ,Karmul, Raitala, Kashipur, Poruhakhoj, Khandabandha, Ratanpur, Bidharpur,Gondia, Khankira,Sadangi,Kaluria, Mathatentulia,Neulpoi,Deog aon, Laulai,Kabera,Nibalprasad, Nibalprasad and Bega Block Level Workshop - 19.7.08 KAMAKHYANAGAR Sarpanch/ Executive Officers from the following GPs attended along with other officers: Bairpur,Badasuanlo,Mahulp al, Budhibil, Bankual, Sogar, Kusumajodi, Kantapal, Jagannathpur, Kadua,Kantiokatani, Baunsapal,Kotagora,Rai Nrusinghapur, Kantio long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Discussion were held with the GP level representatives on the following issuesa. A village wise GP level database creation as per prestructured tools b. Assessment of infrastructure gap. c. Pallisabha/gram sabha resolution for filling up of the gap. d. Panchayat level planning – issues and strategies The plan for GP wise field data collection by the TSI taskforce was prepared. As proposed by the As above Kamakhyanagar BDO, a day long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Discussion were held with the GP level representatives on 13 District Plan Report Page 13 of 160 pasahi, Tumusingha, Kalapura,Baligorada, Baisinga and Baruan Block Level Workshop - 19.7.08 KANKADAHAD Sarpanch/ Executive Officers from the following GPs attended along with other officers: Ghagaramunda, Dashipur, Biramal, Garhpalasuni,Makuakateni ,Mahabirod,Kankadahada,K antapal ,Kantol, Balikuma,Jhili,Batagan, Pangatira,Chandapur,Bam, Kerajoli,Raibol,Biribolei, Karagola, Kuturia and Maruabilli the following issuesa. A village wise GP level database creation as per prestructured tools b. Assessment of infrastructure gap. c. Pallisabha/gram sabha resolution for filling up of the gap. d. Panchayat level planning – issues and strategies The plan for GP wise field data collection by the TSI taskforce was prepared. As proposed by the As above Kankadahad BDO, a day long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Discussion were held with the GP level representatives on the following issuesa. A village wise GP level database creation as per prestructured tools b. Assessment of infrastructure gap. c. Pallisabha/gram sabha resolution for filling up of the gap. d. Panchayat level planning – issues and strategies The plan for GP wise 14 District Plan Report Page 14 of 160 Block Level Workshop - 21.7.08 Parajang Sarpanch/ Executive Officers from the following GPs attended along with other officers: Kalada,Mundheilo,Saranga, Pitiri, Manikamara, Akhupala,Renthapat, Kumusi, Kualo, Kankili,Basoi, Kandarasingha,Sanda,Basul ei, Gegutia,Chandapur,Lodhani , Patrapada,Road,Jayapuraka teni, Muktapashi, Badajhara, Barihapur, Parjanga, Kantor and Kankadasoda GPs were covered Follow-Up Visit – Sadar and 22.7.08 Gondia Block field data collection by the TSI taskforce was prepared. As proposed by the As above. Parjang BDO, a day long orientation workshop on District Plan Formulation, as well as consultation with the PRI Members was held at the Block Headquarters. Discussion were held with the GP level representatives on the following issuesa. A village wise GP level database creation as per prestructured tools b. Assessment of infrastructure gap. c. Pallisabha/gram sabha resolution for filling up of the gap. d. Panchayat level planning – issues and strategies The plan for GP wise field data collection by the TSI taskforce was prepared. TSI Task Force As above. Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. 15 District Plan Report Page 15 of 160 Follow-Up Visit – Bhuban 23.7.08 and Kamakhya Nagar Block Follow-Up Visit – Bhuban 24.7.08 and Gondia Block Follow-Up Visit – Bhuban 25.7.08 and Kamakhya Nagar Block Follow-Up Visit – Sadar and 26.7.08 Kamakhya Nagar Block TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of As above. As above. As above. As above. 16 District Plan Report Page 16 of 160 Follow-Up Visit – Sadar and 28.7.08 Kamakhya Nagar Block Follow-Up Visit – Sadar, 29.7.08 Gondia, Bhuban and Kamakhya Nagar Block Follow-Up Visit – Sadar, 30.7.08 Bhuban and Kamakhya Nagar Block Follow-Up Visit – Sadar, 31.7.08 Gondia, Bhuban and Kamakhya Nagar Block inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data As above. As above. As above. As above. 17 District Plan Report Page 17 of 160 Follow-Up Visit – Bhuban & 1.8.08 Kamakhya Nagar Block Review and Consultation 2.8.08 Meeting on Decentralised Planning Follow-Up Visit – Gondia 2.8.08 Block District Level Consultation 4.8.08 with – DPO, PD, DRDA, Agriculture Dept. Presentation of An Update 6.8.08. Sharing Process. Clarification of inputs furnished and further consultation. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. Attended the meeting convened by the Planning & Coordination Department, vide P&C letter no. 10807, dated 22.07.08 at CYSD – DRTC Campus, Bhubaneswar. TSI Task Force Members were deputed to visit Blocks and GPs for rendering all assistance to the Officials/PRI Members in Data Sharing Process. Clarification of inputs furnished and further consultation. The TSI Team met the concerned officials to report progress of the ongoing field work and clarify issues raised by the officials. The TSI Team called As above. Review and consultation made. As above. TSI emphasised the need for greater involvement of the officials in the process. The Collector 18 District Plan Report Page 18 of 160 to the Collector on the new Collector and District Magistrate, Dr. Mrinalini Darswal, I.A.S. and updated her on the TSI Plan for formulation of the District Plan as well as the progress made on date. District Level Consultation 7.8.08 with – DPO, PD, DRDA District Level Consultation 8.8.08 with – DPO, PD, DRDA District Level Consultation with – DPO, PD, DRDA, Agriculture Dept., DSWO, 9.8.08 In view of the DPC Meeting called on 14.08.08, the Collector desired that the TSI formulates the BRGF Plan for the district for an urgent basis. The TSI Team met the concerned officials to find out the BRGF Plan related data status. Necessary instructions provided to the PD, DRDA. DPO being advised to be the nodal point. The TSI Team met the concerned officials for collecting data relevant for BRGF Plan preparation. The TSI Team met the concerned officials for collecting data relevant for BRGF Plan preparation. Held appreciated the TSI Plan for participatory approach and confirming to the guidelines to the extend possible within the limited time. TSI accepted the challenge of preparing the BRGF Plan within a week. TSI resources are deployed for BRGF Plan preparation on war footing. Partial data was made available. BRGF related data collected from the BPO. Agriculture Department assured to discussions present a draft 19 District Plan Report Page 19 of 160 with the Line Department Officials regarding formulation of CDAP. Communication to TSI from 12.8.08 DPO Submission of the BRGF 13.8.08 Plan C-DAP at the earliest. DSWO assured submission of data as per proforma Meeting with DSWO furnished by the to sort out certain TSI. doubts regarding data sharing by his department. The DPO informed Presumably, a that the Director, last minute Special Projects, decision has Panchayati Raj been taken by Department has the P.R. Dept. issued a circular to the district advising The DPO the authority to informed that no prepare BRGF Plan final decision on their own. was yet taken Having taken note on the DPC of the circular by Meeting the Director, (SP), scheduled on the Collector, 14.08.08 due to adviced the PD, the State DRDA to Election immediately act. Commission Notification. TSI informed the DPO, that the Draft BRGF Plan has also been finalized at the TSI end. Since the Draft BRGF Plan BRGF Plan was submitted. already prepared by the TSI, it was mailed to DPO as an additional reference for the District Authority for the scheduled DPC Meeting. 20 District Plan Report Page 20 of 160 Meeting with the Collector 19.8.08 On 18.08.08 the Collector called the TSI Team Leader and convened a meeting at Dhenkanal on 19.08.08 for giving final touches (by providing contextual texts) to the DPC approved BRGF Plan. Meeting with PD, DRDA 20.8.08 The TSI, Team Leader & Project Coordinator, called on the PD, DRDA to collect the projects approved by DPC for BRGF Annual Plan 2008-09. DPC 21.8.08 A three-member Special Team with Sri D.P. Acharya as head was formed to prepare the textual content of the DPC approved BRGF Plan furnished by the District Authority. TSI Team visited PD, DRDA for collection of 2008-09 NREGA/OREGS data. Finalisation of the approved BRGF Plan Meeting with the PD, DRDA 22.8.08 and Agriculture Department Follow-up A Five-Member TSI Team including Sri D.P. Acharya, Documentation Expert, attended the meeting to take necessary briefing from the Collector. TSI assured the Collector that the completed BRGF Plan will be submitted in a week’s time. DPC approved shelf of projects collected from PD, DRDA. Block visit program by TSI Task Force communicated to the Collector with a request to advice the concerned BDOs to expedite sharing of the required data. The work was taken up on an priority basis. The NREGS data was not made available with the TSI since the same was not yet approved by 21 District Plan Report Page 21 of 160 undertaken with the Agriculture Department regarding Draft District C-DAP Workshop Software Plan Plus 23.8.08 Communication received from PanchayatiRaj Department that a workshop will be held at SIRD on 26th & 27th August on Plan Plus Software Application on BRGF Plan Follow-Up Visit to District/Blocks/GPs the 26.8.08 Follow-up undertaken with all concerned Line Departments/Block Level Officials/GP Executives for collection of remaining relevant data. As desired by the Panchayati Raj Department, the Executive Director of CRD (Team Leader, TSI) personally attended the workshop along with the Project Coordinator. Workshop Software on on Plan Plus 26.8.08 the PD, DRDA. Draft C-DAP prepared at the district level collected. On-going finalization of DPC approved BRGF Plan for the district was put on hold in view of the new development regarding software application in BRGF Plan preparation. Part of the remaining required data collected. The Commissionercum-Secretary, PanchayatiRaj Department expressed his desire that the BRGF Plan of Dhenkanal district be converted in Plan Plus Software and made on-line at the earliest so as to become the first such district in the 22 District Plan Report Page 22 of 160 country. Workshop Software on Plan Plus 27.8.08 TSI Team members attended the second day of the workshop for handsome training of the software. Some Orissa specific modification in input process flow was required. GPs Follow-Up Visit District/Blocks 29.8.08 to Follow-Up Visit to District/Blocks/GPs the the 30.8.08 Follow-up undertaken with all concerned Line Departments/Block Level Officials/GP Executives for collection of remaining relevant data. Follow-up undertaken with all concerned Line Departments/Block Level Officials/GP Executives for collection of remaining relevant data. The decision was communicated to the Collector and the District Magistrate for information. The Director, Special Projects, PanchayatiRaj Department advised the TSI that the conversion of the BRGF Plan in Plan Plus be taken up on completion of the desired modification in the software by NIC, New Delhi. Part of the remaining required data collected. Part of remaining required collected. the data Proforma provided to the PD for furnishing of the wanting input for Plan PD, DRDA was Plus conversion informed of the of the BRGF limitations (as per Plan. 23 District Plan Report Page 23 of 160 Follow-Up Visit to District/Blocks/GPs Follow-Up Visit to District/Blocks/GPs Communication Collector & Magistrate the 1.9.08 the 2.9.08 to the 5.9.08 District Follow-Up Visit to District/Blocks/GPs the 6.9.08 requirement of the Plan Plus Software) in the project proposal details furnished in the DPC approved BRGF Plan. Follow-up undertaken with all concerned Line Departments/Block Level Officials/GP Executives for collection of remaining relevant data. Follow-up undertaken with all concerned Line Departments/Block Level Officials/GP Executives for collection of remaining relevant data. A request made to the Collector and District Magistrate to advice the Block Level Officers for extending greater cooperation in sharing data with the TSI for preparation of District Vision Document, Perspective Plan and Annual Plan. Follow-up undertaken with all concerned Line Departments/Block Level Officials/GP Executives for collection of Part of remaining required collected. Part of remaining required collected. the data the data Compliance by the concerned officials expected. Part of remaining required collected. the data 24 District Plan Report Page 24 of 160 remaining data. relevant 25 District Plan Report Page 25 of 160 CHAPTER- II 2.1 DISTRICT DEVELOPMENT PROFILE District Profile At a Glance Sl. No. 1 2 a) b) c) d) e) 3 4 5 1 2 3 4 5 6 7 8 9 10 11 Indicators Figures General Indicators Total Population Male population Female population SC population SC Male population SC Female population Total no. of ST population Total no. of G.P. Total no. of Village Total no. of Household Total no. of Fire Station Total number of elected representatives MLA Zilla Parisad Member Sarpanch P.S. Member 1066878 544001 522877 140308 100095 97185 112818 199 1221 171847 10 425 4 27 199 199 Year of Last Election (for b ,c ,d) 2007 Total Forest Area (Sq. Km.) 1737.60 Reserve Forest(Sq. Km.) 1141.02 Demarcated Forest(Sq. Km.) 13.78 Other Forest(Sq. Km.) 582.78 Name of the Water Resource Baitarani, Sapua, Ground water Percentage of Population Affected by 21% of Cultivator families Natural Calamities (Drought) in 2003 Educational Attainments Literacy levels of people by social 62.42 groups and by sex (%) Literacy rate-Male 80.57 Literacy rate-Female 57.89 Total Number of Schools 1978 Number of Primary Schools 1244 Number of M.E. Schools 496 Number of High Schools 238 Number of General Colleges 4 Number of Non-Governmental 12 Colleges Number of Vocational Colleges 10 Total Number of ITI & IT Institution 12 22 District Plan Report Page 26 of 160 1 2 3 4 5 6 7 8 1 3 7 8 9 10 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 9 10 Health Attainment Birth Rate (per 1000 persons) 17 Death Rate (per 1000 persons) 5 Infant Mortality Rate (per 1000 live 18 births) Number of Govt. Hospitals 2 Number of Dispensaries 6 Number of CHCs 6 Number of PHCs 33 Total Number of Doctors 112 Income and Poverty Indicators Number of Families Below Poverty 127159 Line (as per BPL Census 2002) Major Crops (2005) Area in Yield in Productio Ha. % n in MT. Rice (K) 95066 14.27 15701 Rice (R) 2748 27.25 7488 Wheat 184 20.35 374 Maize (K) 2619 9.09 2381 Maize (R) 284 18.62 529 No. of Agricultural Labour 122000 Wage Rate for Skilled Labour(in Rs) 115 Wage Rate for Un-Skilled Labour 65 Items Supplied through PDS(2004-05) Allotment (in MT) Rice 2205.0 Wheat 435.0 Sugar 33.2 K. Oil(in K lit.) 10992 Infrastructure & Other Facilities % of Villages Electrified 98% Commercial Banks 9 Rural RRBs 1 DCCB 1 PLDBs 3 Total no .Of Branches 74 Existence of Money Lenders Yes Agriculture & Related Sectors Crop (2005-06 Area Yield in in Ha. % Paddy 9506 14.27 6 Wheat 184 20.35 Ragi 101 3.56 Mung (K) 7162 2.14 Mung (R) 1583 4.26 0 Brinjal 4,777 Tomato 5,551 Mustard 2926 3.52 5 G. Nut (K) 4111 10.41 Production in M.T. 135701 374 36 1530 6743 71,655 73,717 1043 4278 23 District Plan Report Page 27 of 160 11 12 13 14 15 1 2 3 4 5 Note: 2.2 G. Nut (R) 8584 15.20 T. Fibre 1774 8.92 Cotton 42 5.90 Mango 7,003 Banana 399 Industry – Traditional/Small No. of Cottage Industry 630 No. of handlooms 504 No. of SSI 119 No. of Large Industry Nil No. of Chromite mines 2 Data published here is obtained from different official sources. 13047 1582 25 24,590 4,713 DISTRICT BACKGROUND Dhenkanal, a vassal state was amalgamated with the state of Orissa in 1948. The present Dhenkanal district came into existence with effect from April 01, 1993 after bifurcation of old Dhenkanal into Dhenkanal and Angul. It is commonly believed that it owes its name to a Sabara (tribal) chief called Dhenkanal who formerly ruled over the tract. Dhenkanal district is situated in mid central table land agro climatic zone and lies between 200 3’ to 210 16’ North latitude and 840 6’ to 860 6’ East longitude with 300 metres above mean sea level. The district is centrally located in the state of Orissa. The total area of 4452 sq. km. (3% of state area) can be divided in to three natural divisions. 1. Southern Hilly Region. 2. The River Valley with tributary. 3. The Northern Hilly Region. 24 District Plan Report Page 28 of 160 It is situated on the Cuttack- Sambalpur Road (NH–42) and the CuttackSambalpur SE Railway line. It is surrounded by Keonjhar district in North, Cuttack district in South, Jajpur in East and Angul in West. The river Brahmani and Sapua flow in the district. The climate of the district is generally hot with high humidity during April and May and cold during December and January. The monsoon generally breaks during the month June and the major crops are grown under rain fed condition. 2.3 HISTORICAL BACKGROUND The district has a prehistoric habitation. However, the pre-historic facts are showed in oblivion. But the Nasik rock inscription shows that, during 2nd century A.D. Dhenkanal was a part of the Sattabahana Empire. In the 3rd & 4th century A.D., It was a part of the Gupta Empire. In the 6th &7th century A.D. the region remained under the sway of the Bhauma Karas. The Sulki dynasty ruled over some part of Dhenkanal in 8th& 9th century A.D. The Somavansis ruled over the part of this region. After them the Ganga vansis occupied the area and drove away the Stamvas from the western part of the district. When the Suryavansis emerged in the political field of Orissa, by that time Dhenkanal was scattered in many small kingdoms. By 16th century A.D., a tribal chief namely ‘Dhenka’ was ruling over Ghumuranali, Dudianali & Kantanali. He was a shabara and was ferocious. However, Sridhar Bhanja of Besalia defeated and killed him in the battle. His kingdom was annexed. He named the kingdom “Dhenkanal” after the shabara chief ‘Dhenka’. Subsequently, Hari Singh Vidyadhar who was a commander of Gajapati Prataprudra Deva defeated the Bhanja kings and occupied Dhenkanal and Karamul, its capital in 1529 A.D. Subsequently, the capital was shifted from Karamul to Dhenkapidha and the kingdom was named Dhenkanal. Geneologically the following kings ruled over Dhenkanal. 2.4 MAJOR TOURIST SPOTS OF DHENKANAL DISTRICT Kapilash: It is situated at a distance of 24 km from Dhenkanal. It is famous for Chandrashekar Shiva Temple which is situated on a hillock. The captivating natural scenery attracts the visitors. A deer park is situated nearby. Saptasajya: It is situated at a distance of 12 km from Dhenkanal. It is the place of scenic beauty and is famous for Saptarisi (seven sages) and Raghunath. In Mahabharat, it is said that 'the Pandavas' had taken rest here. Deulijhar: It is situated at a distance of 12 km from Dhenkanal. It is famous for the Mahima Temple and the seat of Mahima Dharma. 25 District Plan Report Page 29 of 160 Kamakhyanagar: It is famous for Goddess Kamakhya temple. The second largest bridge can be seen on the way of Kamakhyanagar. Joranda: Situated at a distance of 13 km from Dhenkanal, it is famous for the seat of Mahima Cult. The Sunya temple attracts the tourists. 2.5 GENERAL STATISTICS There are 1221 number of villages and 171847 households in the district. Out of the total villages 1060 are inhabitated and 161 are uninhabitated. The block-wise details are presented in the Table – 2.1. Table – 2.1 GENERAL INFORMATION Block-wise Number of Villages and Households Sl. No . 1 2 3 4 5 6 7 8 No. of GPs Block Sadar Odapada Gondia Hindol Kamakhya Nagar Bhuban Parjang Kankadahad Total 27 25 27 36 20 17 26 21 199 No. of Villages UnInhabitate inhabtaite d d 144 19 123 28 166 30 177 8 129 32 105 94 122 1060 30 74 7 161 Total Village s No. of Household s 163 151 196 185 161 31249 20253 21770 26750 18985 135 1014 129 1221 17170 20119 15551 171847 Source: Dist. Statistical Hand Book Table – 2.2 General Information Educational Infrastructure in the district Primary School M.E. School High School General College Non-Govt Colleges Presence of Educational Institutions 1244 496 238 4 12 26 District Plan Report Page 30 of 160 Table – 2.3 General Information Health Infrastructure in the district Health Infrastructure in the district District Headquarter Hospital 1 Sub Divisional headquarter Hospital 6 Community Health Centre 6 Primary Health Centre 31 Municipal Health Unit 4 Beds 385 Ayurvedic Hospital & Dispensary 22 Homoeopathic Hospital &Dispensary 19 Table – 2.4 General Information Educational Infrastructure in the district Distance (km) 131 17 106 242 714 5670 628 226 51 Communication (Type of Road) NH SH MDR ODR RURAL Road GP Road PS Road Forest Road Railways 2.6 POPULATION As per 2001 census, the total population of the district is 10,66,878. The population density is 239 per sq. km and sex ratio is 962 female per 1000 males. The demographic pattern of the district is given below in table – 2.5. Table – 2.5 GENERAL INFORMATION Urban and Rural Statistics Population Male Female Total Rural 495078 478886 973964 % 91.00 91.58 91.29 Urban 48923 43991 92914 % 8.99 8.41 8.70 Total Population 544001 522877 1066878 Source: Dist. Statistical Hand Book 27 District Plan Report Page 31 of 160 Table – 2.6 GENERAL INFORMATION Block-wise Area with Population Sl. Block No. 1 Dhenkanal 2 Odapada 3 Gondia 4 Hindol 5 Kamakhya Nagar 6 Bhuban 7 Parjang 8 Kankadahad Total Area (Sq. Km.) 420.51 332.88 397.35 593.40 418.86 270.61 427.66 574.68 3435.95 Total Population 195150 126855 137484 159021 123624 112541 120859 91344 1066878 SC Population 18275 21285 15548 29025 15672 13351 17195 9957 140308 ST Population 17382 7426 23136 7318 12708 7260 7194 30394 112818 Source: Dist. Statistical Hand Book Table – 2.7 Block-wise Male & Female Sl . N o 1 2 3 4 5 6 7 8 Name of the Block Bhuban Rural Population Male Femal Total e 4696 7 Dhenkanal 7128 5 Gondia 7011 0 Hindol 7934 3 Kamakhyanag 5511 ar 3 Kankadahad 4576 a 9 Odapada 6536 9 Parjang 6062 6 45440 92407 66214 67374 79678 53509 44680 61486 60233 13749 9 13748 4 15902 1 10862 2 90449 Urban Population Male Femal e Bhuban NAC DhenkanalMunicipa lity Kamakhya nagar NAC 1033 9 3047 9 7979 9735 27172 7023 Total 2013 4 5765 1 1500 2 12685 5 12085 9 28 District Plan Report Page 32 of 160 Figure - 4 SEXWISE SC & ST POPULATION OF DHENKANAL DISTRICT 120000 100000 MALE FEMALE 80000 MALE FEMALE 60000 40000 20000 0 SC POPULATION ST POPULATION Source: District Handbook, Dhenkanal 2005 29 District Plan Report Page 33 of 160 COMPARISON OF SC/ST POPULATION TO GENERAL POPULATION SC Population, 14% General, 76% ST Population, 10% Source: District Handbook, Dhenkanal, 2005 SEXWISE RURAL POPULATION IN DIFFERENT BLOCKS IN DHENKANAL DISTRICT Male g rja n Pa da pa da Od a ah a ar Ka nk ad am ag ma kh y Hi nd ol Female Ka Bu ba n Dh en ka na l Go nd ia 90000 80000 70000 60000 50000 40000 30000 20000 10000 0 30 District Plan Report Page 34 of 160 SEXWISE RURAL POPULATION IN DIFFERENT BLOCKS IN DHENKANAL DISTRICT 90000 80000 70000 60000 50000 40000 30000 20000 10000 0 Male g rja n Pa da pa da Ka Od a da ha ar nk a am ag ol hy Hi nd m ak Ka Go n di a l na ka Dh en Bu ba n Female 2.7 CLIMATE AND RAINFALL The climate of the Dhenkanal district is tropical which is characterized by hot summer and well distribution of rains by the South-West monsoon. The maximum rainfall is received during July and August. The winter commences from November and last till the end of February. The summer follows thereafter and continues till 2nd week of June. The mean maximum and minimum temperature of the district are 36.2 and 12.4 degree Celsius respectively. Table – 2.8 GENERAL INFORMATION Normal Rainfall during different Climatic Period of a year Period Pre-monsoon Monsoon Post-monsoon Winter Month March April May June July August September October November December January February Normal Rainfall in mm. 18.7 28.8 59.5 208.9 382.0 333.0 220.0 93.6 25.2 4.5 15.5 30.8 1420.5 Total Source: District Statistics Office. 31 District Plan Report Page 35 of 160 Table 2.9 GENERAL INFORMATION Year wise and Block wise Rainfall Sl Block 1 2 3 4 5 Sadar Odapada Gondia Hindol Kamakhya Nagar 6 Bhuban 7 Parjang 8 Kankadaha d Average 2005-06 rainfall mm 1738.0 1525.5 1700.5 2541.4 1630.0 Rainfall and Rainy Days 2004-05 2003-04 No. of No. of rainfall rainfall R.D. R.D. mm mm 55 1100.0 57 2143.0 57 1010.0 55 1431.0 82 1117.0 62 1901.5 80 1203.2 73 1800.5 74 1252.0 69 1470.0 No. of R.D. 79 74 82 75 64 1543.0 1514.0 1563.0 64 50 69 925.0 996.0 925.0 52 61 62 1487.0 1327.0 1380.5 54 66 52 1719.4 65 1065.0 61 1518.1 58 Source: ATMA, Dhenkanal. Figure No. – 3 32 District Plan Report Page 36 of 160 TABLE – 2.10 GENERAL INFORMATION Data on weather Sl. No . Rainfall Name of Taluk Sadar Oupada Gandia Hindol Kamakhaya Nagar Bhuban Parajanga Kankadaha d 1 2 3 4 5 6 7 8 Temperature No. of Rainy Days 61 61 72 69 Average Rainfall (mm) 1230 1248 1365 1455 62 Humidity (%) Min. C Max. C Min Max 11 10 10 10 42 43 42 43 36 35 30 30 98 97 98 98 1294 11 45 28 97 62 53 1310 1315 11 12 43 43 32 36 95 95 59 1274 10 42 30 95 Source: District Statistical Office. 2.8 LAND USE PATTERN & LAND HOLDINGS About 30% of the total area of the district i.e. 1,32,522 ha. is the net area sown. Interestingly, 56,580 ha. is fallow (current and other) land. Another 24,860 ha. is under culturable waste land. The details of the Block-wise land utilization statistics is given below (Table – 2.11): Table – 2.11 GENERAL INFORMATION Block-wise Land Utilisation Statistics Sl . 1 2 3 4 5 6 7 8 Block Sadar Odapada Gondia Hindol Kamakhya Nagar Bhuban Parjang Kankadah ad Total 2909 3176 3261 5766 6859 Misc. tree crops and groves not include d in net area shown 2455 1194 1024 954 1417 1585 6024 24820 235 1059 986 958 1394 1542 968 3918 2991 1945 4814 2577 2214 1109 1784 2128 2637 2545 1447 3568 3630 12332 17722 15272 5440 0 9324 12272 24860 3091 3 11138 2703 8 2954 2 13252 2 Forest Area Permane nt pasture and other grazing land Cultureab le waste Land put to non agril. Use Barren and uncultivab le land Curre nt fallow Other fallow Net area sown 1152 793 1059 4287 1087 4869 2004 2408 4200 3502 3233 4300 3783 5620 4641 919 481 1810 2437 382 5891 4731 2202 5393 1511 3215 4184 4064 6419 3015 14553 11530 20820 24243 16050 Source: Dist. Statistical Hand Book 33 District Plan Report Page 37 of 160 34 District Plan Report Page 38 of 160 83% of the cultivators i.e. 90549 in the district belong to small and marginal category. Their collective holding is about 57% and the per capita landholding is about 0.89 ha. In other words, 17% of the cultivators hold 43% of the land and their average individual holding is about 3.33 ha. This indicates a skewed distribution of land holdings and area operated by the farmers in the district. Small size of land holding becomes uneconomic from the point of view of modernization in agriculture. Table No. – 2.12 GENERAL INFORMATION Land Holding Pattern Sl. No. 1 2 3 4 5 Total Area No. (Ha.) Class Marginal < 1 Ha. Small 1–2 Ha. Semi-Medium 2 – 4 Ha. Medium 4 – 10 Ha. Large > 10 Ha. Total SC ST No. Area (Ha.) No. Area (Ha.) 50726 26487 7450 3577 5208 2937 39823 54139 4781 6414 4871 6524 14678 38910 1105 2870 1226 3150 2873 15772 120 639 141 715 237 4580 7 90 10 121 10833 7 13988 8 13463 13590 11456 13447 Table – 2.13 GENERAL INFORMATION Land Category wise Kharif Paddy Coverage Category of Land High Medium Low Total Cultivated Area ‘000 Ha. 0.913 0.521 0.403 1.837 % 50 28 22 Kharif paddy area ‘000 Ha. 0.061 0.488 0.403 0.952 % 5 51 43 35 District Plan Report Page 39 of 160 2.9 SOIL The climate, vegetations, present rock types, topography and other biotic factors have considerably influenced genesis of soil and consequently great variation in soils in different parts of the district has been observed. Red and laterite soils are mostly found in Dhenkanal Sadar, Odapada, parts of Hindol, Gondia, Kamakhyanagar, Parjang; part of Kankadahada and Bhuban. Besides, there is presence of black soils in some parts of Hindol, Gondia, Kankadahad, and Parjang block. Further, red to black forest soils are observed in some parts of Hindol, Kankadahad and Parjang. Alluvial soils of river banks, sandy loam soils of most of the blocks are very much suitable for groundnut. Reddish black forest soils is suitable for sugarcane crops. It is observed that the soils of Dhenkanal district is mainly acidic on the basis of soil test. The block wise soil reaction and fertility status is indicated in the Table 2.14. Table – 2.14 GENERAL INFORMATION Block wise Soil Characteristics Name of the DA Circle Dhenkan al K. Nagar Name of the Block Sadar Odapada Hindol Gondia K. Nagar Parjang Bhuban Kankadah ad Sample s analyse d 3806 2109 2752 2220 2202 1778 1645 1593 Nutrient Index Acidi c (%) Neutr al (%) Alkalin e (%) 83.45 78.33 66.35 85.50 86.29 84.25 74.65 86.57 15.66 21.29 31.72 13.87 12.67 15.02 22.01 12.93 0.89 0.38 1.93 0.63 1.04 0.73 3.34 0.50 O.C . Av.P . Av. K 1.47 1.40 1.53 1.59 1.41 1.59 1.52 1.41 1.15 1.21 1.19 1.24 1.20 1.27 1.33 1.19 1.55 1.62 1.56 1.59 1.49 1.55 1.57 1.41 Source: ATMA, Dhenkanal. 36 District Plan Report Page 40 of 160 2.10 DEVELOPMENT INDICATOR WISE COMPARATIVE CHART: The main indicators in terms of which the development of a district can be judged compared to the state is given below: Sl. No . 1 A B C 2 A B C 3 A B C D 4 A B C 5 A B C D E F G Infrastructure Component Electricity Percentage of villages electrified (as per pre 2003-04 definition) Percentage of villages electrified (as per pre 2003-04 definition) Percentage of rural consumers to total consumers Transportation Road density per 1000 sq.km No. of transport vehicles (registered vehicles of all types) per 1000 sq.km Villages connected by pucca roads Irrigation Irrigated area to net cropped area Percentage of area irrigated through ground water Percentage of area irrigated through surface water No. of tube wells per 100 ha. of cropped area Communication No. of telephone lines per hundred population Population served per post office Average area served per post office (sq.km.) Education Literacy rate Literacy rate – Male Literacy rate – Female No. of schools (Elementary education up to standard VII per 1 lakh population) No. of Secondary and senior secondary schools per 1 lakh population No. of degree and professional colleges per 1 lakh population Teacher pupil ration up to Class V Class V to VIII Distric t State Categor y 98% 80% A+ 97% 81% A+ 19% 64% D 1668 19500 1521 9365 A+ A+ 28% 40% B 33% B 35% 444.94 % 9.94% 65% 35% A+ 0.12 0.55 A+ 3.5 4635 20 3.06 4509 19.23 A+ A+ A+ 69.42 80.57 57.89 125 63.08 75.95 50.5 167 A+ A+ A+ B 24 19.4 A+ 2.72 5.44 C 1:42 1:37 1:53 1:21.71 A+ C A+ 37 District Plan Report Page 41 of 160 6 A B C D E F G H I 7 A 8 A 9 A 10 A 11 A B C D E Health Birth rate (per 1000 persons) Death rate (per 1000 persons) Maternal mortality rate (MMR) per 1000 live births Infant mortality rate (IMR) per 1000 live birth. Life expectancy at birth Sub Centres/Primary Health Centres/ Community Health Centres per 1 lakh population (Allopathic only) No. of dispensary and hospitals per 1 lakh population (Allopathic only) No. of beds in hospitals per 1 lakh population (Allopathic only) Doctors (Modern i.e. allopathic system) per 1 lakh population Water Supply Percentage of villages having drinking water supply (Fully or Partially) Agriculture Markets No. of agriculture markets per 100 sq.km. Poverty Percentage of rural people below poverty line Agriculture Marketing No. of regulated markets per 100 sq.km Productivity of major agriculture crops in kg/ha Paddy Ground Nut Sugar Cane Biri Potato 17 5 5 23 9.7 - A+ A+ A+ 18 NA 3.19 83 4.15 A+ A+ B 1.13 0.47 A+ 23 37.73 C 12.8 13 A 99% 91.36% A+ 5 0.33 A+ 51% 48% A 0.04 0.22 D 1505 1540 60975 374 9286 1455 1171 68600 263 9491 A+ A+ A A+ A Source: NABARD Database (published in PLCP, 2008-09) 38 District Plan Report Page 42 of 160 Chapter – IV DHENKANAL VISION-2020 A vision is not a project report or a plan target. It is an articulation of the desired end results in broader terms. A. P. J. Abdul Kalam 4.1 VISION STATEMENT To fulfil aspirations of the people, without any discrimination, whatsoever, particularly the weaker sections and disadvantaged, to provide urban amenities in rural areas and encourage entrepreneurship as well as private–public partnership in creating opportunities. By 2020, Dhenkanal will be a developed district. 4.2 TARGETS FOR FIVE YEAR PERSPECTIVE PLAN 2008 – 2013 It is imperative from the vision statement that the district aims at reducing the urban and rural disparity in all aspects of the term. Every resident of the district should feel proud to be a citizen of India which would be a developed nation by 2020. Therefore, the residents should enjoy all the benefits of a developed nation. The road to vision of the district and for the district cannot be attended in isolation. Balasore, being a constituent part of the state and as a part of the country; it has to move forward in a cohesive manner. It is known that development and growth could be achieved better, if it remains in synergy with external forces. While the primary target of the district for the next five years is two folds. First, to be at par with the state level in terms of the development indicators as envisaged by the state for the eleventh five year plan period. Secondly, to attain the national level by the end of 11th plan period. Incidentally, in case of some development indicators are at par or above the state level e.g. literacy, agricultural productivity and rural electrification. At the same time, it has to accept and achieve the Millennium Development Goals accepted by the country, which have been translated in terms of National Development Goals and further into State Development Goals the district should adopt these goals. They are: 57 District Plan Report Page 43 of 160 GOAL 1 GOAL 2 GOAL 3 : : : GOAL 4 GOAL 5 GOAL 6 diseases. GOAL 7 GOAL 8 : : : : : To eradicate extreme poverty and hunger. To achieve universal primary education. To promote gender equality and empowerment women. To reduce child mortality. To improve maternal health. To combat HIV/AIDS, malaria and other To ensure environmental sustainability. To develop a global partnership for collective action and co-operation. In the new era of decentralised planning for development, when the focus is on the outcome oriented and need based planning, it is essential to build a vision for broad perspective and goal by which all of our planning can head towards. Building the collective vision has some areas of concern as well as the collective vision also needs to be based on some development principle as well as goals which are tried and tested. It needs to be reflective of people’s aspiration from all walks of life. Development Vision to be a developed district/state-wise is reflected through three broad aspects of development i.e. Human Development, Infrastructure Development and Development in the Productive Sector. Human Development Indicators comprises primarily enhancement in the sectors such as health, education, women and child welfare, social justice and availability of basic minimum services. Likewise, Indicators for Infrastructure Development are availability, affordability and adoption of appropriate environment friendly technology and infrastructure for enhancement in production in the productive sectors, enhancement in the human growth and development aspects. Indicators for Development in the Productive Sector would consider what the potential of the district is and what can be reached within the plan period, considering the natural and human resources available in the district. Cutting across the vision building exercise along the three aspects, the sector wise development goals, outcome planning and strategies have to be drawn because of the interdependence nature of the sectors and the possible convergence needed for making the country a developed nation by 2020. Apart from that, as it had been a collective vision owned by all, critical issues like ensuring participation of women and marginalised sections in the process of vision building have been given utmost importance at appropriate levels. Thus, the vision has covered all the possible local response to the changes taking place as a result of national, state and private development efforts. Further, the monitorable targets set for Orissa for XIth Plan period becomes automatically binding for the district. The nine indicator-based targets have been furnished in the table: 58 District Plan Report Page 44 of 160 59 District Plan Report Page 45 of 160 PRESENT STATUS TARGET FOR 11TH PLAN , ORISSA 65 (NFHS-III) 37 358 (SRS 2004) 119 2.4 (NFHS-III) 2.1 44 (NFHS-III) 27.2 % 63.0 (NFHS-II) 31.5 No of female per 1000 male 950 (Census 2001) 961 Drop out rate in 7. elementary education % 34.7(2002-03) 31.99 8. Literacy rate % SL NO INDICATORS 1. IMR 2. MMR 3. TFR Malnutrition of children(0-3) Anemia among 5. women(15-49years ) 4. 6. Sex ratio(0-6) 9. Gender gap in literacy UNIT Per 1000 live birth Per 1000 live birth No of children per couple % of weight for age below 2 SD % points 63.61( Census 2001) 24.98( Census 2001) 83.96 15.10 Sector-wise XIth Plan period targets have been provided at the relevant section of the plan document. 60 District Plan Report Page 46 of 160 CHAPTER-III SWOT ANALYSIS OF THE DISTRICT 3.1 BACKGROUND Reportedly about 50% of the district population, i.e., about five lakhs rural residents in the district live below poverty line. It is high time that the economic condition and living standard of this five lakh plus population is improved urgently. One of the reasons for this situation is that a large part of the growth comes from manufacturing and service sector. While the Indian economy has been growing at around 8%, the growth in the agriculture sector has been dismal at around 2%. Incidentally, majority of the BPL population depends on agriculture and wage earning as agriculture labourers. At present, they deserve utmost attention. We have to ensure that the agriculture sector grows at least at 4% per annum. For providing this growth and economic upliftment of five lakh population of the district, we need to emulate the model of Providing the Urban Amenities in the Rural Areas- PURA Programme. The theme of PURA is apart from concentrating on and reinforcing agriculture emphasis be on agroprocessing, development of rural craftsmanship, dairy, fishery, animal husbandry, etc. So that the non-farm revenues from the rural sector is enhanced based on the core competence of the region. PURA also suggests that the rural economy should primarily be driven by renewable energy. Access being essential for socio-economi8c well-being, a key component of rural development is the provision of roads for connectivity. It is empirically proven that families residing alongside roads benefit from better health and greater educational opportunities compared to the families living in remote villages. It is encouraging that under current plans, all villages with more than 500 inhabitants are expected to be connected by all-weather roads in the near future. 38 District Plan Report Page 47 of 160 3.2 METHODOLOGY Fulfillment of individual livelihood aspirations is the essence of whatever vision we draw. Therefore, the focus of the SWOT analysis of a district having consideration to area specific inherent relative advantages has to be livelihood opportunity oriented and obviously, largely depends on the availability/connectivity/accessibility of the four types of infrastructural resources, namely, Physical, Economic, Electronic, and Knowledge. Following the approach considered by Dr. A.P.J Abdul Kalam and his team for the PURA mission, the SWOT analysis of the district has been done by a composite method involving connectivity analysis of main development indicators. Connectivity analysis of the above mentioned four types of infrastructure has been the basis for identification of the strengths. In addition, physical survey has been considered for weakness, threat and opportunity assessment. Further, development indicator wise district vis-à-vis state comparative status has been considered for identification of the present weak sectors (may refer Annexure – III). Other initiatives of the District Vision have also been considered to get a comprehensive view of the SWOT Analysis. The comprehensive view has been presented at the end of this chapter. Accordingly, the SWOT analysis undertaken for the district measures the type of road and distance to the infrastructural resources/service centers from each village. The distance again has been classified into three categories like easy, moderate and difficult. This classification of the three categories has been made as per people’s understanding and perception of what is easy or moderate or difficult. For example, if accessibility to primary school is beyond two kilometers, it is believed to be difficult, whereas a distance of 15 kilometers to block headquarters is considered to be moderate. Such understanding may or may not follow the government parameters. Relevance of assessing IT connectivity in the present village level scenario in the district may be questioned by some quarters. It is understandable that, it is ‘thinking far ahead’. Actually it is not so. Ground realities have been given due considerations, at the same time, it is looking at the likely changes in the service delivery system that the Government of Orissa has envisaged. E-governance programme of the state government is no longer a concept. It is going to be a reality in near future. If necessary preparedness is not initiated now, then the rural population will not be able to avail the benefits of the IT enabled services when it will be on offer. 39 District Plan Report Page 48 of 160 IT enabled services are going to have a great positive impact on various services across the sectors. Village level connectivity to IT enabled services and necessary preparedness to avail the same is pre-requisite for improving the quality of life of about 90% of the population of the district. Once services like ‘telemedicine and e-banking’ are provided in the district, an individual will be able to access the best available medical consultation in the country without going beyond the PHC. An individual will be able to receive financial remittance from Surat or San Francisco in minutes. The barriers that the IT-enabled services which had been able to remove; should reach to the rural people, irrespective of their socio-economic status and location of the habitation. Infrastructure has been classified into essential, additional and optional. Non availability or non accessibility to essential infrastructure indicates lack of basic amenities; lack of development and ‘backwardness’. Similarly, availability and accessibility/connectivity to additional and optional infrastructure is indicative of higher degree of development. The process of SWOT Analysis by the TSI Team was started with a village wise data collection with the help of a pre-structured data collection form, it has been placed at Annexure-IV. Such an extensive data collection drive has been taken for creating GP level, village-wise data base. Also, data of each G.P. (G.P’s. infrastructure, man power, own resource etc.) has been collected through a separate pre-structured data collection form (AnnexureV). Mapping of G.P. level village wise livelihood related data has been collected through another data form (Annexure-VI).The data of Annexure-VI has been sourced from the women SHGs functioning in the villages under MISSION SHAKTI Programme of Govt. of Orissa. Analysis of the economic activity being pursued by the WSHGs provides an over view of village wise prevailing livelihood opportunities and locally available primary raw materials. The village wise data thus collected has been consolidated at the G.P. level and subsequently at the Block level. In the next stage, data of all eight Blocks has been consolidated at the district level .Though, the district level consolidated data would have been adequate for formulation of Vision – 2020, but, as each G.P. is a planning unit and such data would be subsequently required for micro planning purpose as well as prioritization of G.P. level development project work, it was prudent to collect all the required village level data at one time. 40 District Plan Report Page 49 of 160 The critical aspect of SWOT analysis is articulation/defining of the SWOT abbreviation. The definitions that have been adopted in the present case have been as follows: S (STRENGTH) : Connectivity to infrastructure and livelihood options. W (WEAKNESS) : Lack of connectivity to infrastructure and inherent natural disadvantages (e.g. Soil Type) O (OPPORTUNITY) : Critical gaps (Infrastructural and service related) T (THREAT) Uncontrollable : factors (e.g. Prone to Cyclone/Drought/Flood) Subsequent to field survey of data collection, data collation, filtration and database creation, the actual process of the SWOT analysis was undertaken in a phased manner in five steps: Step – 1: Weakness and Threat Analysis Step – 2: Identification of Essential Infrastructure Accessibility according to connectivity classification wise (Easy, Moderate and Difficult) Step – 3: Total Connectivity Analysis Step – 4: Livelihood Analysis Step – 2, 3 and 4 provides the Strength Analysis. Step – 5: Opportunity Analysis However, the findings of SWOT Analysis have been presented in the standard sequence, i.e. strength, weakness, opportunity and threat. 41 District Plan Report Page 50 of 160 3.3 THE SWOT ANALYSIS Strength Strength has been defined in terms of connectivity or accessibility to basic infrastructural resources and has been classified into four categories – physical, economic, electronic and knowledge. The following tables provide accessibility status of the four category of infrastructural resource available in the district: Physical Connectivity This table provides the connectivity status related to ten basic infrastructures which are frequently accessed by the rural population. By this analysis we will get a general overview of the physical connectivity trend or status. GP-basis village-wise actual status has been surveyed and database created for future planning purpose. Block basis GP-wise list will be furnished to the concerned PRIs. Table – 3.1 Average Physical Connectivity Status to Basic Infrastructure Remark Particulars Sl. No. (Connectivity (General Infrastructure) Status) 1 Distance from Gram Panchayat Easy 2 Distance from Block Difficult 3 Distance of Primary Health Centre Moderate 4 Distance of Anganwadi Centre Easy Distance of Power Station 5 Easy (Local Electricity Source) 6 Distance of Transportation Centre Moderate 7 Distance of Bus Stop Easy 8 Distance of Fuel Station Easy 9 Distance of Ayurvedic Centre Difficult 10 Distance of Railway Station Difficult Table – 3.2 Percentage of Stratified Connectivity Status Easy Moderate Difficult 50% 20% 30% 42 District Plan Report Page 51 of 160 Observation It is evident from the findings from the above table that in case of five types of infrastructure, there is no accessibility or physical connectivity problem. Out of the remaining five infrastructures, two are moderately connected and three are difficultly accessed. Further, scrutiny reveals that difficulty relating to connectivity with the block should be improved. Connectivity to railway station is an issue beyond the purview of the GP. Further, if accessibility and service of PHC is improved, the alternative to PHC i.e. Ayurvedic center could be accepted. Ideally accessibility to Ayurvedic center should be easy. Considering both from the quality of life and planning perspective, the above analysis is a reference point for getting future direction. Economic Connectivity The economic growth is directly related to availabilityy or connectivity of economic activity related infrastructure. The analysis of economic connectivity attempted here measures the physical accessibility to ten important economic activity related infrastructure. Table – 3.3 Average Physical Connectivity Status to Economic Infrastructure Sl. No. 1 2 3 4 5 6 7 8 9 10 Remark (Connectivity Status) Moderate Difficult Moderate Moderate Moderate Difficult Difficult Difficult Easy Difficult Particulars Distance of Lift Irrigation Distance of Mandi Distance of Bank Distance of Cooperative Distance of Godown Distance of Grain Bank Distance of Chilling Centre Distance of Cold Storage Distance of Village Market Distance of DIC Table – 3.4 Easy 10% Percentage of Stratified Connectivity Status Moderate 40% Difficult 50% 43 District Plan Report Page 52 of 160 Observation Even if you overlook those infrastructure/indicators which are moderate, we find that five out of ten indicators such as accessibility to Mandi (Wholesale Commodity Market), Grain Bank, Chilling Center, Cold Storage and DIC are difficult. Since the analysis provides a general status overview in relation to Village/GP/Block, the case of DIC can also be excluded. But economic growth is largely dependent on growth of other infrastructure and also vice versa. Perhaps ‘private-public partnership’ could play a catalytic role and necessary Opportunity Study on this aspect could be taken up. Electronic Connectivity The economic growth and quality of life is dependent on the economic accessibility to socio-economic activity related infrastructure. The physical connectivity to electronic accessibility of ten relevant infrastructure/indicators has been analysed in the table given below. Considering the growth of electronic connectivity within the state as well as outside and also government’s emphasis on its growth, the significance of this analysis from the planning perspective cannot be over emphasised. Table – 3.5 Average Physical Connectivity Status to Electronic Infrastructure Sl. No. 1 2 3 4 5 6 7 8 9 10 Particulars Distance of Distance of Distance of Distance of Distance of Distance of Distance of Distance of Distance of Distance of Post Office Telegraph Office Rural Telephone Exchange PCO Internet Cafe (Cyber Cafe) IT Kiosk (e-Choupal) ATM Centre E - Bank Facility (CBS) Tele-Education Centre Tele-Medicine Centre Remark (Connectivity Status) Easy Easy Easy Easy Difficult Difficult Difficult Difficult Difficult Difficult Table – 3.6 Percentage of Stratified Connectivity Status Easy Moderate Difficult 40% 00% 60% 44 District Plan Report Page 53 of 160 Observations Inclusion of Postal as well as Telegraph services and PCO under the electronic connectivity classification could be debated. Instead of any such debate, considering its contribution on quality of life and development of an area, instead of any such debate let it remain as it is more so when the connectivity aspect is found to be favourable. Connectivity to 60% of the other indicators being difficult is not surprising or revealing. Still those infrastructures/indicators have been included for analysis purpose, so that, the indicators get due attention of the planners, particularly, in the rapidly changing connectivity scenario and the far reaching potential of the indicators. Knowledge Connectivity Knowledge is the greatest among all resources. It gives synergy to development. Losing vision for accessibility to knowledge or inability to invest towards growth of knowledge would be a great blunder. Planners perhaps would have to repent if vision for accessibility to knowledge infrastructure is not drawn early. Perhaps the significance of knowledge in socio-economic development need not be emphasised, till now. It would not be out of context to remember that India’s Green Revolution is a dramatic example of how the input of greater knowledge in the form of improved production technologies could rapidly increase the productivity of scarce land resources. IT revolution in the country is also a striking instant of how the importance of human capital has come to acquire a higher position than that of material plant and machinery I.E. The economic growth and the quality of life are dependent on the accessibility of knowledge related infrastructure. The physical connectivity to accessibility of ten knowledge related infrastructures/indicators has been analysed given below: Table – 3.7 Average Physical Connectivity Status to Knowledge Infrastructure Sl. No. 1 2 3 4 5 6 7 8 9 Particulars Distance of Distance of Distance of Distance of Distance of Distance of Distance of Distance of Distance of School Adult Literacy Centre Vocational Training Centre Professional Training Centre Agriculture Extension Centre Veterinary Centre Fisheries Extension Centre Soil Testing unit Watershed Development Centre Remark (Connectivity Status) Easy Difficult Difficult Difficult Difficult Moderate Difficult Difficult Difficult 45 District Plan Report Page 54 of 160 10 Distance of Non Government Organisations Moderate 46 District Plan Report Page 55 of 160 Table – 3.8 Percentage of Stratified Connectivity Status Easy Moderate Difficult 10% 20% 70% Observations It is not surprising to find that 70% of the knowledge related infrastructure comes under difficult connectivity category. It has been found difficult because such facilities are available mostly at the district level and not at the village or GP-level. Obviously, the findings of the present village-level analysis will be disturbing. Though the finding is disturbing, as stated above, the analysis holds much relevance for the GP/Block/District level planners. The knowledge and skill of our workforce will be a major determinant of future rate of economic growth. The greater the knowledge and skill, the higher will be the productivity, the better the quality and the lower the cost of the products and services we generate. In other words, the greater will be the comparative advantage and the market potential. Interestingly, 60% to 80% of labour force in 20 – 24 age category in most industrialized nations and as much as 96% in South Korea has undergone formal vocational training. No such statistics is available for the district or state. The country statistics is 5%. The network of vocational training institute and the range of vocational skills taught needs to be expanded substantially in rural areas to impart those skills for which institutional training is most suitable. The private sector which promotes the rapid proliferation of the computer training institute through out the country should be encouraged to recognize the commercial potential as well as social importance of vocational training in many other fields. Apart from addressing the needs of the large illiterate population, particularly among SC/ST and females, our vision and strategy for knowledge must developed innovative approaches to enhance knowledge acquisition among the large community of school dropouts. 47 District Plan Report Page 56 of 160 Weakness: The weakness of villages can be analyzed in various ways. In case of Dhenkanal district, the weakness has been analyzed on the basis of eight criteria stated below. Considering agricultural is the source of livelihood of about 90% population, five factors influencing agriculture have been included among eight criteria considered for analysis. There are 1029 inhabited villages in the district. Apart from agriculture related factors, accessibility and status of several development indicators have also been considered to identify inaccessible and over all backward villages. It is accepted that tribal dominated villages are largely backward; therefore the number of tribal villages in the district has also been counted. Accordingly, the villages have been analyzed and number of villages under each type of weakness has been identified and presented in a tabular below. In case of some villages, the type of weakness is multiple. Therefore one village has been counted under more than one category. Naturally the total number of villages as per the table below is more than the total number of inhabited villages in the district. Table – 3.9 Weakness Category-wise Number of Villages in the District Sl. No. Typology of Villages Number of Villages 1 Inaccessible 38 2 Hilly 225 3 Undulated Topography 114 4 Tribal 299 5 Arid 52 6 Rain fed 305 7 Lack of Irrigation facility 856 8 Backward 588 9 Mining Activities 49 10 Low Cash Crop Cultivation 146 Observation It is evident from the above analysis that irrigation is a major concern for the farming (BPL) community as about 50% villages suffer from lack of irrigation About 75% of the villages are lacking in several development indicators. It includes the Tribal dominated 15% villages. About 40% villages are having weakness caused by natural factors. A data base of villages coming under different categories has been created. Also, G.P. wise list of the villages has been prepared. It will be provided to the block administration and each G.P. for their future planning purpose. 48 District Plan Report Page 57 of 160 Opportunity Opportunities are those having a good future. Opportunities need to be prioritized and optimized for maximum socio-economic benefit to the people. The opportunities have been identified in a systematic and composite manner, involving livelihood analysis and findings of three alternative sources: (a) consultation, (b) findings of connectivity analysis, (c) future trends (secondary data). Livelihood Fulfillment of livelihood aspirations of the people, particularly the BPL population is the dominant feature of the District Vision 2020. The vision is to create maximum employment opportunities, employable skill development and profitable as well as sustainable self employment opportunities. In view of the livelihood related vision of the district, it is imperative to analyse and examine the scope for self employment opportunities, particularly for women. Importance of economic empowerment of the women for socio-economic development of community is universally accepted. Given below is the frequency of livelihood activity observed among 800 WSHGs surveyed in different blocks of the district. Since some WSHGs are undertaking more than one economic/livelihood activities, WSHG could have been counted under more than one type of activity. Naturally, the total no. of frequency as per the table below will not match with the sample size. 49 District Plan Report Page 58 of 160 Table – 3.10 Frequency of Livelihood Activity Undertaken by the WSHGs Sl. Particulars No . 1 Agriculture I) Onion Cultivation II) Vegetable Cultivation III) Nursery 2 Agri. Allied Sectors I) Sheep rearing II) Goatery III) Piggery IV) Poultry V) Duckery VI) Fishery VII) Honey Collection VIII) Dairy 3 Agro. Processing I) Floriculture II) Paddy Processing III) Chuda/ Mudhi IV) Spices Grinding V) Oil Extraction VI) Pickle Making/Badi/Pappad 4 Utilisation of Local Raw Materials I) Leaf Cup and Plate Making II) Sabai Rope Making III) Broom Making, Collection and Processing 5 Others I) Tailoring II) Handicraft III) Business & Trading Frequency of SHGs Livelihood Activities 14 399 9 50 428 10 28 8 110 12 54 3 334 35 71 8 72 28 3 14 30 10 45 Table – 3.11 Five Most Preferred Livelihood Activities Vegetable Cultivation Goatery Frequenc y 428 Rank 1 Frequenc y 399 Pickle Making/Badi/Pappa d Fishery Rank 2 Frequenc y 110 Rank Frequency Rank 3 72 4 Spices Grdinging Frequenc y 71 Rank 5 50 District Plan Report Page 59 of 160 Observations It is found that twenty three income generating activities are pursued by the WSHGs for economic gain or livelihood. Those twenty three activities can be further classified under five categories mentioned above. On the basis of the frequency of the activities pursued by the WSHGs, the percentage and ranking of the activities have been made to find out which are the activities found to be suitable by the WSHGs in the rural context. The analysis is indicative of opportunities presently available in the district for self employment creation. It is also suggestive of the type of skills readily available for women self employment creation. Further study of the activities would provide future scope; potential for income generation through the activities; nature of assistance that would lead to further growth and possibility of addition of new activities or new opportunity creation. The relevant data and findings of the analysis would give directions to the planners in planning for greater self employment creation among women in particular in the district. 51 District Plan Report Page 60 of 160 a) Opportunities Identified by Consultation Process Table – 3.12 Sl. No. 1 2 3 4 5 6 7 8 9 10 Description Category or Sector Health clinics Modern diagnostic centre Poly clinics Speciality clinics English medium public schools Vocational training centres Professional training centres Crèche Working women hostel Cold storage/Cold chain 11 Refrigerated Vans, Trucks 12 Agro-processing units, 13 Renewable power generation units 14 Waste disposal and management 15 Housing 16 Entertainment complexes 17 Shopping complexes and malls 18 ITES 19 Travel and Courier Service 20 Small and cottage industries Health/Human Dev. Health/Human Dev. Health/Human Dev. Health/Human Dev. Education/Human Dev. Education/Human Dev. Education/Human Dev. Women & Child Welfare Women Welfare Agri. & Allied Sectors/ Infrastructure Dev. Agri. & Allied Sectors/ Infrastructure Dev. Dev. Of Productive Sectors Energy/Infrastructure Dev. Environment/Infrastruct ure Dev. Basic Amenities/ Infrastructure Dev. Basic Amenities/ Infrastructure Dev. Basic Amenities/ Infrastructure Dev. Livelihood/Employment/ Dev. Of Productive Sectors Dev. Of Productive Sectors Dev. Of Productive Sectors Observations The opportunities thus identified are suggestive for business potential. Require investment, providing of scope for private as well as private-publicparticipation. 52 District Plan Report Page 61 of 160 b) Findings of Connectivity Analysis The opportunities identified through consultation process have been reexamined with the findings with the connectivity analysis to be assured of their potential. Table – 3.13 Sl. No. Description Category or Sector 1 Health clinics Health/Human Dev. 2 Modern diagnostic centre Health/Human Dev. 3 Poly clinics Health/Human Dev. 4 Speciality clinics Health/Human Dev. 5 English medium public Education/Human Dev. schools Vocational training centres Education/Human Dev. 6 7 8 Professional centres Crèche 9 Working women hostel 10 Cold storage/Cold chain 11 12 13 14 15 16 17 18 19 training Education/Human Dev. Women & Child Welfare Women Welfare Findings of Connectivit y Analysis Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Potential exist Agri. & Allied Sectors/ Infrastructure Dev. Refrigerated Vans, Trucks Agri. & Allied Sectors/ Infrastructure Dev. Agro-processing units, Dev. Of Productive Sectors Renewable power Energy/Infrastructure generation units Dev. Waste disposal and Environment/Infrastruct management ure Dev. Housing Basic Amenities/ Infrastructure Dev. Entertainment complexes Basic Amenities/ Infrastructure Dev. Shopping complexes and Basic Amenities/ malls Infrastructure Dev. ITES Livelihood/Employment/ Dev. Of Productive Sectors Travel and Courier Service Livelihood/Employment/ Potential Dev. Of Productive exist 53 District Plan Report Page 62 of 160 20 Small and industries Sectors cottage Livelihood/Employment/ Potential Dev. Of Productive exist Sectors Observations Some of the potentials identified through consultation such as crèche, entertainment complexes, etc. were not included in the survey instrument. Avoiding those exceptions, majority of the opportunities were covered by the survey and the status of those surveyed confirmed their need and potential. c) Future Trends Significantly, the identified opportunities are related to service sector. In fact, it reaffirms the macro perspective that the future growth belongs to the service sector. The opportunities identified through (a) and (b) have been further examined on the basis of future demand or marketing prospect so as to be reassured of reasonable return on investments. The expectation of a healthy demand is also based on a belief that a stronger rural economy will lead to greater disposable income among the rural population and therefore they would be able to enjoy more services for enhanced quality of life. It is encouraging that in case of the twenty identified opportunities, the future trend, or the future demand or potential have been found to be positive for all. 54 District Plan Report Page 63 of 160 Threat: Historical evidence suggest that different areas are prone to certain natural calamities e.g. flood; cyclone; drought; pest menace, etc. Such natural calamities are threat to development. Basing on such past trend, an analysis has been made to find out village wise propensity to such natural calamities. In the present case, the threat to the villages has been analyzed on the basis of eight criteria mentioned below. Accordingly, threat to the villages has been classified. The number of village prone to each category has been Identified and presented in a tabular form here below. Since some villages are prone to multiple threats, one village has been counted under more than one type of threat. Naturally the total number of villages as per the table below is more than the total number of inhabited villages in the district. Table – 3.15 Number of Villages Prone to Different Types of Threat Sl. Type of Disasters No. of Villages prone to No. 1. Flood 216 2. Cyclone 301 3. Drought 752 4. Epidemics (Pests and diseases) 384 5. Epidemics (Human diseases) 453 6. Wild Animal Attack 321 7. Forest Fire 240 8. Wind Erosion 185 Total Observations About 45% of the villages are prone to drought, cyclone and flood. Any long term future planning should take note of such natural calamities and formulate a strategic action plan to address these factors. Epidemic among human population (16%) and agriculture/horticulture (13%) activities are also cause great distress to the people. Necessary preventive measures for both factors need to be adopted in addition to the on-going measures. 55 District Plan Report Page 64 of 160 3.4 ANALYSIS HIGHLIGHTS Table – 3.16 SWOT Analysis Some Infrastructural Highlights Sl. Numbe Infrastructure Component r 1 Electricity a Number of rural consumers 2 a Transportation Villages connected by all weather roads 3 a 4 a Irrigation Irrigated area to net cropped area Education Number of schools (Elementary education up to standard VII per 1 lakh population) b Number of degree and professional colleges per 1 lakh population c Teacher pupil ration up to Class V Class V to VIII Health Sub Centres/Primary Health Centres/ Community Health Centres per 1 lakh population (Allopathic only) Number of beds in hospitals per 1 lakh population (Allopathic only) Doctors (Modern i.e. allopathic system) per 1 lakh population Water Supply Drinking water supply 5 A B C 6 A 7 a Agriculture Markets Number of agriculture markets per 100 sq.km. Remarks It is observed while 98% villages have been electrified, only very few of rural households are having connection. Only 340 villages have been connected with pucca roads. Is only 33%. Number of schools needs to be increased. Number of degree and professional colleges needs to be increased. Teacher pupil ratio needs to be increased. Number has to be increased. Number has to be increased. Number has to be increased. Drinking water availability to about 50% villages is inadequate. Too low. More number of agriculture markets have to be established. 56 District Plan Report Page 65 of 160 8 a 9 a 10 11 12 13 Poverty Percentage of rural people below poverty line Agriculture Marketing Number of regulated markets per 100 sq.km More than average state More number of agriculture markets have to be established. Sanitation Facility There is no proper sanitation in about 60% villages. Agriculture and Allied Sectors More number of Extension Centers centers to be created. IT-Kiosk/IT Enabled Service Centers Too low. More number of service centers have to be established. Food Grain Godown, Grain Bank, Cold Too low. More number Storage, etc. of centers have to be established. 57 District Plan Report Page 66 of 160 PROCEEDINGS OF DHENKANAL DISTRICT PLANNING COMMITTEE MEETING HELD ON 23RD OCTOBER 2009. The meeting of District Planning Committee, Dhenkanal was held on 23.10.2009 at 1 1 A.M. in the Sadbhabana Hall of Collectorate, Dhenkanal under the Chairmanship of Sj. A.U. Singh Deo, Hon'ble Minister, Planning & Co-Ordination, Public Enterprises, Orissa. Smt. Anjali Behera, Hon'ble State Minister, Handloom & Textiles, Orissa, Sj. Prafulla Kumar Mallik, Hon'ble M.L.A., Kamakhyanagar, Dr. Nrusingha Charan Sahoo, Hon'ble M.L.A, Parjang, representative of Hon'ble M.P., Rajya Sabha Sj. R.N. Pany, representative of Hon'ble M.L.A., Dhenkanal, Sri Vijay Arora, [AS, Special Secretary to Government, Planning & Co-Ordination Department and the District Level Officers attended the meeting as special invitees. The list of members who attended the meeting and took part in the deliberations is given in the Annexure. Welcoming all the participants, the Collector, Dhenkanal - cum Member Convener briefed the House that the meeting has been convened for approval of Annual Plan on Backward Region Grant Fund (BRGF) 2008-09 & 2009-10, Comprehensive District Agriculture Plan (CDAP), Annual Plan on National Rural Health Mission (NRHM) and the Comprehensive District Sectoral Plan of Dhenkanal district for the year 2009-10. In his welcome address, the Hon'ble Chairman reiterated that a meaningful Plan document could be drawn up if an updated data-base is available at all levels of PRIs and that the TSI engaged in the Plan process would take-up steps for developing such a database with active participation of the Government Officials. District Plan Report Page 67 of 160 Approval of BRGF Plan 2008-09 and 2009-10 While giving an elaborate picture of the BRGF Plan, the P.D., DRDA, Dhenkanal said that the objective of the BRGF is to bridge and supplement the gaps of the Plan Schemes. He also said that after introduction of NREGS, the scope for construction of C.C. roads & Anganwadi Centres have been squeezed and therefore, such category of works are given importance in BRGF Plan. The Annual Plan of 2008-09 and 2009-10 has been framed within the prescribed norms of the guidelines taking the population ratio into consideration and the proposals have been finalized after due consultation with the PRI members at all levels. The highlights of the Plan are as follows. 1. More weightage to Anganwadi Centres and boundary walls of educational institutions. 2. Development of infrastructure. 3. Emphasis on Bridges, C C roads, C D works. 4. Creating opportunity for irrigation, electrification and water supply & sanitation. Some of the DPC members suggested for modification of the BRGF Plan document for the year 2008-09 and 2009-10. The Committee authorized the Collector to incorporate the modified proposals submitted by the members which are found to be admissible as per guidelines r" before the same is submitted to Government. After due deliberation the BRGF Plan for the year 2008-09 with an outlay of -Rs-.2308.75 lakh and Plan for the year 2009-10 with an outlay of Rs.2308.00 lakh was approved. Modification to approved BRGF projects for the year 2006-07 & 2007-08 The P.D., DRDA, Dhenkanal informed the House that execution of most of the approved Plan proposals for the year 2007-08 with out-lay of 15.42 crores are in full swing. District Plan Report Page 68 of 160 The Hon'ble MLA, Parjang pointed out that the total cost of all the approved projects of 2007-08 exceed the allocation of Rs.15.42 crores. Thus, he enquired to know about the projects which will be deleted due to paucity of funds. In reply, the Collector said that none of the projects will be deleted and attempts will be made to cover all the approved projects by dovetailing the labour components with NREGS e.g. upto metalling of the roads out of NREGS and concrete portion out of BRGF. Sri Laxmidhar Sahoo, Member drew the attention of Collector, Dhenkanal regarding execution of Kandarsinga to Damol Barabanka Nalla Bridge which is estimated with a cost of Rs. 28.00 lakh and suggested that the project should be executed by the R.D. Department. The PD, DRDA, Dhenkanal was authorized to call for a meeting of concerned Officials and sort out the matter early. Answering to different questions & suggestions of members, the Collector assured that all the suggestions will be examined and appropriate action will be taken. Similarly, some of the members pointed out the difficulties in execution of the on-going projects approved for the year 2007-08. The Special Secretary, P & C Department impressed upon the P.D., DRDA to convene a meeting to list out such problematic projects and solve them with Collector, Dhenkanal. The Hon'ble Minister, Handloom & Textiles drew the attention of Chairman '& Special Secretary, P & C Deptt. to allocate funds for the projects which are not covered under BRGF, NREGS etc for all round development of the district. Considering the problems in execution, the Committee decided to substitute the following approved projects of 2006-07 & 2007-08 with new projects mentioned against them as follows: District Plan Report Page 69 of 160 (Amount in Lakh) BRGF - 2006-07 Reasons for Name of the New Amt substitution Project a roved project Not feasible CC Road from 4.50 15.t Baranali Adi bandha Jagateswar temple to Tareni Mandir 3.00 Dhalpada Dehurisahi CC Road from Godi Chhak to GP Office Anala Purunasahi 4.00 CC Road Anala Nuasahi UPS 3.50 to Paridasahi roadNo habitation CC road from 3.00 0 3.C NH 200 to Dhobasahi to NH Kaluasandha CC road 200 of village of village Palasapithia, Palasapithia, GN GN Prasad GP Prasad GP 18.00 18 .00 Total Out of unspent 0.66 Const of Boundary surplus of wall of Puruna different Rekula UPS, Ward projects No-11 Name of the Block / NAC Bhuban Block Kam. Nagar NAC Am BRGF -2007-08 Block / NAC Bhuban NAC Name of the approved project from Banka Drain Amt 14.00 Behari house to Cananel CC Road and culvert from Durga ghar to Ragadi Total Sadar Canst of AWC Block Manipur Sabar saki 4.00 18.00 at 12.50 Water supply of 3.00 Const of AWC at Manipur Paschima Amt 14.00 Total 5.50 Const of Bridge over Daunsanali 4.00 Reasons for substitution Due to public demand 4.00 -do- 18.00 2.50 r„r Already covered under SL ^pplementanv Const of Majhisani -do- village road Lavatory at Saptasajya GP Office K.Had Block Name of the New Project Road with drain from Banka Behari house to Cannel in Ward No-1 CC Road and culvert from Durga ghar to Ragadi via Basudevpur Matha chhak 5.50 Compl of Daunsanali CC Road Const of culvert on Dholigotha to Kathapura road 2.00 Not feasible at present 2.00 District Plan Report Page 70 of 160 Const of bridge over Patabeda to Kalada toad K.Had Block ti Gondia 10.00 Kusamundia Harijan Sahi culvert Total 2.00 AWC at Biswnathpur of 3.00 2.50 AWC at Jandaposi 3.00 Proposed under PMGSY 2.50 5.00 2.00 Due to public demand 16.00 16 .00 Deogan GP Block Const of Patabeda Godisahi CC road Const of Patabeda Ragadisahi CC Road Culvert of RD Road to Mundasahi Road Kusamundia Harijan Sahi CC Road of Deogan GP Already covered under Supplementary Plan 2006-07 The above substitute projects were unanimously approved in the meeting. Approval of Comprehensive District Plan 2009-10 Initiating discussion on the Comprehensive District Plan 2009-10, the Chairman, ERA Consultancy, Ltd, Bhubaneswar (TSI) explained that the development programmes included in the Plan document have been prepared after careful need assessment and priority setting in close consultation and involvement of PRIs, ULBs, District level Officers. He expressed that the aspirations from various levels have been reflected in the document within the resource flow to the district from various sources such as (i) Own resources of PRIs & ULBs (ii) Resource allocation through State Plan, Central Plan and Centrally Sponsered Plan Schemes etc. He also said that attempts have been made for establishing inter sectoral linkages in due consultation with the sectoral heads by way of organizing workshops at District & Block levels. The Sector wise allocation under different plan programmes was presented in the meeting. After due deliberation, the Annual Plan for the year 2009-10 with proposed out-lay of Rs. 78228.858 lakh including BRGF, CDAP, NRHM and other district Sector Schemes of different development Departments was approved. The Sector wise approved allocation is.given below. District Plan Report Page 71 of 160 (Amount in lakh) Name of the Sector Agriculture & Allied Rural Develo pment Special Area Programme ( BRGF ) Irrigation and Flood Control Energy Industry & Minerals Transport Pro posed autla y for 2009-10 1154.855 46605.81 2313.00 781.47 9. 10. Science , Technology & Environment General Economic Services Social Services 11. General Services SI No 1. 2. 3. 4. 5. 6. 7. 8. 14177.36 204.54 93.54 854.41 3642.10 8338.48 63.29 Total 78228.858 The Committee impressed upon the TSI to prepare the Plan document incorporating the sector wise approved outlays as mentioned above as well as the schemes discussed in the meeting adhering strictly to the guidelines issued by P & C Department and communicated to them in Memo No . 16247 ( 17)/P dt. 07 . 09.09 and submit the Plan document to appropriate quarters immediately. Other Matters 1. Some of the DPC members expressed that they are not aware about the ongoing Schemes/projects implemented in different Blocks. The Collector assured that Booklet comprising Block wise information on different ongoing schemes & projects will be compiled by the DIPRO, Dhenkanal which will be made available to the members. 2. Sj. Alekh Sethy , Member drew the attention of the Chairman regarding strengthening of District Planning Office in the district. The Special Secretary , P & C Deptt . expressed that it has been decided by the Government to strengthen the District Planning District Plan Report Page 72 of 160 Offices in the State. Sri Sethy also suggested that the Y Government should depute the members of DPC to States like Kerala & Maharshtra so that the members get exposure on taking active role in the decentralized Planning Process. 3. Sj. Sangram Keshari Satpathy, Member demanded for development of the Chadakamara to Nihalprasad RD road and suggested that the Road should be handed over to PWD. 4. Sj. Jayakrishna Jena, Member pointed out the difficulties faced in the Palli Sabhas and the problem in fixing up the priorities. He also drew the attention of Collector regarding diversion of BRGF projects by BDO, Parjang. The Collector assured to look into the matter. The meeting ended with vote of thanks to the Chair. Approved Hon' ble Minister, Planning Co-Ordination, Public Enterprises, Orissa- cum- Chairperson, District Planning Committee, Dhenkanal 1 l`ui1nistoi planning & Co-ordination Public Enterprises , ORISSA District Plan Report Page 73 of 160 DISTRICT PLANNING OFFICE, DHENKANAL / date 9 • /1• Memo No Copy forwarded to the Private Secretary to Hon' ble Minister, Planning & CoOrdination, Public Enterprises , Orissa and Chairman, DPC, Dhenkanal for favour of kind information of Hon'ble Chairman. Collector & Member Secretary, DPC, Dhenkanal Memo No. date C . J • Q^'J Copy forwarded to the Private ecretary to Hon'ble Deputy Chairman, State Planning Board, Orissa, Bhubaneswar for favour of information. Collector & Member Secretary , DPC, Dhenkanal Memo No . /date Copy forwarded to all mehib errof" DPC, Dhenkanal for information and necessary action. Collector & Member Secretary. DPC. Dhenkanal . / date Memo No 1 lfJ Copy forwarded to the Hon'ble M.P., L'ok Sabha Dhenkanal / Sj. R.N. Pany, Hon'ble M.P., Rajya Sabha / Hon'ble MLAs of Dhenkanal District for kind 5-6 0 information and necessary action. Collector & Memb r Sccre tary, DPC, Dhenkanal Memo No /date q • f J• ctJ Copy submitted to the Commissioner - cum Secretary to Government, Panchayati Raj Department, Orissa Bhubaneswar for information and necessary action. Collector & Member Secretary , DPC, Dhenkanal fiQ1__4 Memo No / date Copy submitted to the Special Secretary to Government , Planning & CoOrdination Department , Orissa, Bhubaneswar for information and necessary action. olvo Collector & Mem retary, DPC, Dhenkanal eb r Sec 'l -V. Memo No / date // Copy submitted to the Director , Agriculture & Food Production , Orissa, Bhubaneswar for information and necessary action. Collector & Member Secretary, DPC, Dhenkanal District Plan Report Page 74 of 160 'cl Memo No.^^_/ Copy forwarded to the P.D., DRDA, Dhenkanal / A.D.M., Dhenkanal for information and necessary action. Collector & Member Secretary , DPC, Dhenkanal 9 Memo No . / date • / J - I Copy forwarded to concerned District Level Officers of Dhenkanal district for information and necessary action. 5^^ Collector & Member Secretary , DPC, Dhenkanal Memo No . • /date Copy forwarded to E.O ., Dhenkanal Municipality / EO, Kamakhyanagar NAC / EO, Bhuban NAC for information and necessary action. Collector & Member Secretary, DPC, Dhenkanal cc Memo No / date Copy to Managing Director, ERA Consultancy, Pvt. Ltd , BBSR (TSI) for information and necessary action with a request to distribute necessary copies of the approved Plan document as mentioned below. 1. Chairman, DPC, Dhenkanal 2. All DPC Members 3. Hon'ble M.Ps & MLAs (1 Hard copy and 1 soft copy) (18 Hard copies) (6 Hard copies) 4. P& C Department, Dhenkanal 5. P.R. Department, Orissa 6. Agriculture Department, Orissa 7. Collector, Dhenkanal 8. DRDA, Dhenkanal 9.District Planning Office (5 Hard copies and 1 soft copy) (2 Hard copies and I soft copy) (2 Hard copies and 1 soft copy) (1 hard copy and I soft copy) (2 Hard copies and I soft copy) (2 Hard copies and 1 soft copy) r" Collector & Member Secretary, DPC, Dhenkanal District Plan Report Page 75 of 160 Annexure List of Members participated in the DPC Meeting held on 23.10.09 DPC Members 1. 2. 3. Sj., A.U. Singh Deo, Hon'ble Minister, Planning & Co_Ordination, Public Enterprises, Orissa Smt. Rebati Behera, Hon'ble Chairperson, ZP, Dhenkanal Sri Girish S.N., AS, Collector, Dhenkanal Chairman Member Member Secretary 4. Sri Ranjan Kumar Nanda, Vice-President, ZP, Dhenkanal Member 5. Smt Khulana Behera, ZP member Member 6. Smt Ratnaprava Panda, ZP Member Member 7. Smt Abanti Sethi, ZP Member Member 8. Sri Sajalendra Jena, ZP member Member 9. Sri Sangram Keshari Satpathi, ZP member Member 10. Sri Sudhakar Behera, ZP member Member H. Sri Nauri Singh, ZP member Member 12. Sri Nabin Dehury, ZP Member Member 13. Sri Jayakrushna Jena, ZP Member Member 14. Sri Bhuban Mohan Nayak, ZP member Member 15. Sri Alekh Sethi, ZP member Member 16. Sri Laxmidhar Sahoo, ZP member Member Special Invitee 18. Special Invitees Smt. Anjali Behera, Hon'ble Minister of State, Handloom & Textiles, Orissa Dr Nrusingha Charon Sahoo, Hon'ble MLA Parjang Special Invitee 19. Sri P.K.Mallick, Hon'ble MLA Kam.Nagar Special Invitee 20. Sri Ramesh Ch samal, Nominee of Sj R.N.Pany, Hon'ble MP (RS), Orissa Sri Indramani Nayak, Nominee of Hon'ble MLA, Dhenkanal Sri V.K.Arora, IAS, SpI Secy to Planning & Coordination Deptt District. Level Officers Special Invitee 17. 21. 22. n-' Special Invitee Special Invitee 23. Sri Bishnu Ch Prusty, PD DRDA, Dkl Special Invitee 24. Sri Gunanidhi Jena, ADM, Dkl Special Invitee 25. Sri Anadi Ch Sahoo, EE, RWD, Dkl Special Invitee 26. Sri Manamohan Panigrahi, DFO, Dkl Special Invitee 27. Sri Laxmidhar Behera, DDA, Dkl Special Invitee 28. Smt Jyotidipta Pattnaik, Agronomist Special Invitee 29. Sri Sukanta Mohan Mohanty, Rep of DDH, Dkl Special Invitee 30. Sri Jyoti Prakash Mohanty, EE, OLIC, Dkf Special Invitee 31. Sri B.D. Panigrahi, GM DIC, Dkl Special Invitee 32. Sri Sudarsan Mishra, EO, Dkl Municipality Special Invitee District Plan Report Page 76 of 160 33. Sri Bhabni Shankar Mohanty, SDO, PHD, Dkl Special Invitee 34. Sri Balaram Nayak, EO, K.nagar NAC Special Invitee 35. Sri Rabindra Kumar Mishra, EO, Bhuban NAC Special Invitee 36. Sri Surendranath Sahoo, JE, Bhuban NAC Special Invitee 37. Dr Rajkishore Beura, CDVO, Dkl Special Invitee 38. Sri L.D.Rath, DLO, DkI Special Invitee 39. Sri Mrutyunjaya Mohanty, AE, MI Divn, DkI Special Invitee 40. Sri Bighneswar Rout, JE, MI Office Special Invitee 41. Sri Pradipta Kumar Mohanty, IC, Dist Sports Officer Special Invitee 42. Sri Bansidhar Singh, Dist Panchatay Officer Special Invitee 43. Sri Sanatan Tunga, EE, CESU, Dhenkanal Special Invitee 44. Sri Prasanta Kumar Nayak, DWO, Dkl Special Invitee 45. Sri Manas Ranjan Mohanty, Dist Employement Officer Special Invitee 46. Sri Lingaraj Behera, PS to Minister handloom & Textiles Special Invitee 47. Sri Prasanna Kumar Sahoo, AE, PWD, Dkl Special Invitee 48. Sri Parsuram Maharana, SARCS, DRCS, Dkl Special Invitee 49. Sri Pitambar Soren, DIPR Office Special Invitee 50. Sri J.C.Roul, DIPRO, DkI Special Invitee 51. Sri P.N.Rout. DI of school Special Invitee 52. Sri Gadadhar Das, HAO, Cl of School Special Invitee 53. Smt Tuna Behera, DSWO, Dkl Special Invitee 54. Sri Somanath Hansdah, Dist Probation Officer Special Invitee 55. Smt Namita Baral, ADS, Dkl Special Invitee 56. Sri Nihar Ranjan Parija, ACSO, Dkl Special Invitee 57. Sri Satish Ch Pattanaik, 0/0- ADS, Dkl Special Invitee 58. Sri Surya Narayan Sahu, ADT, Dkl Special Invitee 59. Sri S.K. Acharya, ADF, DkI Special Invitee 60. Sri M.C. Mohanty, DSO, Dkl Special Invitee 61. Sri Debesh Ch. Behera, AE, 0/0 SCO, Dkl Special Invitee 62. Sri Sall Sekhar Samanta, EE, RWS&S Dvn, Dkl Special Invitee 63.- • Sri Srikonta Ku Mishra, AE, RWS&S Dvn, Dkl Special Invitee 64. Dr. P.K. Sahu, CDMO, Dkl Special Invitee 65. Dr. P.K. Sahoo, Addl. CDMO, Dkl Special Invitee 66. Miss Neeta Mohanty, Dist. Planning Officer Special Invitee 67. Sri P.K. Tripathy, SEI, 0/0 DPO, Dkl Special Invitee 68. Sri B.C. Swain, SEI, 0/0 DPO, DkI Special Invitee 69. Smt. I. Pattanaik, Cartographer, 0/0 DPO Special Invitee r-I TSI Representatives 70. Dr. Abhash Ch. Panda, MD, ERA Consultancy, BBSR 71. Bhagaban Mohapatra, Dist. Coordinatior of TSI District Plan Report Page 77 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure I Planunit Abstract District Block Panchayat Panchayat Total no. of Village Corporation Municipality Notified Area Panchayat Town Area Line Department Council 1 8 199 0 1 0 2 22 1 8 192 0 1 0 2 0 Planunits No. of Planunits included in Report District Plan District Panchayat Block Panchayat Village Panchayat ULB Line Department Total Expected Planned Expected Planned Expected Planned Expected Planned Expected Planned Expected Planned Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay Allocation Outlay 3,56,80,000 3,56,80,000 5,29,70,000 5,29,70,000 8,82,50,000 8,82,50,000 5,43,00,000 5,43,00,000 0 0 23,12,00,00 23,12,00,00 0 Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : 0 Page 1 of 15 District Plan Report Page 78 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Proposed works and Planned Outlay S.No. Sector Works Planned Outlay 1 Roads 389 11,91,00,000 2 Education 297 6,99,20,000 3 General Expenditure 47 2,35,50,000 4 Public health 12 41,00,000 5 Roads and bridges 3 34,50,000 6 Agriculture 9 30,00,000 7 Minor irrigation 6 24,00,000 8 Water supply for domestic 1 20,00,000 9 Land improvement 4 16,00,000 10 Social welfare 1 8,80,000 11 Welfare of the weaker sections 1 7,00,000 12 Drinking water 1 3,00,000 13 Markets and fairs 1 2,00,000 772 23,12,00,000 Total Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 2 of 15 District Plan Report Page 79 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 3 of 15 District Plan Report Page 80 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 4 of 15 District Plan Report Page 81 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 5 of 15 District Plan Report Page 82 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA ** - Plan not available Panchayat Component District Panchayat Plan Unit Name Expected Block Panchayat Planned Outlay Plan Unit Name Availability DHENKANAL 3,56,80,000 Expected Village Panchayat Planned Outlay Plan Unit Name Availability 3,56,80,000 BHUBAN 48,15,000 Expected Planned Outlay Availability 48,15,000 ARAKHAPAL 2,00,000 2,00,000 BALIBO 4,00,000 4,00,000 BARUAN(B) 6,00,000 6,00,000 BHUSAL 6,00,000 6,00,000 DAYANABILI 8,00,000 8,00,000 DHALAPADA 2,80,000 2,80,000 DIGHI 2,00,000 2,00,000 EKTALI 5,00,000 5,00,000 GADA 3,00,000 3,00,000 JAMUNAKOTE ** ** JIRAL 6,00,000 6,00,000 KANAPAL(MAH 5,00,000 5,00,000 KUNINDA 8,00,000 8,00,000 MARTHAPUR 8,45,000 8,45,000 MATHAKARGO 4,00,000 4,00,000 MRUDANGA 6,00,000 6,00,000 SURA PRATAP 4,00,000 4,00,000 4,50,000 4,50,000 4,50,000 4,50,000 NRUSINGHA PRASAD ULPAL) LA PUR DHENKANAL 72,90,000 SADAR 72,90,000 BALADIBANDH A BALIAMBA Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 6 of 15 District Plan Report Page 83 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA BANASINGH 4,50,000 4,50,000 BARADA 4,50,000 4,50,000 BELTIKIRI 4,50,000 4,50,000 BHALIBOL 4,50,000 4,50,000 BHAPUR 4,50,000 4,50,000 CHANDRASEK 4,50,000 4,50,000 CHAULIA 4,50,000 4,50,000 DHIRAPATNA 4,50,000 4,50,000 GENGUTIA 4,50,000 4,50,000 GOBINDAPUR 4,50,000 4,50,000 KAIMATI 4,50,000 4,50,000 KAKUDIBHAG 4,50,000 4,50,000 KANKADAHAD 4,50,000 4,50,000 KANKADPAL 4,50,000 4,50,000 MADHUSAHUP 4,50,000 4,50,000 MANGALPUR 4,50,000 4,50,000 MANIPUR 4,50,000 4,50,000 NADIALI 4,50,000 4,50,000 NAGIAPASI 4,50,000 4,50,000 SANKARPUR 4,50,000 4,50,000 SANKULEI 4,50,000 4,50,000 KATENI HAR PRASAD ATNA Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 7 of 15 District Plan Report Page 84 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA GONDIA 73,00,000 SAPTASAJYA 4,50,000 4,50,000 SOGARPASI 4,50,000 4,50,000 TALABARKOT 4,50,000 4,50,000 TARABHA 4,50,000 4,50,000 2,00,000 2,00,000 BEGA 6,00,000 6,00,000 BIDHARPUR 8,00,000 8,00,000 DASAMANPAT 2,00,000 2,00,000 DEOGAN 5,00,000 5,00,000 DIGAMBARPUR 2,00,000 2,00,000 GONDIA 6,50,000 6,50,000 JORANDA 2,00,000 2,00,000 KABERA 3,00,000 3,00,000 KALURIA 6,00,000 6,00,000 KARAMUL 6,00,000 6,00,000 KASIPUR 4,00,000 4,00,000 KHANDA 8,00,000 8,00,000 KHANKIRA 6,00,000 6,00,000 LAULAI 2,00,000 2,00,000 LETHEKA 4,00,000 4,00,000 MANDAR A 6,00,000 6,00,000 MATHA 4,00,000 4,00,000 73,00,000 BAINSIA NA BANDHA TENTULIA Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 8 of 15 District Plan Report Page 85 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA NEULAPOI 4,00,000 4,00,000 NIHAL PRASAD ** ** PINGUA 9,00,000 9,00,000 PORUHAKHOJ 4,00,000 4,00,000 4,00,000 4,00,000 10,00,000 10,00,000 SADANGI 4,00,000 4,00,000 SANTHAPUR 2,00,000 2,00,000 SORISIAPADA 2,00,000 2,00,000 2,00,000 2,00,000 BABANDHA 2,00,000 2,00,000 BAMPA 6,00,000 6,00,000 12,00,000 12,00,000 BUHALIPAL 4,00,000 4,00,000 CHITALPUR 3,00,000 3,00,000 DANDIRI 3,00,000 3,00,000 DUDURUKOTE 2,00,000 2,00,000 GALAPADA 2,00,000 2,00,000 GANDANALI 2,00,000 2,00,000 GIRIDHAR 7,00,000 7,00,000 3,00,000 3,00,000 A RAITALA RATANAPUR HINDOL 88,65,000 88,65,000 ASARADA BAUNSA POKHARI PRASAD GULEHI Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 9 of 15 District Plan Report Page 86 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA HATURA 3,00,000 3,00,000 JARADA 2,00,000 2,00,000 KADALA 4,00,000 4,00,000 KALINGA 3,00,000 3,00,000 KANSARA 6,00,000 6,00,000 KANTAMILA 9,00,000 9,00,000 KANTIMILI 3,00,000 3,00,000 KARANDA 6,00,000 6,00,000 KHALIBOREI 8,00,000 8,00,000 KUKUTA 3,00,000 3,00,000 KUNUA ** ** KUTUNIA 6,00,000 6,00,000 MADHAPUR 3,00,000 3,00,000 MAHALUNDA 2,00,000 2,00,000 NABAKISHORE 6,00,000 6,00,000 NIZIGARH 7,00,000 7,00,000 NUABAG 8,00,000 8,00,000 NUAGAN ** ** PAIKA 6,00,000 6,00,000 PATALA 6,00,000 6,00,000 RANJAGOL 4,00,000 4,00,000 RASOL 3,00,000 3,00,000 PUR PURUNAKOT Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 10 of 15 District Plan Report Page 87 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA KAMAKHYANA 54,00,000 SANJAPADA ** ** THOKAR 2,00,000 2,00,000 3,00,000 3,00,000 BAISINGA 4,00,000 4,00,000 BALIGORADA 5,00,000 5,00,000 BANKUAL 6,00,000 6,00,000 BARUAN(K) 3,00,000 3,00,000 BAUNSAPAL 3,00,000 3,00,000 BHAIRPUR 3,00,000 3,00,000 BUDHIBILI 2,00,000 2,00,000 JAGANNATHPU 4,00,000 4,00,000 KADUA 3,00,000 3,00,000 KANAPURA 5,00,000 5,00,000 KANTAPAL 5,00,000 5,00,000 KANTIOKATNEI 6,00,000 6,00,000 KANTIOPUTAS 2,00,000 2,00,000 KOTAGARA 3,00,000 3,00,000 KUSUMJODI 6,00,000 6,00,000 MAHULPAL 9,00,000 9,00,000 RAI 3,00,000 3,00,000 7,00,000 7,00,000 54,00,000 BADASUANLO GAR R AHI NARASINGHPU R SOGAR Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 11 of 15 District Plan Report Page 88 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA KANKADA HAD 58,50,000 TUMSINGA 8,00,000 8,00,000 58,50,000 BALIKUMA 5,00,000 5,00,000 BAM 4,50,000 4,50,000 BATAGAON 5,00,000 5,00,000 BIRASAL 5,00,000 5,00,000 BIRIBOLEI 5,00,000 5,00,000 CHANDAPUR 4,00,000 4,00,000 DASHIPUR 4,00,000 4,00,000 GADAPHALAS 7,50,000 7,50,000 4,50,000 4,50,000 JHILLI 5,00,000 5,00,000 KANAKADAHA 4,00,000 4,00,000 KANTAPAL 4,50,000 4,50,000 KANTOL 5,00,000 5,00,000 KARAGOLA 4,50,000 4,50,000 KERJULI 4,50,000 4,50,000 KUTURIA 4,00,000 4,00,000 MAHABIROD 4,50,000 4,50,000 MAKUAKATENI 4,50,000 4,50,000 MARUABILI 3,00,000 3,00,000 PANGATIRA 4,00,000 4,00,000 RAIBOL 5,00,000 5,00,000 4,50,000 4,50,000 UNI GHAGARAMUN DA D ODAPADA 66,60,000 Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 66,60,000 BADALO Annexure-I : Page 12 of 15 District Plan Report Page 89 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA BALARAM 4,50,000 4,50,000 BALARAMPUR 4,50,000 4,50,000 BANGURISING 4,50,000 4,50,000 BIDO 4,50,000 4,50,000 GADASILA 4,50,000 4,50,000 GHATIPIRI 4,50,000 4,50,000 GOBINDA 4,50,000 4,50,000 GUNADEI 4,50,000 4,50,000 GUNDICHA 4,50,000 4,50,000 INDIPUR 4,50,000 4,50,000 KALANGA 4,50,000 4,50,000 KANDA 4,50,000 4,50,000 4,50,000 4,50,000 KHUNTAJHARI 4,50,000 4,50,000 KOTAM 4,50,000 4,50,000 KUSUPANGA 4,50,000 4,50,000 MANGALPUR 4,50,000 4,50,000 MOTANGA 2,00,000 2,00,000 NADHARA 4,50,000 4,50,000 NAYA 4,00,000 4,00,000 PRASAD HA PRASAD PADA BINDHA KHARAG PRASAD BHAGIRATHIP UR Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 13 of 15 District Plan Report Page 90 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA PARJANG 67,90,000 NIMIDIHA 4,50,000 4,50,000 ODAPADA 7,00,000 7,00,000 SADASIVAPUR 4,00,000 4,00,000 SIMINAI 4,00,000 4,00,000 2,00,000 2,00,000 BADAJHARA 6,50,000 6,50,000 BARIHAPUR 5,50,000 5,50,000 BASOI 2,50,000 2,50,000 BASULEI 2,00,000 2,00,000 CHANDPUR 6,50,000 6,50,000 16,00,000 16,00,000 GENGUTIA 2,50,000 2,50,000 JAYAPURAKAT 4,00,000 4,00,000 KALADA 4,00,000 4,00,000 KANDARSINGA 6,50,000 6,50,000 KANKADASOD 2,50,000 2,50,000 KANKILI 4,50,000 4,50,000 KANTOR ** ** KUALO 4,50,000 4,50,000 KUMUSI 4,00,000 4,00,000 LODHANI 2,50,000 2,50,000 67,90,000 AKHUAPAL GADAPARJAN G ENI A Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 14 of 15 District Plan Report Page 91 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA MANIKAMARA 4,75,000 4,75,000 MUKTAPASI ** ** MUNDEILO 2,00,000 2,00,000 PATARPADA 6,00,000 6,00,000 PITIRI 4,00,000 4,00,000 11,00,000 11,00,000 RODA 2,00,000 2,00,000 SANDA 3,00,000 3,00,000 SARANG 4,50,000 4,50,000 RENTHAPAT Municipal Component Plan Unit Name Expected Allocation Planned Outlay Dhenkanal 3,40,50,000 3,40,50,000 Bhuban 1,18,00,000 1,18,00,000 84,50,000 84,50,000 Kamakshyanagar Line Department Component District Line Department Name Expected Allocation Planned Outlay No data available Report generated through PlanPlus on Wed Dec 02 12:47:49 IST 2009 Annexure-I : Page 15 of 15 District Plan Report Page 92 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure II:Sectoral View Tied Component : Sector Wise Expected Allocation v/s Planned Outlay (Consolidated RLB/ULB/Line Department) S.No. Sector RLB Expected Allocation ULB Planned Outlay Expected Allocation Line Department Planned Outlay Expected Allocation Total Planned Outlay Expected Allocation Planned Outlay No data available Untied Component : Expected Allocation (Consolidated RLB/ULB/Line Department) From RLB ULB Line Department Total Expected Allocation Expected Allocation Expected Allocation Expected Allocation Own Fund 0 0 0 0 From all Schemes 17,69,00,000 5,43,00,000 0 23,12,00,000 Total 17,69,00,000 5,43,00,000 0 23,12,00,000 Untied Component : Planned Outlay Sector General Expenditure RLB ULB Line Department Total Planned Outlay Planned Outlay Planned Outlay Planned Outlay 1,64,50,000 71,00,000 0 2,35,50,000 19,00,000 11,00,000 0 30,00,000 3,00,000 0 0 3,00,000 Roads 7,90,50,000 4,00,50,000 0 11,91,00,000 Education 6,99,20,000 0 0 6,99,20,000 16,00,000 0 0 16,00,000 Markets and fairs 2,00,000 0 0 2,00,000 Social welfare 8,80,000 0 0 8,80,000 Welfare of the weaker sections 7,00,000 0 0 7,00,000 Minor irrigation 24,00,000 0 0 24,00,000 Roads and bridges 11,00,000 23,50,000 0 34,50,000 0 20,00,000 0 20,00,000 24,00,000 17,00,000 0 41,00,000 17,69,00,000 5,43,00,000 0 23,12,00,000 Agriculture Drinking water Land improvement Water supply for domestic Public health Total Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 1 of 13 District Plan Report Page 93 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 2 of 13 District Plan Report Page 94 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 3 of 13 District Plan Report Page 95 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Panchayat Component Sector District Panchayat Expected Allocation Planned Outlay Block Panchayat Expected Allocation Planned Outlay Gram Panchayat Expected Allocation Total Planned Outlay Expected Allocation Planned Outlay No data available Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 4 of 13 District Plan Report Page 96 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Untied Component : Expected Allocation : Panchayat Component From District Panchayat Block Panchayat Gram Panchayat Total Expected Allocation Expected Allocation Expected Allocation Expected Allocation Own Fund 0 0 0 0 From all Schemes 3,56,80,000 5,29,70,000 8,82,50,000 17,69,00,000 Total 3,56,80,000 5,29,70,000 8,82,50,000 17,69,00,000 Untied Component : Planned Outlay :Panchayat Component From District Panchayat Block Panchayat Gram Panchayat Total Planned Outlay Planned Outlay Planned Outlay Planned Outlay General Expenditure 16,00,000 98,00,000 50,50,000 1,64,50,000 Agriculture 17,00,000 2,00,000 0 19,00,000 0 0 3,00,000 3,00,000 Roads 1,20,00,000 1,33,50,000 5,37,00,000 7,90,50,000 Education 1,28,00,000 2,92,20,000 2,79,00,000 6,99,20,000 16,00,000 0 0 16,00,000 0 2,00,000 0 2,00,000 Social welfare 8,80,000 0 0 8,80,000 Welfare of the weaker sections 7,00,000 0 0 7,00,000 24,00,000 0 0 24,00,000 8,00,000 0 3,00,000 11,00,000 12,00,000 2,00,000 10,00,000 24,00,000 3,56,80,000 5,29,70,000 8,82,50,000 17,69,00,000 Drinking water Land improvement Markets and fairs Minor irrigation Roads and bridges Public health Total Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 5 of 13 District Plan Report Page 97 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 6 of 13 District Plan Report Page 98 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 7 of 13 District Plan Report Page 99 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 8 of 13 District Plan Report Page 100 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Municipal Component Sector Muncipality Expected Allocation Planned Outlay Corporation Expected Allocation Planned Outlay Town Area Expected Allocation Planned Outlay Notified Area Council Expected Allocation Planned Outlay Total Expected Allocation Planned Outlay No data available Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 9 of 13 District Plan Report Page 101 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Untied Component : Expected Allocation : Municipal Component From Muncipality Corporation Town Area Notified Area Council Total Expected Allocation Expected Allocation Expected Allocation Expected Allocation Expected Allocation Own Fund 0 0 0 0 0 From all Schemes 3,40,50,000 0 2,02,50,000 0 5,43,00,000 Total 3,40,50,000 0 2,02,50,000 0 5,43,00,000 Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 10 of 13 District Plan Report Page 102 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Untied Component : Planned Outlay : Municipal Component From Muncipality Corporation Town Area Notified Area Council Total Planned Outlay Planned Outlay Planned Outlay Planned Outlay Planned Outlay General Expenditure 0 0 71,00,000 0 71,00,000 Agriculture 0 0 11,00,000 0 11,00,000 3,17,00,000 0 83,50,000 0 4,00,50,000 23,50,000 0 0 0 23,50,000 Water supply for domestic 0 0 20,00,000 0 20,00,000 Public health 0 0 17,00,000 0 17,00,000 3,40,50,000 0 2,02,50,000 0 5,43,00,000 Roads Roads and bridges Total Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 11 of 13 District Plan Report Page 103 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 12 of 13 District Plan Report Page 104 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Tied Component : Sector Wise Expected Allocation v/s Planned Outlay : Line Department Component Sector District Line Department Expected Allocation Planned Outlay No data available Report generated through PlanPlus on Wed Dec 02 12:49:33 IST 2009 Annexure-II : Page 13 of 13 District Plan Report Page 105 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure III:Scheme View Scheme Wise Expected Allocation v/s Planned Outlay (Consolidated RLB/ULB/Line Department) Scheme RLB Expected Allocation ULB Planned Outlay Expected Allocation Line Department Planned Outlay Expected Allocation Total Planned Outlay Expected Allocation Planned Outlay 1.Backward Region Grant Funds 17,69,00,000 17,69,00,000 5,43,00,000 3,40,50,000 0 0 23,12,00,000 21,09,50,000 Total 17,69,00,000 17,69,00,000 5,43,00,000 3,40,50,000 0 0 23,12,00,000 21,09,50,000 Report generated through PlanPlus on Wed Dec 02 12:51:17 IST 2009 Annexure-III : Page 1 of 3 District Plan Report Page 106 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Scheme Wise Expected Allocation v/s Planned Outlay : Panchayat Component Scheme District Panchayat Expected Allocation Planned Outlay Block Panchayat Expected Allocation Planned Outlay Gram Panchayat Expected Allocation Total Planned Outlay Expected Allocation Planned Outlay 1 .Backward Region Grant Funds 3,56,80,000 3,56,80,000 5,29,70,000 5,29,70,000 8,82,50,000 8,82,50,000 17,69,00,000 17,69,00,000 Total 3,56,80,000 3,56,80,000 5,29,70,000 5,29,70,000 8,82,50,000 8,82,50,000 17,69,00,000 17,69,00,000 Report generated through PlanPlus on Wed Dec 02 12:51:17 IST 2009 Annexure-III : Page 2 of 3 District Plan Report Page 107 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Scheme Wise Expected Allocation v/s Planned Outlay : Municipal Component Scheme Muncipality Corporation Expected Allocation Town Area Planned Outlay Expected Allocation Notified Area Council Expected Allocation Planned Outlay Planned Outlay 1 .Backward Region Grant Funds 3,40,50,00 0 3,40,50,00 0 0 0 2,02,50,00 0 0 0 Total 3,40,50,00 0 3,40,50,00 0 0 0 2,02,50,00 0 0 0 Report generated through PlanPlus on Wed Dec 02 12:51:17 IST 2009 Expected Allocation Planned Outlay Total Expected Allocation Planned Outlay 0 5,43,00,00 0 3,40,50,00 0 0 5,43,00,00 0 3,40,50,00 0 Annexure-III : Page 3 of 3 District Plan Report Page 108 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.General Expenditure District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Market Complex near Laulai GP. Backward Region Grant Funds 4,00,000 2 Completion of SSB Sikhyaniketan Building . Backward Region Grant Funds 4,00,000 3 Improvement Const.of boundary wall of play field at Naranapada Backward Region Grant Funds 4,00,000 4 Const. of Laulai Panchayat Office Boundary wall. Backward Region Grant Funds 4,00,000 Block Panchayat S.No. 1 BHUBAN Work Name Const. of Training -Cum- Resource Centre Sources of Funding Backward Region Grant Funds Block Panchayat S.No. 1 10,00,000 DHENKANAL SADAR Work Name Const.of Training -Cum-Resource Centre Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Block Panchayat S.No. Outlay Under the Scheme 10,00,000 GONDIA Work Name Sources of Funding Outlay Under the Scheme 1 Compl. of Passenger Rest Shed at Poruhakhoja Sulabha Souchalaya near Blok Backward Region Grant Funds 2,00,000 2 Const. of Passenger Rest Shed at khandabanadha Chhaka at main road. Backward Region Grant Funds 2,00,000 3 Const.of Training-Cum-Resource Centere Building Backward Region Grant Funds 10,00,000 Block Panchayat S.No. HINDOL Work Name Sources of Funding Outlay Under the Scheme 1 Khaliborei GP Office Boundary wall Backward Region Grant Funds 3,00,000 2 Const.of Training -Cum-Resource Centre Backward Region Grant Funds 10,00,000 Block Panchayat S.No. 1 KAMAKHYANAGAR Work Name Const.of Training-Cum-Resource Centre Sources of Funding Backward Region Grant Funds Block Panchayat S.No. Outlay Under the Scheme 10,00,000 KANKADA HAD Work Name Sources of Funding Outlay Under the Scheme 1 Renov.o Bam to Chauliajharana Culvert Backward Region Grant Funds 5,00,000 2 Const.of Foot Over Bridge over Akhupal Nullah to Baghua Backward Region Grant Funds 3,00,000 3 Const.of Training-Cum-Resource Centre Backward Region Grant Funds 10,00,000 Block Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 ODAPADA Annexure-IV : Page 1 of 51 District Plan Report Page 109 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. 1 Work Name Const.of Training-Cum-Resource Centre Sources of Funding Backward Region Grant Funds Block Panchayat S.No. Outlay Under the Scheme 10,00,000 PARJANG Work Name Sources of Funding Outlay Under the Scheme 1 Panivandar Village Play Ground Backward Region Grant Funds 3,00,000 2 Const. of Training Cum Resource centre Backward Region Grant Funds 10,00,000 Gram Panchayat S.No. KUNINDA Work Name Sources of Funding Outlay Under the Scheme 1 Completion of Kubera Sahi Drain, Kuninda Backward Region Grant Funds 2,00,000 2 Const.of Chandana Nagar Sahi, Drain Kuninda Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. CHANDRASEKHAR PRASAD Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Phulajhari sahi Culvert Backward Region Grant Funds 2,00,000 2 Const.of Bharatiapal Culvert Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. 1 MANIPUR Work Name ADDITION OF G.P.OFFICE BUILDING AT MANIPUR Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Repair and grading of Nadiali GP Office Building Sources of Funding Const.of Drain at Sankarpur Mangala Temple Sources of Funding Comp.of Ganra Bandha and Culvert Sources of Funding 4,50,000 BAINSIA Work Name Bainsia Bus-Stand Chhaa Culvert. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 TALABARKOT Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 SANKARPUR Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 4,50,000 NADIALI Work Name S.No. Outlay Under the Scheme 2,00,000 BEGA Work Name Sources of Funding Outlay Under the Scheme 1 Langal Dhua Tank to Mundia Dandi Road Culvert. Backward Region Grant Funds 2,00,000 2 Barapokharia Bara Tree to Munda Sahi Culvert Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. DASAMANPATNA Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 2 of 51 District Plan Report Page 110 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Saptasakha Boundary Wall at Dasamanapatana. Backward Region Grant Funds Gram Panchayat S.No. 1 DEOGAN Work Name Const. of GP Office Boundary Wall Deogaon. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. 2,00,000 2,00,000 KASIPUR Work Name Sources of Funding Outlay Under the Scheme 1 Const. of GP Boundary wall Backward Region Grant Funds 2,00,000 2 Repair of old GP Building and Godown. Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KHANDA BANDHA Work Name Const. of Boundary Wall at Chandimandir Puruna Amanga. Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 GP Boundary Wall, Laulai. Sources of Funding Sogor Gopalpur Drain Sources of Funding Imp.of Makuakateni Play Ground Sources of Funding Work Name Sources of Funding 2,00,000 ODAPADA Work Name Const.of Podapada Pata Culvert Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Town Area S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 KHUNTAJHARI Khuntajhari G.P.Boundary Wall S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 MAKUAKATENI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 SOGAR Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 LAULAI Work Name S.No. Outlay Under the Scheme 5,00,000 Kamakshyanagar Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Market Complex having four rooms. Backward Region Grant Funds 5,00,000 2 Electrification with fixing of poles from post office chhaka towards RamMan Backward Region Grant Funds 7,00,000 Town Area S.No. Bhuban Work Name Sources of Funding Outlay Under the Scheme 1 Market Complex with in NAC Area Backward Region Grant Funds 25,00,000 2 Const.of Drain and Culvert from Gauradevi Chhak to Chinara Pokhari W.No.13 Backward Region Grant Funds 6,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 3 of 51 District Plan Report Page 111 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 3 Const.of Drain and Culvert Baula Chhak to Cinema Hall Chhak W.No. 1 Backward Region Grant Funds 3,00,000 4 Repair of Drain from Baji Chhak to Chinara Pokhari in Ward No. 14 Backward Region Grant Funds 5,00,000 5 Electrification through NAC Area Backward Region Grant Funds 15,00,000 6 Renovation of Kaingadia Tank W.No. 13 Backward Region Grant Funds 5,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 4 of 51 District Plan Report Page 112 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Agriculture District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Chandpur -I, II Backward Region Grant Funds 4,00,000 2 Batasinga -I, II Backward Region Grant Funds 4,00,000 3 Lahada Lift Irrigation project Backward Region Grant Funds 4,00,000 4 Karanda Tota Village Cross Bandha. Backward Region Grant Funds 5,00,000 Block Panchayat S.No. 1 GONDIA Work Name Sources of Funding Outlay Under the Scheme Const. of Field Channel Near Goudasahi , Biswanathpur. Backward Region Grant Funds Town Area S.No. 2,00,000 Kamakshyanagar Work Name Sources of Funding Outlay Under the Scheme 1 Dev.of Jhumpan Tank in Ward No. 2 Backward Region Grant Funds 5,00,000 2 Dev. of Badabandha Tank in Ward No. 8 Backward Region Grant Funds 2,00,000 3 Dev. of Subudhi Bandha in ward No. 1 Backward Region Grant Funds 2,00,000 4 Dev. of Nadia Bandha in Ward No.6 Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 5 of 51 District Plan Report Page 113 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Drinking water Gram Panchayat S.No. 1 BARIHAPUR Work Name Barihapur Village Water Supply Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 3,00,000 Annexure-IV : Page 6 of 51 District Plan Report Page 114 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Roads District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Kusuma Gothe Sahi CC Road. Backward Region Grant Funds 4,00,000 2 Madanpal village CC Road. Backward Region Grant Funds 4,00,000 3 Khajuri Chasa Sahi and Patra sahi CC Road with CD work. Backward Region Grant Funds 4,00,000 4 Const. of CC road in Tarajanga Gopal Sahi to Patra Sahi. Backward Region Grant Funds 4,00,000 5 Const. of rahani Siva Mandir Chakka to gaon Pokhari CC Backward Region Grant Funds Road. 4,00,000 6 Const. of CC road from Baji Rout Smruti to Chandisahi . Backward Region Grant Funds 4,00,000 7 Const. of Bamuan Harijan Sahi to UP school chhaka CC road. Backward Region Grant Funds 4,00,000 8 Const. of Bherugunia village CC road. Backward Region Grant Funds 4,00,000 9 Const.of Nua Barada Sahi Village C.C.Road Backward Region Grant Funds 4,00,000 10 Const. of CC road of village Badajhara. Backward Region Grant Funds 4,00,000 11 Const. of Panivandara Tantisahi CC road. Backward Region Grant Funds 4,00,000 12 Copnst. of CC road from Lukhia tangara to Chaupahdi , Damola Backward Region Grant Funds 4,00,000 13 Satasanga Kendra Road via Harijan sahi Basti to NH-42 CC Road Backward Region Grant Funds 4,00,000 14 Dayanidhipur Village CC Road Backward Region Grant Funds 4,00,000 15 Padatalasahi to Village pond CC Road Backward Region Grant Funds 4,00,000 16 Jayapanga Pradhan Sahi CC Road Backward Region Grant Funds 4,00,000 17 Thokar Gotiadandi Village CC Road Backward Region Grant Funds 4,00,000 18 Karanda Khaira sahi to dhuliamunda village cc road Backward Region Grant Funds 4,00,000 19 Menkapasi to Goudasahi CC Road Backward Region Grant Funds 4,00,000 20 Imp.of Patala Burungi Bhui Road with CD Work Backward Region Grant Funds 4,00,000 21 Const.of CC Road at Kusumjodi Shabarasahi Backward Region Grant Funds 4,00,000 22 Const.of CC Road in Khuntabati Village Backward Region Grant Funds 4,00,000 23 Bhagirathipur Bada Sabarasahi CC Road Backward Region Grant Funds 4,00,000 24 Badapathar Harizansahi CC Road, Kendupasi Backward Region Grant Funds 4,00,000 25 Sibaji Nagar CC Road, Jiridamali Backward Region Grant Funds 4,00,000 26 Const.of Drain and CC Road of Aluajharana Juangasahi Village Backward Region Grant Funds 4,00,000 27 Const. of Sadangi Village CC Road. Backward Region Grant Funds 4,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 7 of 51 District Plan Report Page 115 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 28 Const. of Muturibandha Juanga Sahi CC Road. Backward Region Grant Funds 4,00,000 29 Const. of Nilakanthapur village CC road Backward Region Grant Funds 4,00,000 30 Const. of Club Building to takughar CC Road of Kansari Backward Region Grant Funds 4,00,000 Block Panchayat S.No. BHUBAN Work Name Sources of Funding Outlay Under the Scheme 1 Const. of CC Road from tareno to Khetrapal, Asurabandha Backward Region Grant Funds 2,00,000 2 Const. of Nilakatha pur CC Road Backward Region Grant Funds 2,00,000 3 Const. of Adipura Village CC Road Backward Region Grant Funds 3,00,000 4 Const. of Anlajhari Village CC Road Backward Region Grant Funds 3,00,000 5 Const. of Tareni Mandir to Nua Sahi CC Road Backward Region Grant Funds 2,00,000 6 Const. of CC Road from Bijuli Chhaka to Jiral High School via Gothapatna Sa Backward Region Grant Funds 2,00,000 7 Const. of Brahman Sahi CC Road, Chandara Backward Region Grant Funds 2,00,000 8 Const. of Renendapatna CC Road Backward Region Grant Funds 2,00,000 9 Const. of Mathakhoksa Village CC Road Backward Region Grant Funds 2,00,000 10 Const. of CC Road from NH-200 to Bhagabat Tungi, Dayanbili Backward Region Grant Funds 2,00,000 11 Const. of Balijhati Dehury Sahi CC Road Backward Region Grant Funds 2,00,000 12 Const. of NH-200 to Bamuan Village CC Road Backward Region Grant Funds 2,00,000 13 Const. of Dighi Nua Sahi Road Backward Region Grant Funds 3,00,000 14 Improvement of Odisha ( Senapati sahi ) Road Backward Region Grant Funds 3,00,000 Block Panchayat S.No. HINDOL Work Name Sources of Funding Outlay Under the Scheme 1 Anadipur village C.C.Road Backward Region Grant Funds 2,00,000 2 Pada Talasahi C.C.Road Backward Region Grant Funds 2,00,000 3 Malatimunda sahi C.C.Road Backward Region Grant Funds 2,00,000 4 Const.of Barasahi C.C.Road Backward Region Grant Funds 2,00,000 5 Const.of Kandarasuni Tanla Sahi C.C.Road Backward Region Grant Funds 2,00,000 6 Const.of Harijan Sahi C.C.Road Backward Region Grant Funds 2,00,000 7 Const.of Harijan Sahi C.C.Road Backward Region Grant Funds 2,00,000 8 Balisahi C.C.Road Backward Region Grant Funds 2,00,000 9 Imp.of Nutanpatana Rupali Road Backward Region Grant Funds 3,00,000 Block Panchayat S.No. KANKADA HAD Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Sarabereni Uppersahi CC Road Backward Region Grant Funds 3,00,000 2 Comp.of Bhagamunda CC Road Backward Region Grant Funds 2,50,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 8 of 51 District Plan Report Page 116 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 3 Const.of Kampulei Dehury Sahi CC Road Backward Region Grant Funds 3,00,000 4 Imp.of Road and Culvert from Dangapal to Amba Taeila Backward Region Grant Funds 4,50,000 5 Imp.of Mahabirod Hat Road Backward Region Grant Funds 4,00,000 6 Imp.of Karadakhaman to Andhari Road with Culvert Backward Region Grant Funds 4,00,000 Block Panchayat S.No. ODAPADA Work Name Sources of Funding Outlay Under the Scheme 1 Naraharipur to Ghodadian C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of C.C.Road from Bariksahi to Ambatota Via Dhobasahi Backward Region Grant Funds 2,00,000 3 Const.of Sainbiri Tala Harijana Sahi C.C.Road Backward Region Grant Funds 2,00,000 4 Const.of C.C.Road from Tankasahi to Sabarsahi Backward Region Grant Funds 2,00,000 5 Const.of Chhatia Village C.C.Road Backward Region Grant Funds 2,00,000 6 Const.of Dinabandhupur Ambasahi C.C.Road Backward Region Grant Funds 2,00,000 7 Const.of C.C.Road from Bhandarisahi to Harijan Sahi Backward Region Grant Funds 2,00,000 8 Const.of C.C.Road from Khuntajhari to Gundurapasi Backward Region Grant Funds 2,00,000 9 Const.of Kottam Harijansahi C.C.Road Backward Region Grant Funds 2,10,000 10 Meramandali Harijan Sahi C.C.Road Backward Region Grant Funds 2,50,000 11 Siminari Sabar SAhi C.C.Road Backward Region Grant Funds 2,50,000 Block Panchayat S.No. PARJANG Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Mandap to Purusottampur CC Road Backward Region Grant Funds 2,00,000 2 Const. of Kosthibeda CC Road Backward Region Grant Funds 2,00,000 3 Const. of Govindpur CC Road Backward Region Grant Funds 2,40,000 4 Muktapasi kanti Dagar CC Road Backward Region Grant Funds 2,50,000 5 Const. of CC Road from Majhichaupadhi to PMGSY Backward Region Grant Funds 2,50,000 6 Kankili Village CC Road Backward Region Grant Funds 3,00,000 7 Const. of CC Road from R.D, Road to UP School. Backward Region Grant Funds 2,50,000 8 Const. of CC Road from Harijan Sahi to Pradhan Sahi. Backward Region Grant Funds 2,00,000 9 Const. of Ria Village CC Road. Backward Region Grant Funds 2,50,000 10 Baiginia Upper harijan Sahi CC Road. Backward Region Grant Funds 2,00,000 11 Balipasi Dhobasahi CC Road Backward Region Grant Funds 3,00,000 12 Roda Village CC Road Backward Region Grant Funds 2,00,000 13 Dihadol Village CC Road Backward Region Grant Funds 2,00,000 14 Const. of Mahapata to Parjang Village CC Road Backward Region Grant Funds 2,00,000 15 Sadanapada Sahi CC Road Backward Region Grant Funds 4,00,000 16 Rehabereni CC Road Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 9 of 51 District Plan Report Page 117 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Gram Panchayat S.No. 1 BALIBO Work Name Const.of Nuasahi CC Road , Balibo Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 BARUAN(B) Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Verubania Village C.C.Road Backward Region Grant Funds 2,00,000 2 Completion of Badakathia village CC Road Backward Region Grant Funds 2,00,000 3 Const.of Kolhania Village CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. BHUSAL Work Name Sources of Funding Outlay Under the Scheme 1 Shikharpur Village Road, Asurabandha Backward Region Grant Funds 2,00,000 2 Const.of road from Bhusal M.E.School to Kothaghara Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 DAYANABILI Work Name Const.of CC Road from Gabagoda Mandap to Siba Mandir, Dayanabili Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of C.C.Road from Anal H.S. to Nuasahi Village Road Sources of Funding Road from saradipur PWD road to Kairanali Sources of Funding Const.of Maa Chariakhia C.C.Road at Ektali Tala Sahi Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 EKTALI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,80,000 DIGHI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 DHALAPADA Work Name S.No. Outlay Under the Scheme 2,50,000 GADA NRUSINGHA PRASAD Work Name Sources of Funding Outlay Under the Scheme Const.of C.C.Road from Udhaba School House to Dhoba Backward Region Grant Funds Sahi. G.N.Prasad Gram Panchayat S.No. 3,00,000 JIRAL Work Name Sources of Funding Outlay Under the Scheme 1 Road from Jiral H.S. to Bijuli Chhak , via Gotha Patna Road Backward Region Grant Funds 2,00,000 2 Road from Badheisahi Bada Pokahri Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KANAPAL(MAHULPAL) Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 10 of 51 District Plan Report Page 118 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Const.of C.C.Road from Bala Sahi to RD Road with CD Work Backward Region Grant Funds 3,00,000 2 Const.of Ojha Sahi to Barik Sahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KUNINDA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Gopal Sahi CC Road, Kendudhipa Backward Region Grant Funds 2,00,000 2 Const.of CC road at Village Kumursinga Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. MARTHAPUR Work Name Sources of Funding Outlay Under the Scheme 1 Jineilo Nua Sahi C.C.Road Backward Region Grant Funds 2,45,000 2 Const.of Govindpur Harijan Sahi C.C.Road Backward Region Grant Funds 2,00,000 3 Const.of Odhana Nua Sahi villge Road Backward Region Grant Funds 2,00,000 4 Const.of Jineilo Puruna SaAhi to Nadi Kula Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. MATHAKARGOLA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Oringa Brahman Sahi C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of Harijan Sahi C.C.Road, BadaMuktapasi Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. MRUDANGA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Mrudanga Nua Hata Sahi CC Road Backward Region Grant Funds 4,00,000 2 Const.of Nuahata Sahi C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. SURA PRATAP PUR Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Srirampur Village CC Road Backward Region Grant Funds 2,00,000 2 Const.of Tipilei to Weekly Market C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. BALADIBANDHA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Baladiabandha Colony Sahi C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of Kurumtangar Baunsagotha Juangasahi C.C. Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. BALIAMBA Work Name Sources of Funding Outlay Under the Scheme 1 Comp.of C.C.road with drain at Baliamba Backward Region Grant Funds 2,50,000 2 Const.of C.C.Road and drain Sarakpatna East Side Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 BANASINGH Work Name Const.of C.C.Road from Kara Samals house to Thakua Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 4,50,000 Annexure-IV : Page 11 of 51 District Plan Report Page 119 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Ghara Gram Panchayat S.No. 1 BARADA Work Name Const.of C.C road with drain from Matrubhabana sahi to Station Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 4,50,000 BHALIBOL KATENI Work Name Const.of Sardeipur Kundisahi C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 4,50,000 BHAPUR Work Name Sources of Funding Outlay Under the Scheme 1 Const.of C.C.Road of Benguniapal Nuasahi Backward Region Grant Funds 2,50,000 2 Const.of C.C.Road of Tenua Harijan Sahi Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. CHAULIA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Nagena village C.C.Road Backward Region Grant Funds 2,50,000 2 Const.of C.C.Road Tavapal village Gada Das House to Badajora Nala Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. DHIRAPATNA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of C.C.Road from R.D.Road to Rana Sahi and R.D.Road to Dash Sahi Backward Region Grant Funds 2,50,000 2 Const.of C.C.Road from R.D.Road to Dhirapatna School Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 GENGUTIA Work Name Const.of C.C.Road from Gurujang Pry.School to Village end Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 4,50,000 GOBINDAPUR Work Name Sources of Funding Outlay Under the Scheme 1 Const.of C.C.Road of Govindpur Ward No. 10 Backward Region Grant Funds 2,00,000 2 Const.of C.C.Road from NH to Kanteikolia Mohanty sahi Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. KAIMATI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of C.C.Road from PWD road to Harijan Sahi Backward Region Grant Funds 2,00,000 2 Comp.of Gahamakhunti Harijan Uparsahi incomplete C.C.Road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. 1 KAKUDIBHAG Work Name Kakudibhag Community Centre to Puruna Pokhari Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 Annexure-IV : Page 12 of 51 District Plan Report Page 120 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA C,.C.Road 2 Ichhapur to Similoipatna Nuasahi C.C.Road Backward Region Grant Funds Gram Panchayat S.No. 2,50,000 KANKADAHAD Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Majuri incomplete C.C.road Drain Backward Region Grant Funds 2,00,000 2 Const.of Namachira Uparsahi Incomplete C.C.Road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. 1 KANKADPAL Work Name Const.of Rangiabahali Juangasahi CC Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 4,50,000 MADHUSAHUPATNA Work Name Const.of C.C.Road from Bimbola chasa Sahi to Sebasrama School Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 4,50,000 MANGALPUR Work Name Sources of Funding Outlay Under the Scheme 1 Const.of C.C.Road from Mangalpur Upar Ragadi sahi to Banjhia Amba Via Sani Backward Region Grant Funds 2,00,000 2 Const.of Panchakahania Village C.C.Road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. NADIALI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Nadiali Ward No. 5 Korei Sabar sahi C.C.Road Backward Region Grant Funds 1,00,000 2 Const.of C.C.Road Regeda Paika Sahi Backward Region Grant Funds 1,50,000 Gram Panchayat S.No. NAGIAPASI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Dahimal Sabar Sahi C.C.Road Backward Region Grant Funds 2,50,000 2 Comp.of Nagiapasi Incomplete C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 SANKARPUR Work Name Const.of Parbatia East Side road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 SANKULEI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of C.C.road and drain from Balabhadrapur Nua sahi to Village Play Backward Region Grant Funds 3,00,000 2 Const.of C.C.road from Bebartakateni Tala Sahi to Polia road Electric Poll Backward Region Grant Funds 1,50,000 Gram Panchayat S.No. SAPTASAJYA Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 13 of 51 District Plan Report Page 121 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Const.of C.C.Road from Bankuala village to village bandha Backward Region Grant Funds 2,00,000 2 Comp.of Padmanavpur Adibasi Sahi Incomplete road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. 1 SOGARPASI Work Name Const.of C.C.Road from Subarnapur School to Pradhan House Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of C.C.Road of Kotapal Village Sources of Funding CC Road from Mangala Mandir to Kothaghar, Deogaon Sources of Funding PWD Road to Matha Chhaka via Sundhi Sahi. Sources of Funding 4,50,000 KABERA Work Name Kabera RD Road to Dolamandap CC Road. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 GONDIA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 4,50,000 DEOGAN Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 4,50,000 TARABHA Work Name S.No. Outlay Under the Scheme 3,00,000 KARAMUL Work Name Sources of Funding Outlay Under the Scheme 1 Bhalikana VIllage CC Road. Backward Region Grant Funds 2,00,000 2 CC Road at Bhaliakana Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KHANDA BANDHA Work Name Sources of Funding Outlay Under the Scheme 1 Khandabanadha Behera Sahi CC Road. Backward Region Grant Funds 2,00,000 2 Culvert at Gopalpur nadikula Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 MATHA TENTULIA Work Name CC Road at Mugapada Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Work Name Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 NEULAPOI Chandrasekharpur Talasahi CC Road S.No. Outlay Under the Scheme 2,00,000 PORUHAKHOJA Work Name CC Road from Stadium to Srihari Patna. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 Annexure-IV : Page 14 of 51 District Plan Report Page 122 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Gram Panchayat S.No. 1 RAITALA Work Name Const. of singa CC Road. Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 RATANAPUR Work Name Kanta Patna Village Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 SADANGI Work Name Sources of Funding Outlay Under the Scheme 1 Jharada Matha CC Road. Backward Region Grant Funds 2,00,000 2 Barada Minor School to Babutaila Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 ASARADA Work Name Imp.of road from Dolamandap to Bandha Sahi Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Imp.of Harijan Sahi Road Sources of Funding Const.of C.C.Road from Bhoisahi to Khairasahi Sources of Funding Nuakote Harijan Sahi C.C.Road Sources of Funding Const.of Chamara Sahi C.C.Road Sources of Funding Const.of Kuruma Harizan Sahi C.C.Road Sources of Funding Manipur Village C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 DUDURUKOTE Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 DANDIRI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 CHITALPUR Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 BAUNSA POKHARI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BAMPA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BABANDHA Work Name S.No. Outlay Under the Scheme 2,00,000 GALAPADA Work Name Imp.of R.D.to Brahmani Dei Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 GANDANALI Annexure-IV : Page 15 of 51 District Plan Report Page 123 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. 1 Work Name Const.of Kharachuli to Khandadhua Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Tutupada Village C.C.Road Sources of Funding 3,00,000 KALINGA Work Name Const.of Tanla Sahi C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 HATURA Work Name S.No. Outlay Under the Scheme 3,00,000 KANSARA Work Name Sources of Funding Outlay Under the Scheme 1 Kansara Tenlisahi Jenasahi C.C.Road Backward Region Grant Funds 3,00,000 2 Ambithi to Biswal Sahi Road to Khirasahi Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 KARANDA Work Name Const.of Harizan Sahi (Karanda) C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Bauriataila Harizan Sahi C.C.Road Sources of Funding Guagaria Juangsahi C.C.Road Sources of Funding 3,00,000 MADHAPUR Work Name Const.of Ghudughuda Sahi C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 KUTUNIA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 KUKUTA Work Name S.No. Outlay Under the Scheme 3,00,000 PATALA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of West Harizan Sahi C.C.Road Backward Region Grant Funds 3,00,000 2 Iswarpur Village C.C.Road Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 BADASUANLO Work Name Tulasipasi Patrasahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 3,00,000 BAISINGA Work Name Sources of Funding Outlay Under the Scheme 1 Kandarsingha village C.C.Road Backward Region Grant Funds 2,00,000 2 Tentulisingha Village C.C.Road Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 16 of 51 District Plan Report Page 124 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Gram Panchayat S.No. BALIGORADA Work Name Sources of Funding Outlay Under the Scheme 1 Baligoroda C.C.Road Backward Region Grant Funds 3,00,000 2 Talagoroda C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. BANKUAL Work Name Sources of Funding Outlay Under the Scheme 1 Bankual Village C.C.Road Backward Region Grant Funds 3,00,000 2 Pallikateni Village C.C.Road Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 BARUAN(K) Work Name Baruan Baditaila C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Outlay Under the Scheme 3,00,000 BAUNSAPAL Work Name Sources of Funding Outlay Under the Scheme C.C.Road from N.H.200 to Khairasahi to Tala Harijansahi Backward Region Grant Funds of Sibulapasi Gram Panchayat S.No. 1 BHAIRPUR Work Name PWD Road to Guneibil Sabarsahi C.C.Road Sources of Funding 1 3,00,000 BUDHIBILI Work Name Verumunda Harijan Sahi C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. 3,00,000 2,00,000 JAGANNATHPUR Work Name Sources of Funding Outlay Under the Scheme 1 J.N.Pur Harijan Sahi Village C.C.Road Backward Region Grant Funds 2,00,000 2 Koriapal Village C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KADUA Work Name Kadua Baisa Gopal Sahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 3,00,000 KANAPURA Work Name Sources of Funding Outlay Under the Scheme 1 C.C.Road from Rajukulakateni to Nilamadhabpur Backward Region Grant Funds 3,00,000 2 Jiridamali Harijan Sahi C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KANTAPAL Work Name Sources of Funding Outlay Under the Scheme 1 Kantapal Sabar Sahi Village C.C.Road Backward Region Grant Funds 3,00,000 2 Const.of Kaliahata C.C.Road Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 17 of 51 District Plan Report Page 125 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Gram Panchayat S.No. KANTIOKATNEI Work Name Sources of Funding Outlay Under the Scheme 1 Kantiokateni Village C.C.Road ( Harijan Sahi, Satabhaya Sahi, Godinali Sahi Backward Region Grant Funds 3,00,000 2 Kantiokateni Sidhashram sahi C.C.Road Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 KANTIOPUTASAHI Work Name Jaka Village C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 KOTAGARA Work Name Kotogora Uparsahi Harijan Sahi C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 3,00,000 KUSUMJODI Work Name Sources of Funding Outlay Under the Scheme 1 Nua-Analabereni Juangasahi C.C.Road Backward Region Grant Funds 3,00,000 2 Const.of New Salapada Village C.C.Road Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. MAHULPAL Work Name Sources of Funding Outlay Under the Scheme 1 Kakudia Village C.C.Road Backward Region Grant Funds 3,00,000 2 Bijasahi PWD Road to Harijansahi C.C.Road(Via Godisahi) Backward Region Grant Funds 2,00,000 3 Mahulpal PWD Road to Nahakani Upersahi C.C.Road ( Via - Mathasahi) Backward Region Grant Funds 2,00,000 4 Mahulpal Harijan Sahi C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 RAI NARASINGHPUR Work Name Srirampur Uparsahi C.C.Road up to Indrajeet Nala Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 3,00,000 SOGAR Work Name Sources of Funding Outlay Under the Scheme 1 Sogor Bank Chhak to Dhobasahi Road Backward Region Grant Funds 2,00,000 2 Sogor Alekha Mandir to Barun Chhak C.C.Road Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. TUMSINGA Work Name Sources of Funding Outlay Under the Scheme 1 Dhobobahali Harijan Sahi C.C.Road Backward Region Grant Funds 3,00,000 2 Const.of Srimula Village C.C.Road Backward Region Grant Funds 5,00,000 Gram Panchayat S.No. 1 BALIKUMA Work Name Const.of Dholighotha to Tarenipasi Road With Culvert Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 3,00,000 Annexure-IV : Page 18 of 51 District Plan Report Page 126 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Gram Panchayat S.No. BAM Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Pathagarh CC Road Backward Region Grant Funds 2,50,000 2 Const.of Pakatamunda village C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 BATAGAON Work Name Const.of CC Road at Bramhania Village Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of CC Road from village to Siba Temple Sources of Funding 2,00,000 BIRIBOLEI Work Name Const.of Biribolei village C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BIRASAL Work Name S.No. Outlay Under the Scheme 2,50,000 CHANDAPUR Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Chandapur Village C.C.Road (Phase - III) Backward Region Grant Funds 2,00,000 2 Const.of C.C.Road at Tipeijharan Matia Sahi Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 DASHIPUR Work Name Const.of Gurujanguli Balisahi Matiasahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 4,00,000 GADAPHALASUNI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Goudasahi C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of Karadakhaman Village C.C.Road Backward Region Grant Funds 2,00,000 3 Const.of Kharkhari C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. GHAGARAMUNDA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Ghagaramunda Padmapur Chemetishai C.C.Road Backward Region Grant Funds 2,50,000 2 Const.of Katumunda School Sahi C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. JHILLI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Jhilli Nuasahi to Kholla Sahi C.C.Road Backward Region Grant Funds 2,50,000 2 Const.of Torodanali Gaon hitarsahi C.C.Road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. KANAKADAHAD Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 19 of 51 District Plan Report Page 127 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Const.of Kandhara Kandisahi C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of R.D.Road to Patabeda C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KANTAPAL Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Gotamara village C.C.Road Backward Region Grant Funds 2,50,000 2 Const.of C.C.Road at Colony No.4 Nuagaon Sahi Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KANTOL Work Name Const.of Chilida Mahantasahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 KARAGOLA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Dangapal Santalsahi to Colony Sahi C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of Karagola Basudevpur C.C.Road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. 1 KERJULI Work Name Const.of Rodanga Dalak Sahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 KUTURIA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Madarangamunda Village C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of Kuturia Goudasahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 MAHABIROD Work Name Const.of Dhobalipathar Matiasahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 MAKUAKATENI Work Name Const.of Khajuria C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 PANGATIRA Work Name Sources of Funding Outlay Under the Scheme 1 Comp.of Bramanadhara Village C.C.Road Backward Region Grant Funds 2,00,000 2 Const.of Andhari Village C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. RAIBOL Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Maidharpur Patrasahi to Mahantsahi C.C.Road Backward Region Grant Funds 3,00,000 2 Const.of Sitalbasa Village C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 GADASILA Annexure-IV : Page 20 of 51 District Plan Report Page 128 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. 1 Work Name Chainpurpatana Masania C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 BADALO Work Name Const.of C.C.Road from G.P.Office to R.D.Road via Mahadev Mandir Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 BALARAM PRASAD Work Name Sources of Funding Outlay Under the Scheme 1 Artasantrakateni Harijan Sahoo C.C.Road Drain Backward Region Grant Funds 2,50,000 2 Imp.of Patala Dala danda Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. BANGURISINGHA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Nuabangursingh C.C.Road Drain Backward Region Grant Funds 2,50,000 2 Const.of Bangursingh nali road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 BIDO Work Name Const.of Malibido Upper Harijan Sahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 GHATIPIRI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Baliborei Ndikula C.C.Road Backward Region Grant Funds 2,50,000 2 Const.of Rathapada Tantisahi C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 GUNDICHA PADA Work Name Const.of Gundichapada Juanga Sahi C.C.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 INDIPUR Work Name Const.of Indipur Tantisahi to Harijan Sahi C.C.Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 KHARAG PRASAD Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Shivapur Harijan Sahi C.C.Road Backward Region Grant Funds 2,50,000 2 Khadagaprasad Kocipada Nalia sahi C.C.Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KHUNTAJHARI Work Name Khuntajhari to R.D.Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 KOTAM Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 21 of 51 District Plan Report Page 129 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 R.D.Road to Rathiapal road C.C.Road Backward Region Grant Funds Gram Panchayat S.No. 2,00,000 KUSUPANGA Work Name Sources of Funding Outlay Under the Scheme 1 Kusupanga Majhi Sahi C.C.Road Backward Region Grant Funds 2,50,000 2 Narendrapur Harijan Sahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 MANGALPUR Work Name Const.of Mangalpur Gopal Sahi CC Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Dolamandapa to Baramana C.C.Road Sources of Funding Const.of Sanaranibania School CC Road Sources of Funding N.H.42 to Nadighat Road Sources of Funding Const.of Tentuliapada Dehury Sahi C.C.Road Sources of Funding Imp.of Road from N.H.42 to Badakhora Road Sources of Funding 2,00,000 AKHUAPAL Work Name Gelheipasi CC Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 SIMINAI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 SADASIVAPUR Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 ODAPADA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 NIMIDIHA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 NADHARA Work Name S.No. Outlay Under the Scheme 2,00,000 BADAJHARA Work Name Sources of Funding Outlay Under the Scheme 1 Badajhara Palamandap to ashram Chhaka CC Road Backward Region Grant Funds 2,00,000 2 Nuasahi Plamandap to Bandha Sahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 BARIHAPUR Work Name Barihapur Gotha Sahi CC Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 BASOI Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 22 of 51 District Plan Report Page 130 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Basoi Village CC Road Backward Region Grant Funds Gram Panchayat S.No. 1 BASULEI Work Name Durgamandir to baruneswar Club CC Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. 2,50,000 2,00,000 CHANDPUR Work Name Sources of Funding Outlay Under the Scheme 1 Mangala Sahi CC Road Backward Region Grant Funds 2,00,000 2 Batasingh Village CC Road Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. GADAPARJANG Work Name Sources of Funding Outlay Under the Scheme 1 Janhapada Village CC Road Backward Region Grant Funds 3,00,000 2 Bhimasenpur CC Road Backward Region Grant Funds 2,00,000 3 Khandulmunda CC Road Backward Region Grant Funds 3,00,000 4 Dihadol Nandi sahi CC Road Backward Region Grant Funds 2,00,000 5 Medical Campous CC Road Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 GENGUTIA Work Name Gengutia Village CC Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 JAYAPURAKATENI Work Name Sources of Funding Outlay Under the Scheme 1 Padmapokhari CC Road Backward Region Grant Funds 2,00,000 2 Kadabasanta Colony C C Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KALADA Work Name Sources of Funding Outlay Under the Scheme 1 Kundheikhol Ambaburi sahi CC Road Backward Region Grant Funds 2,00,000 2 Kalda Bahal sahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KANDARSINGA Work Name Sources of Funding Outlay Under the Scheme 1 Khalibahal to canal CC Road Backward Region Grant Funds 2,00,000 2 Kadua sahi Chhaka to talasahi model primery school CC Road Backward Region Grant Funds 2,50,000 3 Majhika harijan Sahi Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KANKADASODA Work Name Ramachandrapur CC Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,50,000 KUALO Annexure-IV : Page 23 of 51 District Plan Report Page 131 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. Work Name Sources of Funding Outlay Under the Scheme 1 Paramhansapur Village CC Road Backward Region Grant Funds 2,50,000 2 Natya Kualo Gudi Sahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KUMUSI Work Name Kumushi Village CC Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Nadighata CC Road Sources of Funding 2,50,000 MANIKAMARA Work Name Manikmara Purunagaon CC Road Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 LODHANI Work Name S.No. Outlay Under the Scheme 2,25,000 PATARPADA Work Name Sources of Funding Outlay Under the Scheme 1 Sankamar CC Road Backward Region Grant Funds 2,00,000 2 Dihakamar CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. PITIRI Work Name Sources of Funding Outlay Under the Scheme 1 NH-200 to Odasingha Mundeilo Road Backward Region Grant Funds 2,00,000 2 Jatia Tangar Sahi CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. RENTHAPAT Work Name Sources of Funding Outlay Under the Scheme 1 Panibhandar to Katabahal Road Backward Region Grant Funds 2,00,000 2 PMGSY Road to Budhithakurani CC Road Backward Region Grant Funds 3,00,000 3 Compl. of harijan sahii CC Road Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 RODA Work Name Roda Talasahi CC Road Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Santinagar Sahi CC Road Sources of Funding 3,00,000 SARANG Work Name Bhliataila CC Road Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 SANDA Work Name S.No. Outlay Under the Scheme Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Muncipality Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,50,000 Dhenkanal Annexure-IV : Page 24 of 51 District Plan Report Page 132 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. Work Name Sources of Funding Outlay Under the Scheme 1 S/R to the road and drain from Laxman Mohanty Res towards Santosh Mohapatra Backward Region Grant Funds 5,00,000 2 S/R to the road from Rabi Samal Res towards kunjakanta Backward Region Grant Funds Tank in W.N. 2 5,00,000 3 S/R to the Southern Embakment road to Kunjakanta Tank in Ward No. 2 Backward Region Grant Funds 10,00,000 4 S/R to the road From Danda Road towards Dhala Babu Res.in Ward No. 4 Backward Region Grant Funds 3,00,000 5 S/R to the road and drain from Banadurga Temple towards Balaram Temple W.N. Backward Region Grant Funds 3,00,000 6 S/R to the road and drain from Banadurga Temple towards Binod Kar Res. W.N. Backward Region Grant Funds 2,00,000 7 S/R to the raod and drain from Muslim Sahi Club Chhak towards Urdu U.P.Scho Backward Region Grant Funds 3,00,000 8 S/R to the raod and drain from Hirasagar towards Sunil Mishra Res. in Housi Backward Region Grant Funds 3,00,000 9 S/R to the road and drain From H.Satpathy towards Jenadevi C.C.along Keshar Backward Region Grant Funds 4,00,000 10 S/R to the road and drain from Bhapur Road towards Municipal well Backward Region Grant Funds 4,00,000 11 S/R to the road and drain from Panda Babu Res. towards Backward Region Grant Funds Dolagobinda 2,00,000 12 S/R to the Muktadeipur Sasan road and drain in Ward No. 15 Backward Region Grant Funds 3,50,000 13 S/R to the road and drain from Birabar Sahoo Res back side towards Dr.Seba Backward Region Grant Funds 5,00,000 14 S/R to the road and drain in front of Baral Babu Res in Gayatri Nagar in Backward Region Grant Funds 5,00,000 15 S/R to the Chasa Sahi Road and drain in Ward No. 17 Backward Region Grant Funds 4,00,000 16 S/R to the road and drain from Benudhar Nayak Res towards Lala Babu Res i Backward Region Grant Funds 3,00,000 17 S/R to the Similia sabar sahi road and drain in Ward No. 18 Backward Region Grant Funds 2,00,000 18 S/R to the road and drain at back side of Sarala Engineering in Ward . 18 Backward Region Grant Funds 2,00,000 19 S/R to the Rameswarpur Tala Sahi road and drain in ward no. 18 Backward Region Grant Funds 2,00,000 20 S/R to the road and drain from Rabi Babu Res towards Babaji Babu Res Backward Region Grant Funds 3,00,000 21 S/R to the Similia Village main road and drain in Ward No. 19 Backward Region Grant Funds 4,00,000 22 S/R to the Similia Driver Sahi road and drain in Ward No. Backward Region Grant Funds 19 6,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 25 of 51 District Plan Report Page 133 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 23 S/R to the road and drain from CC road end towards Bhrambarbar Dalei Res Backward Region Grant Funds 6,00,000 24 S/R to the road and drain in front of Gatikrushna Mohapatra Res in Town Pla Backward Region Grant Funds 3,00,000 25 S/R to the road and drain from Tuna Mohapatra Res towards Dubey Colony Backward Region Grant Funds 3,00,000 26 S/R to the road and drain from Sunakar Nayak Res towards station Bazar Backward Region Grant Funds 5,00,000 27 S/R to the road and drain from PWD main road towards Babu Mohapatra Backward Region Grant Funds 2,00,000 28 S/R to the road and drain in front of Mangala Mandir from Backward Region Grant Funds Hata Road towards 5,50,000 29 S/R to the road and drain from NH42 near Anil Mohapatra Res Backward Region Grant Funds 5,00,000 30 S/R to the drain from H.Satpathy Res towards Jena Devi CC along Kesaria,W.N 31 S/R to the road and drain from Bhutia Babu Res towards Kainthapolia in Ward Backward Region Grant Funds 3,00,000 32 S/R to the road and drain from CC road end towards Dakshinkali road in Ward Backward Region Grant Funds 15,00,000 33 S/R to the road and drain in Surya Nagar in Ward No. 1 Backward Region Grant Funds 10,00,000 34 S/R to the road from Rathagada towards Khamar Sahi in Ward No. 10 Backward Region Grant Funds 25,00,000 35 S/R to the road and drain in Korian Harijan Sahi (Main road) in ward no. 23 Backward Region Grant Funds 25,00,000 36 S/R to the road and drain from Dakshinkali road towards Millik Babu Res Backward Region Grant Funds 15,00,000 37 Dev.of the road from PWD main road towards Banjhakusuma Solid Waste Backward Region Grant Funds 8,00,000 38 S/R to the Balaram Vihar road and drain in Ward No. 9 Backward Region Grant Funds 4,00,000 39 S/R to the road and drain from Devi Mohanty Res towards NH By pass in Ward Backward Region Grant Funds 2,00,000 40 S/R to the road and drain from Baunsia Tank towards Akhi Mohanty Res Backward Region Grant Funds 4,00,000 41 S/R to the road and drain from CC Road end towards Bila Sahi in Ward No.10 Backward 6,00,000 42 S/R to the road and drain from CC Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 26 of 51 District Plan Report Page 134 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Region Grant Funds road end towards Pattanaik Sahi Chhak Backward Region Grant Funds 4,00,000 43 S/R to the road and drain infront of Sarat Mishra Res in Ward No 11 Backward Region Grant Funds 3,00,000 44 S/R to the road and drain from Main Bazar road towards Sakuntala Hotel Backward Region Grant Funds 3,00,000 45 S/R to the road from PWD road towards Bhagirathi Sagar bathing ghat ward no Backward Region Grant Funds 2,00,000 46 S/R to the road and drain from Ganesh Steel Chhak towards Dhruabanarayan Backward Region Grant Funds 3,00,000 47 S/R to the drain from Prativa Das Res towards Surya Hotel Chhak in Ward No Backward Region Grant Funds 2,00,000 48 S/R to the road and drain from MuslimSahi Club Chhak towards Urdu UP School 49 S/R to the road and drain from Suria Naik chhak towards Lenka Babu Res Backward Region Grant Funds 3,00,000 50 S/R to the road and drain from Danish Babu Res towards Backward Region Grant Funds Soumya Das 3,00,000 51 S/R to the road and drain from Suria Naik Res chhak towards Jagannath Babu Backward Region Grant Funds 2,50,000 52 S/R to the road and drain from Rabi Mohanty Res towards Trilochan Nayak Backward Region Grant Funds 2,00,000 53 S/R to the road and drain from Hira Sagar towards Sunil Mishra Res in WN.14 54 S/R to the road and drain from Pravakar Rout Res towards Rudra Parasad Moha Backward Region Grant Funds 3,00,000 55 S/R to the road and drain from Sarat Panigrahi Res towards Sarat Sahoo Res Backward Region Grant Funds 3,00,000 56 S/R to the road and drain from Ranju Dalei Res towards Amiya Das Res in Hou Backward Region Grant Funds 3,00,000 57 S/R to the road and drain in Paradise Lane in Ward No. 15 Backward Region Grant Funds 3,50,000 58 S/R to the road and drain from ByPass NH 42 towards Bankual Sahi in ward Backward Region Grant Funds 3,00,000 59 S/R to the road and drain from ByPass NH 42 towards Debendra Samanta Backward Region Grant Funds 2,00,000 60 S/R to the road and drain from PWD main road towards Dama Panda Res Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 27 of 51 District Plan Report Page 135 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Backward Region Grant Funds 5,00,000 61 S/R to the road and drain from Pravat Behera Res towards Parida Sahi Backward Region Grant Funds 5,00,000 62 S/R to road and drain from Banadurga Temple towards Balaram Temple 63 S/R to the road and drain from Banadurga Temple towards Binod Kar Res in 64 S/R to the road from Benudhar Champati Res.towards Nityananda Mishra Res in Backward Region Grant Funds 5,00,000 65 S/R to the road and drain fron NH 42 towards Parbatia Sahi Ward No.1 Backward Region Grant Funds 5,00,000 66 S/R to the Southern embakment road of Kunjakanta Tank in Ward No.2 67 S/R to the road from Ananda Charan Mishra Res towards Backward Region Grant Funds Kunjakanta Tank Ward 5,00,000 68 S/R to the road from Purna Sarangi (Ex-DFO) Res Ward No.4 Backward Region Grant Funds 6,00,000 69 S/R to the road from Danda raod towards Dhala Babu Res in Ward No.4 70 S/R to the road from Nageswar Behera towards Rudra Satpathy in Ward No.4 Backward Region Grant Funds 3,00,000 71 S/R to the road and drain from BB High School Chhak towards D.I. Office Backward Region Grant Funds 8,00,000 Town Area Kamakshyanagar Sources of Funding Outlay Under the Scheme S.No. Work Name 1 Imp.of Road from Rekula School to Sabarsahi in ward no. 11 Backward Region Grant Funds 3,00,000 2 Imp. of Road from Sankar Samal towards Kumbhar Sala, in ward no. 6 Backward Region Grant Funds 3,00,000 3 Imp. of road from N.H. 200 towards Khuntapasi in ward no. 8 Backward Region Grant Funds 5,00,000 4 Imp. of Road from N.H. 200 to Baniasahi in ward no. 9 Backward Region Grant Funds 4,00,000 5 Imp. of Road from ITI Chhaka towards water Tank in Ward No. 8 Backward Region Grant Funds 3,00,000 6 Imp. of Indipur road in ward No. 1 Backward Region Grant Funds 5,00,000 7 Imp. of Road from Binayak Mishra House towards Harijan sahi in ward No . 3 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 28 of 51 District Plan Report Page 136 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Backward Region Grant Funds 3,00,000 8 Imp. of Road from Durga Mishra house to Judhisthira Bihari House in Ward No Backward Region Grant Funds 3,00,000 9 Imp. of Road from G.B. Park to Range Office SDJM Qrs to P. Mishra . Backward Region Grant Funds 4,00,000 10 Tahasil Office to Dasi Pokhari in Ward No. 11 Backward Region Grant Funds 5,00,000 11 Const. of Harijan Sahi Road in ward No. 11 Backward Region Grant Funds 2,00,000 12 Back side of G.B. Park in ward No. 5 Backward Region Grant Funds 2,00,000 13 Const. of Road from Narottam Das house towards Chitta Bisoi house in W.N. 7 Backward Region Grant Funds 2,50,000 Town Area Bhuban Sources of Funding S.No. Outlay Under the Scheme 1 Work Name Road from Anil Cloth Store to PWD Road via Bangalisahi well, Ward No.6 Backward Region Grant Funds 10,00,000 2 Brudheswar Road Backward Region Grant Funds 10,00,000 3 Const .of Road Drain Baula Chhak to Godi Pokhari Chhak W.No.1 Backward Region Grant Funds 15,00,000 4 Road from Cinema Hall to Deol Gadia W.No.1 Backward Region Grant Funds 4,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 29 of 51 District Plan Report Page 137 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Education District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Chilida Primary School Boundary Wall Backward Region Grant Funds 4,00,000 2 Akhupal Primary school Boundary wall. Backward Region Grant Funds 4,00,000 3 Const. of Jiral high School Boundary wall. Backward Region Grant Funds 4,00,000 4 Const. of Surapratappur High School Boundary wall. Backward Region Grant Funds 4,00,000 5 Const. of Bamuan Tipilei Nodal U.P. School Compound Wall. Backward Region Grant Funds 4,00,000 6 Radhadeipur H.S. Boundary wall cycle stand Backward Region Grant Funds 4,00,000 7 Const.of Boundary wall Bhojeipur UP School Backward Region Grant Funds 4,00,000 8 Const.of Boundary Wall at Lambodarpur Pry.School Backward Region Grant Funds 4,00,000 9 Const.of Boundary Wall at Dhalpur Sevashram School Backward Region Grant Funds 4,00,000 10 Incomplete Compound wall U.P.School Backward Region Grant Funds 4,00,000 11 Baladiabandha Balibati residental School Boundary Wall Backward Region Grant Funds 4,00,000 12 Khamar Pry.School room with Boundary Wall Backward Region Grant Funds 4,00,000 13 Const. of Jambunali (Ambapalash ) U. P School building. Backward Region Grant Funds 4,00,000 14 Const. of building for Parjang College. Backward Region Grant Funds 4,00,000 15 Baniapada U.P.School Boundary wall Backward Region Grant Funds 4,00,000 16 Const. of Raghuabil Mundasahi UP school ( Tulasipasi) Backward Region Grant Funds 4,00,000 17 Const.of Gundichapada H.S.Boundary Wall Backward Region Grant Funds 4,00,000 18 Const.of Class Room of Kamalanga H.S. Backward Region Grant Funds 4,00,000 19 Incomplete Building Boundary Wall (Sidheswar H.S.) Bhaktapur Backward Region Grant Funds 4,00,000 20 Const. of Karamula ME School Compound Wall Backward Region Grant Funds 4,00,000 21 Const. of Kendupada high School Compound Wall. Backward Region Grant Funds 4,00,000 22 Const. of Puruna Amanga UP School boundary wall. Backward Region Grant Funds 4,00,000 23 Tulasipasi U.P.School Boundary Backward Region Grant Funds 4,00,000 24 Jiridamali H.S.Boundary Wall Backward Region Grant Funds 4,00,000 25 Boundary wall of Kotagara M.E.School Backward Region Grant Funds 4,00,000 26 Addl. Class Room of Baruan Anchalika H.S. Backward Region Grant Funds 4,00,000 27 Improvement of Kotagara H.S. Backward Region Grant Funds 4,00,000 28 Const. of Ankurda UP School Boundary Wall. Backward Region Grant Funds 4,00,000 29 Const. of Nityanandapur UP School Boundary wall. Backward Region Grant Funds 4,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 30 of 51 District Plan Report Page 138 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 30 Const. of Additional Class Room at MKGC College Backward Region Grant Funds 4,00,000 31 Const. of panchayat High School boundary wall. Backward Region Grant Funds 4,00,000 32 Const. of Saranga Sabar Sahi UP School building. Backward Region Grant Funds 4,00,000 Block Panchayat S.No. BHUBAN Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Anatpur UP School Boundary Backward Region Grant Funds 2,00,000 2 Const. of Anal UP School Boundary Backward Region Grant Funds 2,00,000 3 Const. of Boundary Wall Panchayat High School, Bedhapal Backward Region Grant Funds 2,15,000 Block Panchayat S.No. DHENKANAL SADAR Work Name Sources of Funding Outlay Under the Scheme 1 Comp.of Jenasahupatna AWC Backward Region Grant Funds 50,000 2 Comp.of AWC at Nadiali Backward Region Grant Funds 1,50,000 3 Comp.of Kurumtangar AWC Backward Region Grant Funds 40,000 4 Comp.of Banasingh AWC Backward Region Grant Funds 80,000 5 Comp.of Bhuinpur AWC Backward Region Grant Funds 80,000 6 Comp.of Radhadeipur B AWC Backward Region Grant Funds 80,000 7 Const.of Bandhanuagaon New AWC Backward Region Grant Funds 2,00,000 8 Comp.of Bhapur A AWC Backward Region Grant Funds 80,000 9 Const.of New AWC at Lambodarpur Backward Region Grant Funds 2,00,000 10 Const.of C.S.Prasad A AWC Backward Region Grant Funds 1,50,000 11 Const.of Barahata New AWC Backward Region Grant Funds 2,00,000 12 Comp.of Kamadhenukote AWC Backward Region Grant Funds 80,000 13 Comp of Gurujan AWC Backward Region Grant Funds 80,000 14 Comp.of Borapada AWC Backward Region Grant Funds 2,50,000 15 Comp.of Sankhua AWC Backward Region Grant Funds 1,80,000 16 Comp.of Guhaldihi AWC (East.Cost. 3.50 Lakh) Backward Region Grant Funds 1,00,000 17 Comp of Ichhapur AWC Backward Region Grant Funds 1,50,000 18 Comp.of Kankadahad A AWC Backward Region Grant Funds 80,000 19 Comp.of Namachira AWC Backward Region Grant Funds 80,000 20 Const.of New AWC at Kata Khamar Mandapal Sahi Backward Region Grant Funds 2,00,000 21 Comp.of Mangalpur AWC Backward Region Grant Funds 1,50,000 22 Comp.of Deopada AWC Backward Region Grant Funds 80,000 23 Comp.of AWC at Regeda Backward Region Grant Funds 1,50,000 24 Const.of AWC at Dahimal Backward Region Grant Funds 2,00,000 25 Const.of AWC at Koranga Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 31 of 51 District Plan Report Page 139 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 26 Const.of AWC at Sankulei Backward Region Grant Funds 2,00,000 27 Comp.of Majhi Sahi AWC Backward Region Grant Funds 1,80,000 28 Comp.of Patrabhag A Navajibanpur AWC Backward Region Grant Funds 80,000 29 Comp.of AWC at Parikheda Backward Region Grant Funds 80,000 30 Comp.of AWC at Nathua Backward Region Grant Funds 80,000 31 Comp of AWC at Arda Backward Region Grant Funds 50,000 32 Comp.of AWC at Dudhukateni Backward Region Grant Funds 80,000 33 Comp.of AWC at Talabarkote B Backward Region Grant Funds 80,000 34 Comp.of AWC (Jatrapadia) Backward Region Grant Funds 1,00,000 35 Comp.of Baunsaputia AWC Backward Region Grant Funds 1,00,000 36 Comp.of AWC at Nuagaon A Backward Region Grant Funds 80,000 37 Const.of Addl.Class Room at G.C.Bidyapitha Baladiabandha Backward Region Grant Funds 2,00,000 38 Const.of Addl. Class Room at Balyamba H.S. Backward Region Grant Funds 2,00,000 39 Comp.of Addl Class Room for Barada Pry.School Backward Region Grant Funds 2,00,000 40 Const.of Baguniapal Pry.School Building Backward Region Grant Funds 2,00,000 41 Addl.Class Room at Dhirapatna U.P.School Backward Region Grant Funds 2,00,000 42 Const.of Gengutia Panchayat College office Building Backward Region Grant Funds 2,00,000 43 Comp.of Lochapalli U.P.School Class Room Backward Region Grant Funds 1,00,000 44 Comp.of Kankadahad G.P.High School Building (Est.Cost 2.60 ) Lakh Backward Region Grant Funds 60,000 45 Const.of Rajuapatana School Building Backward Region Grant Funds 2,00,000 46 Comp.of New Building at Radhakant Jew Bidyapitha (Est.Cost Rs.4.00) Lakh Backward Region Grant Funds 1,30,000 47 Const.of Khalibandha U.P.School Building Backward Region Grant Funds 2,00,000 Block Panchayat S.No. GONDIA Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Majhisahi AWC Backward Region Grant Funds 2,00,000 2 Const. of Elijanga AWC. Backward Region Grant Funds 2,00,000 3 Const. of Dalsinga Marthapur AWC at Chhaka Sahi Backward Region Grant Funds 2,00,000 4 Const. of Jamunalia AWC Building. Backward Region Grant Funds 2,00,000 5 Const. of Nabalinga AWC building. Backward Region Grant Funds 2,00,000 6 Const. of Latadeipur AWC building. Backward Region Grant Funds 2,00,000 7 Const. of AWC at Ramachandra pur. Backward Region Grant Funds 2,00,000 8 Const. of AWC at Gondia Harijansahi Backward Region Grant Funds 2,00,000 9 Const. of Brundabanpur AWC and Boundary wall. Backward Region Grant Funds 2,00,000 10 Const. of sadangi AWC in Ward No . 5 Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 32 of 51 District Plan Report Page 140 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 11 Const. of Nityananadpur AWC (c) Backward Region Grant Funds 2,00,000 12 Const. of Chhotatentuli AWC Backward Region Grant Funds 2,00,000 13 Const. of Nabakashipur AWC and Boundary wall. Backward Region Grant Funds 2,00,000 14 Const. of AWC at Singa, Singa Backward Region Grant Funds 2,00,000 15 Const. of Kathpal AWC, Kathapal Backward Region Grant Funds 2,00,000 16 Const. of AWC at Gundurapashi- I, Gundurapashi Backward Region Grant Funds 2,00,000 17 Const. of Saantarapur AWC. Backward Region Grant Funds 2,00,000 18 Const. of AWC at Chirulei. Backward Region Grant Funds 2,00,000 19 Const. of AWC at Chirulei. Backward Region Grant Funds 2,00,000 20 Const. of new AWC at Atinda Nuasahi Village. Backward Region Grant Funds 2,00,000 21 Const. of Nuasahi AWC at Birikhunti. Backward Region Grant Funds 2,00,000 22 Const. of AWC at Solagadia Tala sahi. Backward Region Grant Funds 2,00,000 23 Const. of New AWC at Ramsudha Patna. Backward Region Grant Funds 2,00,000 24 Const. of Chirulei high School Boundary Wall and Gate Backward Region Grant Funds 3,00,000 25 Primary School , Deogaon Backward Region Grant Funds 2,00,000 26 Brjanath Badajena High School Building. Backward Region Grant Funds 2,00,000 27 Cosnt. of New Kabera High School. Backward Region Grant Funds 2,00,000 Block Panchayat S.No. HINDOL Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Pry.School Building Backward Region Grant Funds 3,00,000 2 Const.of Bilekhali School Building Backward Region Grant Funds 3,00,000 3 Const.of M.E.School Building Backward Region Grant Funds 2,50,000 4 Const.of School Building Backward Region Grant Funds 3,00,000 5 Const.of Coloni Sahi AWC Backward Region Grant Funds 3,00,000 6 Const.of AWC Building Backward Region Grant Funds 3,00,000 7 Imp.of AWC Building Backward Region Grant Funds 2,00,000 8 Const.of AWC Building Backward Region Grant Funds 2,00,000 9 Const.of Harijan Sahi AWC Building Backward Region Grant Funds 2,00,000 10 Const.of AWC Building Backward Region Grant Funds 2,00,000 11 Const.of AWC Building Backward Region Grant Funds 2,00,000 12 Const.of Champati Sahi AWC Building Backward Region Grant Funds 2,00,000 13 Const.of AWC 1 2 Backward Region Grant Funds 2,00,000 14 Const.of AWC Building - 1 Backward Region Grant Funds 2,00,000 15 Const.of Boundary wall of Pry.School Backward Region Grant Funds 2,15,000 16 Const.of School Boundary wall Backward Region Grant Funds 3,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 33 of 51 District Plan Report Page 141 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 17 Const.of School Boundary wall Backward Region Grant Funds 3,00,000 18 Const.of School Boundary wall Backward Region Grant Funds 3,00,000 19 Const.of School Boundary wall Backward Region Grant Funds 2,50,000 20 Cons.of Boundary wall of Pry.School Backward Region Grant Funds 2,50,000 21 Const.of High School Boundary wall Backward Region Grant Funds 2,50,000 22 Const.of UGME School Boundary wall Backward Region Grant Funds 2,50,000 23 Khaliborei H.S.boundary wall Backward Region Grant Funds 2,00,000 Block Panchayat S.No. KAMAKHYANAGAR Work Name Sources of Funding Outlay Under the Scheme 1 Khatakhura AWC (B) Backward Region Grant Funds 3,00,000 2 Const.of AWC Building Tulasipasi Backward Region Grant Funds 2,50,000 3 Pallisantarapur Pry.School Compound Wall Backward Region Grant Funds 3,00,000 4 Samatangi Old Pry.School Boundary Wall Backward Region Grant Funds 3,00,000 5 Sunajhari Juangasahi U.P.School Boundary Wall Backward Region Grant Funds 2,00,000 6 Balipada (Dimiria) U.P.School Boundary Wall Backward Region Grant Funds 3,00,000 7 Baisingha Pry.School Boundary wall Backward Region Grant Funds 3,50,000 8 Kamagarapatna Pry.School Building Backward Region Grant Funds 3,00,000 9 Const.of AWC Building Bhagirathipur Backward Region Grant Funds 2,50,000 10 Panchasakha Ucha Vidyapitha, Tumusingha, Srimula H.S. Compound wall Backward Region Grant Funds 3,00,000 11 Const.of AWC Building , Aluajharan Backward Region Grant Funds 2,50,000 12 Const.of AWC Building Bankual (B) Backward Region Grant Funds 2,50,000 13 New AWC Building Danapasi Backward Region Grant Funds 3,00,000 14 Const.of AWC at Baunsapal Backward Region Grant Funds 2,50,000 15 Kantapal H.S. Boundary wall Backward Region Grant Funds 2,00,000 16 Const.of Boundary wall of J.K.S.High School , Kotagara Backward Region Grant Funds 3,00,000 Block Panchayat S.No. KANKADA HAD Work Name Sources of Funding Outlay Under the Scheme 1 Comp.of Dolia AWC Building (Roof Level) Backward Region Grant Funds 2,00,000 2 Const.of Balisahi AWC Backward Region Grant Funds 3,00,000 3 Const.of Sologaon AWC Backward Region Grant Funds 3,00,000 4 Const.of Kusumundia AWC ( Plastering Flooring) Backward Region Grant Funds 1,00,000 5 Const.of Dangapal AWC Backward Region Grant Funds 3,00,000 6 Const.of Gatarei-1 AWC Backward Region Grant Funds 2,50,000 7 Const.of Tarajanga AWC Backward Region Grant Funds 3,00,000 8 Comp.of Khajuria U.P.School Building Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 34 of 51 District Plan Report Page 142 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Block Panchayat S.No. ODAPADA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of AWC at Kamalanga -I Backward Region Grant Funds 2,50,000 2 Const.of AWC-II at Tala Baghalunda Backward Region Grant Funds 2,50,000 3 Const.of AWC building at Nimidha Backward Region Grant Funds 2,50,000 4 Const.of Boundary Wall of Dhalapur Nodal School Backward Region Grant Funds 2,00,000 5 Const.of Nua-Odapada Pry.School Boundary Wall Backward Region Grant Funds 2,00,000 6 Const.of Baulpur U.P.School Compound Wall Backward Region Grant Funds 2,00,000 7 Const.of Brundabanpur to Ghatipiri C.C.Road Backward Region Grant Funds 2,00,000 8 Const.of Indipur H.S. Compound Wall Backward Region Grant Funds 2,00,000 9 Const.of Patalla Pry.School Boundary Wall Backward Region Grant Funds 2,50,000 10 Const.of Balarampur Pry.School Compound wall Backward Region Grant Funds 2,50,000 11 Const.of Bido Pry.School Building Boundary wall Backward Region Grant Funds 2,50,000 12 Const.of Kaunriapal Pry.School Boundary Wall Backward Region Grant Funds 3,00,000 13 Const.of K.Prasad pry school building Boundary Wall Backward Region Grant Funds 3,00,000 14 Const.of Kusupanda Pry.School Boundary wall Backward Region Grant Funds 2,50,000 Block Panchayat S.No. PARJANG Work Name Sources of Funding Outlay Under the Scheme 1 Tulasipasi AWC Building Backward Region Grant Funds 2,50,000 2 Kadapal UP SChool Boundary Wall Backward Region Grant Funds 2,00,000 3 Ambapalash UP SChool Boundary Wall Backward Region Grant Funds 2,00,000 4 Anchalika High School Boundary Wall Backward Region Grant Funds 2,00,000 5 Renthapata Primary School Boundary Wall Backward Region Grant Funds 2,00,000 6 Raghunath Jew High School Building Backward Region Grant Funds 2,00,000 7 Addl. Class Room at Parjang Hihg School Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 ARAKHAPAL Work Name Const.of Boundary Wall of APG High School , Khurusia Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Dadhisingha Primary School Building Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BALIBO Work Name S.No. Outlay Under the Scheme 2,00,000 BHUSAL Work Name Sources of Funding Outlay Under the Scheme Const.of Primary School Boundary , Kingol-Asurabandha Backward Region Grant Funds Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 DAYANABILI Annexure-IV : Page 35 of 51 District Plan Report Page 143 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Chandimata H.S.Boundary Kanheipal Backward Region Grant Funds 3,00,000 2 Const.of AWC at Jharana Sahi, Kanheipal Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 EKTALI Work Name Const.of Class room of Purusottampur bjirout Memorial High School Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Girls High School Boundary Sources of Funding Const.of U.P.School Boundary Wall at Beltikiri Sources of Funding 4,50,000 BEGA Work Name Compl. of AWC Building at Bega. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BELTIKIRI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 JIRAL Work Name S.No. Outlay Under the Scheme 2,00,000 BIDHARPUR Work Name Sources of Funding Outlay Under the Scheme 1 Compl. of Annapur AWC Building Backward Region Grant Funds 2,00,000 2 Compl. of Aruhan AWC Building Backward Region Grant Funds 2,00,000 3 Compl. of Jhilli AWC Building Backward Region Grant Funds 2,00,000 4 Compl. of Gundurapasi AWC Building Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 DIGAMBARPUR Work Name Const. of Parbata Kani Primary School Boundary wall Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Compl. of Gondia A AWC. Sources of Funding 2,00,000 JORANDA Work Name Const. of Atinda AWC Building Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 GONDIA Work Name S.No. Outlay Under the Scheme 2,00,000 KALURIA Work Name Sources of Funding Outlay Under the Scheme 1 Const. of AWC Centre at Mahapada. Backward Region Grant Funds 2,00,000 2 AWC Centre at Kendupada. Backward Region Grant Funds 2,00,000 Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 KARAMUL Annexure-IV : Page 36 of 51 District Plan Report Page 144 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. 1 Work Name AWC at Makundapur Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 KHANDA BANDHA Work Name Compl. of AWC at Gopalpur. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 KHANKIRA Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Nabalualia AWC Backward Region Grant Funds 2,00,000 2 Const. of Pimpuria AWC Backward Region Grant Funds 2,00,000 3 Const. of Chhotatentuli AWC. Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. LETHEKA Work Name Sources of Funding Outlay Under the Scheme 1 Compl. of Letheka AWC Backward Region Grant Funds 2,00,000 2 Const. of Sankara Prasad High School Boundary wall. Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. MANDAR A Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Raipur Sabarasahi AWC Building. Backward Region Grant Funds 2,00,000 2 Const. of Nabalinga AWC Building. Backward Region Grant Funds 2,00,000 3 Const. of Chitalpur Bijaya Nagar AWC Building (New) Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 MATHA TENTULIA Work Name Const. of AWC at Barapal. Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 NEULAPOI Work Name Const. of Chhatia AWC Building. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 PINGUA Work Name Sources of Funding Outlay Under the Scheme 1 Comple. of Incomplete AWC Kususgoda. Backward Region Grant Funds 2,00,000 2 Completion of Incomplete AWC, Toalarpasi. Backward Region Grant Funds 2,00,000 3 Compl. of Incomplete AWC Pingua (D). Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 PORUHAKHOJA Work Name Const. of Sandhapasi Primary School Boundary Wall Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 RAITALA Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 37 of 51 District Plan Report Page 145 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Anthukuda Kateni Primary School Boundary Wall. Backward Region Grant Funds Gram Panchayat S.No. 2,00,000 RATANAPUR Work Name Sources of Funding Outlay Under the Scheme 1 Compl. of old AWC at Erapada . Backward Region Grant Funds 2,00,000 2 Const. of Solagadia AWC Backward Region Grant Funds 2,00,000 3 Const. of Erpada AWC Backward Region Grant Funds 2,00,000 4 Raising Prasad Nodal High School Boundary wall. Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 SANTHAPUR Work Name Const. of Santhasara AWC Building. Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 2,00,000 SORISIAPADA Work Name Compl. of Ramei AWC. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 BAUNSA POKHARI Work Name Sources of Funding Outlay Under the Scheme 1 Const.of M.E.School Boundary Wall Backward Region Grant Funds 2,00,000 2 Const.of AWC Building Backward Region Grant Funds 2,00,000 3 Const.of AWC Building Backward Region Grant Funds 2,00,000 4 Const.of AWC Building Backward Region Grant Funds 2,00,000 5 Const.of AWC Building Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. BUHALIPAL Work Name Sources of Funding Outlay Under the Scheme 1 Const.of AWC-2 Building Backward Region Grant Funds 2,00,000 2 Const.of AWC Building Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. GIRIDHAR PRASAD Work Name Sources of Funding Outlay Under the Scheme 1 Const.of AWC Building Backward Region Grant Funds 2,00,000 2 Const.of AWC Building Backward Region Grant Funds 2,00,000 3 Const.of Pry.School Building Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 GULEHI Work Name Const.of AWC Building Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Outlay Under the Scheme 3,00,000 JARADA Work Name Const.of AWC Building Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 Annexure-IV : Page 38 of 51 District Plan Report Page 146 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Gram Panchayat S.No. 1 KADALA Work Name Const.of AWC 1 2 Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 4,00,000 KANTAMILA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of School Building Backward Region Grant Funds 3,00,000 2 Const.of School Building Backward Region Grant Funds 3,00,000 3 Const.of Nodal School Building Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 KANTIMILI Work Name Const.of of AWC Building Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 3,00,000 KARANDA Work Name Const.of Bahala Harizan Sahi P.S.Boundary Wall Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 3,00,000 KHALIBOREI Work Name Sources of Funding Outlay Under the Scheme 1 Bimbori AWC Completion Backward Region Grant Funds 2,00,000 2 Bimbori Pry,.School Building Backward Region Grant Funds 3,00,000 3 Khanda sahi Pry.School Boundary Wall Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 KUTUNIA Work Name Const.of School Boundary Wall Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Pry.School Building Sources of Funding 2,00,000 NABAKISHOREPUR Work Name Const.of Pry.School Boundary Wall of Kapisahi Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 MAHALUNDA Work Name S.No. Outlay Under the Scheme 3,00,000 NIZIGARH Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Boundary Wall with Building of Banamalipur Pry.School Backward Region Grant Funds 3,00,000 2 Const.of Dhundinali AWC Building Backward Region Grant Funds 2,00,000 3 Const.of Gopalpu AWC Building Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. NUABAG Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 39 of 51 District Plan Report Page 147 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Const.of Compound Wall of Pry.School Backward Region Grant Funds 3,00,000 2 Const.of School Boundary Wall Backward Region Grant Funds 3,00,000 3 Bhagadharia Pry.School Building Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. PAIKA PURUNAKOT Work Name Sources of Funding Outlay Under the Scheme 1 Const.of AWC Building Backward Region Grant Funds 3,00,000 2 Const. of AWC Building. Backward Region Grant Funds 3,00,000 Gram Panchayat S.No. 1 RANJAGOL Work Name Const.of Pry.School Building Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Harijan Sahi AWC Sources of Funding Const.of School Building Sources of Funding Const.of Hatibarisahi C.C.Road Sources of Funding Const.of Purunasahi to Nuasahi CC Road Sources of Funding Const.of Kathapal AWC Sources of Funding Const.of Jangu Chamarasahi C.C.Road Sources of Funding Completion of Jarada AWC (Comp.up to roof level) Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 GADAPHALASUNI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 BIRIBOLEI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 BIRASAL Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BATAGAON Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BALIKUMA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 THOKAR Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 4,00,000 RASOL Work Name S.No. Outlay Under the Scheme 1,50,000 KANTOL Work Name Const.of Kantol AWC Building Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 3,00,000 KERJULI Annexure-IV : Page 40 of 51 District Plan Report Page 148 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. 1 Work Name Const.of Compound Wall at Kendumunda School Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Compound Wall of Mohabiroad College Sources of Funding Const.of Pitldhua AWC Sources of Funding Const.of Sankarpratappur Pry.School Builiding Compound Wall Sources of Funding 2,50,000 BADALO Work Name COMP.OF AWC BUILDING BADALO Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 GADASILA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 MARUABILI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 MAHABIROD Work Name S.No. Outlay Under the Scheme 2,50,000 BALARAMPUR Work Name Sources of Funding Outlay Under the Scheme 1 COMP.OF MAHIDHARPUR AWC BUILDING Backward Region Grant Funds 2,00,000 2 Const.of Balarampur Pry.School and Compound Wall Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. 1 BIDO Work Name Const.of Budhapanka Pry.School Building Compound Wall Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,00,000 GOBINDA PRASAD Work Name Sources of Funding Outlay Under the Scheme 1 Ranipal School Boundary wall Backward Region Grant Funds 2,00,000 2 Const.of G.Pradad AWC (1) Backward Region Grant Funds 2,50,000 Gram Panchayat S.No. GUNADEI Work Name Sources of Funding Outlay Under the Scheme 1 Gailo Pry.School Boundary wall Backward Region Grant Funds 2,50,000 2 Mahadia Pry.School Boundary wall Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 GUNDICHA PADA Work Name Const.of Gundichapada AWC (Juangasahi) Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme 2,50,000 INDIPUR Work Name Sources of Funding Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Outlay Under the Scheme Annexure-IV : Page 41 of 51 District Plan Report Page 149 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA 1 Comp.of Indipur AWC (4) Backward Region Grant Funds Gram Panchayat S.No. 2,50,000 KALANGA Work Name Sources of Funding Outlay Under the Scheme 1 Kalikaprasad AWC Building Backward Region Grant Funds 2,50,000 2 Kalanga Paltasingh School Compound Wall Karadasingh Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. KANDA BINDHA Work Name Sources of Funding Outlay Under the Scheme 1 Const.of Tamanda Pry.School Compound Wall Backward Region Grant Funds 2,50,000 2 Const.of AWC at Tamanda Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 KOTAM Work Name Const.of Kottam School Boundary Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const.of Achalkote Pry.School Boundary Wall Sources of Funding Const.of Chintapokhari Pry.School Boundary wall Sources of Funding 2,00,000 NADHARA Work Name Const.of Nadhara Pry.School Boundary wall Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 MOTANGA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 MANGALPUR Work Name S.No. Outlay Under the Scheme 2,50,000 NAYA BHAGIRATHIPUR Work Name Sources of Funding Outlay Under the Scheme 1 Cons.of Ranibania Pry.School Building Backward Region Grant Funds 2,00,000 2 Const.of Benakarkateni AWC Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 NIMIDIHA Work Name Const.of Nimidha Balisahi AWC Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Pasasingh P.S.Building Compound Wall Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 SADASIVAPUR Work Name S.No. Outlay Under the Scheme 2,00,000 SIMINAI Work Name Const.of Mulisingh AWC Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 BADAJHARA Annexure-IV : Page 42 of 51 District Plan Report Page 150 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA S.No. 1 Work Name Bandajhara High School Boundary Wall Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Const. of UP School Building Sources of Funding Parjang College Boudary Wall Sources of Funding Kankili Primery School Boundary wall Sources of Funding Ria AWC Sources of Funding U.P. School Boundary wall Sources of Funding Add. Class Room at Mundeilo High School Sources of Funding 2,00,000 PATARPADA Work Name Patrapada High School Bopundary wall Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 MUNDEILO Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 MANIKAMARA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 KUMUSI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 KANKILI Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 GADAPARJANG Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,50,000 CHANDPUR Work Name S.No. Outlay Under the Scheme 2,00,000 RENTHAPAT Work Name Sources of Funding Outlay Under the Scheme 1 Panigengutia AWC Backward Region Grant Funds 2,00,000 2 Panibhandar UP School Boundary Wall Backward Region Grant Funds 2,00,000 Gram Panchayat S.No. 1 SARANG Work Name Add Class Room at -NUPS Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 Annexure-IV : Page 43 of 51 District Plan Report Page 151 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Land improvement District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Const. of Kandhara Village Play Ground, Nuasahi. Backward Region Grant Funds 4,00,000 2 Patharkota Play Ground. Backward Region Grant Funds 4,00,000 3 Completion of Chirulei Play ground. Backward Region Grant Funds 4,00,000 4 Completion of Play Ground near hanuman Mandir, Deogaon Backward Region Grant Funds 4,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 44 of 51 District Plan Report Page 152 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Markets and fairs Block Panchayat S.No. 1 GONDIA Work Name Const. of Market Complex at Laulai GP , 4 Rooms. Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 2,00,000 Annexure-IV : Page 45 of 51 District Plan Report Page 153 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Social welfare District Panchayat S.No. 1 DHENKANAL Work Name Const.of Sanitary Latrine at Kathagada Seva Shram Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 8,80,000 Annexure-IV : Page 46 of 51 District Plan Report Page 154 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Welfare of the weaker sections District Panchayat S.No. 1 DHENKANAL Work Name Const.of Yatri Mandap at passhimeswar Temple Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 7,00,000 Annexure-IV : Page 47 of 51 District Plan Report Page 155 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Minor irrigation District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Paschimeswar Backward Region Grant Funds 5,00,000 2 Manipur - II Backward Region Grant Funds 4,00,000 3 Rasasingh Nadikula Pata Culvert Backward Region Grant Funds 4,00,000 4 Mahadia -I ,II Backward Region Grant Funds 4,00,000 5 Chitalpur - I Backward Region Grant Funds 4,00,000 6 Indipur - I II Backward Region Grant Funds 3,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 48 of 51 District Plan Report Page 156 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Roads and bridges District Panchayat S.No. 1 DHENKANAL Work Name Const. of Bridge Kandarasinga to Damola (Barabanka Nallah Bridge ) , Majhik Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Work Name Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Muncipality 1 8,00,000 PINGUA Small Bidge on Balikiari road. S.No. Outlay Under the Scheme 3,00,000 Dhenkanal Work Name S/R to the drain from the culvert near Dr. B.Rams house towards Dakshinkali Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 23,50,000 Annexure-IV : Page 49 of 51 District Plan Report Page 157 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Water supply for domestic Town Area S.No. 1 Bhuban Work Name Water Supply in 15 nos Wall Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 20,00,000 Annexure-IV : Page 50 of 51 District Plan Report Page 158 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure IV:Work Details District Plan Report:DHENKANAL 1.Public health District Panchayat S.No. DHENKANAL Work Name Sources of Funding Outlay Under the Scheme 1 Compound wall of PHC (New) Backward Region Grant Funds 4,00,000 2 Meramandali Medical Boundary Wall Backward Region Grant Funds 4,00,000 3 Roada School Tutha. Backward Region Grant Funds 4,00,000 Block Panchayat S.No. 1 PARJANG Work Name Sundhikateni Village Pond bathing Step Sources of Funding Backward Region Grant Funds Gram Panchayat S.No. 1 Thakurpal Uppersahi Drain. Sources of Funding Const.of Ayurbedik Medical Building Sources of Funding Const.of Hemeopathy Dispensery Building Sources of Funding 3,00,000 KANKILI Work Name Kankili Village Drain Sources of Funding Outlay Under the Scheme Backward Region Grant Funds Town Area S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 3,00,000 NABAKISHOREPUR Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 BAMPA Work Name S.No. Outlay Under the Scheme Backward Region Grant Funds Gram Panchayat 1 2,00,000 KALURIA Work Name S.No. Outlay Under the Scheme 2,00,000 Kamakshyanagar Work Name Sources of Funding Outlay Under the Scheme 1 Drain from Res. of Sub-Collector towards Mundideuli, Ward No. 4 5 Backward Region Grant Funds 5,00,000 2 Drain from SDJM Qrs to range Office in Ward No. 5 Backward Region Grant Funds 5,00,000 3 Drain from Park to Tahasildar Qrs, ward no. 5 Backward Region Grant Funds 5,00,000 4 Drain from back side of G.B. Park with culvert in Ward No. 5 Backward Region Grant Funds 2,00,000 Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Annexure-IV : Page 51 of 51 District Plan Report Page 159 of 160 District Plan Report(2009-2010), DHENKANAL District, ORISSA Annexure V:Process Checklist Process Checklist S.No. Check List Status 1 Has District Undertaken a baseline survey of the district, in accordance with the guidelines issued by the State ? Y 2 Have meetings been held at the level of gram sabhas, gram panchayat, intermediate panchayat, district panchayat to approve their respective plans ? Y 3 Is a diagnostic study of district’s backwardness undertaken ? Y 4 Is allocations to each Panchayat/ULB of the funds available to them under various programmes through a district link book indicated ? Y 5 Is professional planning support for DPCs and Panchayats/ULBs Enlisted ? Y 6 Is the prioritized plan based on the diagonistic study and critical gaps from base line survey ? Y 7 Is the visioning workshops, in which the district vision is developed taking into account identified priorities, held ? Y Report generated through PlanPlus on Wed Dec 02 12:54:01 IST 2009 Remark Annexure-V : Page 1 of 1 District Plan Report Page 160 of 160