OPPORTUNITIES FOR THE NEBRASKA INNOVATION ZONE
Transcription
OPPORTUNITIES FOR THE NEBRASKA INNOVATION ZONE
OPPORTUNITIES FOR THE NEBRASKA INNOVATION ZONE Nebraska Innovation Zone Commission Beltline Images I-80 undeveloped land – truck weighing station (Waverly) Lincoln Parking Lots Linoma Beach aerial Linoma Beach at grade Platte River aerial Omaha 1925 11th St. @ Howard / Omaha 2002 11th St @ Howard Ashland, RR Station + Barnes Oil Co. Service Station (Merchants Bank) Vacant landmark, Greenwood Vacant general store, South Bend RR Rock Island Greenwood aerial RR. TRANSPORTATION CAPACITIES Transportation Capacities 30-Minute Travel Times Mode of Transport Distance Speed SUBWAY (regular service) 15 miles 30+ mph 20,000 LIGHT RAIL 15 miles 30 mph 3,000 BUS (dense city traffic) 1.5 miles 3 mph 750 BUS (suburban streets) 4 miles 8 mph 1,200 7.5 miles 15 mph 3,000 BUS RAPID TRANSIT (BRT) Capacity Bronx subway service map / vacant map Existing Max FAR (Assuming residential use permitted on all sites) New DU's on soft sites 25% or less than Max FAR New DU's on soft sites 50% or less than Max FAR Bronx Soft Sites map 10-40,000 new DUs 100 ft corridor 10,389 14,617 1/4 mi corridor 29,652 43,720 Beltline Images Branding Atlanta’s “Beltline Emerald Necklace” Power of an Idea: Beltline “An ‘Emerald Necklace’ May Grace Urban Atlanta” - October 24, 2005 “With Emerald Vision, seeking to reinvent Atlanta” - March 9, 2005 “Atlanta Strings a New ‘Emerald Necklace’” - January 27, 2005 “Atlanta Transit Loop is a Vision in Green” - December 19, 2004 Physical Feasibility Physical: CSX rendering + aerial Financial Feasibility Financial: Cost Estimates TAX INCREMENT FINANCING (over 25 years) $20 – 30 billion Projected Private Development $2 – 3 billion Projected TIF Revenue $1.3 – 1.7 billion CONSERVATIVE BOND ISSUE COST ESTIMATES (in millions) Right-of-way Acquisition Beltline Trail Development Beltline Transit Development $50 – 100 $25 – 30 $600 – 1 billion Open Space Development $275 – 350 Workforce Housing $250 – 325 Infrastructure $300 - 400 TOTAL DEVELOPMENT COSTS $1. 5 - $2.2 billion Political: Waterworks Political Feasibility Clear Image Clear Image: Beltline Emphasis on Design Quality Design: Quarry Unique I-80 Brand = Waverly + Greenwood Ashland, National Bank of Ashland (Lutton Law) / Havelock