here. - Naza Project Solutions

Transcription

here. - Naza Project Solutions
NAZA Project
Solutions Limited
Local Contractor:
Mechanical, Civil & Electrical Related works
COMPANY PROFILE
NAZA Project
Solutions Limited
Table Of Contents
1.
2.
3.
4.
5.
6.
Contacts
Introduction
Our Core Values
Scope of Services
Selected Undertaken Projects
a. Mechanical Projects
b. Civil Projects
c. Electrical & Telecom Related Projects
Owned Equipment & Tools
COMPANY DATA
Company Name : NAZA PROJECT SOLUTIONS LIMITED
Certificate of Incorporation : 87092
CRB Registration : Mechanical and Civil Contractor
Address
: Mbezi Juu, Goba road (Off Bagamoyo road),
P.O .Box 32068, Dar es Salaam, Tanzania.
: +255 754 829938 / +255 655 829938
: nazapsltd@gmail.com : info@naza.co.tz
: www.naza.co.tz
Contact Number
E‐MAIL
Website
Our Office
\
The Company
NAZA Project Solutions Limited is a local registered private company
incorporated in Tanzania in 2011. Registered by Contractors
Registration Board (CRB) as Mechanical and Civil work Contractors
Class IV & VI respectively and Tanzania Revenue Authority (TRA) as
Tax Payer and VAT collector.
Our Company is offering clients with high quality and timely
engineering Services including Turnkey Projects in the wide span of
Mechanical and Civil Construction Industry with related Telecom &
Electrical works by deploying competent team of experienced
professionals with individual proven track records of consistent good
performance while observing Health, Safety, Security & Environment
(HSSE) procedures.
We have set a foundational objective to consistently and timely meet
and surpass the need of our clients by developing and delivering
innovative solutions to complex engineering related projects and
technical operations.
OUR CORE VALUES
- Competence
- Efficiency
- Integrity
MISSION
To provide high quality and timely services at reasonable price to meet customers’ business targets as well as our company; without compromising with quality of the end product.
VISION
Becoming a strategic business partner of our clients and be the preferred company for construction services in Tanzania and expanding our market throughout Africa by improving local skills to meet new technology for meeting customer demands. HEALTH, SAFETY, SECURITY AND ENVIRONMENT POLICY
Our motto is “Safety for Life”. NAZA Project Solutions Limited observes compliance with relevant legislation as the principal requirement aiming to exceed this requirement where necessary. We are committed to provide and maintain safe working environment and health manpower by deploying proper tools, equipment and safety gears at site. We protect manpower and assets/equipment against accidents for both; our company and clients as well. Scope of Services Offered
Mechanical works
a) Oil & Gas Engineering services
• Skid fabrication & erection
• Tank fabrication, erection & repair
• Underground & aboveground Piping
• Pump installation and maintenance
• Pre-fabrication, welding & erection of all kind of steel structures
b) Solar Energy systems design and installation
c) Air conditioning systems design and installation
d) Water Piping, plumbing & pumps installation
e) Motor vehicle maintenance, service and body repair
f) Firefighting piping & equipment installation for Industries & buildings
g) Lift and Elevator Installation and servicing
h) Generator installation and servicing
i) Bore hole drilling and pump installation
j) Engineering Design and Project Management services – Turnkey projects.
Scope of Services Offered
Civil works
a) Designing and Construction of Fuel storage terminals and fuel filling
stations (canopies).
b) Structural concrete works, paving and curbstones installation.
c) Earth excavation, filling with hardcore and compacting for drive ways, car
packing, storage yards.
d) Fuel terminal concrete paving c/w drainage systems i.e. oil interceptors,
e) Design and construction of foundation for bulk storage fuel tanks.
f) Supply and install of construction materials e.g. construction aggregates,
river sand, stones, etc.
Electrical & Telecom related works
a) Supply and installation of Industrial electrical materials and accessories
e.g. ACDB, DCDB, Control boxes, Breakers, Cables, cable trunks,
grounding bars, etc
b) Supply and installation of 6m rooftop poles, GSM & Antennae poles,
Scope of Services Offered
Electrical & Telecom related works cont….
c) Supply and installation of electrical machines including Electrical motors,
Generators, Water & fuel pumps.
d)
Supply and installation of Industrial electrical materials e.g. ACDB, Control
boxes, Breakers, Cables, etc.
e)
Supply and installation of electrical machines including Electrical motors,
Generators, Water & fuel pumps.
f)
Electrical Design and installation for domestic and industrial sub-stations,
g) Collocation works for telecom sites i.e. electrical and civil works upgrade,
h)
Telecom tower erection / rigging; and
Scope of Services Offered
Electrical & Telecom related works cont…
h) Telecom Towers reticulation works - re-torqueing, re-painting, backfilling
i) Electrical power installation (DCDB, ACDB, cabling, grounding)
j) Rectifier and battery cabinets Installation, swapping & configuration;
k) Generator installation and maintenance services;
l) Passive & active maintenance for telecom sites;
m) BTS & Transmission installations and commissioning (Ericsson, Huawei, Flexi
MR)
n) Electrical fence and alarm installation, testing and commissioning;
SELECTED UNDERTAKEN PROJECTS
A: Mechanical works
Oil & Gas Sites
PROJECT: Testing, repair and commissioning of underground petrol station tanks (4 @ 30KL
tanks),
CLIENT
: STAR OIL LIMITED, Moshi. (October, 2014)
PROJECT: a) Steel pipes fabrication, Installation and commissioning for petroleum
products & Fire water System.
b) Installation of Product pumps, Fire Water Pumps c/w Foam Tanks
CLIENT
: STAR OIL LIMITED Fuel terminal, Kurasini-Dar es Salaam. (2012-2013)
PROJECT: a) Supply, Installation and commissioning of fire alarm system
b) The Proposed Lubricants and Greases Blanding Plant.
CLIENT : GENERAL PETROLEUM LTD, Temeke- Dar es salaam. (March, 2012)
Factories
PROJECT: a) Steel pipeline fabrication, Installation and commissioning for steam pipelines.
b) Steel structure fabrication and erection for mezzanine floor and pipeline
supports.
CLIENT :
A-ONE PRODUCTS AND BOTTLERS LIMITED, Dar es Salaam. (Feb 2014 - Jan 2015)
PROJECT: Fabrication and installation of steam piping work at East Coast Fats & Oil Ltd.
CLIENT :
EAST COAST FATS & OIL LTD, (2014)
B: Civil Works
PROJECT: Construction of parking and storage yard c/w paving at NAZA office.
CLIENT
: NAZA Project Solutions Ltd, Dar es salaam (Feb- Oct 2015)
PROJECT: Construction of 3m x 3m x 3m IBS (Internal Building Shelters) 9 telecom sites
CLIENT : Helios Towers Tanzania (HTT) (Jan 2013 – Dec 2014)
PROJECTS cont.
B: Civil Works cont…
PROJECT: Construction of Rear-Gate Access Road at MOGAS
fuel Terminal, Kurasini Dar es Salaam.
CLIENT
: MOGAS International Limited.
C: CIVIL WORKS FOR TELECOM SITES (c/w Electrical related works)
PROJECT: Viettel Collocation project 60sites: Civil & Electrical work site upgrade
CLIENT : Helios Towers Tanzania (HTT) (June-Oct 2015)
PROJECT: Tigo sites 2G & 3G 42 Sites upgrade – civil & electrical upgrade works
CLIENT : Helios Towers Tanzania (HTT) (Aug-Oct 2015)
PROJECT: Rectifier swap project 60sites
CLIENT : Helios Tower Tanzania (HTT) (Feb-May 2015)
PROJECT: Construction of Internal Building Shelters (IBS) & Power installation - 9 telecom
sites
CLIENT : Helios Tower Tanzania (HTT) (Jan 2013-Dec 2014)
PROJECT: Tigo 2G & 3G Collocation; Civil and Power upgrade work 110 sites, in Tanzania
main land
CLIENT : Helios Towers Tanzania (HTT) (March-June 2013)
PROJECT: Tigo 2G Expansion work- Civil and power upgrade work Morogoro, Tanga, DSM &
Zanzibar.
CLIENT : Helios Towers Tanzania (HTT) (2013).
PROJECT: Site and Structural Audit work in Rukwa and Katavi regions.
CLIENT : AMANZI Telecommunications Limited (2013).
PROJECTS cont.
C: CIVIL WORKS FOR TELECOM SITES cont…
PROJECT: Tigo 7sites Collo works in Tanga region
CLIENT : AMANZI Telecommunications Limited (2012).
PROJECT: Tigo site 2G collocation works– civil & Electrical upgrade -Lilungu – Mtwara site
CLIENT : Amanzi Telecommunications (T) Limited (July 2012)
PROJECT: Tigo 3G Expansion work- Civil and power upgrade works, 10 Sites in Iringa
CLIENT : Helios Towers Tanzania (HTT) (2013).
PROJECT: Tigo 2G Expansion work- Civil and electrical power upgrade work
CLIENT : Helios Towers Tanzania (HTT) (2013).
PROJECT: Tigo Sites reticulation works; repainting, re-torquing, rebackfilling 15sites in Tanga
CLIENT : PIVOTECH (T) Limited (2013).
PROJECT: Installation of electrical power equipment and rectifiers for 3 telecom sites in
Zanzibar.
CLIENT : Lead Com Limited (Aug 2012)
PROJECT: Site & Structural Audit for 53 Tigo Telecommunication Towers in Lindi, Mtwara
and Mbeya
CLIENT : Amanzi Telecommunication (T) Limited (May-July 2012).
Owned Equipment & Tools
S/N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
GENERAL DESCRIPTION
Vehicles
Pickup double cabin
Tipper truck 2t
Toyota truck 2t c/w Hiab Crane
Suzuki Carry - truck
Station wagon / Supervision vehicles
Other Equipment
Welding machines
Tirfor
Chain blocks
Mobile Generator
Gas cutting equipment
Earth testers
Prismatic compasses
GPS Devices / cameras
Hand Drilling machines
Angle Grinders
Air compressor
Pipe cutter
Leveling instrument
Concrete Vibrator
Concrete mixer
Plate Compactor
QTY
CONDITION
4
1
1
1
4
Good
Good
Good
Good
Good
12
2
5
2
5 sets
2
4
4
8
10
1
1
1set
1
1
1
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good