Special Exception Application - Memphis Stone and Gravel Co.
Transcription
Special Exception Application - Memphis Stone and Gravel Co.
PANOLA C OUNTY L AND D EVELOPMENT C OMMISSION REQUEST FOR S PECIAL E XCEPTION TO M INE S AND AND G RAVEL PROPOSED MINE EXPANSION BRASELL MINE Special Exception to Mine and Process Sand and Gravel Two adjacent properties referenced as either Robinson Et Al. and Dugger T9S, R7W, pt. pt. N 1/2 of Section 19 Panola County, MS (See attached for more detailed descriptions) Note: Memphis Stone and Gravel Company has contracted to purchase/lease the subject properties. Sellers/Lessors are as follows: 1) Heirs of Mary Lou Robinson (see attached listing) 2) Carl B. Dugger, 100 Patton Lane, Batesville, MS 38606; Rose M. Dugger, 1795 South Parkway East, Memphis, TN 38114 See attachment In Process See attachment Memphis Stone & Gravel Company P.O. Box 1683, Memphis, TN 38101. Ph. (901) 774-7874 email: alan.parks@msgravel.com December 1, 2013 Robinson Et Al Tract, Panola County, MS Updated: 10‐10‐13 Owner Name Wesley Andre Hubbard Key Contact (for mail) Crystal Hubbard Makala Shiree Hubbard Crystal Hubbard Anthony Hamiton Nakisha Reed Warr Eddie Hamilton Nakisha Reed Warr George Hamilton Theresa Hamilton Laquita Jones Varis Morris Annie F. Miller Annie F. Miller Barbara Hamilton Webster Bob Parker Barbara Hamilton Webster Bob Parker Cecil Mae Strong Pat Hamiton Bob Parker Eddie Hamilton Eddie Hamilton Eddie Hamilton Pamela Hamiton Jacqueline Johnson Eddie Hamilton Jacqueline Johnson Lamar Reed Lamar Reed Cecil Mae Clark Larence Henry Reed Lamar Reed Larence Henry Reed Mack Hamilton Mack Hamilton Mary Helen Harris Mary Helen Harris Peggie Ann Washington Peggie Ann Washington Richard Hardiman, Jr. Richard Hardiman, Jr. Robert Lee Reed Willie H. Reed Ryan Hentz Robert Lee Reed Robert Lee Reed Ryan Hentz Rochelle Hearn Theresa Hamilton Ryan Hentz Theresa Hamilton Delores Hamiton Kerry Hamiton Varis Morris Theresa Hamilton Theresa Hamilton Varis Morris Elbert L. Barr Sonia Robinson Kendrick Barr Varis Morris Varis Morris Varis Morris Address Phone 7607 October Rose Dr., Memphis, 901‐679‐6303 TN, 38119 7608 October Rose Dr., Memphis, 901‐679‐6304 TN, 38119 4685 Millstream Dr. #2, Memphis, TN, 38116 10327 Housely Place, White Plains, 808‐255‐2458 MO, 20695 P. O. Box 1233, Batesville, MS, No Phone 38606 P.O. Box 2342 Country Club, IL, 60478 1709 West Grand Blvd, Detroit, MI, 312‐802‐9496 48208 4070 Leech Rd., Memphis, TN, 901‐785‐3688 38109 901‐526‐3387 1521 So Wabash #907, Chicago, IL, 773‐979‐3212 60605 9237 South Calumet Avenue, 773‐965‐1832 Chicago, IL, 60619 1135 Aprilwood Circle #301, Memphis, TN, 38107 215 So. Central Park, Chicago, IL, 60624 901‐462‐1329 622 E. Streicher, Toledo, OH, 43608 53 Croley St., Hunnington, NY, 11743 614 E. Rasback St., Centralia, IL, 62801 1031 East 176th St., Euclids, OH, 44119 371 Griswold St. Apt. 1, Elgin, IL, 60123 212 Percyville, Sardis, MS, 38660 419‐729‐3469 773‐965‐1832 631‐223‐2148 618‐532‐6456 216‐486‐5597 224‐200‐7643 662‐609‐6075 3225 Ashby Road, Apt. #5, St. Ann, 314‐601‐4134 MO 63074 252 Goldstar Street, Henderson, NV, 89012 708‐341‐4219 283 Lamar Thomas Road, Batesville, TN 38606 662‐578‐5285 Memphis Stone and Gravel Company Proposed Extension of Brasell Mine Operations Operations Narrative November 25, 2013 INTRODUCTION Memphis Stone and Gravel Company seeks authorization to operate a sand and gravel mining and processing operation on two separate fifty acre parcels in Panola County. The parcels are listed below and are referred to jointly as “Brasell Mine Extension”: Robinson Et Al Property Map 184, Section 19, Parcel 3 Panola County, MS Dugger Property Map 184, Section 19, Parcels 2, Panola County, MS PROJECT SUMMARY The project contains approximately 26 acres of indicated and/or measured resources with an additional 9 acres of inferred area that could extend pit limits. The project is near MS&G’s existing wash plant permitted as the "Brasell Mine" The Brasell Mine is located approximately one mile south of Highway 6 on the west side of Hwy 35. Memphis Stone and Gravel Company has been at the site since 2003. ENVIRONMENT, SAFETY, and COMMUNITY Memphis Stone and Gravel Company must comply with regulations pertaining to environmental protection and worker safety. The company is regulated by state and federal agencies, primarily the Mississippi Department of Environmental Quality, the federal Mine Safety and Health Administration (MSHA), The US Department of the Army Corps of Engineers, state and federal Department of Transportation (DOT), and the federal Environmental Protection Agency (EPA). Based on national and local trends it takes approximately 10 tons of aggregate each year for new construction and to maintain our existing infrastructure. The growth in Panola County demands a good source of local aggregate. Memphis Stone & Gravel Company believes this deposit has value to the local economy and will likely be lost to future residential development if not managed as a resource for construction material. The highest best use for the property is to mine the sand and gravel then return the land to other productive use following reclamation. Currently it is the last available resources to sustain the life of the mine. Memphis Stone and Gravel Company has listed all the relative project information on its website at www.msgravel.com. PROJECT DURATION It is difficult to predict exactly the start date because of the uncertainties about future demand at our existing operation. We expect the project to have a five year time line after mining begins (mining and reclamation). Mining at the site should begin within one year following the permitting process. Page 1 of 4 MINING PROCESS Principle operations can be divided into 1) stripping, 2) mining, 3) processing, 4) sales and 5) reclamation. Stripping overburden is generally accomplished using scrapers, excavators and trucks, or dozers. A hydraulic excavator (appx. 5 cubic yard) will be used to mine the sand and gravel. One to two front-end loaders will be used to feed the raw product to a conveyor system, which will transport the material to a stationary wash plant using water to clean and separate the sand from the rock. The plant is located to the east of the project area on the Brasell property. The resource can be divided into two categories: 1) processed material (i.e., washed product) and 2) clay gravel. The processed materials are separated into five basic products: 1) concrete sand, 2) masonry sand, 3) pea gravel, 4) size #57 gravel (¼ inch to ¾ inch), and 5) oversize (+2 inch). These materials are then marketed primarily for construction aggregate (e.g., ready mix concrete and asphalt concrete). The finished products are loaded onto trucks by front-end loaders at the wash plant site. Trucks are weighed and ticketed prior to them leaving the property. Approximately 10% of the resource is identified as “clay gravel” and will not be processed at the wash plant. Clay gravel is stripped and stockpiled near the pit prior to mining the wash product. Clay gravel will normally not be conveyed; instead it is trucked in an “unprocessed” state directly to the job site (after it is weighed at the plant). Clay gravel will be hauled along the same conveyor route (discussed above) to the plant site to be weighed. Although reclamation is identified as the fifth step above, the bulk of the reclamation activity is done concurrently with stripping operations. As one pit is stripped the overburden is hauled to the previously stripped and mined pit. This is the most efficient process, as you do not want to “rehandle” overburden. Final grading follows and the site is stabilized with vegetation. The project is still in the mine planning stages, but it is expected to begin mining on the north end of the project and then move south. The mined out basins could be used as part of the processing system and actually filled in over time with sand and clay. The property will be permitted for this type of use. Mined material is a naturally wet product and very little dust is generated by the actual mining activity. Occasionally, the haul roads will dry out and contribute to dust. Memphis Stone & Gravel Company uses water trucks to spray water on haul roads when conditions warrant. Memphis Stone & Gravel Company uses a variety of operational practices to help control noise. In most instances, operational areas are isolated with soil berms built around the operations to help buffer noise and reduce our visibility to the public. Material stockpiles placed between operations and perimeters also reduce noise levels considerably. Memphis Stone & Gravel Company has began using innovative MSHA approved backup alarms that eliminate “beep-beep” sounds from conventional alarms by using a different alarm sound frequency which quickly dissipates as it moves away from the alarm. EROSION CONTROL Memphis Stone & Gravel Company follows the practices described in the Tennessee Department of Environment and Conservation’s Erosion and Sediment Control Handbook, Forth Edition, 2012 or its equivalent, for environmental compliance. Erosion and sedimentation control is accomplished using a variety of engineering controls and practices including the following techniques/controls: Settling Ponds Page 2 of 4 Diversion Berms Drainage Ditches Terraced Slopes Temporary/permanent Seeding Silt Fence Check dams Temporary cover using mulch or seeding with grasses RECLAMATION AND REVEGETATION PLAN All topsoil is segregated from other less fertile parts of the overburden strata. Topsoil is stockpiled as berms around operational areas until it can be returned to promote re-vegetation. The berms are temporarily seeded with grass or mulched to reduce soil erosion. All high-walls are reduced to blend with the approximate original contour. Slopes are reduced to a gradient no steeper than 3 foot horizontal to 1 foot vertical (3:1). The general plan for re-vegetation is to reestablish grass cover as quickly as possible following disturbance. This is accomplished by grading slopes then drilling in grass seed. Seeded areas are normally protected with temporary covering (e.g., blown hay, mulch) to reduce detachment during precipitation events. In some areas turf reinforced matting (TRM) may be used when ground conditions warrant. Seeded slopes will often be crimped. All discharge points will be reinforced using TRM or hard armor methods (e.g., rip rap). Seeding for permanent re-vegetation should consist of the following characteristics: Seeding Dates February 1 to July 1 June 1 to August 15 April 15 to August 15 August 1 to December 1 February 1 to December 1 Grass Seed Variety Kentucky 31 Fescue Korean Lespedeza English Rye Kentucky 31 Fescue English Rye Korean Lespedeza German Millet Bermuda (hulled) Annual Lespedeza Kentucky 31 Fescue English Rye White Clover Kentucky 31 Fescue Crown Vetch English Rye Percentages 80% 15% 5% 55% 20% 15% 10% 70% 30% 70% 20% 10% 70% 25% 5% Lime / Fertilizer Rates will generally be applied as follows: Initial plantingLime: Fertilizer (13/13/13): 3 tons/acre 600 lbs/acre For successive years prior to 100% releaseFertilizer (13/13/13): 300 lbs/acre (as needed) Page 3 of 4 Established permanent vegetative cover will be mowed twice per year in May and September. As areas are mined, a lake will be formed to compensate for the mined material. Generally, a water body approximately 30 percent of the mined area will be developed. These lakes will be designed to be supportive of aquatic habitat and/or recreational use. Examples of reclaimed areas can be found at Memphis Stone & Gravel Company’s website www.msgravel.com. Page 4 of 4 Wash Plant oa d all W sR Buffer of Undisturbed Vegetation to Remain 50 ft. x 1000 ft. with 12 ft. Berm To Be Built Highway 35 Pond not part of system Process Basins Recycled System Ë 1 inch = 600 feet Robinson Et Al Dugger Brasell Ext Berms Brasell Ext Conveyor Rd Permit Boundary Expansion Indicated/Measured 0 300 600 1,200 1,800 Feet Memphis Stone & Gravel Company Proposed Brasell Mine Extension T9S, R7W, Section 19 Panola County, MS November 25, 2013 Wash Plant oa d all W sR Buffer of Undisturbed Vegetation to Remain 50 ft. x 1000 ft. with 12 ft. Berm To Be Built Highway 35 Pond not part of system Process Basins Recycled System Ë 1 inch = 600 feet Robinson Et Al Dugger Brasell Ext Berms Brasell Ext Conveyor Rd Permit Boundary Expansion Indicated/Measured 0 300 600 1,200 1,800 Feet Memphis Stone & Gravel Company Proposed Brasell Mine Extension T9S, R7W, Section 19 Panola County, MS November 25, 2013