Hugues Berthet - Baltic Ports Organization

Transcription

Hugues Berthet - Baltic Ports Organization
Shore connection solutions
Plug in to green power
Baltic Port Organization
Ystad, April 2015
Hugues Berthet
Shore Connection
www.schneider-electric.com/shore-connection
Business Development1 Director
Such as
airports, there
are several
years, Ports are
currently their
revolution to
limit pollution
and the impact
on the
environment
2
Shore connection general overview
Up to
66%
Savings
Electrical
network
Existing or
New substation
Frequency adaptation
And safety operation
0
Cable dispenser
to ship connection
Emission
Noise
Vibration
Ship to supply
ShoreBoxTM
Container ship
Hinterland
Energy provider
Shore
Port
Terminal
To
Quay
Shore / Ship Interface
Ship
Ship
3
Shore connection general overview
Up to
66%
Savings
Electrical
network
Existing or
New substation
Frequency adaptation
And safety operation
0
Cable dispenser
to ship connection
Emission
Noise
Vibration
Ship to supply
ShoreBoxTM
Ferry, RoRo
Cargo
G Cruise
Hinterland
Energy provider
Shore
Port
Terminal
To
Quay
Shore / Ship Interface
Ship
Ship
4
Main Interface Requirements
HVSC Main Standard :
IEC / ISO / IEEE 80005-1, HVSC
IEC / ISO / IEEE 80005-2, Com. Protocol
IEC / ISO / IEEE 80005-3, LVSC
Container ship
Plugs & Sockets outlets
IEC 62 613, Plugs & Sockets Outlets
Interface Voltage
MV : 6,6 / 11kV, (+ 6% / - 3,5%)
LV : 400 / 440V / 690V, (+ 6% / - 5%)
Basket of Ships Power Demand
MV : 1MVA up to 20MVA
LV : <1MVA, 350A maxi per plug
Ferry, RoRo
Cargo
Cruise
Frequency on Board: 50Hz / 60 Hz
Compensation Tide System : 9m
Distance between ShoreBoX to connection point :
LV / 300 m maxi & MV No limit
5
Our Solution Offer
Plug in to
Green Power
Shore Connection Solution
6
3 Years of tests to learn the behaviour
of a global Solution in 3 test platforms
1 Montbonnot
Platform GFC
• 10 GFC //, 5 MVA
• Genset 1 MVA
• Network Synchronization
• General behaviour
2 Eybens
Simulation Platform
• HVAC
• Fans
• LV Automation
Control Command
3 Volta Lab
Final test in Lab
• Test at In, 3 MVA
• TVD
• Type tested
• Safety loop
• Interface Shore / Ship
• Adaptation to Ship
7
A complete platform to test & simulate
5 MVA
10 GFC in //
Ship Loads
1 MVA
Ship generator
Test platform
Energy management
8
An Integrated System is
prefabricated & industrialized
This is not a car
But spare parts
This is a car
performed entirely
by a manufacturer
with a guarantee of performance
over the duration of its life cycle
9
10
An Integrated System is
MV – 50 Hz
a prefabricated
electrical substation
Knowledge,
Return on Experience,
Port Context
Usage values
2,3 MVA
400V – 50 Hz
Upstream
LV busbar
RM6
SM6
Premset
GFC
7000
Downstream
Busbar
2 MVA
Transformer
400V – 60 Hz
6,6 kV
MV plug
To ship
GFC Galaxy 7000
Standard
Product
Standards
compliant
6,6 kV – 60 Hz
11
Schneider Electric worldwide references
Bergen
Riga
Marseille
Los Angeles
Tanger
Casablanca
Kalibaru
12
13
Helsinki Viking Line
ShoreBoX
overview
Electrical
network
LV Cable dispenser
Cable to ship
connection
Ship to
supply
ShoreBoxTM
Safety operation
&
Energy Management
G
Hinterland
Utility
Viking Line Terminal
Interface
Shore to Ship
Ship Gabriella
Mariella
14
OSV connection at Port of Bergen
● All in one ShoreBoX, 1 MVA
● Operational middle of 2015
● Supply electricity to OSV
Offshore Supply Vessels at berth
ShoreBoX
15
9th March 2015
Containership terminal at Port of Riga
● Port: Riga, Latvia
● Ship type: Containership
● Offer: 2x2MVA ShoreBoX
with frequency conversion
Berth under construction
ShoreBoX shipped from France
16
Future Kalibaru Container Terminal
•
Existing port does not have the capacity
to host the increasing sea freight
volumes
•
Development of the new KCT (Kalibaru
Container Terminal) started in March
2013
•
Future capacity 13 M 20-foot
containers / year
•
First phase is scheduled for completion
in late 2017
•
When fully operational, it will be the
country’s largest industrial port and
the 3rd in South East Asia
● New green, modern port in South Asia
● First phase includes 9 berths equipped
with Schneider Electric 5-MVA shore
connection systems
● 2nd and 3rd phases will equip berths with
shore connection as well
Future Kalibaru
Container Terminal
17
Navy ship connection at Port of Toulon
• Facility to provide 60hz to the base network
• First installation to be operational in 2015.
• 2x ShoreBoX MV-> MV 4MVA with frequency conversion
• 2 types of ships connected , BPC 2,2MVA & FREMM 1,2MVA
ShoreBoXTM
18
Moroccan Navy Port
The ShoreBoX leaving the factory
beginning of January 2014
During the commissioning,
end of January 2014
The ShoreBoX installed and
fully operational
The customer has passed another order
for an equivalent system for another
Moroccan Navy Port
FREMM French Frigate
19
CMN Marseille south of France
● Customers need: Supply 3 Ferries
● 3 Berths : Poste 68, 70 & 74
● Voltage on Port : 20kV in substation
● Power per ship : 1,8MVA, 11kV
● 50hz (no frequency conversion)
20
CMN Ship modification in Marseille France January 2015
5
2
1
4
1
2
5
3
1 Incomer
2 MV Premset Cubicle
3 Transformer if reauired
4 Main Switchboard
5 Bridge
1
1
3
1
3
3
3
2
21
Plug in to
Green Power
Thank you for your attention
Shore Connection Solution
At your disposal
hugues.berthet@schneider-electric.com
Mobile : +33 6 08 56 54 41
22