Fitchburg Sand and Gravel Site, Fitchburg, MA
Transcription
Fitchburg Sand and Gravel Site, Fitchburg, MA
C O M M O N W E A L T H O F M A S S A C H U S E T T S 43D SITE EVALUATIONS Prepared for: Massachusetts Alliance for Economic Development Massachusetts Executive Office of Housing and Economic Development October 2008 Fitchburg g Sand and Gravel Site Fitchburg, g, MA Moran,, Stahl & Boyer y COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS T bl off Contents Table C t t Description Page Introduction 1 Sit Evaluation Site E l ti Overview O i 2 Evaluation of Site 7 • General Comments and Resource Assessment 8 • Recommendations 8 • General Site Information 9 • Overall O ll M Map off Si Site Location i 9 • General Proximity Information 10 • Local Access Information 10 • Site Characteristics 11 • Demographic Map of 30-Minute Commute Zone Around Site 13 • Nearby N rb C Commercial mm r i l and nd Ind Industrial tri l B Businesses in 14 • Nearby Retail Businesses, Food Establishments and Banks 14 • Aerial View of Site and Surrounding Area 15 • Pictures of Site/Facilities 16 • Housing Examples Within Surrounding Area 17 This report was prepared by Moran, Stahl & Boyer. For additional information or comments, please contact: John M. Rhodes, Senior Principal Phone: (941) 755-0074 E-Mail: john.rhodes@msbconsulting.com COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 1 Introduction As part of an overall initiative to identify, evaluate and ultimately market sites under Massachusetts General Law Chapter 43D, The Massachusetts Alliance for Economic Development (MAED) along with the Massachusetts Executive Office of Housing and Economic Development retained Moran, Stahl & Boyer, a nationally known site selection and economic develop- ment consultant, to perform evaluations of selected sites (see Figure 1 below). The evaluation included on-site reviews, input from site contacts, data collection, and ultimately an assessment of site resources, best uses for the site, and recommendations for any site upgrade required to achieve a needed level of readiness. Figure 1 – Location of the 43D Sites That Were Included in the Site Evaluation Process Location Description Pittsfield Former GE site being developed as William Stanley Business Park of the Berkshires Dalton Ashuelot Park (former Beloit manufacturing complex currently owned by Crane & Co.) Holyoke Multiple sites within Crossroads Business Park off I-91 Athol North Quabbin Business Park at corner of SR 2 and SR 32 Fitchburg (2) Sand and gravel operation off Airport Rd and site off Princeton Road (former sludge pits) Lowell Downtown Lowell Hamilton Canal District North Andover 1600 Osgood Street (former Lucent Technology complex) Haverhill Industrial land off SR 125/Hilldale Avenue on NH/MA border A Amesbury/Salisbury b /S li b G ld T Golden Triangle i l site it att iintersection t ti off I-95 I 95 and d II-495 495 Worcester South Worcester Industrial Park Douglas Current sand and gravel operation and other adjacent lots off SR146 and Gilboa St North Grafton Grafton Science Park adjacent to the Tufts University School Veterinary Medicine Medway Medway Industrial Park at I-495 and SR 109 Brockton processing gp plant at 309 Battles St Former Howard Johnson and other food p New Bedford Former Polaroid office and manufacturing complex in the New Bedford Business Park Haverhill Dalton Athol Fitchburg (2) Lowell Amesbury/Salisbury North Andover Pittsfield Medway Brockton Worcester H l k Holyoke Douglas North Grafton New Bedford COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 2 Site Evaluation Overview Site evaluation is a multi-step process that includes information gathering, reflecting on options, and assigning best use(s) as outlined in Figure 2 . Information is packaged into seven modules as noted in Figure 3 and presented as tabular data, maps and photographs. A sample Site Evaluation Form is presented at the end of this section. The end result of the evaluation is to address the following questions: • What types of resources (labor, transportation, education, R&D, industry employment, etc.) are accessible to the site? • What are the primary attributes of the site and related buildings (as they exist)? • What level of readiness is the site and related buildings (as they exist), including completion of any studies and securing any permits? • What are the soil conditions and the presence of rock outcrops and wetlands/flood plain that may impact site development? • What level of local market competition exists? • What types of industries and operations would be most interested in the site and related buildings (as they exist)? With this information, the site owner and/or developer can formulate a strategy for highest/best use as well as for marketing the site and seeking prospects with the most interest. Figure 2 - Site Evaluation Process • • • • • • Task 1 Gather Background Information General Site Information Resources Within 30-45 Minutes of Site Resources Within 2-3 Miles of Site Site Details Existing g Building g Details Real Estate Market Analysis • • • • • • • • • • • Task 2 Reflect on Potential Options Realistic Options will be Based on: Size and Configuration of Site Activities Adjacent to Site Si and Size dT Types off Buildings/Space B ildi /S Level of Readiness of Site and Buildings Access to Transportation (air, interstate, etc.) Availability of Labor (skills and cost) Education and Training Resources Access to University R&D Activity Local Amenities (restaurants, shopping, etc.) Utilities (cost and capacity) Other Considerations Task 3 Assignment of Best Uses Taking into Consideration the Following: • Target Industries Within the Region/City • Local Situation vs. Needs of Companies in Certain Industries, Life Cycle Stages and Types yp of Operations p Task 4 Marketing Strategy Develop and execute marketing strategy for site as it reaches the level of readiness for the target prospects. COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 3 Figure 3 - Information Modules for Site Evaluation Module 1: Evaluation of Site • General Comments and Resource Evaluation • Recommendations for Site Use and Improvement Module 2: General Site Information • Site designation • Economic development region • Address/location of site • Local contact information • Property owner(s) • Current real estate broker • Map identifying site location Module 3: Resources Within 30-45 Minutes of Site • List regional airport(s) and travel distances • Demographic map (population concentration) within 30-minute commute distance • Demographic profile within 30-minute commute distance - Population - Average annual growth rate over past five years - Adult population with HS diploma only* - Adult population with 4-year college and above* - Median household income* - Population in the 25 to 34 year old cohort* * Compare with national averages • Description of housing cost and supply within 30-45 minutes of site Comment: For the prospective company, the information related to a 30-minute commute from the site is of greater value than region or metro area data. COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS Module 4: R Resources Within Withi 2 2-3 3 Mil Mile P Proximity i it tto Sit Site • Distance to interstate or major limited access highway • Condition of access road (pavement condition, shoulders, turning lanes, lights at intersections, etc.) • Existence/plans for any of the following on the access highway between site and interstate: major shopping areas, schools, hospitals, parks or residential developments 4 Comment: The resources that are within close proximity are important for headquarters, back office and R&D operations, and are less important for manufacturing operations. • Access to public transportation (rail and/or bus) • Access to any of the following amenities within two miles of the site: restaurants, shopping areas, banking, daycare, gym/workout facilities, outdoor trails, personal services • Access to any of the following business services: copy/printing, office supplies, computer retail/service, etc. Module 5: Site Details • Aerial photo of site noting proximity to other businesses, retail options and nearby residential properties • Site plan of developed site/park • Overall size of site/developable acres • Level of site readiness to build new or move into existing structures • Zoning classification/description and maximum allowable build-out (sf) • Use/zoning of adjacent land • Presence of wetlands or sections within 100-year flood plain • Greenfield or brownfield site and current land cover • Site studies completed, such as: - Environmental review (Phase 1 and 2) - Environmental Impact Study - Wetlands and flood plain review - MEPA review - Archaeological sites review - Traffic impact study - Soils analysis • Site plans prepared - Overall site plan - Runoff Water Management Plan • Permits secured - Site plan approval - Overall environmental permit - Wetlands permit - Highway access/curb cut permit - Army Corps permit (100-yr. flood plain) - Steep slope permit - Other permits • Overview on utility services (power, gas, water, sewer, and telecom) - Name of utility - Capacity/availability (particularly water) - Dual feed/backup for power and telecom - Cost of power (cents/kWh) Comment: Site details provide not only general attributes of the site but also factors that help define the level of readiness of the site. Refer to Tables 3 and 4 for details on site readiness. COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS Module 6: E i ti Existing B Building ildi Details D t il • Number of buildings on site • Designated use(s) of buildings (office, light manufacturing, warehouse, lab, etc.) • Age and condition of each building and class of office space (A,B or C) • Overall square footage and size of floor plate for each building o industrial dust a buildings: bu d gs ceiling ce g height, e g t, co column u widths, dt s, sslab ab thickness, t c ess, • For crane rails in place, etc. • Parking capacity (open or garage) • Lease or buy options • Offering price/lease rate for space 5 Comments: • For F r office ffi space, p parking p rki capacity p it is often quoted in spaces per 1,000 sf of office. • LEED Designation: the U.S. Green Building Council has defined The Leadership in Energy and Environmental Design (LEED) Green Gr Building B ildi R Rating ti System™ to encourage and accelerate global adoption of sustainable green building and development practices. • Level of building readiness (months to move in) • Is this a LEED certified building? Module 7: Real Estate Market Analysis • Overall market situation (strong or weak) • Average purchase price for land in similar situation (stand alone, within office or industrial park, etc.) • Description of comparable property/building • Average lease rate for comparable space • Other information about local market Comment: The ability to define comparable market data will be determined by the level of specialization and unique features the site offers. The average lease rate for generic office and industrial space and gross inventory of space (in metro areas) will be the easiest information to gather from the marketplace. COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 6 Figure 4 – Sample Site Evaluation Sheet General Comments and Resource Assessment Site Designation Address or other designation Ownership Current owner(s) of site General Description of Site and Buildings Overall size of site and usable acres as well as size of buildings and floor plate Readiness of Site and Buildings The time required to complete the site and/or building before the prospective company can have employees productively at their jobs Site/Building Amenities Parking, café, locker rooms, trails, etc. Transportation Access Air, interstate, rail, port and public transportation Labor Resources Population growth, education levels and specific industry presence Education & Training Two/four-year colleges and other technical/business training resources University R&D Access R&D as an economic engine and the support of specific industries Amenity Access Access to shopping, restaurants, personal services, gym, bank, etc. Utilities Note any extreme situation in capacity or cost for water, electric power, gas, sewer or telecom Other Comments Unique aspects of site or situation Recommendations Highest/best use for site/buildings 1. Considerations for improving the site 2. Other recommendations COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 7 Fitchburg Sand and Gravel Site Fitchburg, MA COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 8 General Comments and Resource Assessment Site Designation Sand and Gravel Operation off of Airport Road Ownership City of Fitchburg General Description City owned sand and gravel operation of about 70 acres. Site and Building Readiness Level 6, undeveloped site with land in the hands of the original owner. Site/Building Amenities Possible development of bike trails along the North Nashua River. Transportation Access Air Access: Manchester-Boston Regional (39 mi) and Logan Int’l (63 mi). Located adjacent to the Fitchburg Regional Airport. Interstate/Limited Access Highway: Located 2.5 miles from Route 2. Labor Resources Modest population growth rate with significant industrial labor base. Education & Training Fitchburg State (local) and Mount Wachusett Community College College. University R&D Access Worcester Polytechnic Institute and UMass Lowell. Local Amenities Accessible to restaurants, shopping, and personal fitness. Utilities Utilities exist along Airport Road. Other Comments The area surrounding the site is currently heavy industrial, although there is a project in progress to renovate a mill complex to become high-end residential and retail. There is a consideration to install a biomass power generation unit on the site supported by 30 tractor trailer loads/day. There is also a 100-year flood plain along the North Nashua River at the front of the property. Recommendations There are three options to consider for the development of the site: 1. Develop it as an alternative energy center to provide low cost power to area industrial operations. 2. Develop the site as an attractive light industrial site with heavy landscaping to create an environment amenable to higher end retail/residential area already being developed. There is also an opportunity to leverage the availability of the adjacent airport. 3. Position the site as a low cost industrial option in line with current adjacent heavy industrial and commercial operations. COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS General Site Information Site Designation Current Sand and Gravel Site Region North Central Address/location Airport Road Local contact Phone No. E-mail Address Dan Curley 978-345-1018 dcurley@fitchburg-ma.gov Property Owner(s) City of Fitchburg Simonds International Current Broker Contact Phone No. E-mail E mail Address None Overall Map of Site Location 9 COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 10 General Proximity Information Description Input Closest regional airport(s) with travel distance Manchester-Boston Regional (39 mi) Logan Int’l – Boston (63 mi) Distance to Major Cities Worcester (26 mi) Lowell (32 mi) Manchester (42 mi) Boston ((59 mi)) Demographics W/ 30-Minute Commute Input Overall population 269,900 Growth rate (2000-2006) 3.8% / Mass Avg = 0.67% / Nat’l Avg = 6.4% Adult population with HS diploma only 30.4% / Mass Avg = 28.2% / Nat’l Avg = 30.2% Adult population with 4 4-year+ year+ college 26 6% / Mass Avg = 37 26.6% 37.0% 0% / Nat’l Nat l Avg = 27 27.0% 0% Median household income $37,004 / Mass Avg = $59,963 / Nat’l Avg = $48,451 Population in 25 to 34-year old cohort 11.9% / Mass Avg = 12.7% / Nat’l Avg = 13.3% Cost of Living (Nat’l Avg = 100) • Overall Cost of Living • Cost of Housing • Cost of Utilities Reference: Sperling’s Best Places web site 97 73 110 Local Access Information Description Input Distance to interstate/major highway Rt 12 (1 mi) and Rt 2 (2.5 mi) Condition of access highway Must travel down small two-lane two lane road to gain access to Rt 2 Existence/plans for any of the following on the access highway between site and interstate: major shopping areas, schools, hospitals, parks or residential developments Area surrounding site is predominately industrial with plans to renovate a nearby mill building and create high-end condos and retail as well as restaurant. Access to public transportation (rail or bus) MBTA Commuter Rail station located in downtown Fitchburg Fitchburg, North Leominster MBTA station located nearby, and bus transit provided by the Montachusett Regional Transit Authority. Access to any of the following amenities within two miles of the site: restaurants, shopping areas, banking, daycare, gym/workout facilities, outdoor trails, trails personal services Retail/restaurants located within one mile of site. Access to any of the following business services: copy/printing, office supplies, computer retail/service, etc. Office copy services and office supply stores (Office Max and Staples) located nearby. COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS Site Characteristics Description Input Overall size of site/developable acres Approximately 58 acres Cost of Land ($/Acre) Zone classification/description and maximum allowable build-out (SF) Industrial Use/zoning of adjacent land Industrial Level of site readiness Level 6, active sand and gravel site Presence of wetlands or sections within 100-year flood plain Yes Greenfield or Brownfield site and current land cover Sand and gravel Site studies complete, such as: • Environmental review (Phase I/II) • Environmental Impact Study • Wetlands and flood plain review • MEPA review • Archeological sites review • Traffic impact study • Soils analysis None completed Site plans prepared • Overall site plan • Runoff Water Management Plan None Permits secured • Site plan approval • Overall environmental permit • Wetlands permit • Highway access/curb cut permit • Army Corps permit (100-yr. flood plain) • Steep slope permit • Other permits: None 11 COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS Site Characteristics Description Input Electric Power Service • Utility • Capacity • Cost (KWH) • Dual feed available (Y/N) None • Unitil • • • Gas Service • Utility • Capacity • Cost None • Unitil • • Water Service • Utility • Capacity • Cost Engineering service and design needed • • • Wastewater Service • Utility • Capacity • Cost Engineering services and design needed. • • • Telecom Service • Utility • Capacity • Dual feed available (Y/N) None • Verizon • • 12 COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 13 Demographic Map Covering 30-Minute Commute Zone Around Site Nashua Fitchburg Leominster 2 91 495 2 190 290 W Worcester t 4 Springfield 90 84 495 395 Providence 91 4 Hartford Population Concentration < 100 100-499 500-1,000 30-Minute Commute Zone 1,000-2,500 Site Location >2,500 COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 14 Nearby Commercial and Industrial Businesses Letter Business Name Employment Line of Work A Gettens Electric Supply Co - HQ 19 Electrical apparatus, equipment, and wiring supplies B New England Road Machinery 20 Mfg mining machinery and structural metal fabrication C Benson Street Storage Center 5 Marking devices D Simonds Industries, Inc - HQ 300 E Minuteman Press 5 Commercial printing, lithographic F Eastern Bearings, Inc 6 Wholesale industrial supplies G Viana Distributors, Inc 8 Equipment rental/leasing H p Brideau Oil Corp 2 Wholesale p petroleum p products I Schwan’s Sales 20 Wholesale general groceries J AKS Recycling, Inc 1 Wholesale brick/stone materials K Iron Construction Co 10 Water, sewer, pipeline, communications, and power line construction L Crawford Street Collision n/a Automotive collision and frame repair p M Alonso Construction Co 20 Sewerage systems repair and construction N Wass-Arthur Signs, Inc 2 Operators of nonresidential buildings Mfg machine tool accessories Nearby Retail Businesses, Food Establishments, and Banks Retail Businesses Food Establishments Banks CVS/Walgreen’s Pharmacy Ninety Nine Restaurant Rollstone B&T Hannaford/Shaw’s Grocery Friendly’s Restaurant Bank of America Staples/Office Max Burger King, McDonald’s, Subway Sovereign Bank Fitness Club at Liberty Place Boston Market TD Banknorth COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 15 Aerial View of Site and Surrounding Area F G E D L M N A J H B C Site Location High Density Retail High Density Residential A Commercial/Industrial Business I COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 16 Pictures of Site/Facility View of Access Road Along Creek Overall View of Site View of Site From Rear Fence Line Boundary Simonds Industries, Inc From Back Fence Line High-End Housing/Retail Development Near Site Current Condition of High-End Development Site COMMONWEALTH OF MASSACHUSETTS 43D SITE EVALUATIONS 17 Housing Examples Within Surrounding Area $200,000 $250,000 $350,000 Fitchburg Fitchburg Fitchburg $204,800 l 3 Bed, 2 Bath 1,520 Sq. Ft. l 0.27 Acres $249,900 l 3 Bed, 2 Bath 1,456 Sq. Ft. l 0.3 Acres $349,900 l 3 Bed, 2.5 Bath 2,020 Sq. Ft. l 0.46 Acres Leominster Leominster Leominster $207,900 l 3 Bed, 1 Bath 1,613 Sq. Ft. l 0.24 Acres $254,750 l 3 Bed, 1 Bath $ 1,545 Sq. Ft. l 0.17 Acres $349,900 l 4 Bed, 2 Bath $ 3,270 Sq. Ft. l 0.32 Acres Gardner Gardner Gardner $205,000 l 3 Bed, 2 Bath 1,900 Sq. Ft. l 0.23 Acres $249,800 l 3 Bed, 2.5 Bath 2,182 Sq. Ft. l 0.25 Acres $339,900 l 4 Bed, 2.5 Bath 1,956 Sq. Ft. l 0.28 Acres
Similar documents
Hilldale Industrial Properties, Haverhill, MA
company can have employees productively at their jobs
More informationGolden Triangle ,Amesbury/Sailsbury, MA
labor coming from the local area as well as NH and ME. Commuting employees having typically gone into Boston or the 128 area for jobs and have valued access to multiple employers. However, with the...
More information