Contents
About this Asset Sale …………………………………………………. 3
Existing Plant ……………………………………………………………… 4
Plant Overview …………………………………………………………… 6
Plant Overview – current operations …………………………. 9
Marketing …………………………………………………………………. 13
Potential NEW sites for biodiesel plant………………………. 14
General Assets …………………………………………………………… 17
Process – Transesterification ……………………………………… 69
Chemical Area ……………………………………………………………. 93
Electrical In-Process Area ………………………………………….. 101
Chemical Laboratory …………………………………………………. 115
Glycerin Tanks …………………………………………………………… 127
Other Assets ……………………………………………………………... 130
Pipeline Assets ………………………………………………………….. 134
Asset Inventory List …………………………………………………… Ask
1/7/2015
2
About This Asset Sale
Vanguard Synfuels, LLC is 100% owned by its holding company, Consolidated Energy Holdings, LLC (CEH).
CEH are asking $5.25 million ($0.35/annual nameplate gallon) for the assets of Vanguard Synfuels, LLC
(ww.vanguardsynfuels.com) a fully licensed, 15MMgy, EPA accredited, operating biodiesel plant.
The sale requires the buyer to move the plant’s assets from its current location to a site of the buyer’s choosing; however,
Vanguard will aid in re-establishing the fully operational plant (the existing Vanguard site is being re-purposed for others).
On the site of a former anhydrous ammonia (fertilizer) plant, Vanguard’s biodiesel plant was commissioned in 2005 as a
biodiesel plant to run very low FFA oils such as soy and canola. In 2010 bioenergy engineering firm, Jatrodiesel
(www.jatrodiesel.com), re-designed and managed the construction of a major plant upgrade allowing the processing of
up to 22% FFA oils such as poultry fat, fish oil, yellow grease, used cooking oil and tallows. The work also increased the
plant’s annual throughput (nameplate) from 12MMgy to 15MMgy.
Jatrodiesel will provide engineering services to design and manage the tear-down, transportation to the new site, and
erection of the plant on a turn-key basis. This includes permitting and all engineering and construction required for
commissioning the new plant (either as an add-on to an existing plant or a greenfield).
Additionally, for approx. $4 million, the plant could be expanded to 30MMgy.
1/7/2015
3
Existing Plant
 Fully operational biodiesel plant at Pollock, near Alexandria, LA
1/7/2015
4
Existing Plant
 Plant from the air in 2012
I
A
J
D
G
B
C
LEGEND:
A: Administrative offices
B: Main processing building
C: Control & chemistry lab
D: Warehouse
E: Finished biodiesel
F: Rail spur (on theUP)
G: 9.2 million gal. tank
H: Cooling towers (not used)
I: Settling ponds (not used)
J: Feedstock tank
H
E
F
1/7/2015
5
Plant Overview
 Current operations, facilities and logistics
1/7/2015
Fully operational 15
million gallons per
year production
Continuous process
technology (as
opposed to batch)
Multi-feedstock
capability: soy, corn and
animals fats, up to 22%
FFA.
Facility includes a
6,000 sq. ft. brick
administration office
Biodiesel chilling
system for meeting
winter spec product
Adequate storage for
feedstock, biodiesel,
chemicals and glycerin
Facility sits on 320
acres with 100 for
industrial use
Glycerin processing
and storage (to 84%
purity level)
Truck access with
certified scales and
micro-motion meters
Fresh water permitted ponds (not
used) and two
permitted water
wells
Dry wash system
(uses no water).
More efficient,
better final product
Rail access via Vanguard’s
two rail spurs off the
Union Pacific mainline
Plant connected to
two industrial natural gas pipelines
Distillation column
removes methanol
from glycerin
Water access via Red
River port 16 miles from
plant. Connects to Gulf
and Mississippi River
6
6
Plant Overview
Jerome Whiddon,
Plant Manager
 How Vanguard makes its biodiesel . . . (steps 1-6)
1. Feedstock is drawn from storage
2. Removal of moisture and impurities
3. Steam boiler keeps feedstock hot
4. FFA in feedstock is esterified to biodiesel
5. Methanol & catalyst to start reaction
6. Transesterification tanks (continued . . . )
1/7/2015
7
Plant Overview
Jerome Whiddon,
Plant Manager
 How Vanguard makes its biodiesel . . . (steps 7-12)
7. Glycerin is settled out of biodiesel
8. Methanol is removed from glycerin
9. Biodiesel is chilled to remove sterols
Feedstock is drawn from storage
10. Partially complete biodiesel storage
1/7/2015
11. Biodiesel stored before final polishing
12. Biodiesel finished product tank
8
8
Operations Overview
 Plant operations managed from a single control center, 7/24
• The PLC (programmable logic control) is manned by a single operator
• Plant runs two 12-hours shifts seven days a week
• On night-shift, one operator and a utility man
• Day-shift is the same as night plus up to two maintenance personnel
• PLC controls all feedstock, chemical and biodiesel processing
pump flows, dwell times including temperatures and pressures.
1/7/2015
9
9
Operations Overview
 Chemistry lab and testing of biodiesel
• At right a sample of biodiesel
Vanguard typically produces and
processed from a blend of used
cooking oil and animal fats
(called yellow grease or YG)
• Below left a sample of #2
diesel fuel.
• At right, the same fuel blended
with 20% Vanguard biodiesel
• All incoming feedstock is tested
to meet agreed upon specifications
(typically not over 15% FFA or 2%
moisture, impurities and unsaponafiable
materials
• While the PLC controls product flows,
temperature and pressure, material in process must be
checked manually for meeting correct condition at certain points
• Once the biodiesel is finished it is tested to meet the ASTM 6751
specification required by customers and for obtaining government subsidies.
1/7/2015
• 100% #2 diesel
• 80% #2 diesel
w/20% biodiesel
10
10
Operations Overview
 Typical Biodiesel Certificates of Analysis
11
1/7/2015
11
Operations Overview
 Loading for rail cars
• Two spurs connecting to the Union Pacific
• A total of 33 cars can be berthed at a time
• Fast biodiesel loading racks for multiple cars
• Designed for off-loading feedstock
• Steam injection to cars to ease unloading
in winter months for low iodine feedstocks
1/7/2015
 Trucks 15 minutes to Interstate
• Easy off-loading of trucks to feedstock tank
• Micro-motion meter and scales for measuring
incoming and outgoing loads
• Paved roads throughout plant
• Steam injection system for high iodine feedstock
unloading
12
12
Marketing
 Biodiesel marketing and sales
• (Left) Darrell Duboc, CEO with Ian Lawson,
Sales & Marketing Manager
• Almost all biodiesel produced finds a ready
market within about 350 miles of the plant
• The company sells to distributors who blend the
biodiesel to between 5% biodiesel and 95% #2
diesel fuel and 20% biodiesel and 80% #2 diesel fuel
• The biodiesel finds its way to retail stations all over Texas
and along the Gulf coast
• The local market for biodiesel is handled through the port (PAAL)
where local distributors can pick up blended biodiesel and deliver to
stations in central Louisiana
• An increasing number of sales are made to customers using 100% biodiesel.
1/7/2015
Pilot is America’s
largest truck stop
chain
13
13
Potential Plant Location
 Site marked in yellow w/rail and water access. I-49 is ½ mile away
7 acres
1/7/2015
14
Asset Inventory List
 List of all assets (and pictured in separate pdf document)
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1/7/2015
Description
Reactor 302 -1250 gal Acid Neutralization
Reactor 501 -1250 gal Biodiesel Dryer Holding Tank
Coalescer 701 -Glycerin Dryer Column
Coalescer 201- Feedstock Dryer Column
Coalescer 301- Post Esterification Dryer Column
Coalescer 302- Post Esterification Dryer Column
Coalescer 501- Biodiesel Dryer Column
Coalescer 502- Biodiesel Dryer Column
Reactor 301 -20,000 gal esterification reactor with 3 lightening mixers (agitators)
Jatro Esterification Skid (whole) with pumps/heat exchangers & valves
Vacuum Pump and orange 810 tank
Pump 810- vacuum pump
Niagara Condensing Unit
Cleaner Brooks Boiler serial no. 1-67404
Derator with pumps and skid
Ingersoll-Rand compressor, dryer and holding tank
Pump 101- Feedstock offloading pump
Pump 100- Feedstock Recirculating pump with electrical controls and piping
Tank 450- 6000 gal fiberglass biodiesel tank
Tank 451 -6000 gal fiberglass biodiesel tank
Tank 452 -6000 gal fiberglass biodiesel tank
Pump 451- Biodiesel Transfer Pump with electrical controls and piping
Coalescer 402- 20,300 gal Biodiesel Coalescor
Glycerin Day Tank-12,750 gal with transfer and recirculating pumps (2)
GDT Pump
Column 601- 16,500 gal cone bottom tank
DT 601- 16,900 gal Bio Holding tank
DT 602- recirculating pump and transfer pump
Distallation effulent 6300 gal tank and pump
Jatro Diesel Distillation Column
Jatro Diesel Dist Column with reflux drum and Heat Exchanger and 4 associated pumps
Cooling towers 1 and 2 (fiberglass) for Distillation Column and plant
Cooling Tower Pump and Electrical
Tank 4300 -Lined Skid Mounted Tank
Tank 5- 12,670 gal Recovered Methanol Tank with Heat Exchanger and Valves
36
Trane 60 ton Biodiesel Chilling Unit
37
Glycol Storage Tank and Circulating Pump
38
Biodiesel Chilling Heat Exchanger
39
Biodiesel Chilling Shed
40
Siemens 25 HP Biodiesel Chilling Pump
41
DT 602- 30,000 gal Bio Chilling Tank
42
Small Biodiesel chilling Transfer Pump between tanks
43
DT 603 30K Biodiesel Chilling Tank # 2
44
Horizontal Leaf Filter 601 with stand and controls
45
Green Magnesol Transfer Dumper
46
Post Chiller reheat Heat Exchanger
47
Large Blue Sock Filter
48
Post Filter Holding Tank and Pump
49
Horizontal Leaf Filter 602 Small Blue Horizontal Leaf Filter
50
Horizonaton Leaf Filter 602 Dumpster
51
Post 602 Sock Filter
52
Air Holding Tank
53
230 gal White biodiesel Tank with Pumps
Process (Transesterification) Area*
54
Biodiesel Process Shed
55
Reactor 401- 7200 gal Trans Reactor
56
Pump 405 - Transesterification Recirculating Pump
57
Transesterification 1 Heat Exchanger
58
Coalescer 401 -3800 gal
59
Coalescer 401 Pump
60
Reactor 402 -7200 gal Transesterification Reactor # 2
61
Pump 407 -Transesterification 2 Pump
62
Reactor 701- 3800 gal Clycerin Reactor
63
Glycerin Reactor Heat Exchanger
64
Transesterification 2 Heat Exchanger
65
Feedstock Day Tank 2100 gal
66
Pump 201- Feedstock Day Tank
67
Feedstock Day Tank Screen Filter
68
Empty 2100 gal Resin Tank
69
Resin Tank 2100 gal
70
Resin Tank 2100 gal
15
Asset Inventory List
 List of all assets (and pictured in separate pdf document)
71
Reactor 601- 3600 gal Powder Tank
72
Reactor 602 -3600 gal Powder Tank
73
Reactor 603 Circulation/Transfer Pump for 601 and 602
74
Reactor 604 -3600 gal Powder Tank
75
Chemical Lab
100
2 Hot Plates
101
Titration Bench
102
Centrifuge (Large)
103
Flash Point Tester
Pump 607 -Transesterification/Recirculating Pump for 604
104
Chiller Unit
76
(2) Diaphram (Air) Powder Pump with hoses
105
Lab Oven
77
Ash Weigh Scale - OHAUS MFG
106
Analytical Balance
107
Karl Fischer with Spin Plate
108
Lab Incubator
109
Flammable Cabinet
110
Benchtop Stirrer
111
CP 3800 Varian Gas Chromatograph
112
15,000 gal (Short Tank)
Chemical Area
78
Pump ______ Acid Pumps (2) with Siemens Flow Meter
79
80
Glycerin Neutralization Pump Skid
Pump 404- Transesterification 2 Sodium Methylate Pump with FIT 405 Coreolis
Meter
Pump 402 -Transesterification 1 Sodium Methylate Pump with FIT 403 Coreolis
Meter with stainless steel piping and valves
113
16,000 gal (Tall Tank)
81
114
30,000 gal Watco Horizontal Tank
82
Sodium Methylate Pump with stainless steel piping and valves
115
(3) 20 y d Magnesol Rolloff Dumpster
83
Pump 403- Transesterification 2 Methanol Pump with FIT 404 Coreolis Meter
116
20,000 gal White Horizontal Tank (Skid)
84
Pump 401- Transesterification 1 Methanol Pump with FIT 402 Coreolis Meter
117
Misc. Biodiesel Plant Parts
118
Pipeline Plot Plan
85
Pump 301 -Methanol to esterification Pump with FIT 303 Coreoling Meter with
stainless steel piping and valves
Glycerin Storage Tanks
Electrical- In Process Area
86
Micro Motion Meter for Finished Biodiesel
87
Portable Pump Disconnect
88
120 Vac Breaker Panel
89
480/277 Lighting Panel
90
JB2-DCS Cabinet (stainless steel) 24 Volts -direct current
91
JB3 DCS Cabinet (stainless steel) 120 Volts -alternating current
92
MCCM # 1 Variable Frequency Drives with cabinet for JatroDiesel Equipment
93
MCCM # 3 Variable Frequency Drives with cabinet
94
120Vac/24dc Variable Frequency Drive Control Cabinet
95
MCCM # 2 Variable Frequency Drives with Cabinet
96
Delta V Control System and Control Board/Monitors
97
Siemen Control System with Monitors
98
Delta V Input/ Output (I/O) Cabinet
99
Siemens CR1-Digital Control System 1
1/7/2015