hippo and bubale fields
Transcription
hippo and bubale fields
RIALTO WEST AFRICA AFRICA OIL and GAS SUMMIT, LONDON 28th-29th January 2013 CHARLES NIETO, CHIEF OPERATING OFFICER 1 DISCLAIMER Certain statements contained in this presentation, including information as to the future financial or operating performance of Rialto Energy Limited (“Rialto”) and its projects, are forward‐looking statements. Such forward‐looking statements: - are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Rialto, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies; - involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward‐looking statements; and - may include, among other things, statements regarding targets, estimates and assumptions in respect of production and prices operating costs production prices, and results, capital expenditures, reserves and resources and anticipated flow rates, and are or may be based on assumptions and estimates related to future technical, economic, market, political, social and other conditions. Rialto disclaims any intent or obligation to update publicly any forward‐looking statements, whether as a result of new information, future events or results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward‐looking statements. All forward‐looking statements made in this presentation are qualified by the foregoing cautionary statements. Investors are cautioned that forward‐looking statements are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward‐looking statements due to the inherent uncertainty therein 2 RIALTO’S OFFICES & ASSETS DUAL LISTED ON ASX (RIA) AND AIM (RIA) Operating Philosophy: • Zero LTI • Strong local partnership • Fully staffed technical team, sub-surface, drilling, testing, and Facilities Engineering • Leading Edge Technologies 3 Assets in 3 Countries: • Cote d’Ivoire (CI-202) - Operator • Ghana (Accra) • Australia (WA-399-P) Rialto Offices Rialto New Entry Rialto Assets 3 RIALTO ENERGY COTE D’IVOIRE OPERATED BLOCK CI-202 IN THE WEST AFRICAN TRANSFORM MARGIN Jubilee Field 4 REGIONAL INFRASTRUCTURE CONCEPT Mature Gas Market and Onshore Infrastructure Mature Power generation network, CI exports electricity from gas fired power stations Major new energy-intensive mining projects planned Current gas supply deficit and increasing demand predicted Infrastructure Concept Develop Existing discoveries • Gazelle • Hippo/Bubale • Stranded Discoveries in neighbouring Blocks 5 CI202 - OVERVIEW 15 wells drilled on block: 14 recovered HCOs to surface 8 Exploration wells 4 discoveries Additional discovery extends onto block Reservoir deliverability confirmed by single zone test rates of: • Gas 40mmscfpd • Oil 3200bopd Equity; Block CI-202 • 85% Rialto • 15% Petroci Gazelle EEA • 74% Rialto • 26% Petroci 6 RIALTO’S CURRENT WORK PROGRAMME Rig contracted for firm drilling programme Work toward regional infrastructure plans Seeking Industry Partner for 2013 E&A Drilling Programme CPR up-dated to incorporate: o 3D seismic acquisition o Upgraded Prospect Inventory o Appraisal drilling OPERATIONS 8 CORPORATE SOCIAL RESPONSIBILITY Built schools in Tankesse and Kokomian Renovating orphanage and building & equipping medical centres We respect the community and are sensitive to local customs 9 COMPANY HSEQ STANDARDS Incorporated IFC Performance Standards and EHS guidelines into Rialto’s policies and procedures Maintain minimal impact to the environment 10 3D ACQUISITION AND PROCESSING 2012 • Modern acquisition design & technology • 860km2 full fold data + 140km2 MAZ • State of art PSDM processing sequence Significant uplift in seismic imaging Accurate definition of existing discoveries Identification of attractive new prospects Quantitative seismic reservoir prediction 11 RIALTO AS A DRILLING OPERATOR 2012 Experienced West Africa Drilling Team • Successfully drilled 2 wells a Sidetrack & DST, at 40⁰ deviation to 3500m • 207 rig operating days and 267,000 man hours worked • ZERO LTI’s • Improvements made to rig operations Vastly improved drilling performance Decrease in non productive time Fewer Maintenance related failures Well testing P3 Rig at night 12 EXISTING DISCOVERIES GAZELLE, HIPPO, BUBALE, AND ADDAX 13 EXISTING DISCOVERIES 14 CONTINGENT RESOURCES Contingent Oil Resources (mmbbls) Gazelle Field Condor Hippo-Bubale 5.7 Addax Contingent Gas Resources (Bscf) Gazelle Field Condor Hippo-Bubale 0.3 9 19 105 143 15.1 13 Contingent Resources Oil and Condensate (mmbbls) Area Gazelle Field Mean (mmbbls) 5.7 Condor Hippo-Bubale 0.3 15.1 Addax Total 19 40 Contingent Resources Gas (Bscf) Area Mean (Bscf) Gazelle Field 143 Condor 13 Hippo-Bubale 105 Addax 9 Total 270 Addax GAZELLE FIELD Two 2012 appraisal wells plus sidetrack (2 wells suspended as future producers) GAZELLE Complex Geology Static Model being built CPR revision New 3D MAZ seismic to optimise positioning of future producers 16 HIPPO AND BUBALE FIELDS Inline from 2012 Polarcus 3D Seismic Bubale Canyon Hippo Canyon IVCO-22 • Missed high N:G axis • Net pay 18m • Test flow rates of 2000bpd • Planned Appraisal well Hippo 1 • Gas Discovery • Encountered high N:G channel system • Net pay 24.9m • Test flow rates of 19.3mmscf/d Base Maastrichtian Unconformity 17 ADDAX FIELD IVCO-13 IVCO-25 Oil Leg 18 PROSPECTS FOR 2013 DRILLING 19 PROSPECTIVE RESOURCES Prospective Resources Oil and Condensate (mmbbl) Prospective Resources Gas (Bcf) Area Mean (Bscf) GPoS (%) Area Mean (Bscf) GPoS (%) Condor 20 16-27 Condor 999 16-27 Faucon 181 12-23 Faucon 111 12-23 Arius 289 18-27 Arius 145 18-27 Hippo-Bubale 127 13-38 Hippo-Bubale 684 13-38 Chouette 206 10-23 Chouette 764 10-23 Addax Deep and Bongo 75 15-16 Addax Deep and Bongo 233 15-16 Total 898 10 - 38 Total 2936 10-38 Prospective OIL Versus Prospective GAS Gas Prospects (MMBoe) Oil Prospects (Mmbbls) 35% 65% CI-202 2013 DRILLING PROSPECT LOCATIONS Oil Appraisal Well Locations Exploration wells 2013 Prospects Condor Gazelle Greater Chouette Complex Addax Hippo Faucon Bubale Chouette Arius Gas Vantage Sapphire Rig contracted • Drilling programme starting May 2013. New 3D has upgraded prospect inventory • Upper Cretaceous Petroleum System • Independent play types • Stacked prospects • Stratigraphic & structural traps • Albian horsts & grabens • Cenomanian drapes • Confined slope canyons • Break in slope fans • Growth faults GROWTH FAULT - CONDOR PROSPECT Growth fault with thick Ceno-Turonian Fill Red Horizon Structure Map Hydrocarbons proven in Lower Cenomanian in P3-ST1 well Thick section to north of Gazelle against fault Numerous prospective packages within Condor sub-basin Line of section 22 SENONIAN FANS - ARIUS PROSPECT Thick Anomalous Ceno-Turonian Base of Slope Fan Top Arius Amplitude Hydrocarbons up-dip (IVCO-18) and down-dip (B3-X) Analogous to nearby Jubilee / Tweneboa fan system discoveries Well defined seismic-stratigraphic geometries & amplitude trends Line of section 23 SLOPE CANYONS - CHOUETTE PROSPECT Top Chouette Depth Thick Anomalous Ceno-Turonian Slope Canyon Adjacent to & to analogous Hippo & Bubale slope canyon discoveries Well defined seismic-stratigraphic geometries & amplitude trends IVCO-22 Significant stacked prospects above and below Chouette HIPPO-1 24 CENOMANIAN FOUR WAY DIP – FAUCON PROSPECT Faucon Lower Cenomanian 4 way dip- channel and fan complex Same depositional fairway as pay sands in IVCO24 Gazelle P4, IVCO13 & gas sands in IVCO-2, 10 & 15 Four way dip closed structure, stacked prospects Lower Cenomanian sands draped over Albian high 25 VOLUMETRICS – MEAN RESOURCES Prospective Resources 1,387 mmboe* & Contingent Resources 85 mmboe* Prospects Mean Resources, Unrisked 1387mmboe* Mean Prospective Resources, Unrisked Gazelle 2% Mean Prospective v Contingent Resources (*) Gas volume conversion: 6 Bcf per 1 mmboe 26 ACCRA BLOCK, GHANA 27 OFFSHORE ACCRA BLOCK OVERVIEW Key Facts Hess announce fifth discovery on block Pecan-1, 75m of oil pay in Turonian •Block : Offshore Accra •Ratified by Parliament : March 2010 •Gross Acreage : 2,000 sq km •Operator : Ophir •Exploration Period : max. 7 years •Agreement Term : 30 years 28 ACCRA BLOCK OVERVIEW • High impact exploration opportunity in a politically stable environment • Offshore Ghana has been the location of several world class oil discoveries in the last five years – Jubilee; Tweneboa; Odum; Teak and most recently Pecan-1 • Strong joint venture post-Tap Oil farmout with new experienced African drilling operator in place • Good quality 3D seismic has defined 10 large prospects with a P50 Resource* of around 3 billion barrels (gross/unrisked) (~375 mmbbls net to Rialto) • Near term drilling activity with Starfish-1 well planned for Q3 2013 • Mean unrisked resource* of 645 mmbbls (80 mmbbls net to Rialto) • Offshore Keta Basin contains similar petroleum systems to Tano Basin • Starfish-1 will be the first testing of Jubilee play in Eastern Ghana • Initial Exploration Period 2.5yrs (ends Sept’13) • All work programme commitments completed except drilling of 1 exploration well (Q3 2013) • Joint Venture Partners: Party Participating Interest Effective Interest Ophir (Operator) 20% 18% Rialto 12.5% 11.25% Vitol 30% 27% Tap Oil 17.5% 15.75% Afex 20% 18% GNPC - 10% (*) Ghana volumes quoted are TAP Operators’ figures 29 CONTACTS Rialto Energy Limited Investec Jade Hockie Telephone: Email: +44 (0)20 7042 8500 IR@rialtoenergy.com Ben Colegrave, Chris Sim and Neil Elliot Telephone: Email: +44 (0)20 7597 4000 rialto@investec.co.uk Buchanan Ben Romney or Tim Thompson (Financial PR London) Telephone: Email: +44 (0)20 7466 5000 rialtoenergy@buchanan.uk.com Magnus Investor Relations John Gardner and Corporate Communications (Financial PR and Investor Relations Australia) Telephone: +61 8 9212 0101 or +61 413 355 997 Email: jgardner@magnus.net.au 30
Similar documents
investor presentation
- involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward ‐looking...
More information