port of lobito rehabilitation project
Transcription
port of lobito rehabilitation project
CONTRACT For EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Date: November 10, 2011 Employer: Ministry of Public Works and Communications Oranapai Towers Wight’s Lane, Kingston Georgetown, Guyana Contractor: China Harbour Engineering Company Ltd. No. 9 Chun Xiu Road Dong Zhi Men Wai Beijing China Post Code: 100027 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents TABLE OF CONTENTS 1. CONTRACT AGREEMENT 2. CONDITIONS OF CONTRACT 3. SCOPE OF WORKS 4. PRELIMINARY DRAWINGS 5. CONTRACT SPECIFICATIONS 6. EMPLOYER’S REQUIREMENTS 7. BILLS OF QUANTITIES 8. FORMS AND APPENDICES Page 2 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents CONTRACT 1. This Contract ( hereinafter called the Contract) is made on the 10Th day of November 2011 COMMUNICATIONS, between the GOVERNMENT MINISTRY OF OF GUYANA PUBLIC WORKS AND (Hereinafter called “the Employer”) of the one party, and CHINA HARBOUR ENGINEERING COMPANY LTD. of No.9 Chunxiu Road, Dongzhimenwai, Beijing, P.R. China. (Hereinafter called “the Contractor”) of the other party; Whereas the Employer is desirous that certain works, hereinafter called the "Works" in the country of Guyana should be executed by the Contractor in accordance with specifications and drawings: EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA and has accepted a Proposal from the Contractor for the execution and completion of such works and remedying of any defects therein. The Employer and the Contractor agree as follows: - 1. In this Contract Agreement words and expressions shall have the same meaning as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents are bound into this Contract and shall be deemed to form and be read and construed as part of this Contract: (a) Contract Agreement (b) Form and Appendices The Conditions of Contract ( Parts I and II) FIDIC 1999 Design Build to be subsequently amended and agreed to be applicable to EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA(subsequently referred to hereinafter as the Contract) (c) The Employer’s Requirements. (d) The Preliminary Bill of Quantities and Forms (e) The Proposal Page 3 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA 3. Contract Documents In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy any associated defects therein, in conformity with the provisions of the Contract. 4. The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works and the remedying of associated defects therein, the Contract Price at the times and in the manner prescribed by the Contract. 5. The Contract Price is agreed by the Employer and the Contractor to be 138,000,000.00 USD (One Hundred and Thirty Eight Million US Dollars) for total excludes all taxes, duties, royalties and fees of all kinds imposed by the Guyana governmental and statutory authorities. Fixed Exchange rate shall be the same as the exchange rate in the Loan Agreement Between the Employer and EXIM Bank of China. In Witness whereof the parties hereto have caused this Agreement to be executed the day and year first before written in accordance with their respective laws. SIGNED by: SIGNED by: Name: Name: Mr. Ren Guangjie Title: Title: General Manager of Business Development Department of China Harbour Engineering Company Limited (Jamaica) For and on behalf of the Employer in the For and on behalf of the Contractor in presence of the presence of Witness : Witness : Name : Name : Page 4 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Address : Address : Date : Date : SIGNED by: Name: Title: For and on behalf of the Ministry of Finance in the presence of Witness : Name : Address : Date : Page 5 of 76 Contract Documents EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 2. CONDITIONS OF CONTRACT Part IThe conditions of contract applying to this Contract shall be those issued by the Federation International Des Ingenieurs-Counsils (F.I.D.I.C.) for “Conditions of Contract for Plant and Design-Build”(YELLOW BOOK), printed in1999. Page 6 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents PART II- Conditions of Particular Application for “Conditions of Contract for Plant and Design-Build”, printed 1999. The Conditions of this Particular Application are amendments and additions to the General Conditions. Clauses in this part are modifications or amplifications of the General Conditions and carry the numbers of the Clauses which they amend. In so far as any of the Part II Conditions may conflict with any of the Part I Conditions, the Part II Conditions shall prevail. 1 General Provisions 1.1.1 The Contract. 1.1.1.9 Delete “Appendix to Tender”; Substitute: “Appendix to Contract”. This change applies to all other Sub-Clauses where reference is made to Appendix to Tender. 1.1.1.11 “Loan Agreement” means the agreement signed between The Export Import Bank of China and The Guyana Government about lending the relevant funds for the Project. 1.1.2 Parties and Persons 1.1.2.5 Contractors Representative ‘’The Contractors Representative shall be ‘Mr Liu Jialin’. 1.1.2.7 Add the following. “Senior site resident personnel for design and construction shall be fluent in the English language, both orally and in writing.” 1.1.3 1.1.3.2 Dates, Tests, Periods and Completion Sub-clause 1.1.3.2 shall be deleted and the following substituted. Page 7 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents “Commencement Date means twenty one days after the date of receipt of the Advance Payment.” 1.1.4 1.1.4.1 Money and Payments Sub-clause 1.1.4.1 shall be deleted and the following substituted. “Contract Price” means the Price amount specified in the Contract Agreement for the execution and completion of the Works and the remedying of any associated defects.” 1.3 Communications Add the following: “All communication, both written and oral shall be in English.” 1.4 Law and Language Delete and insert the following. “(a) The language according to which the Contract is to construed and interpreted shall be English, which is designated the “Ruling Language” (b) The English Language shall be used by the Contractor in all correspondence, drawings, specifications, method statements, descriptive literature and for the preparation of Bills of Lading, Insurance Policies, Invoices and Inspection Certificates. 1.13 Compliance with Laws In sub-paragraph (a), first sentence, before the word “Permanent”, Insert words “Temporary and”. In sub-paragraph (b): replace all words “Contractor” by words “Employer”; replace word “Employer” by “Contractor. 2 2.2 The Employer Permits, Licences or Approvals At the end of Sub-Clause 2.2, add the following: Page 8 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents (c) When blasting operation is required for underwater and quarry operation and dangerous materials are necessary for the construction, the Employer shall assist the Contractor to obtain all the necessary permits, licences or approvals from relevant authorities. These shall be free of charge to the Contractor. (d) The Employer shall assist the Contractor to obtain all licences for all vessels, cars and vehicles, wireless radio, GPS frequency, mobile phone, internet etc. for all the execution of the Works. (e) The Employer shall assist the Contractor to obtain all permits and licences for all the materials, equipment, tools, machinery, instruments, foods, medicines imported by the Contractor for all the execution of the Works. (f) The Employer shall provide the Contractor with all necessary work permits for all their foreign staffs and workers, subject to Guyanese security clearance. (g) The Employer shall assist the Contractor to obtain local ID cards for all their foreign staffs and workers where necessary for the execution of works.. 4 The Contractor 4.2 Performance Security Add at the end of the second paragraph: “The Performance Security shall be in the form annexed to the Particular Conditions.’’ ‘’The Employer shall indemnify and hold the Contractor harmless against and from all damages, losses and expenses (including legal fees and expenses) resulting from any claim under the Performance Security to the extent to which the Employer was not entitled to make the claim.” At the end of Sub-Clause 4.2, insert: “If the Performance Security is in the form of a bank guarantee, it is acceptable to the Employer that the bank guarantee can be issued by a bank incorporated in the home country of the Contractor. The amount of Performance Security shall be ten percent (10%) of the Contract Price.” 4.13 Rights of Way and Facilities Page 9 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents After the end of Sub-Clause 4. 13 add a new paragraph: “The Employer shall provide assistance with obtaining any permission which may be required from the relevant authorities for the use of rights-of-way and facilities and shall be free of charge to the Contractor on property owned by Government.” 4.14 Avoidance of Interference (b) Delete: "occupation of all roads" and Replace: "occupation of all waterways, roads" 4.20 Employer’s Equipment and Free-Issue Material Delete this clause and replace with: 1) “The Employer will provide the sand and other fill material (sites) to the contractor for free, and the distance from material source to the project site shall be within 12 km, but if the distance is more than 12 km, the transportation fee will be increased according to actually distance. The Employer shall be fully responsible for the quantity, quality and timely supply of the abovementioned sand and other fill material. Provided the Employer fails to satisfy this requirement, the Contractor shall be entitled claim expense and time extension accordingly. The acceptance, inspection, care, custody and control of the material supplied by the Employer shall not relieve the Employer of liability for any shortage, defect, or default of the material. 4.21 Progress Reports Add: "(i) an update of the current programme submitted under Sub-Clause 8.3." 6 Staff and Labour 6.1 Engagement of Staff and Labour At the end of Sub-Clause 6.1, insert: Page 10 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents "The Contractor agrees to use local nationals and make sure the proportion of the Chinese labour and the local nationals will not less than the 6:4 except special technical skilled." 6.4 Labour Laws Add the following to this Clause: "The Employer shall provide all assistance reasonably requested by the Contractor for the purpose of obtaining any necessary work permits. The Employer shall act in good time to obtain such work permits as are necessary for the timely execution of the Works." 6.5 Working Hours Delete Sub-Clause 6.5 and substitute: Normal working hours will be 10 hours per day, 7 days per week. , the Employer shall guarantee the Contractor have no less than 10 hours available and effective work-time per day, if the actual work-time of one day is less than 10 hours, the Employer shall remedy the Contract by the time extension and cost compensation. When and where necessary, the Contractor is entitled to work overtime up to 24 hours per day and 7 days per week to cope with the actual site conditions and progress. 6.6 Facilities for Staff and Labour Delete Sub-Clause 6.6 and substitute: The Contractor shall provide and maintain all necessary accommodation and welfare facilities only for Chinese staff and labour. 6.7 Health and Safety Add Sub-Clause 6.12 Professional and Technical Personnel Add the following to this Clause ‘’The Employer will permit the Contractor to import professional and technical personnel as if considers necessary for the work.’’ Page 11 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents ‘’The Employer will issue work permits for all professional and technical personnel upon the application request from the Contractor.’’ 8 Commencement, Delays and Suspension 8.1 Commencement of Works Delete first paragraph and substitute: The Commencement Date of the Works shall be the date on 21 days after the Contractor receives the Advance Payment. The Contractor shall submit the verification of receiving the Advance Payment issued by the Bank to the Employer. 8.3 Programme The first sentence of Sub – Clause 8.3 shall be deleted, and the following substituted: "The Contractor shall submit a detailed construction schedule/time programme to the Engineer within 28 (twenty-eight) days after the Commencement Date. The programme is to be submitted in electronic Microsoft Project format. If the Contractor proposes to use other software, a copy of the software shall be made available to the Engineer and the Employer for the implementation of the Woks during the Contract Period. 14 14.1 Contract Price and Payment The Contract Price Delete sub-paragraph (b) and substitute: (b). All Goods and Equipments imported by the Contractor into Guyana shall be exempt from all all taxes, duties, royalties and fees imposed by the Guyana governmental and statutory authorities, The Employer shall endorse the necessary exemption documents prepared by the Contractor for presentation in order to clear the Goods and Equipments through Customs. If exemption is not then granted, the customs duties payable and paid shall be reimbursed by the Employer. The Employer shall seek exemption for the purposes of the sub-clause, if it is not granted, the relevant taxes paid shall be reimbursed by the Employer. 14.3 Application for Interim Payment Certificates Delete: "six" and Substitute: "three". Page 12 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Applications will be based on % of works complete up to the date of the ‘application for payment’ taking into account any material on site and advance payments made to subcontractors. 14.6 Issue of Interim Payment Certificates The first paragraph of Sub-Clause 14.6 shall be deleted, and the following substituted: "The Contractor and the Engineer shall confer on or about the last working day of each month in order to discuss and (if possible) agree the amounts to which the Contractor is entitled. Thereafter, the Engineer shall, within 14 (fourteen) days after receiving a Statement and supporting documents, issue to the Employer an Interim Payment Certificate which shall state the amount which the Engineer fairly determines to be due, with supporting particulars." 14.7 Payment In Sub-Clause14.7, sub-paragraph (a): - Delete “42 days” and substite”21 days”; Delete “21 days” and substitute “14 days”. Sub – Clause 14.7 (b) shall be deleted, and the following substituted: "(b) the amount certified in each Interim Payment Certificate within 28 (twenty-eight) days of the Engineer advising the Employer of the amount payable; and" In Sub-Clauses (c): Delete the words “within 56 days”, and substitute the words “within 28 days of certification by the Engineer”. With the stipulation of Advance Payment and Performance Security in the contract, the contractor’s submission price is based on: 1). Contract Price of this project only includes: a) Design for the Contractor’s works which is mentioned from Clause 2) to Clause 10) followed. b) Design for New Car Park, Internal Road Area and Handing Equipment Area whose construction will be undertaken by Employer and the Contractor shall be responsibility for the design; c) Mark the position of new Cargo Area and Fuel farm in Layout Drawings and have no responsibility to make the detail design and construction both of which will be undertaken by the Employer and not included in the project scope. d) Land Backfilling work in Runway Extension Area and Airport Terminal Area excluding Page 13 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents the resources fees imposed on the backfilling sand and other borrow material. “The Employer will provide the sand and other fill material (sites) to the contractor for free, and the distance from material source to the project site shall be within 12 km, but if the distance is more than 12 km, the transportation fee will be increased according to actually distance. The Employer shall be fully responsible for the quantity, quality and timely supply of the abovementioned sand and other fill material. Provided the Employer fails to satisfy this requirement, the Contractor shall be entitled claim expense and time extension accordingly. The acceptance, inspection, care, custody and control of the material supplied by the Employer shall not relieve the Employer of liability for any shortage, defect, or default of the material. e) New Airport Terminal Building including Civil Building and relative systems inside of Civil Building Power which are comprised by Power Supply System, Communication Engineering System, Water Supply and Fire Control System, Ventilation and Air Conditioning System. f) Pavement of New Apron g) Layout structure and systems h) Oil tank i) Existing Ground Foundation Treatment in Runway Extension Area. j) Water Supply and Drainage for Runway Extension Area k) Water Supply and Drainage for 2# Fire Pump Station l) Power Supply Line for Runway Extension Area. 2). New Car Park and Internal Road Area Construction; Handing Equipment; Removal of existing terminal, existing cargo store and containers, New Cargo area, new fuel farm, existing LLZ removing or renewing; outside access road and any other which are not mentioned in above clause 1) are not included in the project and the Contract Price, these works will be undertaken by the Employers. The Employer shall finish the Removal of existing terminal, existing cargo store and containers on the Contractor’s requirement. 3). If because the Employer could not cooperate with Contractor to finish the Auxiliary work as well as the Contractor’s schedule, the progress will be delayed, the Employer shall remedy the Contractor by the time extension and cost compensation. 4). The Contract Price excludes all taxes, duties, royalties and fees imposed by the Guyana governmental and statutory authorities, the employer shall be responsible for all taxes, duties, royalties and fees imposed by the Guyana Governmental and statutory authorities. Page 14 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 5). The advance payment provided by the Employer should be 15% of the total contract price; 6). The Performance Security should be 10% the total contract price, the Performance Security will be issued directly through a EXIM Bank in China. 7). Temporary yard for construction will be provided by the Employer for free, the estimation excludes the cost of land acquisition and resettlement which should be undertaken by the Employer; 8). The duration of the project is 32 months, the Employer shall guarantee that the Contractor have no less than 10 hours available and effective work-time per day, if the actual work-time of one day is less than 10 hours, the Employer shall remedy the Contractor by the time extension and cost compensation. 9). The Final Design shall be completed within a maximum 6 months from commencement date; only if the Employer ensures timely review for final design documents submitted by the contractor. Approval of final design documents and technical specifications to be received in writing from the employer within ‘30 calendar days’ from the date of receipt. 17 Risk and Responsibility 17.3 Employer’s Risks At the end of Sub-Clause 17.3 (a), insert: "within the Country." 20 Claims Disputes and Arbitration In Sub-Clause 20.1, first paragraph: - Delete “28 days” and substite”56 days” Page 15 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 3. SCOPE OF WORK 3.1 Scope of Work 1) Design for the Contractor’s works which is mentioned from Clause 2) to Clause 10) followed. 2) Design for New Car Park, Internal Road Area and Handing Equipment Area whose construction will be undertaken by Employer and the Contractor shall be responsibility for the design; 3) Mark the position of new Cargo Area and Fuel farm in Layout Drawings and have no responsibility to make the detail design and construction both of which will be undertaken by the Employer and not included in the project scope. 4) Land Backfilling work in Runway Extension Area and Airport Terminal Area excluding the resources fees imposed on the backfilling sand and other borrow material. “The Employer will provide the sand and other fill material (sites) to the contractor for free, and the distance from material source to the project site shall be within 12 km, but if the distance is more than 12 km, the transportation fee will be increased according to actually distance. The Employer shall be fully responsible for the quantity, quality and timely supply of the abovementioned sand and other fill material. Provided the Employer fails to satisfy this requirement, the Contractor shall be entitled claim expense and time extension accordingly. The acceptance, inspection, care, custody and control of the material supplied by the Employer shall not relieve the Employer of liability for any shortage, defect, or default of the material. 5) New Airport Terminal Building including Civil Building and relative systems inside of Civil Building Power which are comprised by Power Supply System, Communication Engineering System, Water Supply and Fire Control System, Ventilation and Air Conditioning System. 6) Pavement of New Apron 7) Layout structure and systems 8) Oil tank 9) Existing Ground Foundation Treatment in Runway Extension Area. 10) Water Supply and Drainage for Runway Extension Area 11) Water Supply and Drainage for 2# Fire Pump Station 12) Power Supply Line for Runway Extension Area. Page 16 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 4. DRAWINGS The outline design drawing for the CHEDDI JAGAN INTERNATIONAL AIRPORT EXTENSION PROJECT, GUYANA made by the Contractor is attached, while it will be developed during the design process by the Contractor. Page 17 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 18 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 19 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 20 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 21 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 22 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents OPTION A FOR TERMINAL BULIDING Page 23 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents OPTION B FOR TERMINAL BULIDING Page 24 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents OPTION C FOR TERMINAL BULIDING Page 25 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents OPTION D FOR TERMINAL BULIDING Page 26 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 27 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 28 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 29 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 30 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 31 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Page 32 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 5. SPECIFICATIONS The design, the Contractor’s documents, the execution and the completed Works shall comply with the standards of The ICAO Annex 14- Aerodrome – Volume 1 Aerodrome Design and Operation, 4th Edition, July 2004. Page 33 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 6. EMPLOYER’S REQUIREMENTS SECTION I – GENERAL INFORMATION A. Objective The government of Guyana is requesting a proposal to procure professional architectural, engineering and construction services capable of providing all materials, labor, equipment and services necessary to perform the planning, design and construction for the replacement of the existing terminal building with a new, state of the art facility and expand the runway and Apron in order to accept wide body aircraft capable of transcontinental flights at CheddiJagan International Airport. B. Experience Requirements The Design/Build team must be able to demonstrate having recent experience and current knowledge of International Code Council (ICC), ICAO, TSA, FAA and IATA standards, regulations and advisory circulars, as well as all other governing codes and standards. In addition, the Design/Build Team must demonstrate knowledge of the existing airport terminal building and site conditions, knowledge of local construction means and methods, and have all necessary design and construction licenses and certifications required by the Government of Guyana to design and build this project. C. The Work Scope of the Design/Build Team The Scope of Works of the project contains as follow: 1) 2) 3) 4) 5) 6) 7) Design for the Contractor’s works which is mentioned from Clause 2) to Clause 10) followed. Design for New Car Park, Internal Road Area and Handing Equipment Area whose construction will be undertaken by Employer and the Contractor shall be responsibility for the design; Mark the position of new Cargo Area and Fuel farm in Layout Drawings and have no responsibility to make the detail design and construction both of which will be undertaken by the Employer and not included in the project scope. Land Backfilling work in Runway Extension Area and Airport Terminal Area excluding the resources fees imposed on the backfilling sand and other borrow material. “The Employer will provide the sand and other fill material (sites) to the contractor for free, and the distance from material source to the project site shall be within 12 km, but if the distance is more than 12 km, the transportation fee will be increased according to actually distance. The Employer shall be fully responsible for the quantity, quality and timely supply of the abovementioned sand and other fill material. Provided the Employer fails to satisfy this requirement, the Contractor shall be entitled claim expense and time extension accordingly. The acceptance, inspection, care, custody and control of the material supplied by the Employer shall not relieve the Employer of liability for any shortage, defect, or default of the material. New Airport Terminal Building including Civil Building and relative systems inside of Civil Building Power which are comprised by Power Supply System, Communication Engineering System, Water Supply and Fire Control System, Ventilation and Air Conditioning System. Pavement of New Apron Layout structure and systems Page 34 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA 8) 9) 10) 11) 12) Contract Documents Oil tank Existing Ground Foundation Treatment in Runway Extension Area. Water Supply and Drainage for Runway Extension Area Water Supply and Drainage for 2# Fire Pump Station Power Supply Line for Runway Extension Area. SECTION II – DESCRIPTION OF PROJECT A. Background The government of Guyana has identified tourism as a priority in the country’s economic development plan and recognizes that improvement of CheddiJagan International Airport is of paramount importance in order to promote a sustainable tourism industry. The existing airport terminal building is not currently capable of meeting peak traffic demand, or of expanding to meet the desired growth in passenger volume. It also cannot accommodate state-of-the-art airport terminal systems for passenger comfort, convenience and efficiency. The one story buildings cannot accommodate aircraft boarding bridges forcing passengers to walk to and from the aircraft along the apron. The ability to generate revenue from concessions, airline office space and ticket counter usage is also limited. Expansion capabilities of the existing terminal are compromised due to the current terminal configurations. There are currently two intersecting runways. The primary runway is used exclusively for international flight operations, while the secondary runway is used for domestic operations. The length and width of the primary runway (2,270 meters x 45.7 meters) limits the size and range of the aircrafts that can use them. B. Objectives The objectives of this project are as follows: 1. Enlarge runway to provide greater level of service and safety and to allow for emergency diversions. 2. Lower airport operating costs (passenger and cargo). 3. Increased passenger comfort, convenience and efficiency. 4. Increased airport efficiencies through more efficient terminal and airfield design as well as state-of-the-art technologies in security screening, communications, baggage handling and other systems. C. Scope The project scope includes the expansion of the airfield and the terminal area as follows: 1. Airfield: 1. The primary runway is to be extended 1,066.8 meters, to reach a total length of 3,336.8 meters in order to meet the operational requirements of wide body aircraft. The runway will be remain ILS-I type. 2. A turning area is to be provided at the end of the extension. 3. The parallel taxiway will not be included in this project at this time. 4. Navigation facilities such as lighting are to be installed. 5. A service vehicle lane is to be provided as well as emergency facilities such as fire fighting systems. 6. After expansion is completed the airfield shall be Class 4E. Page 35 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 2. Terminal Building: a. A new two story terminal building is to be built west of the existing terminal. b. The new building is to be divided into two parts; the terminal building and the departure lounges/gates and arrival concourse. c. The terminal building is to house the following: • Second Floor (Departure level) o Airline back-of-counter office space o Space for Concessions o Security check point(x-ray) • First Floor (Arrival level) o Baggage make-up rooms (outbound) o Immigrations o Baggage claim (inbound) o Customs o Greeters Lobby o Ground transportation o Twenty (20) check-in counters o Passenger drop-off zone d. The concourse is to house the following: • Second Floor (passenger level) o Departure lounges with 8 loading bridges o Space for Concessions • First Level (airline operational area) o Sterile Corridors o Airside Operations o Sterile corridors (international arrivals) e. Terminal wide low voltage systems to be installed are to be as follows: • Computer Management System • Departure Management System • Flight Information Display System • Building Automation System • CCTV System • Fire Alarm System and linkage control system • Clock System f. Aircraft parking apron is to be expanded. g. The taxiway linking the parking apron with the runway is to be rebuilt and expanded. D. Project Schedule The duration of project is 32 months. Page 36 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents SECTION III – TECHNICAL REQUIREMENT 1. Land Formation The bulk backfilling material shall be local sand material. Quality of sand and Selection of Sand Source should as follows: a. Backfilling Sand Quality: Particles mass (diameter over 0.075mm) must account for over 85% of gross mass. Particles mass (diameter within 0.005mm) must account for less than 3% of gross mass. b. Sand Source Selection The Employer will provide the sand source where the sand quility and quantity shall be suitable to technical requriement to the contractor for free, and the distance from sand source to the project site shall be within 12 km. c. Foundation Treatment The contractor should carry out the foundationtreatment for runway areas, RESA, runway strip, stop way and service road. Foundation treatment requirements are as follows: 1) The commissioned elevation after foundation treatment leveling should be the finished level of foundation treatment. 2) Runway bearing capacity should reach above 180kPa after foundation treatment. 3) Cone penetration test cone pointed resistance shall be as follows: 4) More than 3.0m depth, the static contact resistance value ≥10Mpa; 5) Up to 3.0m depth, the static contact resistance value ≥ 12Mpa. d. SPT N 63.5 1) More than 3.0m depth, N 63.5 ≥20-25; 2) Up to 3.0m depth, N 63.5 ≥ 20-30 e. Surface compaction requirements Surface after vibration roller leveling, within depth of 1.0m, density degree ≥98%; f. For other area, Surface after vibration roller leveling, within depth of 1.0m, density degree ≥90%. 2. Pavement Appropriate pavement structure should be selected for the runway, taxiway and apron extension, and the materials should be suitable for Guyana weather conditions. Requirements of Pavement slope of each area are as follows: a. Pavement area New runway longitudinalslope must naturally connect the original runway. Crossslope of runway and road shoulder should take 1.5% of the double side slope; taxiway and road shoulder take 1.5% of the double side slope; and the slope of apron take 0.8%. b. soil surface area Soil surface area of runway and taxiway (flat area and uneven area) can be connected to the runway and taxiway. For stop way and RESA, longitudinalslope Page 37 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents should take 5% slope, and the crossslope take 2% slope. For runway ends safety areas, crossslope also take 2% slope. 3. Lighting Lighting Aids system involved in this extension project includes new runway lights, centre line lights, new taxiway lights, new airfield apron area lights and the exiting approach lights, threshold lights, runway end lights need to be adjusted. The lighting system should be efficient, safe and convenient to use. Computer control will be adopted for the lighting system in the airport. The lighting control station and control tower can conduct control, supervision (including power supply, fire fighting, video system and monitoring system), maintenance and management over all the navigation lighting system of the airport. 4. Navigation system After expansion, the runway will be remain class I precise instrument landing system. The shifting of existing navigation facilities such as existing LLZ will not in CHEC’s scope. 5. Terminal building The plan and design of the terminal building should aim at fast and efficient operation so as to meet the demand of international airlines. The arrangement in the building is reasonable and walking distance, waiting time and space can meet the requirements of first class airport by IATA. The operation management should also be taken into account so as to reduce operation costs. 6. Parking places The arrangement of apron and parking places should consider following factors: a. The parking demand during peak period b. Current plane types and possible plane types in the future c. Effect of runway capacity limitation d. The interaction between peak demand and annual visitor amount e. The comparison between the airport and similar airports in other countries. 7. The handling process The design of handling process should meet the requirements of arriving and departing passengers. The requirements of the Client’s are as the following: a. The handling process of passenger is in a “two-layer” arrangement. b. 8 sets of passenger boarding bridge should be purchased. The passenger boarding bridge can serve a wide range of commercial aircraft of ICAO Code C, D and E based on the actual apron condition. c. 20 check-in counters and the 20 relevant weighing scales will be arranged in the new terminal building on the second floor. Page 38 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents d. 2 sets of hold baggage inspection (including X-ray baggage scanning machine and the relevant baggage conveyors should be arranged near the above mentioned check-in counters, the Hold Baggage Machines should meet the specifications of the CTX 5800 Morpho Safran Equipment. e. 4 sets of X-ray hand baggage scanning machine should be purchased, (3 for the departures area and one for the VIP Area). f. 2 sets of escalator should be purchased, for carrying passengers up and down the floor. g. 2 sets of accessible elevator should be purchased, for carrying passengers up and down the floor. h. 3 sets of baggage claim turntable should be arranged in the new terminal building on the first floor. i. 4 sets of walk through metal detectors should be purchased. 8. Fire Fighting a. Emergency rescuer facilities shall be built up in the airfield complying with ICAO Standard. b. Firefighting facilities must be set in accordance with the requirements of Fire Code for Terminal Building. 9. Sewage Terminal sewage treatment facilities shall aim to the reuse of water resources, and to achieve zero emissions. 10. Power The Power supply system in the project shall cover the new airport Terminal Building and the new lightings of runway extension and other auxiliary facilities etc. The substation should be composed of generator room, low voltage room, diesel storage room, duty room and etc. Lightings, air conditioning, conveyor, escalator, elevator, X-ray machine, etc. of the new Terminal Building, and other new auxiliary facilities will be supplied by Substations. Energy saving and environmental protection equipment should be selected for the power supply system. Energy saving low-loss dry transformer shall be applied in the Project. 11. Illumination High effect and energy saving Illumination source and facilities shall be applied for the Project. All cables shall be environmental protection isolation material. 12. Control Systems The following control system shall be included: Page 39 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents a. Departure Control System b. Security screening information management system c. Flight information display system d. Clock system e. Fire alarm and linkage control system 13. Environment Protection Environment protection shall comply with the Guyana Environmental Protection Act. 14. Airport Operation Safety During Construction The construction of expansion shall ensure the operation safety of existing airport, and shall complying with FAA Advisory Circular (AC)150/5370-2E Operational Safety on Airport During Construction.. 15. References The main reference documents to be complied with are the following: a. IACO Annex 14- Aerodrome – Volume 1 Aerodrome Design and Operation, 4th Edition, July 2004 b. IATA Airport Development Reference Manual 9th Edition, 2004 c. Other related international codes and standards of STA, FAA and TSA, standards, regulations and advisory circulars. The standards of quality for the terminal building construction materials shall be as required by the following: a. Concrete: i. American Concrete Institute b. Steel: i. American Institute of Steel Construction c. Masonry: ASTM C 90 ASTM C 270 (2009) Loadbearing Concrete Masonry Units (2008a) Standard Specifications for Mortar for Unit Masonry d. Curtain Walls, Aluminum & Glass Doors and Frames: Aluminum Association (AA) AA ASD1 (2009) Aluminum Standards and Data American Society of Civil Engineers (ASCE) ASCE 7-05 (2006; Errata 2007) Minimum Design Loads for Buildings and Other Structures ASTM International (ASTM) e. Escalators & Elevators i. ASME International (ASME) Page 40 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents ii. ASTM IInternational (ASTM) iii. International Code Council (ICC) f. HVAC i. Air Movement and Control Association International (AMCA) ii. Air-conditioning, Heating and Refrigeration Institute (AHRI) iii. American Society of Heating, Refrigerating and Air-conditioning Engineers (ASHRAE) iv. ASME International (ASME) v. ASTM IInternational (ASTM) vi. Sheet metal and Air conditioning Contractors National Association (SMACNA) g. Plumbing and Fire Protection i. National Fire Protection Association (NFPA) ii. ASTM International (ASTM) iii. ASME International (ASME) iv. International Association of Plumbing and Mechanical Officials (IAPMO) v. International Code Council (ICC) h. Electrical i. National Electrical Manufacturers Association (NEMA) ii. Sheet Metal and air conditioning contractors National Association (SMACNA) iii. Underwriters Laboratories (UL) iv. Institute of Electrical and Electronics Engineers (IEEE) v. National fire Protection Association (NFPA) Page 41 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. ITEM AMOUNT(USD) A Pr eliminar ies 8,284,382.53 B Constr uction 122,531,917.47 1 Land Backfilling wor k of Air port Ter minal ar ea 5,026,127.00 2 Pavement wor k for Apr on 9,935,640.00 3 Layout of Air port Ter minal Building 41,999,914.70 3.1 Civil buildings 28,084,982.96 3.2 Power supply 4,184,248.52 3.3 Communication engineering 1,962,573.04 3.4 Control engineering 3,094,976.81 3.5 Water supply and Fire control 1,192,493.14 3.6 Ventilation and Air conditioning 3,480,640.23 4 Runaway and Taxiway Extension 5 Layout str uctur e and systems 4.1 Auxiliary facility 58,211,240.09 7,074,317.08 775,922.59 Page 42 of 76 REMARK New Car Park and Inertial Road Area will be in charge by the employer EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 4.2 Power supply 4,744,827.21 4.3 Water supply and Fire extinguishing system 1,459,971.51 4.4 Sewage treatment station 6 Oil tank 93,595.77 284,678.60 Total Sum of A+B C 130,816,300.00 Site investigation and Design fees 7,183,700.00 Total Sum of A+B+C 138,000,000.00 Page 43 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Rate (USD) Description Unit Quantity 1.1 Allow a sum of 1.2% of the tender sum to cover the cost of insurances P.S 1 1,192,350.63 1,192,350.63 1.2 Allow a sum of 0.75% of the tender sum to cover the cost of Performance Bond or Performance Guarantee. P.S 1 745,219.14 745,219.14 1.3 Allow a sum of 0.5% of the tender sum to cover the cost of advance payment Bond or advance payment Guarantee. P.S 1 496,812.76 496,812.76 1.4 Mobilization (Equipments and material) Sum 1 1,120,000.00 1,120,000.00 1.5 Contractor's supervision of works Sum 1 1,350,000.00 1,350,000.00 1.6 As built drawings Sum 1 100,000.00 100,000.00 1.7 Removal of the rubbish and debris during and after the contract Sum 1 70,000.00 70,000.00 1.8 Safety ,Health and Welfare: Personal equipment; First Aid Facilities Sum 1 300,000.00 300,000.00 1.9 Sampling and testing Sum 1 150,000.00 150,000.00 Amount (USD) PRELIMINARIES Page 44 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 1.10 Contractor's site accommodation and Offices Sum 1 610,000.00 610,000.00 1.11 Site facilities for the Engineer Sum 1 100,000.00 100,000.00 1.12 Temporary roads Sum 1 350,000.00 350,000.00 1.13 Temporary power supply Sum 1 150,000.00 150,000.00 1.14 Water suply for construction Month 30 10,000.00 300,000.00 1.15 Traffic controll during construction Month 30 10,000.00 300,000.00 1.16 Demobilization Sum 1 500,000.00 500,000.00 Total amount 8,284,382.53 Page 45 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate Amount Bill No.1 Land Backfilling work of Airport Terminal area 1 Transportation, Backfilling and Rolling of sand m3 574,000.00 7.315 4,198,810.00 2 Three-dimensional vegetation net m2 27,400.00 9.16 250,984.00 3 Vegetation soil backfilling and layering m3 10,200.00 5.915 60,333.00 4 Orginal Ground Vibration rolling m2 500,000.00 1.032 516,000.00 Total: 5,026,127.00 Bill No.2 Pavement I Apron m2 66,000.00 1 m3 13,200.00 2 Graded crushed stone sub-base (20cm) Cement stabilized crushed stone base course (25cm) m2 66,000.00 3 Concrete pavement (bending 5.0MPa) of 35cm m3 4 Signs and Markings m2 87.00 1,148,400.00 32.00 2,112,000.00 23,100.00 280.00 6,468,000.00 66,000.00 3.14 207,240.00 Total: 9,935,640.00 Page 46 of 76 Remarks EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana Unit: USD CHEC No. Description Unit Remarks Quantity Rate Amount Bill No.4 Runaway and Taxiway 4.1 Backfilling 1 Exploit and transportation of sand m3 4,404,000.00 3.115 13,718,460.00 2 Land layering and rolling m3 3,670,000.00 4.20 15,414,000.00 3 Three-dimensional vegetation net m2 99,600.00 9.16 912,336.00 4 Exploit and transportation of soil vegetation m3 87,360.00 3.115 272,126.40 5 Backfill soil vegetation m3 72,800.00 2.80 203,840.00 Sub-total: 30,520,762.40 4.2 Foundation treatment 1 Land compaction(2000kN·m) m2 100,000.00 2 3,665,742.00 3 51,574.20 2 Vibration rolling m 3 Fill up materials m 730,000.00 1.032 3,783,045.74 4.20 216,611.64 4,729,657.38 Sub-total: 4.3 Pavement Works 1 7.30 Runway(U-turn land)pavement Page 47 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 2 55,872.00 32.00 1,787,904.00 m 2 55,872.00 4.76 265,950.72 Improved medium aggregate bitumen SMA of 6cm m2 55,872.00 28.00 1,564,416.00 1.4 Improved Medium aggregate bitumen SMA of 6cm m2 55,872.00 28.00 1,564,416.00 1.5 Emulsified asphalt slurry seal <1cm m2 55,872.00 2.60 145,267.20 1.6 C15 roller-compacted concrete of 20cm m 2 55,872.00 56.00 3,128,832.00 1.7 Cement stabilized crushed stone of 30cm m2 55,872.00 45.00 2,514,240.00 1.8 Graded crushed stone of 20cm m2 55,872.00 19.60 1,095,091.20 1.1 Improved bitumen SMA of 6cm m 1.2 One layer of glass fibre grid 1.3 2 Runway shoulders pavement 2.1 Improved fine-grained bitumen SMA of 6cm m2 32,282.00 32.00 1,033,024.00 2.2 Improved medium aggregate bitumen SMA of 6cm m2 32,282.00 28.00 903,896.00 2.3 Improved Medium aggregate bitumen SMA of 6cm m2 32,282.00 28.00 903,896.00 2.4 Emulsified asphalt slurry seal <1cm m 2 32,282.00 2.60 83,933.20 2.5 Cement stabilized crushed stone of 20cm m 2 32,282.00 30.00 968,460.00 2.6 Graded crushed stone of 15cm m2 32,282.00 14.70 474,545.40 3 Taxiway Pavement 3.1 Improved bitumen SMA of 6cm m2 9,000.00 32.00 288,000.00 3.2 One layer of glass fibre grid m2 9,000.00 4.76 42,840.00 3.3 Improved medium aggregate bitumen SMA of 6cm m2 9,000.00 28.00 252,000.00 Page 48 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA 2 9,000.00 28.00 252,000.00 m 2 9,000.00 2.60 23,400.00 Cement stabilized crushed stone of 40cm m2 9,000.00 60.00 540,000.00 Graded crushed stone of 20cm m2 9,000.00 19.60 176,400.00 3.4 Improved Medium aggregate bitumen SMA of 6cm m 3.5 Emulsified asphalt slurry seal <1cm 3.6 3.7 4 Contract Documents Taxiway shoulders pavement 4.1 Improved fine-grained bitumen SMA of 6cm m 2 9,000.00 32.00 288,000.00 4.2 Improved medium aggregate bitumen SMA of 6cm m2 9,000.00 28.00 252,000.00 4.3 Improved Medium aggregate bitumen SMA of 6cm m2 9,000.00 28.00 252,000.00 4.4 Emulsified asphalt slurry seal <1cm m2 9,000.00 2.60 23,400.00 4.5 Cement stabilized crushed stone of 20cm m2 9,000.00 30.00 270,000.00 4.6 Graded crushed stone of 15cm m2 9,000.00 14.70 132,300.00 2 16,000.00 70.00 1,120,000.00 5 Fire Lane 5.1 Concrete pavement (bending 4.5MPa) of 25cm m 5.2 Cement stabilized crushed stone of 25cm m 2 16,000.00 37.50 600,000.00 5.3 Graded crushed stone of 15cm m2 16,000.00 14.70 235,200.00 21,181,411.72 Sub-total: 4.4 Water Supply and Drainage for Runway and Taxiway 1 2 Steel-skeleton polyethylene complex pipe De160 PN=1.6MPa Steel-skeleton polyethylene complex pipe De450 PN=1.6MPa m 2,000.00 95.30 190,600.00 m 4,000.00 228.71 914,840.00 Page 49 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA 3 outdoor fire hydrant SA100-1.6 set 44.00 4 Valve pit φ2000 set 5 Gate Valve DN400 PN=1.6MPa Unit Contract Documents 864.03 38,017.32 5.00 6,861.41 34,307.05 5.00 571.78 2,858.90 1,180,623.27 Sub-total: 4.5 Water Supply and Drainage for 2# Fire Pump Station 1 diesel fire pump XBC-8-120/D (Q=120L/s,H=80m) set 3.00 12,706.32 38,118.96 2 regulator facilities for fire hydrant set 1.00 5,294.30 5,294.30 3 Submersible sewage pump 50DASA7-12-0.75,N=0.75KW) set 1.00 6,882.59 6,882.59 4 piping,fitting and valve,etc sum 1.00 19,059.48 19,059.48 69,355.33 Sub-total: 4.6 Power Supply 1 Navaid lighting System renovation sum 1.00 529,429.99 529,429.99 529,429.99 Sub-total: Total 58,211,240.09 Page 50 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate (USD) Amount (USD) Bill No.3 Airport Terminal 3.1 Civil Buildings 1 Reinforced concrete pile m3 1,740.00 1,376.00 2,394,240.00 2 Reinforced concrete platformonpiles m3 1,100.00 881.50 969,650.00 3 Reinforced concrete column m3 1,310.00 989.00 1,295,590.00 4 Reinforced concrete beam and Plate m3 2,000.00 1,010.50 2,021,000.00 5 Steel structure 600.00 5,031.00 3,018,600.00 6 Break wall (Hollow) m3 6,410.00 225.75 1,447,057.50 7 Break wall (Solid) m3 1,797.12 376.25 676,166.40 8 Break hot aluminum alloy Low-e hollow toughened glass curtain wall m2 7,386.00 645.00 4,763,970.00 9 Aluminum curtain wall m2 1,554.00 752.50 1,169,385.00 10 Sound absorption board condole m2 8,100.00 145.13 1,175,553.00 11 Glass roof m2 6,541.00 322.50 2,109,472.50 t Page 51 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 12 Layer 2 Single-layer corrugated steel sheet composite insulation roof Single area m2 5,985.00 193.50 1,158,097.50 13 Skylight m2 3,768.00 279.50 1,053,156.00 14 Layer 2 Single-layer SGLD steel sheet composite insulation roof Single area m2 2,103.00 220.38 463,459.14 15 Automatic window blinds m2 1,801.00 198.88 358,182.88 16 Glass skylight m2 1,801.00 419.25 755,069.25 17 Marble floor m2 6,868.50 182.75 1,255,218.38 18 Wood floor m2 6,868.50 145.13 996,825.41 19 Wall treatment (including painting and others) m2 14,347.00 70.00 1,004,290.00 28,084,982.96 Total: Page 52 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate (USD) Amount (USD) Bill No.3 Airport Terminal 3.2 Power supply 1 LV switchboard 800*600*1800mm piece 10.00 16,373.33 163,733.30 2 Power switchboard Wall mount piece 102.00 1,965.10 200,440.20 3 Dual power switchboard piece 23.00 3,274.45 75,312.35 4 UPS 100KVA 30Min 2 hosts and 1 battery Set 2.00 255,420.00 510,840.00 5 Lighting switchboard Wall mount piece 56.00 1,800.63 100,835.28 6 Set 1.00 242,618.95 242,618.95 7 Lighting control system relay panel, switch ,signal line,etc Hall Two fluorescent lights 120V 2x36W Set 1,180.00 163.54 192,977.20 8 Three fluorescent lights 120V 3x18W Set 120.00 202.63 24,315.60 9 Down lights 120V 18W Set 1,210.00 75.92 91,863.20 10 Down lights 120V 18W IP43 Set 160.00 90.43 14,468.80 11 Down lights 120V 1x13W Set 452.00 44.66 20,186.32 12 Down lights 120V 2x18W Set 392.00 111.63 43,758.96 13 Flat water-proof lamps 120V 32W Set 12.00 97.12 1,165.44 14 Single fluorescent lights 120V 1x36W Set 28.00 41.30 1,156.40 15 Double fluorescent lights 120V 2x36W Set 120.00 61.40 7,368.00 16 Exit sign 120V 10W battery Set 82.00 155.17 12,723.94 17 Evacuation lights 120V 10W battery Set 200.00 155.17 31,034.00 18 Evacuation sign Set 32.00 41.87 1,339.84 Page 53 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 19 Spot lights 120V 150W Set 72.00 553.71 39,867.12 20 Aviation obstruction light 120V 100W Set 42.00 3,069.94 128,937.48 21 Boot logo lightbox 120V 100W Set 238.00 311.47 74,129.86 22 Disabled Call System Set 10.00 2,713.79 27,137.90 23 switch piece 270.00 7.59 2,049.30 24 socket piece 1,580.00 8.71 13,761.80 25 Flame-retardant Cable ZR-YJV-1kV 3x185+2x95 m 620.00 518.33 321,364.60 26 Flame-retardant Cable ZR-YJV-1kV 3x150+2x70 m 560.00 416.80 233,408.00 27 Flame-retardant Cable ZR-YJV-1kV 4x50+1x25 m 520.00 159.64 83,012.80 28 Flame-retardant Cable ZR-YJV-1kV 3x70+2x35 m 580.00 198.15 114,927.00 29 Flame-retardant Cable ZR-YJV-1kV 3x35+2x16 m 260.00 97.62 25,381.20 30 Flame-retardant Cable ZR-YJV-1kV 5x16 m 100.00 58.34 5,834.00 31 Flame-retardant Cable ZR-YJV-1kV 5x10 m 1,300.00 37.59 48,867.00 32 Flame-retardant Cable ZR-YJV-1kV 5x6 m 780.00 23.01 17,947.80 33 Flame-retardant Cable ZR-YJV-1kV 5x4 m 280.00 15.82 4,429.60 34 Flame-retardant Cable ZR-YJV-1kV 5x2.5 m 4,100.00 10.55 43,255.00 35 Flame-retardant Cable ZR-YJV-1kV 3x35+1x16 m 1,600.00 96.64 154,624.00 36 Flame-retardant Cable ZR-YJV-1kV 3x6 m 400.00 15.02 6,008.00 37 Flame-retardant Cable ZR-YJV-1kV 3x4 m 320.00 10.52 3,366.40 38 Flame-retardant Cable ZR-YJV-1kV 3x2.5 m 1,580.00 6.92 10,933.60 39 Fire-resistant cable NH-YJV-1kV 5x6 m 620.00 31.38 19,455.60 40 Fire-resistant cable NH-YJV-1kV 5x4 m 680.00 21.60 14,688.00 41 Fire-resistant cable NH-YJV-1kV 5x2.5 m 1,880.00 14.39 27,053.20 42 Flame-retardant cable ZR-BV-450/750 item 1.00 55,817.98 55,817.98 Page 54 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 44 Fire-resistant Copper conductors with PVC Insulation NH-BV-450/750 Metallic cable bridge CT600x150 45 Metallic cable bridge CT300x100 m 380.00 316.76 120,368.80 46 Metallic raceway MR300x100 m 630.00 189.78 119,561.40 47 Metallic raceway MR200x70 m 420.00 131.61 55,276.20 48 Metallic raceway MR100x70 m 570.00 87.86 50,080.20 49 Accessories item 1.00 16,744.52 16,744.52 50 Welded steel conduit DN100,DN50,DN32 item 1.00 55,817.98 55,817.98 51 Electrical metallic tubing DG25,DG20 item 1.00 27,908.99 27,908.99 52 MEB Set 3.00 223.28 669.84 53 LEB Set 146.00 66.97 9,777.62 54 Equipotential bonding item 1.00 4,465.38 4,465.38 55 Lightning protection zone item 1.00 8,372.59 8,372.59 43 item 1.00 55,817.98 55,817.98 m 650.00 687.68 446,992.00 4,184,248.52 Total Page 55 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate (USD) Amount (USD) Bill No.3 Airport Terminal 3.3 Communication engineering 1 Audio broadcasting system 1.00 65,493.30 65,493.30 2 loudspeaker piece 200.00 559.00 111,800.00 3 Audio system cable item 1.00 5,581.40 5,581.40 4 Matrix 96*16 set 3.00 32,745.58 98,236.74 5 Camera 280.00 1,145.95 320,866.00 6 LV cable KVVP 5*1.5 50,000.00 7.70 385,000.00 7 Monitor 24'' piece 24.00 982.55 23,581.20 8 CCTV system software set 3.00 6,548.90 19,646.70 9 Main distribution frame piece 1.00 4,911.68 4,911.68 10 piece item 669,807.02 12 Shielded twisted pair Category 6E m 1,638.30 10.00 1.00 669,807.02 4.06 53,800.00 16,383.00 11 Intermediate distribution frame Generic cabling system,Category 6E 1000POINT 13 Fiber cable single mode 4core m 2,600.00 4.93 12,818.00 14 Fiber cable single mode 16core m 1,000.00 10.02 10,020.00 set piece m 218,428.00 1,962,573.04 Total Page 56 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate (USD) Amount (USD) Bill No.3 Airport Terminal 3.4 Control engineering Departure Control System 1 supervision workstation include system software set 2.00 13,098.88 26,197.76 2 database server include system software and database software set 1.00 98,238.88 98,238.88 3 pce 2.00 2,619.78 5,239.56 4 5 printer net master workstation include system software download server include system software set set 1.00 1.00 6,548.90 10,479.10 6,548.90 10,479.10 6 adapter server include system software set 1.00 10,479.10 10,479.10 7 access server include system software set 1.00 10,479.10 10,479.10 8 set 2.00 13,425.68 26,851.36 9 departure control application server include system software terminal computer include system software set 25.00 3,222.85 80,571.25 10 boarding pass printer pce 12.00 2,619.78 31,437.36 11 boarding pass scanner pce 16.00 4,911.68 78,586.88 12 IC card reader pce 12.00 1,396.43 16,757.16 13 OCR reader pce 5.00 2,512.28 12,561.40 14 MSR reader pce 5.00 418.18 2,090.90 15 cabin table printer pce 2.00 2,619.78 5,239.56 16 switch pce 5.00 8,186.13 40,930.65 Page 57 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 17 data wire utilize generil cabling system item 1.00 11,162.80 11,162.80 18 UPS set 1.00 16,373.33 16,373.33 19 net master application software set 1.00 6,548.90 6,548.90 20 supervision application software set 2.00 16,373.33 32,746.66 21 download application software set 1.00 6,548.90 6,548.90 22 adapter application software set 1.00 6,548.90 6,548.90 23 departure control application software terminal computer application software system activation、adjusting、commissioning set 2.00 16,373.33 32,746.66 set 25.00 6,548.90 163,722.50 item 1.00 66,981.10 66,981.10 24 25 Security Sreening Information management System 1 supervision workstation include system software set 2.00 13,098.88 26,197.76 2 database server include system software and database software set 1.00 65,493.30 65,493.30 3 printer net master workstation include system software security terminal workstation include system software pce 2.00 2,619.78 5,239.56 set 1.00 6,548.90 6,548.90 set 10.00 6,548.90 65,489.00 6 switch pce 4.00 8,186.13 32,744.52 7 gueat ID message collector set 10.00 2,790.70 27,907.00 8 guest face camera set 10.00 1,953.28 19,532.80 9 set 10.00 559.00 5,590.00 10 11 guest voice collector X radial scanning image data collection data wire utilize generil cabling system item item 1.00 1.00 57,632.90 11,162.80 57,632.90 11,162.80 12 UPS set 1.00 16,373.33 16,373.33 13 net master application software set 1.00 6,548.90 6,548.90 4 5 Page 58 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 14 supervision application software set 2.00 16,373.33 32,746.66 15 security terminal application software system activation、adjusting、commissioning set 10.00 6,548.90 65,489.00 item 1.00 33,490.55 33,490.55 16 Flight Information Display System 1 supervision workstation include system software set 2.00 13,098.88 26,197.76 2 database server include system software and database software set 1.00 65,493.30 65,493.30 3 printer pce 2.00 2,619.78 5,239.56 4 display template design wrokstation include system software pce 1.00 6,548.90 6,548.90 5 set 1.00 6,548.90 6,548.90 6 information release workstation include system software net master workstation include system software set 1.00 6,548.90 6,548.90 7 switch pce 5.00 8,186.13 40,930.65 8 display terminal drive device set 53.00 2,619.78 138,848.34 9 large-scale display screen LCD,4*82” set 6.00 65,493.30 392,959.80 10 display TFT LCD 52” set 12.00 9,824.43 117,893.16 11 set 36.00 6,548.90 235,760.40 12 display TFT LCD 46” data wire utilize generil cabling system item 1.00 16,744.20 16,744.20 13 UPS set 1.00 16,373.33 16,373.33 14 net master application software set 1.00 6,548.90 6,548.90 15 supervision application software set 2.00 16,373.33 32,746.66 16 display design application software information release application software system activation、adjusting、commissioning set 1.00 6,548.90 6,548.90 set item 1.00 1.00 6,548.90 97,680.95 6,548.90 97,680.95 17 18 Page 59 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Clock System 1 supervision computer include system software set 1.00 6,548.90 6,548.90 2 database server include system software and database software set 1.00 32,745.58 32,745.58 3 printer pce 1.00 2,619.78 2,619.78 4 GPS receptor pce 1.00 6,548.90 6,548.90 5 high frequency quartz mother clock set 2.00 3,274.45 6,548.90 6 data transfers controller pce 1.00 4,911.68 4,911.68 7 hub pce 7.00 1,506.08 10,542.56 8 set 25.00 2,512.28 62,807.00 9 son clock data wire utilize generil cabling system item 1.00 5,581.40 5,581.40 10 UPS set 1.00 16,373.33 16,373.33 11 supervision software system activation、adjusting、commissioning set 1.00 16,373.33 16,373.33 item 1.00 11,162.80 11,162.80 1.00 98,238.88 98,238.88 1.00 32,745.58 32,745.58 350.00 210.70 73,745.00 10.00 559.00 5,590.00 300.00 17.20 5,160.00 10.00 204.25 2,042.50 25.00 245.10 6,127.50 12 Fire Alarm and Control System 1 central fire alarm controller intellectual bus type set 2 fire alarm control desk broadcast,phone,manual control unit and monitor set 3 smoke detector bus encode address type pce 5 signal box and terminal box for thermal detective cable bus encode address type linetype thermal detective cable renewing, set temperature 85℃ 6 7 heat detector bus encode address type manual alarm button bus encode address type 4 set m pce pce Page 60 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 8 audible and visual alarm device set 25.00 307.45 7,686.25 9 bus short circuit protector pce 6.00 148.35 890.10 10 control module bus encode address type pce 50.00 265.53 13,276.50 11 connection box pce 6.00 447.20 2,683.20 12 UPS set 1.00 19,647.78 19,647.78 13 14 duct and wire in building system activation、adjusting、commissioning item item 1.00 111,634.45 111,634.45 1.00 22,327.75 22,327.75 Total 3,094,976.81 Page 61 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate (USD) Amount (USD) Bill No.3 Airport Terminal 3.5 Water supply and Fire control 1 Stainless steel tank 18m3 pc 1.00 26,875.00 26,875.00 2 Stainless steel tank 2 Pumps (Q=1L/s,H=20m,N=0.75KW),barrier diaphragm type pressurized water tank(150L) set 1.00 17,861.53 17,861.53 3 Indoor Fire Hydrant Box φ19water gun,DN65water belt25mX1,2 Portable MF/ABC3 set 80.00 1,033.66 82,692.80 4 purifier 2 Portable MF/ABC3 set 15.00 82.69 1,240.35 5 Portable Dry Powder Fire extinguisher set 4.00 1,240.39 4,961.56 6 sprinkler K=80,68℃ pc 1,100.00 12.41 13,651.00 7 sprinkler K=80,93℃ pc 100.00 16.53 1,653.00 8 water flow indicator DN150 pc 5.00 537.50 2,687.50 9 water flow indicator DN100 pc 1.00 413.47 413.47 10 water flow indicator DN80 pc 1.00 355.58 355.58 11 water flow indicator DN65 pc 8.00 12 end water-test set Signal butterfly valve DN150 PN=1.6Mpa set 15.00 206.73 3,100.95 pc 5.00 496.16 2,480.80 13 Page 62 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 14 Signal butterfly valve DN100 PN=1.6Mpa pc 1.00 359.72 359.72 15 Signal butterfly valve DN80 PN=1.6Mpa pc 1.00 302.24 302.24 16 Signal butterfly valve pc 8.00 258.00 2,064.00 17 Remote control float valves DN50 PN=1.0Mpa pc 1.00 259.24 259.24 18 19 Gate valve DN150 PN=1.6Mpa Gate valve DN100 PN=1.6Mpa pc pc 20.00 1.00 1,323.08 806.25 26,461.60 806.25 20 Gate valve DN80 PN=1.6Mpa pc 5.00 578.84 2,894.20 21 Gate valve DN65 PN=1.6Mpa pc 80.00 537.50 43,000.00 22 Check valve DN80 PN=1.6Mpa pc 2.00 516.83 1,033.66 23 Check valve DN65 PN=1.6Mpa pc 1.00 312.16 312.16 24 Stop valve DN50 PN=1.6Mpa pc 10.00 475.48 4,754.80 25 toilet bowl set 69.00 2,121.06 146,353.14 26 Desktop washbasin set 50.00 496.16 24,808.00 27 Vertical washbasin set 6.00 826.92 4,961.52 28 Urinl set 36.00 1,488.47 53,584.92 29 sink set 6.00 620.19 3,721.14 30 Shower set 3.00 387.00 1,161.00 31 Volume type eletric water set 3.00 752.50 2,257.50 32 Floor drain set 45.00 20.67 930.15 33 Hot-galvanized welded steel pipe DN150 m 1,900.00 74.42 141,398.00 34 Hot-galvanized welded steel pipe DN100 m 800.00 49.61 39,688.00 35 Hot-galvanized welded steel pipe DN80 m 400.00 41.34 16,536.00 36 Hot-galvanized welded steel pipe DN65 m 550.00 405.19 222,854.50 Page 63 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 37 Hot-galvanized welded steel pipe DN50 m 500.00 23.98 11,990.00 38 Hot-galvanized welded steel pipe DN40 m 350.00 18.61 6,513.50 39 Hot-galvanized welded steel pipe DN32 m 1,200.00 16.53 19,836.00 40 Hot-galvanized welded steel pipe DN25 m 1,900.00 12.41 23,579.00 41 PP-R pipe De75 m 120.00 42.59 5,110.80 42 PP-R pipe De63 m 300.00 32.66 9,798.00 43 PP-R pipe De50 m 100.00 22.74 2,274.00 44 PP-R pipe De40 m 100.00 17.36 1,736.00 45 PP-R pipe De32 m 100.00 11.58 1,158.00 46 PP-R pipe De25 m 100.00 9.09 909.00 47 PP-R pipe De20 m 700.00 7.44 5,208.00 48 Steel-Plastic Compound Pipe DN50 m 80.00 39.28 3,142.40 49 PVC-U pipe De110 m 800.00 29.36 23,488.00 50 PVC-U pipe De75 m 500.00 20.67 10,335.00 51 PVC-U pipe De50 m 300.00 13.23 3,969.00 52 Holder and corrosion prevention for the pipes item 1.00 69,875.00 69,875.00 53 SIPHON RAINWATER DRAINAGE SYSTEM ON ROOF item 1.00 95,096.16 95,096.16 Total 1,192,493.14 Page 64 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Description Unit Quantity Rate (USD) Amount (USD) Bill No.3 Airport Terminal 3.6 Ventilation and Air conditioning 1 Air-cooled water chiller Refrigerating capacity : 790kW; 2 unit 4.00 232,200.00 928,800.00 Pump Flow: 165m3/h,head:25m,Power:18.5kW unit 4.00 8,930.77 35,723.08 3 Modular air handling unit Air flow: 7081m3/h, Refrigerating capacity: 18.5kW unit 2.00 16,670.77 33,341.54 4 Modular air handling unit Air flow: 8368m3/h, Refrigerating capacity: 64.3kW unit 2.00 19,350.00 38,700.00 5 Modular air handling unit Air flow: 13407m3/h, Refrigerating capacity: 85.3kW unit 4.00 22,937.19 91,748.76 6 Modular air handling unit Air flow: 16562m3/h, Refrigerating capacity: 162.9kW unit 6.00 32,746.16 196,476.96 7 Modular air handling unit Air flow: 29397m3/h, Refrigerating capacity: 239kW unit 6.00 45,275.28 271,651.68 8 Constant-pressure and water charging devices Charging pump flow: 2m3/ h,Head:15m ,Volume of constant pressure tank: 1m3 unit 1.00 6,846.92 6,846.92 9 Softened water devices Softened water flow: 2.0m3/h unit 1.00 3,423.47 3,423.47 Power:250kW Page 65 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 11 Smoke exhaust fan Air flow:48000 m3/h,Power: 11kW,Total pressure: 400Pa Galvanized steel pipe DN50 12 Galvanized steel pipe DN100 m 150.00 45.48 6,822.00 13 Galvanized steel pipe DN150 m 230.00 66.16 15,216.80 14 Galvanized steel pipe DN200 m 80.00 90.97 7,277.60 15 Galvanized steel pipe DN250 m 700.00 103.36 72,352.00 16 Galvanized steel plate duct δ=0.5mm 200*200 m 20.00 67.39 1,347.80 17 Galvanized steel plate duct δ=0.5mm 250*200 m 50.00 73.59 3,679.50 18 Galvanized steel plate duct δ=0.5mm 320*200 m 60.00 81.86 4,911.60 19 Galvanized steel plate duct δ=0.5mm 400*200 m 260.00 90.14 23,436.40 20 Galvanized steel plate duct δ=0.6mm 400*250 m 330.00 102.31 33,762.30 21 Galvanized steel plate duct δ=0.6mm 500*250 m 120.00 118.05 14,166.00 22 Galvanized steel plate duct δ=0.6mm 630*250 m 60.00 138.50 8,310.00 23 Galvanized steel plate duct δ=0.6mm 400*320 m 60.00 113.33 6,799.80 24 Galvanized steel plate duct δ=0.6mm 500*320 m 25.00 129.06 3,226.50 25 Galvanized steel plate duct δ=0.6mm 630*320 m 100.00 149.52 14,952.00 26 Galvanized steel plate duct δ=0.75mm 800*320 m 40.00 196.09 7,843.60 27 Galvanized steel plate duct δ=0.75mm 1000*320 m 110.00 231.10 25,421.00 28 Galvanized steel plate duct δ=1.00mm 1050*320 m 5.00 302.63 1,513.15 29 Galvanized steel plate duct δ=0.6mm 400*400 m 180.00 125.91 22,663.80 30 Galvanized steel plate duct δ=0.5mm 630*400 m 100.00 162.11 16,211.00 31 Galvanized steel plate duct δ=0.75mm 800*400 m 120.00 210.09 25,210.80 32 Galvanized steel plate duct δ=0.75mm 1000*400 m 130.00 245.11 31,864.30 33 Galvanized steel plate duct δ=1.0 mm 1000*400 m 750.00 269.87 202,402.50 10 unit 4.00 11,907.69 47,630.76 m 100.00 28.94 2,894.00 Page 66 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 34 Galvanized steel plate duct δ=1.0 mm 1250*400 m 110.00 318.06 34,986.60 35 Galvanized steel plate duct δ=1.0 mm 1000*500 m 25.00 289.14 7,228.50 36 Galvanized steel plate duct δ=1.0 mm 1250*500 m 650.00 337.34 219,271.00 37 Galvanized steel plate duct δ=1.0 mm 1600*500 m 40.00 404.80 16,192.00 38 Galvanized steel plate duct δ=1.0 mm 1250*630 m 150.00 362.39 54,358.50 39 Galvanized steel plate duct δ=1.0 mm 1600*630 m 120.00 429.86 51,583.20 40 Galvanized steel plate duct δ=1.0 mm 1600*630 m 600.00 429.86 257,916.00 41 Galvanized steel plate duct δ=1.0 mm 1600*800 m 200.00 462.63 92,526.00 42 Square diffuser 180x180 pc 7.00 49.61 347.27 43 Square diffuser 300x300 pc 38.00 70.28 2,670.64 44 Square diffuser 360x360 pc 36.00 86.83 3,125.88 45 Square diffuser 420x420 pc 81.00 95.09 7,702.29 46 Square diffuser 480x480 pc 16.00 119.91 1,918.56 47 Ball nozzle outlet 400mm pc 149.00 2,150.00 320,350.00 48 Single deflection grille 1500x1000 pc 10.00 702.89 7,028.90 49 Single deflection grille 2000x1000 pc 10.00 909.61 9,096.10 50 moke vent 1500x1000 pc 60.00 578.84 34,730.40 51 Valve, fitting and thermal insulation material item 1.00 152,980.77 152,980.77 Total 3,480,640.23 Page 67 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents BILL OF QUANTITIES Project:Terminal Buliding and Runway Extension Porject For Cheddi Jagan International Airport, Guyana No. Bill 5 Description Unit Quantity Rate (USD) Layout structure and systems 7,087,107.29 5.1 Auxiliary Facility 788,712.80 1 Fire Pump Station m2 153.00 2 Domestic Wasterwater Process Station pce 3 Generator Room m2 2,318.00 354,654.00 1.00 206,058.80 206,058.80 300.00 760.00 228,000.00 5.2 Power Supply 1 2 3 4 5 6 7 Amount (USD) 4,744,827.21 layout 25m Lighting lamp pole with 12*220V/NG1000W Lift type Double institutions 6m Steel pole with 1*220V/NG150W Lighting switchboard IP55 cable YJV-1KV 3*240+1*120 cable YJV-1KV 4*50 cable YJV-1KV 4*16 grounding Galvanized steel -40*4 1000m seat root Set m m m item 9.00 25.00 9.00 3,000.00 1,800.00 1,000.00 1.00 Set item 4.00 1.00 437,719.14 48,635.46 21,064.25 842.57 17,688.33 1,965.37 472.24 1,416,720.00 199,188.00 110.66 39,470.00 39.47 9,572.60 9,572.60 The generator room renovation already built 1 2 0.22KV Switchgear transformation (Replace switch, current transformer etc a components) cable Page 68 of 76 8,424.71 4,786.30 33,698.84 4,786.30 Remarks EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Other accessories Civil reconstruction expenses item item 1.00 1.00 1 2 3 4 5 6 7 8 9 new Generator room Diesel generating sets 800KW/1000KVA Load output ark Parallel ark 0.22KV switchgear 0.22KV switchgear Dynamic tracking compensation 300KVar Intensive bar Daily-use oil tank 2m3 cable Other accessories Set Set Set Set Set piece Set item item 4.00 1.00 4.00 14.00 4.00 1.00 4.00 1.00 1.00 1 2 3 4 Apron Facilities Cable row tube CPVCΦ100 Concrete encapsulation cable pit 25m Lighting lamp pole foundation 6m Steel pole foundation m piece piece piece 8,000.00 30.00 9.00 25.00 20.42 1,531.67 11,487.57 204.23 163,360.00 45,950.10 103,388.13 5,105.75 1 2 3 Apron Building Power Fire Pump Station Generator Room Domestic Wasterwater Process Station 153.00 300.00 9.00 127.64 127.64 127.64 19,528.92 38,292.00 1,148.76 m2 m2 m2 3,829.28 9,572.60 3,829.28 9,572.60 3 4 411,944.46 1,647,777.84 35,100.98 35,100.98 33,698.84 8,424.71 216,223.56 15,444.54 174,099.08 43,524.77 47,865.45 47,865.45 5,619.56 1,404.89 9,572.60 9,572.60 4,786.30 4,786.30 5.3 Water supply and drainage and fire extinguishing system General Plan 1 Wire mesh and plastic composite pipe De160 1,459,971.51 m Page 69 of 76 1,300.00 113.46 147,498.00 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 2 Wire mesh and plastic composite pipe De110 m 500.00 78.01 39,005.00 3 Wire mesh and plastic composite pipe De200 m 1,200.00 166.64 199,968.00 Water meter DN150 Outdoor ground-type fire hydrant SS100/65-1.6 set 3.00 2,659.16 7,977.48 set 8.00 638.20 5,105.60 9 10 Gate valve DN200 HDPE pipe DN200 pc m 3.00 700.00 1,950.05 124.10 5,850.15 86,870.00 11 Reinforced concrete sewer manhole Φ1000 pc 35.00 1,418.22 49,637.70 pc pc pc m 1.00 3.00 3.00 1,500.00 7,091.10 2,127.32 886.39 531.83 7,091.10 6,381.96 2,659.17 797,745.00 unit unit 2.00 2.00 25,017.38 19,145.95 50,034.76 38,291.90 5 7 12 13 15 16 17 18 3# Brick Grease Trap Water meter chambe DN150 Valve well Φ1200 Reinforced concrete ditch B=1500 1# Fire pump station Fire pump XBC-5-50/D Spray pum XBC-8-30/D 19 Submersible sewage pump 50DASA7-12-0.75 unit 1.00 1,531.67 1,531.67 20 21 Wet alarm valve DN150 Pipe fittings unit item 4.00 1.00 1,808.23 7,091.10 7,232.92 7,091.10 1 5.4 Sewage treatment station Integrated wastewater treatment Q=3m3/h 93,595.77 set 1.00 45,049.29 45,049.29 2 Submersible sewage pump 50WQ/15-12-1.1 unit 2.00 3,603.95 7,207.90 3 Submersible sewage pump 50WQ/15-12-2.2 unit 2.00 4,294.70 8,589.40 Page 70 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 4 Submersible sewage pump 50WQ/15-12-5.5 unit 2.00 5,946.51 11,893.02 5 Pipe,valve, fittings item 1.00 20,856.16 20,856.16 Bill No. 6 Oil tank 1 284,678.60 Oil tank 500m3 pce Page 71 of 76 2.00 142,339.30 284,678.60 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents 7. Forms and Appendices Performance Guarantee Form To: Performance Guarantee No. We have been informed that CHINA HARBOURING ENGINEERING COMPANY LTD. , with you for the (hereinafter called “the principal”), has entered into a contract dated project of EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA. Furthermore we understand that, according to the conditions of the contract, a performance guarantee is required. At the request for the principal, we, The Export Import Bank of China, Head Office having our registered address at No.30, Fu Xing Men Nei Street, Xicheng District Beijing 100031, P.R. China, hereby irrevocably undertake to pay you any sum or sums not exceeding in total amount of USD upon receipt by us of your first demand in writing and your written stating: 1. That the principal is in breach of his obligation(s) under the underlying contract; and 2. The respect in which the Principal is in breach. Your demand and accompanying documents shall be forwarded to us through your bank for verification of your authorized signature thereon. This guarantee shall become effective upon the effectiveness of the underlying contract. This guarantee shall expire on , at the latest, after which this guarantee shall be automatically cease to be valid whether the original of this guarantee is returned to us or not. Consequently any demand for payment under it must be received by us at this office on or before that date. Any dispute over the interpretation of the conditions of this letter of guarantee shall be subject to the Uniform Rules for Demand Guarantees ICC Publication No. 458. For and on behalf of The Export-Import Bank of China, Head Office _____________________________ Authorizes Signature(s) Page 72 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Advance Payment Guarantee Form To: Advance Payment Guarantee No. We have been informed that CHINA HARBOUR ENGINEERING COMPANY LTD. (hereinafter called “the Principal”), has entered into a contract dated , 2011 with you, for the project of EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA.Furthermore we understand that, according to the conditions of the contract, an advance payment in the sum USD is to be made against an advance payment guarantee. At the request of the Principal, we, The Export-Import Bank of China, Head Office having our registered address at No.30, Fu Xing Men Street, Xicheng District, Beijing 100031, P. R. China, hereby irrevocably undertake to pay you sum or sums not exceeding in total an amount of USD (hereinafter called “the guaranteed amount”) upon receipt by us of your first demand in writing and your written statement stating: 1. That the Principal is in breach of his obligation (s) under the underlying contract; and 2. The respect in which the Principal is in breach. Your demand and accompanying documents shall be forwarded to us through your bank for verification of your authorized signature thereon. This guarantee shall become effective upon receipt of the advance payment by the Principal on his account number at our bank. The effective amount shall always correspond to the amount actually received by the Principal, but in case not exceeding the guaranteed amount. It is a condition for any claim and payment under this guarantee to be made that the advance has been actually received. The maximum amount of this guarantee will be automatically reduced by percent of the total value of interim work finished against presentation to us by the principal of copies of the relevant interim work certificate, This guarantee shall expire upon the time when the total guaranteed amount has been reduced to zero in the above-mentioned manner, or dated , , whichever is earlier, after which this guarantee shall be automatically cease to be valid whether the original of this guarantee is returned to us or not. Consequently any demand for payment under it must be received by us at this office on or before that date. Any dispute over the interpretation of the conditions of this letter of guarantee shall be subject to the Uniform Rules for Demand Guarantees ICC Publication No.458 For and on behalf of The Export-Import Bank of China, Head Office _____________________________ Authorizes Signature(s) Page 73 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA APPENDIX TO CONTRACT Item Sub-Clause Data Employer’s name and address 1.1.2.2 &1.3 Ministry of Public works Oranapai Towers Wight’s Lane, Kingston Georgetown, Guyana Contractor’s name and address 1.1.2.3 & 1.3 China Harbour Engineering Company Ltd. No. 9 chun Xiu Road Dong Zhi Men Wai Beijing, China Post Code: 100027 Commencement Date 1.1.3.2 21 (Twenty one) days after receipt of the Advance Payment. Time for Completion 1.1.3.3 32 (Thirty Two) months. Defects Notification Period 1.1.3.7 365 (Three Hundred and Sixty-Five) days. Electronic transmission systems 1.3 To be determined. Governing Law 1.4 The laws of the Guyana. Ruling language 1.4 English. Language for communications 1.4 English. Right of Access to the Site 2.1 On the Commencement Date. Amount of Performance Security 4.2 10% (Ten percent) of the Accepted Contract Amount Delivery of Performance Security 4.2 7 (Seven) days before the Commencement Date. Page 74 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents General Design Obligations 5.1 Notice to Engineer of error, fault or other defect found in the Employer's Requirements: within 32 (Thirty Two days). Submission of QC/CA Plan, Environmental Management Plan, Health & Safety Plan and other specified submittals 5.4 32 (Thirty-two) days after the Commencement Date. Normal working hours 6.5 Minimum 10 (Ten) hours per day. 7 (Seven) days week. Delay Damages for the Works 8.7 & 14.15 (b) US $ 7,000 (Seven Thousand United States Dollars) per day. Maximum amount of Delay Damages 8.7 5% of Contract price. Total Advance Payment 14.2 15% (Fifteen percent) of the Accepted Contract Amount. Number and timing of Instalments 14.2 One instalment, paid within 32 (Thirty two) days, following delivery and acceptance of the Performance Security, Advance Payment Guarantee and Documents of Insurance. Currencies and proportions 14.2 United States dollars. Start repayment of Advance Payment 14.2 (a) Deductions shall commence in the second Interim Payment Certificate after the Advance Payment is made. Repayment amortization of Advance Payment 14.2(b) 32 (Thirty two) equal payments (deductions) over 32 (Thirty two) months following mobilization to site. Percentage of retention 14.3 10 % (Ten percent). Limit of Retention Monies 14.3 5 % (five percent) of the Accepted Contract Amount. Plant and Materials for payment when shipped en route to the Site Plant and Materials for payment when delivered to the Site 14.5(b) 14.5(c) Not applicable. Applicable to: imported construction materials to be incorporated into the Works and delivered to site. Page 75 of 76 EXTENSION OF CHEDDI JAGAN INTERNATIONAL AIRPORT, GUYANA Contract Documents Certification of Interim Payments 14.6 Within 14 (Fourteen) days of receipt of Pay Application. Minimum amount of Interim Payment Certificates 14.6 Not applicable. Employer Payment 14.7 Within 28 (Twenty Eight) days of Engineer’s certification. Currency of payment 14.15 United States Dollars. Insurance and DAB Minimum amount of insurance for Works and Contractors equipment 18.2 Full replacement / reinstatement cost or 100 % of the Accepted Contract Amount, whichever is greater. Minimum amount of third party insurance 18.3 US$ 1,000,000 (One million United States Dollars). Date by which the DAB shall be appointed 20.2 28 (Twenty Eight) days after notice of intention to refer a dispute to a DAB. The DAB shall be 20.2 One Sole Member /Adjudicator. Appointment (if not agreed) to be made by 20.3 & 20.6 The President of FIDIC or a person appointed by the President. Arbitration Rules 20.6 England and Wales. Number of arbitrators 20.6 One. Place of Arbitration 20.6 England. Signature of Contractor __________________________________ Page 76 of 76