eralab sdn. bhd.
Transcription
eralab sdn. bhd.
ERALAB SDN BHD CORPORATE PROFILE ERALAB SDN. BHD. (Environmental Research and Analytical Laboratory) Environmental Research and Analytical Laboratory Sdn. Bhd., or ERALab in short, commenced operations on 1st June 1995. The office is located at No. 21, Block C, Jalan PJU 1A/3, Taipan Damansara 2, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Services offered include i) consultancy in environmental, health and safety fields, ii) physical site sampling, and iii) analytical laboratory services. ERALab has also obtained the Petronas License in these areas. For the laboratory services, ERALab has acquired SAMM accreditation MS ISO/IEC 17025:2005 by the Department of Standards, Malaysia. The ERALab organization consists of multidisciplinary personnel headed by a Managing Director, Noor Azimah Mustafa (AMIC). She is a registered chemist with the Malaysian Institute of Chemistry and holds a Master Degree in Environmental Science. She also was a research chemist with the Water Supply Department, Negeri Sembilan, prior to joining an engineering and environmental consultancy firm, ERINCO Sdn. Bhd. Her experiences in laboratory analysis and field investigations extend to water related projects, environmental studies, EIA reports and occupational health related projects. Her involvement in water management and environmental consultancy is of great benefit to the laboratory, and to the growth, training and professional development of ERALab personnel. With a staff strength of more than 25, of whom more than half are specialists - chemists, microbiologist, engineers and occupational hygienist, the company is geared to..... ....... SCREEN THE ENVIRONMENT AND HELP PRESERVE MOTHER NATURE Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my SCOPE OF SERVICES ERALab provides Consultancy, Laboratory Testing and Field Monitoring services in the field of Environmental, Safety .and Health (ESH). CONSULTANCY OCCUPATIONAL SAFETY & HEALTH ENVIRONMENTAL Environmental Impact Assessment (EIA) Environmental Management Plan Post EIA Compliance Assessment & Environmental Auditing Environmental Site Assessment Phase I Wastewater Characterization Study (WWCS) Scheduled Waste Management ISO/IEC 17025 Consultant Application for DOE Written Approval ( DOE Kebenaran Bertulis) Health Risk Assessment (HRA) Indoor Air Quality Assessment (IAQ) Chemical Health Risk Assessment (CHRA) Occupational Noise Exposure Local Exhaust Ventilation Testing and Examination (LEV) LABORATORY TESTING Water Quality (River, Marine water, Domestic & Industrial Effluent, Drinking Water, Raw water, Ground water) Physical parameter (pH, DO, Alkalinity, Acidity etc) Organic Parameters (BOD, COD, etc) Chemical Parameters (NH3-N, Heavy Metals etc) Organic Compounds (Pesticides, VOC, SVOC, TPH , BTEX etc) Toxicity Characteristic Leaching Procedure (TCLP) & Compositional Analysis of Scheduled Waste (DOE & Kualiti Alam requirements) Ambient Air Quality Dust Particulates (TSP and PM10) and heavy metals (As, Pb, Cd, etc) Gaseous (SO2, NO2, CO) Oil Mist and Acid mists Hydrocarbon, VOC Physical parameters (Temperature, Humidity, Wind Speed) Dioxin & Furans Other chemical compound by request. Stack Emission Dust Particulate, Total Organic Carbon, Poly aromatic Hydrocarbon (PAH). VOC, Heavy Metals (Cd, Hg, As, Pb, Sb) BTEX, HCl, H2SO4, etc Dioxin & Furan Industrial Hygiene BTEX, Hg, Mineral Dust, Dust Particulate, etc Oil Testing Water Content, Viscosity, TAN, Wear Metals, etc Blood and Urine Test Mercury Content. Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my SCOPE OF SERVICES FIELD MONITORING ENVIRONMENTAL OCCUPATIONAL SAFETY & HEALTH Water Quality (River, Marine water, Domestic & Industrial Effluent, Drinking Water, Raw water, Ground water) Ambient Air Quality ( Area monitoring) Industrial Emission (Isokinetic and nonIsokinetic Stack emission sampling, Boiler, Chimney) Boundary Noise Level Chemical Exposure Monitoring (Mineral dust, Oil Mist, BTEX and other chemicals as specified in USECHH Regulations) Noise mapping, Point Source, Personal Exposure Indoor Air Quality Local Exhaust Ventilation (LEV) Testing TRAINING Health, Safety and Environment (HSE) Training ISO/IEC 17025 Training Oil Testing Training Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL CONSULTANCY ERALab’s professional staff possesses academic and practical experience in the various disciplines that are related to environmental monitoring and consultancy in ensuring quality of services in the fields described as follows:Environmental Impact Assessment (EIA) is a process, which is used to predict the potential environmental impact of physical development and to identify and prescribe mitigating measures to manage the impact. Selected Relevant Experience: EIA for The Proposed Mixed Development Project at Pauh, Kangar, Perlis EIA for The Proposed West Coast Highway from Muar to Gelang Patah for Highway Development Unit, JKR Malaysia EIA for The Proposed Recycling Plant of Plastic Material Made of Polyethylene Terephthalate (PET) to PET Flakes at PT 8645 H.S (D) 82652, Galla Industrial Park, Mukim Labu, Seremban, Negeri Sembilan Darul Khusus EIA for Yard Optimization project for Malaysia Marine Heavy Engineering Sdn Bhd (MMHE) at Pasir Gudang, Johor. EIA for The Proposed Additional Type of Waste Materials for Incineration Process at the Existing WTE plant of GSPP, Lot 7090, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan. . Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL CONSULTANCY An Environmental Management Plan (EMP) describes the processes that an organization or project proponent will follow to maximize its compliance and minimize adverse impact to the environment. This plan also helps the project owner map its progress toward achieving continual improvements. In Malaysia, EMP is usually required to be prepared prior to commencement of a project and to be revised from time to time throughout the project life. Environmental Audits are reviews of an organization’s operations and processes for the purpose of assessing compliance with environmental rules and regulations. They can range from legally mandated reviews of plant safety or emissions to voluntary inspections of environmental practices. In Malaysia, environmental audits are perhaps best known as a means of examining the effectiveness of the EIA recommendations for a given project and adherence to permissible limits and standards As part of Environmental Audit, Post EIA Compliance Monitoring is carried out to allow for an organized assessment of relevant environmental parameters which is then translated into environmental performance. The reports generated allow for informed and efficient decision-making on the part of project proponents and the regulatory authorities. Working hands in hands with highly trained field personnel for environmental monitoring, ERALab’s provides an efficient and comprehensive consultancy in EMP, Environmental audits and Post-EIA Compliance Assessment. Selected Relevant Experience: EMP, Post EIA Compliance, Env. audit for Petronas Gas Berhad Kuantan Compressor Station Expansion Project for SE-TMSB (2007-2009) EMP, Post EIA Compliance, Env. audit for Petronas Gas Berhad Segamat Compressor Station Expansion Project at SE-TMSB (2007-2009) EMP, Post EIA Compliance EIA and Env. Audit for Yard Optimization for Malaysia Marine Heavy Engineering (MMHE), Pasir Gudang. Post EIA Compliance & Env. Audit for Malacca Group III (MG3) Project: Lube Base Oil Plant, at Petronas Penapisan Melaka, Sungai Udang, Malacca for L&T – ECC Construction (M) Sdn.Bhd. (2006 – 2008) Post EIA Compliance & Env. Audit for Megamethanol (Labuan) at Petronas Methanol (Labuan), for Lurgi (Malaysia) Sdn Bhd (2007-2009) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL CONSULTANCY The Environmental Site Assessment Phase 1 (ESA) is to identify recognized environmental conditions at the site by evaluating the presence or likely presence of hazardous substances or petroleum products on or near the Site under conditions that indicate an existing release, a past release, or the material threat of a releaser into the structures at the Site or into soil, groundwater, or surface water at the site. The assessment is performed in accordance with American Society for Testing and Materials (ASTM 2005) Standard Practice E 1527-05 for Phase-I ESA. In the event no contamination is detected, the site is to be certified environmentally clean, posing no risk for its intended use. However, if the site is contaminated, a clear Scope of Works for a Phase II ESA is to be defined. Selected Relevant Experience: Site Assessment at Ex-Dumping Site, Sg. Kancis, Kelang, Selangor. The ESA Phase 1 for Petronas Service Station Telok Kalong, Lot 5010, Kemaman, Terengganu for Petronas Dagangan Berhad. Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL CONSULTANCY Wastewater Characterisation Study (WWCS) is a study to determine the physical, biological and chemical characteristics and the concentrations of constituents in the wastewater. Via the results obtained , the best means of treatment to reduce the pollutant concentrations is determined to comply with the DOE Standards stipulated under Environmental Quality Act 1974, the Environmental Quality Regulations (Sewage and Industrial Effluents) 1979. Selected Relevant Experience: WWCS at KLIA Wastewater Treatment Plan, Sepang for Teknik Datasaab Sdn. Bhd. WWCS for Treatment Plant all over Malaysia for NJS Consultant Co. Ltd. WWCS at Petronas Gas Berhad (GPP-A), Kertih, Terengganu under Tenaga Mashhor Sdn.Bhd. WWCS at Petronas Penapisan (Terengganu) Sdn Bhd. WWCS for Reused Water Project at Petronas Fertilizer (Kedah) Sdn Bhd WWCS at Wastewater treatment plant at Genting Highlands for Metropolitan Engineers & Builders Sdn Bhd Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL CONSULTANCY Scheduled Waste Management Study (SWMS): ERALab specializes in the Application of Special Management of Scheduled Waste (SMSW) as provided under Regulations 7 of the Environmental Quality (Scheduled Waste) Regulations 2005. ERALab’s combined capabilities in analytical services and environmental consultant as well as collaboration with Makmal Bioserasi, Inbiosis UKM and Pusat Teknologi Alam Sekitar & Bioproses, SIRIM, enable us to provide full range of services as required under the Guidelines for the Application of Special Management of Scheduled Waste. Selected Relevant Experience: Pilot Study for the Incineration of Ink Sludge at the “Waste To Energy Plant” of Genting Sanyen Industrial Paper (GSIP) Sdn Bhd, Banting, Selangor (2008). Application for SMSW for Ash residue of the “Waste To Energy Plant”, for GS Paper & Packaging (GSPP) Sdn Bhd (2008-2009) Application for Special Waste Management of Scheduled Waste for Puncak Niaga (M) Sdn Bhd (2008-2009) Waste Classification Study for Nitto Denko Sdn Bhd Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my OCCUPATIONAL SAFETY AND HEALTH CONSULTANCY ERALab has well-trained hygiene experts certified by Department of Occupational Safety and Health of Malaysia (DOSH) to meet the growing needs of occupational safety and health concern in Malaysia. Health Risk Assessment Studies (HRA) involves in identifying health hazards in the workplace and subsequently assesses its risk to human health. The health hazards include those related to chemical, biological, physical, ergonomic and psychosocial elements. Chemical hazards, however, is assessed separately under the Chemical Health Risk Assessment (CHRA). Selected Project Experience: HRA at Miri Crude Oil Terminal (MCOT) for Petronas Carigali Sdn. Bhd., Sarawak Operations. (2008) HRA at Asam Paya for Petronas Carigali Sdn. Bhd., Sarawak Operations. (2008). HRA at Bintulu Crude Oil Terminal (BCOT) for Petronas Carigali Sdn. Bhd., Sarawak Operations. (2008) HRA at Labuan Supply Base (LSB) for Petronas Carigali Sdn. Bhd., Sarawak Operations. (2008) HRA at E11RC Oil & Gas Platform for Petronas Carigali Sdn. Bhd., Sarawak Operations. (2008). HRA at D35 Oil & Gas Platform for Petronas Carigali Sdn. Bhd., Sarawak Operations. (June 2008) HRA at Baronia, Baram and Tukau platforms for Petronas Carigali Sdn. Bhd., Sarawak Operations. (October 2008) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my OCCUPATIONAL SAFETY AND HEALTH CONSULTANCY Indoor Air Quality Assessment (IAQ) is conducted to assess the quality of air in non-industrial places of work in industries as listed under Schedule 1 of the Occupational Safety and Health Act 1994 (Act 514). Work places fall under this category include offices, educational and training facilities, commercial establishments, health care facilities, cafeterias and restaurants, gaming establishments, pubs, bars, and karaoke lounges and discotheques. ERALab’s registered IAQ Assessor conducts the assessment in accordance to the Code of Practice (COP) on Indoor Air Quality (IAQ) as a guide to comply with the general duties of employers prescribed under Section 15 of the Occupational Safety and Health Act 1994 (Act 514). Selected Relevant Experience: IAQ Assessment at FSO Caspean Sea for Murphy Oil & Gas. (March 2007) IAQ Assessment at Entertainment premises Hard Rock Cafe, KL. (August 2007) IAQ Assessment at Talisman Malaysia KL Offices, Menara Citibank for Talisman Malaysia Limited (TML). (July 2008) IAQ Assessment at EXPRO Office, Menara UOA, Bangsar, for EXPRO Exploration Sdn Bh.,(Nov 2008) IAQ Assessment at FSO Cakerawala, Offshore Thailand for CarigaliHess Operating Sdn. Bhd (Oct. 2008) IAQ Assessment at Cakerawala Puteri Platform for Carigali Hess Sdn. Bhd (Oct. 2008) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my OCCUPATIONAL SAFETY AND HEALTH CONSULTANCY Chemical Health Risk Assessment (CHRA) is one of the mandatory requirements of the Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000 under the Occupational Safety and Health Act 1994. In conducting the CHRA, ERALab adheres strictly to DOSH-recommended methods documented in the Assessment of the Health Risks Arising from the Use of Hazardous Chemicals in the Workplace’ (A manual of Recommended Practice 2nd Edition). Selected Relevant Experience: CHRA for MMHE for Pasir Gudang, Johor Darul Takzim. (2005) CHRA for ERB West and Tembungo Platforms for PCSB-SBO. (2005) CHRA for Angsi Platform for PCSB-PMO. (2005) CHRA for Penara and North Lukut Platform, PCSB-PMO Kerteh, Kemaman, Terengganu. (2006) CHRA for PM9 Oilfield Platforms, PCSB-PMO. (2007) CHRA at Onshore Terminals and Offshore Installations (11 sites), PCSB-SKO (2008) CHRA for Polymatec Sdn Bhd, Shah Alam, Selangor. (2008) . Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my OCCUPATIONAL SAFETY AND HEALTH CONSULTANCY Occupational Noise Exposure Monitoring is a requirement under The Factories and Machinery (Noise Exposure) Regulations, 1989 where the employer needs to carry out this monitoring to assess the health risk of employees due to noise exposure in the workplace. This includes the assessment of the provision of control measures to reduce noise levels to an acceptable level. Failing to address this issue may result in prosecution and / or civil claims against the company. ERALab offers services of professionally qualified and competent personnel registered with DOSH in achieving compliance with the above regulations. Services cover the following: noise mapping and point noise source at static locations, Personal noise exposure records using state-of-the-art logging equipment, The above services allow employers to take remedial measures. Selected Project Experience: Initial Noise Survey at 11 sites of Oil and Gas Platforms and Terminal for PCSB, Sarawak (May 2008 – Mar 2009) Initial and Positive Noise Survey at KR1 and KR2 of Petronas Penapisan Terengganu (PP(T) SB) (2006 and 2008) Initial Noise Survey at Ethylene and Polyethylene (M) Sdn Bhd (2009) Initial Noise Survey at TORAY Basf Sdn Bhd (2008) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my OCCUPATIONAL SAFETY AND HEALTH CONSULTANCY Local Exhaust Ventilation (LEV) testing and examination is conducted to control worker’s exposure to harmful substances which has been one of the important requirements of the Regulations made under Factories and Machinery Act 1967 and the Occupational Safety and Health Act 1994. Under Regulation 17(1) of Use and Standards of Exposure of Chemicals Hazardous to Health Regulations 2000, any engineering control such as LEV system must be inspected at an interval of not more than one month by the employer and examined and tested by a registered Hygiene Technician at an interval of not more than twelve months. Selected Project Experience: Provision of Testing and Examination of LEV system at TML PM3 CAA Installation BUNGA RAYA for Talisman Malaysia Ltd. (2008) Provision of Testing and Examination of LEV system at TML Offshore at South Angsi Installations for Talisman Malaysia Ltd. (2008) Provision of Testing and Examination of LEV system at Penjom Goldmine for Specific Resources Sdn Bhd. (2009) Provision of Testing and Examination of LEV system at PERHEBAT (2009) Provision of Testing and Examination of LEV system at TNB Research Sdn Bhd (2009) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my LABORATORY TESTING ERALab Sdn Bhd, is an accredited laboratory under SAMM (Skim Akreditasi Makmal Malaysia) for ISO/IEC 17025 by the Department of Standards, Malaysia. Our laboratory in Ara Damansara, Subang, Selangor DE is equipped with the latest testing equipment handled by trained chemists and technicians using approved methods according to international standards. The fact that the laboratory is accredited for a wide range of inorganic, organic, heavy metal and other physicochemical parameters speaks volumes about its capability and capacity to analyze various types of samples. Water Quality Testing (River, Marine water, Domestic & Industrial Effluent, Drinking Water, Raw water, Ground water) Physical parameter (pH, DO, Alkalinity, Acidity, etc) TSS, TDS, Oil & Grease etc Organic Parameters (BOD, COD, etc) Chemical Parameters (NH3-N, Phosphorus, Cyanide, Heavy Metals and other chemical related to water quality etc) Inorganic parameter (TKN, sulphide, etc) Organic Compounds (Pesticides, VOC, SVOC, TPH , BTEX etc) Toxicity Characteristic Leaching Procedure (TCLP) & Compositional Analysis of Scheduled Waste (DOE & Kualiti Alam requirements) Ambient air quality samples SO2, NO2, TSP, PM10, VOC, Heavy Metals, BTEX, Ozone, HCl, H2SO4, etc Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my LABORATORY TESTING Stack emission samples Dust Particulate, Total Organic Carbon, Poly Aromatic Hydrocarbon (PAH). VOC, Heavy Metals (Pb, Fe, Cd, Cr, Hg, As, Sb etc), BTEX, HCl, H22SO4, etc Dioxin & Furan Chemical Exposure Samples BTEX, Mercury, Mineral Dust, Dust Particulate, Chemicals as stipulated in USECHH Regulations Oil Testing Water Content, Viscosity, TAN, Wear Metals, etc Blood and Urine Test Mercury Content. Fertilizer Samples N, P, K, Cu, NO3, NH3-N, Zn, Mn, Fe, B, Mo and Mg Microbiological Tests Feacal Coliform, Total Coliform, Total Bacteria, Total Fungi, Heterotrophic Plate Count, Feacal Streptococi, etc. Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my LABORATORY TESTING ERALab has also set up a branch in Kemaman, Terengganu to provide laboratory testing services to the East Coast of Malaysia ever growing Oil & Gas market. ERALab (Kemaman Branch) involves in various testing activities mainly on mercury analysis. The laboratory has acquired SAMM accreditation MS ISO/IEC 17025:2005 for analysis of mercury (Hg) in water, personal exposure samples (extracted using hopcalite sorbent tube) and biological samples i.e. urine and blood. The scope of accreditation is for mercury analysis: Water Samples – Using Method USEPA 7473 Personal Exposure Samples – Using Method NMAM 6009 Biological Samples (for Medical Surveillance Testing) – Using Method USEPA 7473 For further enquiries please contact us at :UELS Sdn. Bhd. (ERALab Kemaman Branch) No. 6976, First Floor Bukit Kuang Business Centre 24007 Bukit Kuang, Kemaman, Terengganu Tel: 09-858 4563, Fax: 09-858 5797 Email: eralab_k@streamyx.com or norainishair@yahoo.com Attn: Ms Noraini Shair (019-237 1025) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL FIELD MONITORING Environmental monitoring is an integral part of the Environmental Studies. It comprises the monitoring of three main components of environmental resources namely water, ambient air and noise level. Baseline monitoring of these components provide information to reflect the existing conditions of a particular project site and can become the rational for environmental study areas to be carried out. Meanwhile, the environmental monitoring conducted over a time as per DOE recommendation for each related project is to ensure that there are no environmental hazards occurred during the construction and operational period and all relevant regulations related to the projects are being complied with. Water and Wastewater Quality Monitoring Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL FIELD MONITORING Ambient Air Quality Monitoring Ambient Air Quality Monitoring Boundary Noise Level Monitoring Since its inception in year 1995, ERALab has conducted numerous environmental monitoring which are related to the environmental studies. ERALab provided the environmental monitoring services to many organizations such as Environmental Consultants, Property developers, Industries and the government authorities for the evaluation of the environment in a particular site or region. Selected Relevant Clients: ERINCO Sdn Bhd Sime Engineering –Tractors Malaysia Airport Berhad Perbadanan Air Melaka (PAM) Petlin (Malaysia) Sdn Bhd. Petronas Methanol Labuan Petronas Carigali Snd Bhd -PMO PNB Sdn Bhd Perodua Manufacturing Services Sdn Bhd, Rawang, Selangor Darul Ehsan Petronas Gas Berhad (GPP-A), Kemaman, Terengganu Petronas Gas Berhad Kuantan and Segamat Compressor. Petronas Penapisan (Terengganu) Sdn Bhd Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL FIELD MONITORING Groundwater Quality Monitoring is conducted mainly to assess and determine if there is any contaminations to the groundwater due to the operation of any establish facilities and its associated activities within the site. The groundwater quality is normally recommended to be monitored on a regular basis to ensure early detection of occurrence of any contamination in the future either by the premises operations or the neighbouring facilities. For this, ERALab Sdn Bhd provides professional services in the following areas: Development of groundwater observation well Sampling & analysis of groundwater Assessment of groundwater quality Recommendations for following action Selected Relevant Experience: Development of Permanent Observation Wells and Groundwater monitoring at Selayang Landfill (2005) Development of Permanent Observation Wells and Groundwater monitoring at Petronas Methanol (Labuan) Sdn. Bhd. (2005/2006) Development of Permanent Observation Wells and Groundwater monitoring at ExDumping Site, Sg. Kancis, Kelang, Selangor.(2005) Development of Permanent Observation Wells and Groundwater monitoring at MegaMethanol Project Site (2007) Groundwater monitoring at BP Chemicals Sdn Bhd (2008-2009) Groundwater monitoring at OGT, Kertih for PCSB PMO (2009) Groundwater monitoring at MMHE, Pasir Gudang, Johor (2009) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my ENVIRONMENTAL FIELD MONITORING Stack Emission ERALab conducts Isokinetic and non iso stack-monitoring services and has extensive experience in stack sampling and analysis. The range of measurable stack emission constituents include sulphur, particulate, heavy metals, inorganic compounds, hazardous organic compounds such as dioxin, furan and polynuclear aromatic hydrocarbons (PAH). ERALab employs approved and state of the act of equipment and methods such as those recognized by the United States Environmental Protection Agency (USEPA) and accepted by the Department of Environment, Malaysia. Accurate determination of pollutants emitted into the environment, knowledge and familiarity of the existing legislative requirement as well as extensive experience in the field are all essential factors towards the establishment of an air quality management system. Selected Relevant Experience: Stack emission mon. at Polyplastic Asia Pasific, Gebeng Industrial Estate, Pahang Darul Makmur (2001) Stack emission monitoring at Kaneka PVC Paste Plant, Gebeng Industrial Estate, Kuantan (2001) Stack Emission Monitoring at Petronas Methanol (Labuan) Sdn Bhd (2005) Stack Emission Monitoring at Kilang Kelapa Sawit Krau, Pahang Darul Makmur (2007). Stack Emission Monitoring at Kilang Kelapa Sawit Padang Piol, Pahang Darul Makmur (2007). Stack Emission Monitoring at Kuantan and Segamat, Petronas Gas Berhad (2007). Stack Emission Monitoring at Tiong Nam for GM Consult at Sabah (2007). Stack Emission Monitoring at Petlin (Malaysia) Sdn Bhd. (On-going). Stack Emission Monitoring at TNBG Stesen Janakuasa Port Dickson(2006-On-going) Stack Emission Monitoring at Petronas Penapisan (T) Sdn Bhd (2008) Stack Emission Monitoring at Bp Chemicals (M) Sdn. Bhd., Gebeng Industrial Estate, Pahang Darul Makmur (1998-2000, 2007-2010) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my OCCUPATIONAL SAFETY AND HEALTH FIELD MONITORING Chemical Exposure monitoring is conducted to assess the health risk of personnel at workplace, which is directed towards the measurement of personal exposure and area monitoring to airborne contaminants eg Total dust, respirable dust, mineral dust, oil mist, Hg, BTEX etc. This is to meet DOSH requirement under Occupational Safety and Health (Use and Standard of Exposure of Chemicals Hazardous to Health) Regulations, 2000. ERALab offers Industrial Hygiene Technician I registered with DOSH to conduct this monitoring. Noise survey monitoring is conducted by ERALab Noise Competent Person eas requirement under the Factories and Machinery (Noise Exposure) Regulations, 1989. The monitoring includes noise mapping, point source, personal noise exposure monitoring. Relevant experiences are as per consultancy for Noise survey monitoring. Indoor Air Quality Assessment and Measurement is recognized when it is conducted by IAQ Assessor registered with DOSH. The IAQ measurement include measurement of chemical contaminants, such as carbon dioxide, carbon monoxide, formaldehyde, volatile organic compounds and environmental tobacco smoke (ETS); physical conditions, such as air temperature, air velocity and humidity; biological agents, such as mites, virus, and spores; and radiation such as radon. Relevant experiences are as per consultancy for Indoor Air Quality Assessment. Selected Relevant Experience- Chemical Exposure Monitoring: Personal Exposure and Area Monitoring for BTX at Sabah Gas Terminal, Labuan Gas Terminal and Samarang Platform for Petronas Carigali Sdn Bhd, Sabah Operation. (2003, 2004, 2005 and 2007) One Year Contract of Chemical Exposure Monitoring for Petronas Penapisan Melaka, 2006. Mercury Exposure Monitoring during Shutdown Activities at Gas Processing Plants for Petronas Gas Berhad, Kerteh, Terengganu (2007, 2008 and 2009). Chemical Exposure Monitoring for BTX and Mercury (Hg) at Pulai, Bekok C, Tiong A, Tinggi and Bekok A Platforms for Petronas Carigali Sdn Bhd-Peninsular Malaysia Operations.(2007). Industrial Hygiene Monitoring for Total Dust and Ammonia at BP Chemicals Malaysia (2008). Chemical Exposure Monitoring for BTX and Hg at Duyong Platform for HG Solution Sdn.Bhd.(2008). Chemical Exposure Monitoring for Zinc Oxide, Aniline, Calcium at Nakagawa Rubber Industries Sdn.Bhd.(2008). Chemical Exposure Monitoring for Oil Mist and Total Dust at Shin Etsu (Malaysia) Sdn.Bhd.(2008). Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my TRAINING ERALab provides Health, Safety and Environmental (HSE) Training which is delivered by qualified and competent health, safety and environmental consultants. Through our consultant vast experiences and their dedication, we can help an organization in achieving compliance with legal health, safety and environmental requirements, including the development of their own specific health and safety policy statement and management system in accordance with the Occupational Safety and Health Act, 1994 and industry best practice. We also provide health and safety training courses and other unique management systems developed to OHSAS 18001 and ISO 14001 standards. Trainings provided by ERALab are:- Health, Safety and Environmental (HSE) Training i) ii) iii) iv) v) vi) vii) viii) ix) x) Indoor Air Quality Management for Facility Manager / Building Owner Hazard Communication Safety In Laboratory Introduction of Occupational Hygiene Effective Chemical Register Hearing Conversation Program Biological Hazard Hazard Identification Health Impact Assessment Effective OSH Audit Management System - ISO 14001:2007/ OHSAS 18001:2007 ISO/IEC 17025 Training Oil Testing Training - Maintenance Philosophies Lubrication Fundamentals Oil Sampling – The Very Best Practice Fluid Properties Analysis Contamination Control and Proactive Maintenance Understanding and Analyzing Machine Wear Selecting Routine Test Oil Analysis Report Interpretation Field Tests and Inspection Selected Project Experience: HAZCOM Training at part of CHRA at Kemaman Supply Base (KSB) for PCSB-PMO) HAZCOM Training at part of CHRA at FPSO Bunga Raya for PCSB-PMO IMS (Integrated Management System) Training at PGB-TOD, Segamat ISO/IEC 17025 Training as part of Laboratory Accreditation Program at Department of Water Supply, Brunei Darussalam. Oil Testing Training at Petronas Methanol (Labuan) Sdn Bhd (In collaboration with Focus Lab, Thailand) Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my LICENSES AND PROFESSIONAL REGISTRATION Ministry of Finance (MOF) Department of Standards Malaysia (DSM) PETRONAS Department of Environmental (DOE) Department of Occupational, Safety & Health Data Entry / Software (220503) Laboratory Furniture Supplier (100200) Chemical Laboratory (100101) Marine Equipment (190300) Training Provider (220502) SAMM MS ISO/IEC 17025 Safety Consultancy (SC303010000) Environment Consultancy (SC303020000) Industrial Hygiene Survey & Services (SC303040000) R&D Health, Safety & Environment (HSE) (SC309140000) Soil & Groundwater Investigation (SH206040000) Well Testing Equipment & Services (SP220000000) Laboratory Services – HSE Laboratory (SC310010000), Decontamination Services (SH203000000) Non-Scheduled Waste Management (SC217020000) Monitoring, Treatment & Disposal of Scheduled Waste (SH201050000) Specialist Manpower – Lecturing and Training Personnel (SM203110000) Registered (Individual.) Environmental Consultant Competent person for Noise Industrial Hygiene Technician 1 Industrial Hygiene Technician 2 CHRA Assessor IAQ Assessor Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email : admin@eralab.com.my , eralab@streamyx.com Website: www.eralab.com.my