August 2012 - City of Billings Home
Transcription
August 2012 - City of Billings Home
Agenda Items CITY COUNCIL WORK SESSION AGENDA ITEM CITY OF BILLINGS, MONTANA Monday, August, 20, 2012 TITLE: 2013 Unified Planning Work Program (UPWP) DEPARTMENT: Planning & Community Services Department PRESENTED BY: Scott Walker, Transportation Planner INTRODUCTION: The Planning Division is presenting the Draft 2013 Unified Planning Work Program (UPWP) for the Billings Metropolitan Planning Organization for Planning Board review and recommendation to the Billings Policy Coordinating Committee (PCC). The UPWP is primarily for the purpose of programming the federal dollars Billings receives from the Federal Highway Administration (FHWA) for transportation planning. These funds are passed through the Montana Department of Transportation (MDT). However, all planning activities are included in the UPWP so that it represents a comprehensive document of the urban transportation planning program. This UPWP proposes planning activities for Federal Fiscal Year 2013, which runs from October 1, 2012 through September 30, 2013. This UPWP corresponds directly with the Planning Division’s annual work plan. The significant change in this year’s program are the added PL funds to Work Element 301 to update the Transportation Plan, also the Hospitality Corridor Study will be completed and a Riverfront to Shiloh Road Connection Study will be undertaken. The Transit section is in Chapter II of the UPWP. The document is consistent with past programs. ALTERNATIVES ANALYZED: Accept the plan (recommended) and instruct the Mayor or a designee to give a positive recommendation to PCC; or reject the plan and instruct the Mayor to give a negative recommendation to PCC. The PCC meeting is scheduled for September 18th. FINANCIAL IMPACT: $142,800 $31,400 $375,000 $967,459 $1,516,659 Planning Dept. Fee Revenue (City of Billings) Planning Dept. Fee (Yellowstone County) Yellowstone County (Mill) Federal Planning (PL) Allocation Total Program (UPWP) RECOMMENDATION Staff recommends that the City Council approve the Draft 2013 UPWP at its meeting on September 10th for consideration at the PCC meeting on September 18th. 1 of 1 CITY COUNCIL WORK SESSION AGENDA ITEM CITY OF BILLINGS, MONTANA Monday, August 20, 2012 SUBJECT: Review and Recommendation for 2012-16 TIP THROUGH: Candi Beaudry, AICP, Planning Director PRESENTED BY: Scott Walker, Transportation Planner INTRODUCTION Federal regulations require that Metropolitan Planning Organizations (MPOs) review and update their Transportation Improvement Program (TIP) periodically. The current 2012-16 TIP falls into this category and must be updated to maintain compliance with State and Federal requirements. The TIP is a short-range program of highway and transit projects in the Billings Metropolitan Planning Organization area and is prepared by Planning Division staff in cooperation with state and local agencies. The basic purpose of the TIP is to provide the mechanism for scheduling federal funds for surface transportation projects, indicate regional priorities, and demonstrate a short-range transportation vision for the area. A secondary purpose of the TIP is to provide information about other transportation projects in the urbanized area that are exempt from the TIP approval process such as projects that do not utilize federal funds. This TIP is being presented to the City Council for review due to cost updates to several projects. The projects listed in the TIP include the North By-Pass, Bench Boulevard, MET Bus Operating, Safe Routes to School and CTEP. Staff has attached the document for your convenience. Staff will have a presentation at the meeting. 2012-2016 TIP ADOPTION SCHEDULE • The Technical Advisory Committee met August 14th to review the 2012-16 TIP and is recommending approval. • The Planning Board initially reviewed the 2012-16 TIP at its regular meeting on August 14th and will make a final recommendation of the document at its August 28th meeting and forward its recommendation to the PCC. • The Board of County Commissioners will review the 2012-16 TIP at its August 27 Discussion Session and take action on the 2012-16 TIP at its regularly scheduled meeting on August 28th and forward its recommendation to the PCC. • The City Council will review the 2012-16 TIP at its August 20th Work Session and take action on the 2012-16 TIP at its regular meeting on September 10th and forward its recommendation to the PCC. • The PCC is expected to meet on September 18th to take final local action on the 2012-16 TIP. 1 RECOMMENDATION Staff recommends the City Council recommend approval of the 2012-16 TIP to the Policy Coordinating Committee. ATTACHMENT: A. 2012-16 TIP 2 BILLINGS URBAN AREA TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FY 2012-2016 DRAFT **This document is funded in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation. The contents of this document do not necessarily reflect the official views or policy of the U.S. Department of Transportation. 2012-2016 Billings Transportation Improvement Program Prepared by: Yellowstone County Board of Planning Billings Metropolitan Planning Organization In Cooperation With: City of Billings Yellowstone County Yellowstone County Board of Planning Montana Department of Transportation Federal Highway Administration Federal Transit Administration Reviewed By: Technical Advisory Committee Yellowstone County Board of Planning Billings City Council Yellowstone County Commissioners Approved By: Billings Policy Coordinating Committee Montana Department of Transportation Federal Highway Administration Federal Transit Administration i 2012-2016 Billings Transportation Improvement Program TABLE OF CONTENTS INTRODUCTION ............................................................................................................................ 1 FEDERAL REGULATIONS ........................................................................................................... 2 FINANCIAL RESOURCES ............................................................................................................ 2 AIR QUALITY CONSISTENCY ................................................................................................... 3 CONFORMITY OF THE BILLINGS AREA TRANSPORTATION IMPROVEMENT PROGRAM WITH THE 1990 CLEAN AIR ACT......................................................................... 4 TIP CONFORMITY ........................................................................................................................ 4 ENERGY CONSERVATION CONSIDERATIONS ..................................................................... 5 PROGRAMMING OF NON-URBAN SYSTEM, FEDERAL AID AND STATE FUNDING .. 6 PRIVATE ENTERPRISE PARTICIPATION .............................................................................. 10 ii 2012-2016 Billings Transportation Improvement Program LIST OF TABLES TABLE 1: EXEMPT PROJECTS ............................................................................................................. 5 TABLE 2: REGIONALLY SIGNIFICANT PROJECTS................................................................................. 5 TABLE 3: TRANSPORTATION REVENUE ESTIMATES (2012-2016) ...................................................... 7 TABLES 4A-4B: TRANSPORTATION PRIORITY LIST ...................................................................... 8-9 TABLE 5: TRANSPORTATION PROJECT PRIORITY LIST FTA SECTIONS 5307, 5309, 5310, 5316, 5317 ................................................................................................................................................... 12 TABLE 6: MULTI-YEAR STAGING PROGRAM CALENDAR YEARS 2012-2016 ................................... 13 TABLE 7: HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY 2012 ............................... 14 TABLE 8: HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY 2013 ............................... 15 TABLE 9: HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY 2014 ............................... 16 TABLE 10: HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY 2015 ......................... 17 TABLE 11: HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY 2016 ........................... 18 TABLE 12: BIENNIAL ELEMENT OCTOBER 1, 2011- SEPTEMBER 30, 2013 (HIGHWAY) ................. 19 TABLE 13: BIENNIAL ELEMENT JULY 1, 2011-JUNE 30, 2013 (TRANSIT) ....................................... 20 iii 2012-2016 Billings Transportation Improvement Program METROPOLITAN TRANSPORTATION PLANNING PROCESS SELF-CERTIFICATION The Billings Metropolitan Planning Organization for the Billings, Montana, urbanized area hereby certifies that the transportation planning process is addressing the major issues in the metropolitan planning area and is being conducted in accordance with all applicable requirements of: I. 49 U.S.C. Section 5303 and 23 U.S.C. 134 and CFR 450.334; II. Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C 2000d-1 ) and 49 CFR, Part 21; III. Section 1101(b) of the SAFETEA-LU (Pub. L. 109-59) regarding the involvement of disadvantaged business enterprises in the FHWA and the FTA funded projects (49 CFR part 26); IV. The provision of the Americans With Disabilities Act of 1990 (42U.S.C. 12101 et seq,) and the U. S. DOT implementing regulation (49 CFR Parts 27, 37 and 38); V. The provisions of 49 CFR part 20 regarding restrictions on influencing certain activities; and VI. Sections 174 and 176(c) and (d) of the Clean Air Act as amended (42 U.S.C. 7504, 7506(c) and (d)), 40 CFR, part 93. VII. 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex or age in employment or business opportunity. VIII. 23 CFR, part 230, regarding the implementation of an equal employment opportunity on Federal & Federal-aid highway construction contracts. IX. The Older Americans Act as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in program or projects receiving Federal financial assistance. X. Section 324 of title 23 U.S.C. regarding the prohibition of discrimination based on gender. XI. Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR, part 27 regarding discrimination against individuals with disabilities. Billings, Montana Metropolitan Planning Organization Signature, Paul Gatzemeier President-Yellowstone County Board of Planning Printed Name Date iv 2012-2016 Billings Transportation Improvement Program INTRODUCTION PREFACE The Yellowstone County Board of Planning (YCBP) is the metropolitan planning organization (MPO) for the Billings metropolitan planning area. The Transportation Improvement Program (TIP) is the funding mechanism for transportation projects requesting federal dollars in the Billings urbanized area. All MPO’s are required by the current Federal Highway Bill SAFETEA LU to produce a TIP and update it at least every four years. SAFETEA LU was signed into law by President Bush in 2005, and extended by President Obama through June 2012. The act and extensions authorized highway, highway safety, transit, and other surface transportation programs. On July 6, 2012 Moving Ahead for Progress in the 21st Century (MAP-21) was signed into law. The law provides federal program funding through the end of Federal Fiscal Year 2014 and brings program structure changes that will be fully addressed in future long range transportation plans and TIPs. This document contains a list of all surface transportation projects requesting the use of federal funds. Local jurisdictions working through the Billings MPO’s Policy Coordinating Committee (PCC) determine how the area's transportation system is developed and expanded. PURPOSE OF THE TIP The TIP is a short-range program of highway and transit projects in the Billings metropolitan planning area and is prepared by YCBP staff in cooperation with state and local agencies. The basic purpose of the TIP is to provide the mechanism for scheduling federal funds for surface transportation projects, indicating regional priorities, and demonstrating a short range transportation vision for the area. A secondary purpose of the TIP is to provide information about other transportation projects in the planning area that are exempt from the TIP approval process such as projects that do not utilize federal funds. THE TIP PROCESS The development of the TIP document is the responsibility of the Billings MPO and provides an opportunity for local officials to determine priorities and spending for federal highway and transit funds. Any transportation project located in the Billings metropolitan planning area must be included in the TIP prior to receiving federal funds. TIP projects must be included in the area's 20 year Transportation Plan, and are proposed for the TIP by local elected officials, transit operating officials, or state highway agencies. The TIP is reviewed and endorsed annually by the Billings MPO’s PCC and may be modified through the TIP amendment process. The PCC 1 2012-2016 Billings Transportation Improvement Program includes a Billings City Council representative, the Chair of the Yellowstone County Commission, the President of the Yellowstone County Board of Planning and the District Administrator of the Montana Department of Transportation. After PCC endorsement, the TIP is submitted to the Montana Department of Transportation (MDT) and to the Federal Highway Administration and Federal Transit Administration for federal review of the document and approval of conformity and fiscal constraint determination. FEDERAL REGULATIONS The Transportation Improvement Program (TIP) is a required planning program for federally assisted highway and transit improvements for the Billings metropolitan planning area and the Montana Department of Transportation (MDT) over a five-year period. The principal focus is given to the first two years of the program, the Biennial Element, which contains projects that could be implemented between July 1, 2012 and June 30, 2014. The TIP is prepared annually and is in conformance with 23 CFR, Part 450 324-330. FINANCIAL RESOURCES A range of federal funding sources is available to the Billings planning area for the purposes of funding transportation system improvements. Following is a list of those sources which, when available to the Billings area, are shown in the Transportation Improvement Program. Project implementation is indicated as expected to occur during the pertinent program year. Billings has had a favorable history of receiving federal earmarks as reflected in the table below. BILLINGS FEDERAL EARMARK HISTORY – 2000 through 2009 YEAR EARMARKS 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 TOTAL 10 YEAR AVERAGE $ 3,000,000 $ 2,000,000 $ 4,960,000 $ 35,173,900 $ 0.0 $ 4,596,200 $ 4,750,000 $0.00 $0.0 $54,457 $54,534,557 $5,453,455 FUNDING SOURCES • Surface Transportation Program Urban (STPU) • Surface Transportation Program Primary (STPP) • National Highway System (NHS) 2 2012-2016 Billings Transportation Improvement Program • Interstate Maintenance (IM) • Highway-Railway Crossing Program (RRX) • Transportation and Community and System Preservation (TCSP) • Surface Transportation Enhancement (STPE) • Highway Safety Improvement Program (HSIP) • Bridge Replacement and Rehabilitation Program (HBRRP) • Urban Pavement Preservation (UPP) • Community Transportation Enhancement Program (CTEP) • State Funded Construction (SFC) • Congestion Mitigation Air Quality (CMAQ) • Montana Air Congestion Initiative (MACI) • FTA Section 5309 (Formerly Sec. 3) • FTA Section 5307 (Formerly Sec. 9) • FTA Section 5310 (Formerly Sec. 16) • FTA Section 5316 Job Access and Reverse Commute (JARC) • FTA Section 5317 New Freedom • Congressionally Directed Funds (Montana, NCPD, DEMO) • Safe Routes to School (SRTS) AIR QUALITY CONSISTENCY Billings was designated as a non-attainment area for both Total Suspended Particulates (TSP) and Carbon Monoxide (CO) on March 3, 1978, (Federal Register, Vol. 44, No. 150, page 45421, August 2, 1979). As such, Billings was required to prepare a Transportation Control Plan (TCP). The TCP identified strategies to mitigate the TSP and CO problems. The TCP is the Billings element of Montana's State Implementation Plan (SIP). The TIP is required to be, and is, consistent with the TCP as discussed in the Billings conformity statement. In 1987 the standard for TSP was dropped, and a new standard for particulate matter under 10 microns in size (PM - 10) was adopted (7/1/87 at 52 FR 24854). The Environmental Protection Agency (EPA), has also adopted the PM 2.5 standard and Billings is considered to be in compliance with both of these new standards. 3 2012-2016 Billings Transportation Improvement Program CONFORMITY OF THE BILLINGS AREA TRANSPORTATION IMPROVEMENT PROGRAM WITH THE 1990 CLEAN AIR ACT A portion of the Billings Urbanized Area, (Billings), was designated non-attainment for carbon monoxide (CO) on 3/3/78 (43 FR 8962) with a secondary classification of "unclassified". EPA approved the Billings CO Control Plan on 1/16/86 (51 FR 2397). Billings was then redesignated as “Not Classified” on 11/6/91 (56 FR 56697). The area meets the qualifications of the Clean Air Act (CAA) for classification as an attainment area for ozone. The Billings "not classified" carbon monoxide (CO) nonattainment area was re-designated by the Environmental Protection Agency (EPA) to attainment for the CO National Ambient Air Quality Standards (NAAQS) with an approved limited maintenance plan effective April 22, 2002. Under a CO limited maintenance plan, the motor vehicle emissions budgeted may be treated as essentially non-constraining for the length of the maintenance period because growth would need to exceed reasonable expectations to create a violation of the NAAQS for transportation-related CO. Therefore conformity demonstration using regional emissions analysis is not required; however, individual projects may still be required to conduct "hot spot" analysis. As demonstrated in the following sections, the Transportation Improvement Program (TIP) satisfactorily meets the requirements established by the 1990 amendments to the CAA regarding the conformity of TIP’s. • The most recent estimates of CO mobile source emissions have been developed by the Analytical Services Section, Montana Department of Environmental Quality and are based upon development and transportation data provided by the Yellowstone County Board of Planning. TRANSPORTATION CONTROL MEASURES Specific Transportation Control Measures have not been proposed for Billings recently, however, the SIP completed in 1986 included the widening of Exposition Drive (Main Street) and the signalization at Main Street and First Avenue North. Both of these projects were completed in 1983. There are no Transportation Control Measures (TCM’s) in the State Implementation Plan (SIP) and therefore there are no specific TCM’s recommended for implementation in this TIP. TIP CONFORMITY As a prerequisite for receiving Federal-aid transportation funds through the TIP, a determination must be made that the proposed transportation projects do not cause or contribute to violations of the carbon monoxide ambient air quality standards. An analysis, which meets the EPA conformity determination regulations specified in 40 CFR Part 51 was performed in conjunction with the development of the Billings Urban Area 2009 Transportation Plan. The plan was found to conform at the federal level June 30, 2010. The analysis appears in Section 4, pages 4-24 through 4-27 of the Plan document and is titled "Air Quality/Conformity". As the transportation projects in the TIP are contained in the Transportation Plan's analysis, a separate analysis for the TIP is not necessary. 4 2012-2016 Billings Transportation Improvement Program There are no new regionally significant projects in this 2012-2016 Billings Urban Area TIP. NEW PROJECTS EXEMPT FROM REGIONAL ANALYSIS Project Scope Comments st Exposition Dr & 1 Ave N-concrete pavement rehab 27th St-1st Ave S to Airport-mill/overlay (pavement preservation) 2012 Scour Mitigation-Bridge Scour Mitigation (Dick Johnson Bridge) I-90 Yellowstone River Bridge-Bridge Replacement (Table 1): EXEMPT PROJECTS REGIONALLY SIGNIFICANT PROJECTS Project Scope th Comments 6 Avenue/Bench Connection Reconstruction In design Billings Bypass (aka North Bypass) Location/Environmental Ongoing Bench Boulevard-Billings Phases I and II Phase I letting in 2013 Reconstruction Phase II letting anticipated in 2015 (Table 2): REGIONALLY SIGNIFICANT PROJECTS ENERGY CONSERVATION CONSIDERATIONS Energy impact analyses have been conducted as a part of the urban transportation planning process. In addition, increased attention has been given to energy conservation and contingency planning on a project specific basis. As part of the 2009 update of the Billings Urban Area Transportation Plan, energy conservation was considered in each of the proposed alternative transportation networks. The City of Billings has a well-developed transit system, and ride-sharing opportunities have been examined. Transit facilities and highway system proposals will continue to be considered in a comprehensive method through the adopted Transportation Planning process. The detailed energy conservation analysis of specific projects has been conducted for each of the major highway construction projects recommended in the 2009 update of the Billings Urban Area Transportation Plan. 5 2012-2016 Billings Transportation Improvement Program PROGRAMMING OF NON-URBAN SYSTEM, FEDERAL AID AND STATE FUNDING Proposed projects involving federal-aid funding, other than urban system funding, that are proposed within existing rights-of-way and which are determined to not significantly change traffic patterns, may not be considered to be of appropriate scale to warrant a modification to a currently valid TIP. When there is knowledge of such projects prior to the annual adoption of the TIP, each project will be included in the program. Generally, projects falling within this category are those which serve to preserve and maintain the integrity of the existing plant or facility such as: overlays to improve or maintain surface conditions; bridge expansion joints and deck repairs necessary to maintain structural and surface sufficiency; slope repair necessary to maintain drainage adequacy; etc. Projects of this nature will be identified by MDT with appropriate justification when requesting program approval of federal highway funds. Local urban area officials will be advised by the Department through the local planning process of the Department's intent to expend federal funds (non-urban system) for such improvements in their area. 6 2012-2016 Billings Transportation Improvement Program (Table 3) -TRANSPORTATION REVENUE ESTIMATES (2012-2016) BILLINGS, MONTANA YEAR SURFACE TRANS PROGRAM (STP) (URBAN)* MONTANA AIR CONGESTION INITIATIVE (MACI)* EARMARKS (MT/NCPD/ DEMO) 2012 $ 5,389,044 $ 5,305,565 $ CITY $ 31,458,127 COUNTY $ 195,006 $ 493,249 195,006 2013 CITY $ 2,587,036 $ 1,043,888 COUNTY $ $ 2,587,036 $ 1,043,888 COUNTY $ 2014 CITY 2015 CITY $ 2,587,036 $ CITY $ 2,587,036 $ 1,043,888 $ 15,737,188 $ 9,481,117 $ $ COUNTY $ 1,043,888 2016 TOTAL SURFACE TRANSPORTATION ENHANCEMENT (CTEP) $ COUNTY $ $ 31,458,127 CITY NATIONAL HWY STATE HSIP SYSTEM (NHS) UPP INTERSTATE RRP MAINTENANCE SRTS MDT(IM) MACI BH BR 493,249 GAS CITY $ 252,888 $ 368,562 COUNTY CITY $ 100,000 $ 5,890,104 COUNTY 195,006 $ 2,263,033 $ 1,937,390 COUNTY 493,249 CITY 493,249 195,006 $ CITY 1,600,000 $ 50,000 493,249 COUNTY CITY 195,006 $ 1,000,000 $ 1,050,000 COUNTY $ 2,466,245 $ 5,215,921 $ 9,296,056 CITY COUNTY $ 975,030 COUNTY TAX TRANSIT SEC 5307 TRANSIT SEC 5309** TRANSIT SEC 5310 $ 1,764,579 $ $ 288,905 OPER. $ 1,428,517 $ 47,640 $ 1,485,657 $ 125,000 1,543,083 $ 125,000 $ 1,764,579 $ 288,905 288,905 OPER $ 1,606,886 $ OPER $ 1,671,162 $ 8,822,895 OPER. $ 288,905 7,735,305 $ 1,444,525 $ 47,640 85,000 $ 68,000 *** *** *** *** $ 125,000 $ 625,000 $ 303,000 $ 153,000 ** OPER. $ 50,000 SEC.5310 $ ** * Includes carryover ** Includes Non-Federal Match *** 5316 & 5317 funding no longer available (2014-2016) 7 2,352,921 25,000 $ 49,780,003 2,399,979 25,000 $ 16,729,403 $ $ 70,000 SEC.5310 $ 25,000 $ 14,784,148 $ $ 70,000 SEC.5310 $ 2,496,939 25,000 $ 12,346,488 $ $ 70,000 SEC.5310 $ 2,546,878 25,000 $ 12,860,703 ** ** $ OPER. OPER. $ OPER. 2,447,979 ** OPER. 370,000 OPER. $ 12,244,696 SEC.5310 $ 125,000 FUNDING PROJECTIONS ARE BASED ON BEST AVAILABLE INFORMATION AND ARE SUBJECT TO CHANGE GIVEN CURRENT FUNDING UNCERTAINTIES AND UNKNOWN IMPACTS OF FUTURE CONGRESSIONAL OR OTHER FEDERAL ACTIONS. FEDERAL PROGRAM FUNDING AVAILABILITY MAY IMPACT THE SCHEDULING OF PROJECTS. TOTAL $ 110,000 SEC.5310 $ *** 125,000 $ 1,764,579 $ 153,000 *** OPER $ $ 1,764,579 $ $ OTHER FUNDS (LOCAL) TRANSADE $ $ 288,905 OPER. $ 150,000 TRANSIT SEC 5317 NEW FREEDOM** 125,000 $ 1,764,579 $ TRANSIT SEC 5316 JARC** $ 106,500,745 2012-2016 Billings Transportation Improvement Program RANK PROJECT (TABLE 4-a) -TRANSPORTATION PRIORITY LIST BILLINGS, MONTANA TYPE OF PROJECT WORK LENGTH PHASE ESTIMATED COST FUNDING SOURCE CONST. $300,720 STPU PE RW IC CONST See Earmarks $1,567,915 $1,896,672 $12,462,601 15,927,188 CMAQ CMAQ STPU PE RW IC CONST. UNKNOWN UNKNOWN UNKNOWN UNKNOWN SURFACE TRANSPORTATION PROGRAM-URBAN (STPU) BENCH BLVD. NORTH - PHASE I (See also EARMARKS/DISCRETIONARY GRANTS) Reconstruction BENCH BLVD NORTH - PHASE II Reconstruction GRAND AVENUE 32ND STREET WEST Reconstruction 1 Construction 1.5 TOTAL $0 PE RW IC CONST. UNKNOWN UNKNOWN UNKNOWN UNKNOWN TOTAL $0 MONTANA AIR CONGESTION INITIATIVE (MACI) SEE BENCH BLVD NORTH-PHASE II UNDER STPU EARMARKS/DISCRETIONARY GRANTS 1 6TH AVE NORTH TO BENCH BLVD. (CONNECTION) Phase II Beyond the timeframe of this TIP. 2 BENCH BLVD. NORTH Phase I 3 ZIMMERMAN TRAIL 4 BILLINGS BYPASS (aka North Bypass) PE RW IC CONST. LOCAL TOTAL 3 PE RW IC CONST. CONST. TOTAL $2,707,324 $620,000 $590,157 $4,561,070 $300,720 $8,779,271 PE See above Add climbing lane for portion of roadway Straighten Curve 1 PE RW/IC CONST. LOCAL TOTAL $424,242 $103,896 $4,665,320 $806,542 $6,000,000 MT MT MT LOCAL Environmental Review & Location Study 14 ENV NCPD/DEMO MT TOTAL $14,341,661 $8,004,158 $22,345,819 TCSP LOCAL TOTAL $54,457 $8,441 $62,898 PE/CONST Per Project IM PE CONST $252,888 $2,163,934 $2,416,822 NH NH PE/CONST Per project NH PE CONST $79,000 $520,000 $599,000 PE CONST CONST $3,766,636 $35,657,483 $6,026,616 $45,450,735 25TH STREET PEDESTRIAN BRIDGE INTERSTATE MAINTENANCE (IM) VARIOUS PROJECTS Purchase & replace historic bridge Pavement Preservation NATIONAL HIGHWAY SYSTEM- (NH) MDT PREVENTIVE MAINTENANCE Pavement preservation (2012/2014) 27th St-1st Ave S to Airport & Exposition Dr & 1st Ave N-Blgs VARIOUS PROJECTS LOCAL Reconstruction BENCH BLVD-NORTH - Phase II (See above) 5 CMAQ/LOCAL Pavement preservation N/A MT MT MT MT STPU BRIDGE (BH, BR) 2012 Scour Mitigation (Yellowstone River (Dick Johnson Bridge) I-90 Yellowstone River-Billings (Construction beyond timeframe of this TIP) Replace Bridges 8 BR BR IM 2012-2016 Billings Transportation Improvement Program TABLE 4(B)-TRANSPORTATION PRIORITY LIST BILLINGS, MONTANA SURFACE TRANSPORTATION PROGRAM-URBAN PAVEMENT PRESERVATION(UPP) Pavement Preservation VARIOUS PROJECTS 2012/2013 Montana Ave-Billings & Laurel Road-Billings VARIOUS PROJECTS 2014-2016 SURFACE TRANSPORTATION PROGRAM-HIGHWAY SAFETY (HSIP) SF099 BILLINGS GRAND 17TH SIG SURFACE TRANSPORTATION PROGRAM-RAIL PROGRAM (RRP) 1ST AVENUE SOUTH PE/CONST. $ 1,490,989 UPP(BIENNIAL) Pavement Preservation PE/CONST. Per Project UPP(BIENNIAL) Int/Upgrade Signals PE CONST HSIP HSIP TOTAL $29,000 $74,890 $103,890 PE CONST. $3,000 $92,055 STPRP/STPRR STPRP/STPRR TOTAL $95,055 Circuitry Upgrade N/A OTHER FUNDING STP ENHANCEMENTS Various Projects OTHER 688,255 CTEP SAFE ROUTES TO SCHOOL Various Projects OTHER Per Project SRTS ANNUAL OPERATION AND MAINTENANCE Various Projects OTHER 225,000 LOCAL ANNUAL OPERATION AND MAINTENANCE Various Projects OTHER 446,000 STATE MDT-MACI Equipment Purchase OTHER 220,562 CMAQ/LOCAL MDT-MACI Signal Optimization PE/OTHER 217,500 CMAQ/STATE Various Projects OTHER 1,550,000 $3,347,317 STATE FUNDED MAINTENANCE TOTAL ** CONST. Estimates Include CE Costs 9 2012-2016 Billings Transportation Improvement Program ADVANCEMENT OF PROJECTS It is mutually agreed that the first two years of this program is the best estimate of the project phase that will be undertaken during the Biennial timeframe. Occasionally, projects advance through the design process faster than anticipated. An approved project may accelerate into the next logical phase providing that the funding source does not change from that, which was initially identified in the TIP. Federal, State, and local governments have agreed that a TIP revision is not required in order to accelerate a specific project phase, so long as other planned work is not unduly delayed. The priorities with regard to the FTA Section 5307 projects in the Biennial Element are: 1) Operating Assistance. • The priorities with regard to the FTA Section 5310 projects in the Biennial Element are: 1) Replacement vehicles for MET Special Transit, 2) Replacement vehicles for MET Special Transit. • The priorities with regard to the FTA Section 5309 projects are: 1) Livability Grant for ITS. . PRIVATE ENTERPRISE PARTICIPATION Both the City of Billings and Yellowstone County have locally developed policies and procedures to examine opportunities for private sector participation in the provision of transit services and related support services. The City of Billings adopted resolution 86-15346 which states said policy and provides a process for implementation. The Council approved that resolution on July 7, 1986. Further, a Private Transportation Enterprise Participation Policy (PEP) and implementing procedures were adopted by the MPO's Technical Advisory Committee on April 24, 1986; by the Policy Coordinating Committee on May 8, 1986; and by the Yellowstone County Planning Board on May 13, 1986. The City's MET Transit Department has examined various opportunities for private sector provision of services. The Department utilizes private tire firms to handle parts of servicing of the tire inventory. The Department also contracts with various private firms for radiator repair, air compressor rebuilds, as well as glass, bodywork on the vehicles, and occasional component rebuilds. The required TIP documentation related to the PEP process is as follows: a) The City of Billings MET Transit System solicited the possible interest or involvement of the private sector in providing leased tires for the MET Transit fleet of coaches. In the spring of 1993, 1996, 2001, 2006 and 2011, a Request for Bids was sent to potentially interested private vendors and was also advertised in a local newspaper and a national transit journal. Bids are evaluated based on cost and ability to perform. Three firms requested bid packages. The current contract for the tire lease is in effect through August 31, 2012 with four additional one-year renewal options. b) No other proposals were received from the private sector. c) There are no known impediments to holding service out for competition. d) There are no known private sector complaints. The Yellowstone County-City of Billings Planning Division has and will continue to follow its adopted policy and procedures regarding private sector participation. The mailing list of private providers has been updated and used 10 2012-2016 Billings Transportation Improvement Program to provide notice about TAC and PCC meetings, including those that deal with the Unified Planning Work Program, (UPWP), projects and process as well as the TIP process. Through these mailings the private providers are aware of the development of the proposed transit capital and operating projects as well as the proposed paratransit capital projects for the five years covered in the TIP. FEDERAL TRANSIT ADMINISTRATION PROJECTS The Federal Transit Act funded projects, including FTA Section 5309 grant projects, (Biennial Element) are intended to insure the continued efficient operation, maintenance and administration of the MET Transit system fleet and facilities, including meeting federal regulations such as the Americans with Disabilities Act (ADA). The operating grants are for the fiscal years of July 2011 to June 2012 and July 2012 to June 2013 and the Section 5309 grant projects will permit Bus and Bus Facilities projects in Fiscal Years 2011-2012 through 2012-2013. The vehicle purchases for MET Special Transit are projects to enable the City to continue providing the required specialized demand-responsive paratransit service for citizens who are unable to use the MET Transit System due to their disabling conditions. The projects to purchase vehicles for other entities will address some of the transportation needs of developmentally impaired or disabled residents. 11 2012-2016 Billings Transportation Improvement Program (Table 5) -TRANSPORTATION PROJECT PRIORITY LIST BILLINGS, MONTANA SECTION/PROJECT FTA SECTION 5307 (INCLUDES LOCAL FUNDS) OPERATING PROJECT (7-1-2011 TO 6-30-2012) OPERATING PROJECT (7-1-2012 TO 6-30-2013) OPERATING PROJECT (7-1-2013 TO 6-30-2014) OPERATING PROJECT (7-1-2014 TO 6-30-2015) OPERATING PROJECT (7-1-2015 TO 6-30-2016) PROJECT ESTIMATE 3,781,438 3,885,636 3,993,062 4,103,825 4,218,040 $19,982,001 TOTAL TRANSADE(INCLUDES LOCAL FUNDS) MET SPECIALIZED TRANSPORTATION-OPERATING (2012) MET SPECIALIZED TRANSPORTATION-OPERATING (2013) MET SPECIALIZED TRANSPORTATION-OPERATING (2014) MET SPECIALIZED TRANSPORTATION-OPERATING (2015) MET SPECIALIZED TRANSPORTATION-OPERATING (2016) TOTAL FTA SECTION 5310(INCLUDES LOCAL FUNDS) REPLACEMENT VEHICLES-TRANSIT (FY2012) REPLACEMENT VEHICLES-TRANSIT (FY2013) REPLACEMENT VEHICLES-TRANSIT (FY2014) REPLACEMENT VEHICLES-TRANSIT (FY2015) REPLACEMENT VEHICLES-TRANSIT (FY2016) 88,514 195,607 140,000 140,000 140,000 $704,121 125,000 125,000 125,000 125,000 125,000 125,000 $750,000 * DEPENDENT ON FUNDING AND APPLICATION APPROVALS BY MDT *TOTAL FTA SECTION 5309(INCLUDES LOCAL FUNDS) MET TRANSIT ITS(BUS LIVABILITY GRANT) 47,640 *TOTAL FTA SECTION 5316 (INCLUDES LOCAL FUNDS) JARC (OPERATING) 2012 JARC (OPERATING) 2013 JARC (OPERATING) 2014* JARC (OPERATING) 2015* JARC (OPERATING) 2016* $47,640 $ $ $ $ $ 300,000 306,000 $606,000 $ $ $ $ $ 170,000 136,000 $306,000 TOTAL FTA SECTION 5317 (INCLUDES LOCAL FUNDS) NEW FREEDOM (OPERATING) 2012 NEW FREEDOM (OPERATING) 2013 NEW FREEDOM (OPERATING) 2014* NEW FREEDOM (OPERATING) 2015* NEW FREEDOM (OPERATING) 2016* TOTAL *JARC & NEW FREEDOM FUNDING NO LONGER AVAILABLE 201 TOTAL 12 $22,395,762 2012-2016 Billings Transportation Improvement Program (Table 6) - MULTI-YEAR STAGING PROGRAM CALENDAR YEARS 2012-2016 BILLINGS, MONTANA SURFACE TRANSPORTATION PROGRAM BENCH BLVD-NORTH - PHASE I BENCH BLVD-NORTH - PHASE II GRAND AVENUE 32ND STREET WEST 2012 2013 2014 2015 2016 >2016 MACI MT FUNDED BENCH BLVD-NORTH-PHASE I BENCH BLVD-NORTH-PHASE II VARIOUS FUNDED NORTH BY PASS (ENVIRONMENTAL & LOCATION/DESIGN) CTEP PROJECTS (VARIOUS) BENCH BLVD. NORTH-PHASE I ZIMMERMAN TRAIL MDT PREVENTIVE MAINTENANCE (NH ) MDT PREVENTIVE MAINTENANCE (IM) STP URBAN PAVEMENT PRESERVATION(UPP) 2012 SCOUR REMEDIATION I-90 YELLOWSTONE RIVER-BILLINGS 1ST AVENUE SOUTH (RR CIRCUITRY UPGRADE) INTERSECTION-MAIN ST/AIRPORT RD D5 INTERSTATE FENCING Per Project----------------Per Project------------------------------------------------Per Project---------------------------- ***ALL TIME FRAMES ARE APPROXIMATE PRELIMINARY ENGINEERING RIGHT OF WAY/UTILITIES CONSTRUCTION 13 2012-2016 Billings Transportation Improvement Program (Table 7) - HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY 2012 BILLINGS, MONTANA PROJECT DESCRIPTION PHASING STP URBAN (STPU) MT AIR CONGESTION INITIATIVE (MACI) EARMARKS (NCPD,DEMO, MT,TCSP) SURFACE TRANSPORTATION ENHANCEMENT (STPE) CITY NATIONAL HWY HSIP UPP RRP SRTS** SYSTEM (NHS) MDT MACI INT BRIDGE MAINTENANCE TRANSIT SEC 5307 TRANSIT SEC TRANSIT SEC TRANSIT SEC 5309 5310** 5316 (JARC)** TRANSIT 5317 (NEW FREEDOM)** TRANSADE (STATE) $85,000 $50,000 OTHER* TOTAL COUNTY Estimated carryover balance $ 2,802,008 $ 3,076,539 $31,395,229 Estimated allocation $ 2,587,036 $ 2,229,026 $62,898 $493,249 195,006 252,888 368,562 $1,428,517 $ $125,000 Estimated beginning balance $ 5,389,044 $ 5,305,565 $31,458,127 SF099 GRAND-DIVISION 17TH -SIGNAL PE $ 29,000 BENCH BLVD-BILLINGS PHASE II RW 1,567,915 ZIMMERMAN TRAIL PE $ 490,000 MDT-PREVENTATIVE MAINTENANCE - NH*** PE $ 252,888 MDT-URBAN PVMT PRESERVATION (UPP) PE $ 40,000 2012-SCOUR MITIGATION**** PE $ 79,000 ENHANCEMENT PROJECTS-VARIOUS LOCATIONS ALL $493,249 $195,006 (25th STREET PEDESTRIAN BRIDGE) CONST $ 62,898 SAFE ROUTES TO SCHOOL (SRTS)** ALL MDT-MACI EQUIPMENT PURCHASE OTHER $ 220,562 Adjustment-Airport Road RW/IC $ 35,252 Adjustment-Shiloh Road PE $ 16,094 TRANSIT OPERATING(7/2011-6/2012) OPERATING 1,428,517 VEHICLE PURCHASES PURCHASE $125,000 MET SPECIALIZED TRANS-OPERATING OPERATING MET TRANSIT ITS (LIVABILITY GRANT) SOFTWARE PURCH 47,640 TOTAL $ 51,346 $1,567,915 $552,898 $493,249 195,006 $ 252,888 $ 368,562 $1,428,517 $ $125,000 *Local Match For Transit **Dependent on funding & application approvals by MDT ***27th St-1st Ave S to Airport and Exposition Dr & 1st Ave N-Blgs ****Estimate for one location within the MPO planning area 14 $150,000 $150,000 $85,000 $50,000 $150,000 $85,000 $50,000 $2,507,921 $ $ $ $ $ $ $ $ $ $ $ $ $2,352,921 $ $ $155,000 $ $ $2,507,921 $ 29,000 1,567,915 490,000 252,888 40,000 79,000 688,255 62,898 220,562 35,252 16,094 3,781,438 125,000 440,000 47,640 7,875,942 2012-2016 Billings Transportation Improvement Program (Table 8) - HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FY2013 BILLINGS, MONTANA PROJECT DESCRIPTION PHASING STP URBAN (STPU) MT. AIR CONGESTION INITIATIVE (MACI) EARMARKS (NCPD, DEMO, MT) SURFACE TRANSPORTATION ENHANCEMENT (STPE) NATIONAL HWY HSIP/UPP SYSTEM (NHS) RRP SRTS INTERSTATE BRIDGE TRANSIT SEC 5307 TRANSIT SEC 5309 TRANSIT SEC 5310 ** TRANSIT TRANSIT SEC 5316** 5317** $ $ 125,000 $ 153,000 TRANSADE OTHER FUNDS* TOTAL MAINTENANCE (IM) *** Estimated carryover balance Estimated allocation Estimated beginning balance BENCH BLVD-BILLINGS PHASE I BENCH BLVD-BILLINGS PHASE II BILLINGS BYPASS I-90 YELLOWSTONE RIVER-BILLINGS MDT-PREVENTATIVE MAINTENANCE - IM MDT-PREVENTATIVE MAINTENANCE - NH MDT-URBAN PVMT PRES (UPP)*** 2012-SCOUR MITIGATION**** 1ST AVENUE SOUTH(RR Circuitry Upgrade) ENHANCEMENT PROJECTS-VARIOUS LOCATIONS SAFE ROUTES TO SCHOOL (SRTS)** TRANSIT OPERATING (7/2012-6/2013) VEHICLE PURCHASES MET SPECIALIZED TRANS TOTAL CONST IC PE/DESIGN PE PE PE CONST CONST CONST ALL ALL OPERATING PURCHASE OPERATING $ $ $ $ 5,337,698 $ 2,587,036 $ 7,924,734 $ 300,720 $ 3,737,650 $ 1,043,888 4,781,538 $ $ 1,896,672 $ CITY COUNTY $ 493,249 $ 195,006 30,905,229 $ 100,000 $ 5,890,104 $ 1,485,657 - $ 68,000 $ 110,000 $ 2,609,979 30,905,229 4,561,070 5,000,000 $ 3,766,636 $ $ 100,000 $ 1,466,413 $ 520,000 $ 92,055 $ 493,249 $ 195,006 $ 45,000 $ 45,000 $ 2,399,979 $ 1,485,657 $ 125,000 $ 300,720 $ 1,896,672 $ * LOCAL MATCH ** DEPENDENT ON FUNDING & APPLICATION APPROVAL BY MDT 9,561,070 $ 493,249 $ 195,006 $ 100,000 $ 5,890,104 $ 1,485,657 $ *** Montana Ave-Billings and Laurel Road-Billings ****One location in MPO planning area 15 - $ 153,000 $ 68,000 $ 110,000 $ 165,000 $ 125,000 $ 153,000 $ 68,000 $ 110,000 $ 2,609,979 $ 4,861,790 $ 1,896,672 $ 5,000,000 $ 3,766,636 $ $ 100,000 $ 1,466,413 $ 520,000 $ 92,055 $ 688,255 $ 90,000 $ 3,885,636 $ 125,000 $ 496,000 $ 22,988,457 2012-2016 Billings Transportation Improvement Program (Table 9) - HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FISCAL YEAR 2014 BILLINGS, MONTANA PROJECT DESCRIPTION PHASING STP URBAN (STPU) MT. AIR CONGESTION INITIATIVE (MACI) EARMARKS (NCPD, DEMO, MT) SURFACE TRANSPORTATION ENHANCEMENT (STPE) NATIONAL HWY SYSTEM (NHS) STATE HSIP/UPP RRP SRTS BRIDGE MDTMACI TRANSIT SEC 5307 $ 1,937,390 $ $ 74,890 $ 50,000 $ $ 45,000 217,500 TRANSIT SEC 5309 TRANSIT SEC 5310 ** TRANSIT SEC 5316** TRANSIT 5317** TRANSADE OTHER FUNDS* TOTAL INTERSTATE MAINTENANCE Estimated carryover balance Estimated allocation Estimated beginning balance SF099-BILLINGS-GRAND 17TH SIG ZIMMERMAN TRAIL MDT-PREVENTATIVE MAINTENANCE - IM MDT-PREVENTATIVE MAINTENANCE - NH***\ MDT URBAN PAVEMENT PRESERVATION (UPP) ENHANCEMENT PROJECTS-VARIOUS LOCATIONS SAFE ROUTES TO SCHOOL (SRTS)** SIGNAL OPTIMIZATION TRANSIT OPERATING (7/2013-6/2014) VEHICLE PURCHASES MET SPECIALIZED TRANS INTERSECTION-MAIN ST/AIRPORT RD D5 INTERSTATE FENCING TOTAL *LOCAL MATCH FOR TRANSIT $ 7,604,014 $ 2,587,036 $ 10,191,050 $ $ $ 2,884,866 $ 1,043,888 $ 3,928,754 $ CONST RW/IC PE CONST PE ALL ALL OTHER OPERATING PURCHASE OPERATING PE/CONST PE/CONST $ CITY COUNTY 21,344,159 $ $ $ 493,249 $ 195,006 $ 21,344,159 2,263,033 1,478,277 $ - $ 125,000 $ - $ $ 493,249 $ 1,545,083 $ 125,000 **** - $ $ 195,006 $ $ 70,000 100,000 2,163,033 $ - $ 120,000 $ $ $ - 120,000 $ 493,249 $ 195,006 $ 2,263,033 $ $ $ 900,000 650,000 1,937,390 $ 1,545,083 $ **DEPENDENT ON FUNDING AND APPLICATION APPROVALS BY MDT *** 27th St-1st Ave S to Airport and Exposition Dr & 1st Ave N-Blgs ****5316 &5317 funding no longer available (2014) 16 - $ 125,000 $ - $ **** $ 70,000 $ - $ 70,000 $ 2,517,979 $ $ $ $ $ $ $ $ 2,447,979 $ $ 70,000 $ $ $ 2,517,979 $ 74,890 120,000 100,000 2,163,033 50,000 688,255 45,000 217,500 3,993,062 125,000 140,000 900,000 650,000 9,266,740 2012-2016 Billings Transportation Improvement Program (Table 10) - HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FISCAL YEAR 2015 BILLINGS, MONTANA PROJECT DESCRIPTION PHASING STP URBAN (STPU) MT. AIR CONGESTION INITIATIVE (MACI) EARMARKS (MT, NCPD SURFACE TRANSPORTATION ENHANCEMENT (STPE) DEMO) CITY Estimated carryover balance $ 10,191,050 $ Estimated allocation $ 2,587,036 $ 1,043,888 Estimated beginning balance $ 12,778,086 $ 4,972,642 ZIMMERMAN TRAIL CONST BENCH BLVD-BILLINGS PHASE II CONST 3,928,754 $ 21,224,129 $ 21,224,129 $ 5,390,000 $ 493,249 NATIONAL HWY SYSTEM (NHS) INTERSTATE MAINTENANCE (IM) HSIP UPP TRANSIT SEC 5307 TRANSIT RRP SRTS SECTION BRIDGE 5309 T TRANSIT RSEC 5310** A N S I TRANSIT SEC 5316** TRANSIT SEC 5317** $ $ TRANSADE OTHER FUNDS* TOTAL COUNTY $ 195,006 $ 1,600,000 $ 1,537,408 $ 125,000 - - $ 70,000 $ 2,611,939 $ 12,462,601 $ 5,390,000 $ 12,462,601 MDT-PREVENTATIVE MAINTENANCE - IM PE/CONST $ 1,500,000 $ 1,500,000 MDT-PREVENTATIVE MAINTENANCE - NH PE $ 100,000 $ 100,000 MDT-URBAN PAVEMENT PRESERVATION (UPP) CONST ENHANCEMENT PROJECTS-VARIOUS LOCATIONS ALL SAFE ROUTES TO SCHOOL (SRTS)** ALL $ $ 493,249 $ - $ 195,006 $ $ TRANSIT OPERATING (7/2014-6/2015) 50,000 $ 1,606,886 REPLACEMENT VEHICLES $ TOTAL **** $ 12,462,601 $ - $ 5,390,000 $ 493,249 $ 195,006 $ 1,600,000 $ 17 50,000 $ 1,606,886 $ - $ $ 45,000 $ 95,000 $ 2,496,939 $ 4,103,825 $ 125,000 $ 70,000 $ 140,000 2,611,939 $ 24,604,681 125,000 MET SPECIALIZED TRANS.-OPERATING 125,000 $ - **** $ $ - $ 70,000 688,255 70,000 $ 2012-2016 Billings Transportation Improvement Program (Table 11) - HIGHWAY/TRANSIT MULTI-YEAR IMPROVEMENT PROGRAM FISCAL YEAR 2016 BILLINGS, MONTANA PROJECT DESCRIPTION PHASING STP URBAN (STPU) MT. AIR CONGESTION INITIATIVE (MACI) EARMARKS (MT, NCPD,DEMO) SURFACE TRANSPORTATION ENHANCEMENT (STE) NATIONAL HWY SYSTEM (NHS) INT MAINTENANCE (IM) CITY COUNTY Estimated carryover balance $ 315,485 $ 4,972,642 $ 15,834,159 Estimated allocation $ 2,587,036 $ 1,043,888 $ $ 493,249 $ 195,006 $ Estimated beginning balance $ 2,902,521 $ 6,016,530 $ 15,834,159 MDT-PREVENTATIVE MAINTENANCE - IM PE/CONST $ MDT-PREVENTATIVE MAINTENANCE - NH PE/CONST $ MDT-URBAN PVMT PRES (UPP) CONST ENHANCEMENT PROJECTS-VARIOUS LOCATIONS ALL $ 493,249 $ 195,006 SAFE ROUTES TO SCHOOL (SRTS) ALL TRANSIT OPERATING (7/16-6/17) Operating VEHICLE REPLACEMENTS** Purchase MET SPECIALIZED TRANS.-OPERATING** Operating TOTAL $ $ $ $ 493,249 $ 195,006 $ *Local Match for Transit **Dependent on Funding & Application Approvals by MDT **** 5316 & 5317 funding no longer available (2016) 18 1,000,000 HSIP UPP RRP SRTS** BRIDGE TRANSIT SEC 5307 $ 1,050,000 $ 1,671,162 TRANSIT SEC 5309 $ - TRANSIT SEC 5310** TRANSIT SEC 5316** $ 125,000 TRANSIT SEC 5317** 0 0 $ TRANSADE OTHER FUNDS* 70,000 $ 1,000,000 $ 1,000,000 $ 50,000 $ 1,671,162 $ $ 125,000 1,000,000 $ 1,050,000 $ 1,671,162 $ - $ 125,000 $ **** $ **** $ $ 70,000 $ 70,000 $ TOTAL 2,616,878 $ $ $ $ $ 2,546,878 $ $ 70,000 $ 2,616,878 $ 1,000,000 1,000,000 688,255 50,000 4,218,040 125,000 140,000 7,221,295 2012-2016 Billings Transportation Improvement Program PROJECT/PHASE SF099 GRAND-DIVISION 17TH-SIGNAL (PE) BENCH BLVD-BILLINGS PHASE II (RW) ZIMMERMAN TRAIL (PE) MDT-PREVENTIVE MAINTENANCE (NH) (PE) MDT-URBAN PVMT PRESERVATION(UPP) (PE) 2012 SCOUR MITIGATION (PE) CTEP PROJECTS (PE, RW, IC, CONST) MDT-MACI EQUIPMENT PURCHASE (PURCHASE) BENCH BLVD-BILLINGS PHASE I (CONST) BENCH BLVD-BILLINGS PHASE I (CONST) BENCH BLVD-BILLINGS PHASE II (IC) BILLINGS BYPASS (PE-DESIGN) I-90 YELLOWSTONE RIVER-BILLINGS (PE) MDT-PREVENTIVE MAINTENANCE (NH) (PE/CONST.) MDT-URBAN PVMT PRESERVATION(UPP) (CONST) 2012-SCOUR MITIGATION (CONST) 1ST AVENUE SOUTH (CONST) OPERATION AND MAINTENANCE - STATE (PE/CONST.) OPERATION AND MAINTENANCE - LOCAL (PE/CONST.) (Table 12) - BIENNIAL ELEMENT OCTOBER 1, 2011 - SEPTEMBER 30, 2013 (HIGHWAY) BILLINGS, MONTANA PROJECT NUMBER FEDERAL NON-FEDERAL FUNDS AND PROJECT TOTAL SOURCES DESCRIPTION ESTIMATED FUNDS HSIP 1004 CM 1036( ) MT 1001 NH UPP 1020(20) & 1020(18) BH STPE VARIOUS CM STWD(110) UPGRADE/SIGNAL UPGRADE/SIGNAL RECONSTRUCTION 29,000 1,567,915 ADD CLIMBING LN STRAIGHTEN CRVE MAINTENANCE MAINTENANCE PAVEMENT PRESERVATION REMEDIATION 490,000 252,888 40,000 79,000 MT 1036( ) SWEEPER PURCHASE RECONSTRUCTION 4,561,070 MT-STPU 1036( ) RECONSTRUCTION 300,720 CM 1036( ) RECONSTRUCTION 1,896,672 MT NEW CONST. 5,000,000 BR 90- 3,766,636 NH VARIOUS STRUCTURES STRUCTURES MAINTENANCE UPP 1020(20)&1020(18) BH MAINTENANCE PAVEMENT PRESERVATION REMEDIATION 220,562 100,000 1,466,413 520,000 N/A RR CIRCUITRY UPGRADE OP./MAINT. 446,000 N/A OP./MAINT. 225,000 STPRP 1022(7) 92,055 19 25,108 FHWA 1,357,501 3,892 STATE MATCH 210,414 FHWA 424,242 FHWA 227,599 FHWA 34,632 FHWA 72,080 FHWA STATE MATCH 65,758 LOCAL MATCH 25,289 STATE MATCH 5,368 STATE MATCH 6,920 STATE MATCH FHWA 190,963 FHWA 3,948,974 FHWA 260,363 FHWA 1,642,139 FHWA 4,329,000 FHWA 3,389,972 FHWA 90,000 LOCAL MATCH 29,599 LOCAL MATCH 612,096 STATE MATCH 40,357 STATE MATCH 254,533 STATE MATCH 671,000 STATE MATCH 376,664 STATE MATCH 10,000 FHWA 1,269,620 FHWA 450,216 FHWA 82,850 FHWA 0 FHWA 0 FHWA STATE MATCH 196,793 STATE MATCH 69784 STATE MATCH 9206 STATE MATCH 446,000 STATE 225,000 LOCAL RECIPIENT OF FUNDS RESPONSIBLE IMPLEMENTING MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT MDT 2012-2016 Billings Transportation Improvement Program (Table 13) - BIENNIAL ELEMENT JULY 1, 2012-JUNE 30, 2014 (TRANSIT) BILLINGS MONTANA PROJECT/FUNDING SOURCE TOTAL EST COST FEDERAL FUNDS AND SOURCES NON-FEDERAL FUNDS AND SOURCES RECIPIENT OF FUNDS RESPONSIBLE IMPLEMENTING AGENCY FTA SECTION 5307 OPERATING PROJECT (7-1-11 TO 6-30-12) 3,781,438 1,428,517 2,352,921 CITY CITY OPERATING PROJECT (7-1-12 TO 6-30-13) 3,885,636 1,485,657 2,399,979 CITY CITY 47,640 38,112 9,528 MDT CITY REPLACEMENT VEHICLES(2012) 125,000 100,000 25,000 STATE VARIOUS LOCAL REPLACEMENT VEHICLES (2013) 125,000 100,000 25,000 STATE VARIOUS LOCAL MET SPECIALIZED TRANSIT OPERATING-2012 200,000 100,000 100,000 CITY CITY MET SPECIALIZED TRANSIT OPERATING-2013 220,000 110,000 110,000 CITY CITY JARC OPERATING-2012 150,000 75,000 75,000 CITY CITY JARC OPERATING-2013 153,000 76,500 76,500 CITY CITY OPERATING-2012 170,000 85,000 85,000 CITY CITY OPERATING-2013 *Dependent on Funding & Application Approvals by MDT 136,000 68,000 68,000 CITY CITY FTA SECTION 5309 MET TRANSIT ITS (LIVABILITY GRANT FTA SECTION 5310* TRANSADE* FTA SECTION 5316* FTA SECTION 5317* 20 CITY COUNCIL WORK SESSION AGENDA ITEM CITY OF BILLINGS, MONTANA Monday, August 20, 2012 TITLE: 2009 Transportation Plan Amendment DEPARTMENT: Planning & Community Services Department PRESENTED BY: Lora Mattox, ACIP, Transportation Planner PROBLEM/ISSUE STATEMENT: In June of 2010, the Policy Coordinating Committee approved an update to the Billings Urban Area Long-Range Transportation Plan. Identified in this plan was the Billings Bypass Project that constructs a 2-lane highway from approximately the I-90/I-94 interchange to Highway 312. This construction includes a new Yellowstone River crossing. At the time of plan approval, the estimated cost of the bypass was $63 million. The current cost of the project is estimated to be $89.5 million. With the increased cost and the need to fiscally constrain the project, additional funding needs to be identified. An amendment to the Transportation Plan is needed to show the updated cost of the Billings Bypass project as well as the redirection of all Surface Transportation Program (Urban Funds) and Montana Air & Congestion Program (MACI) funding from 2015 to 2020 to fiscally constrain the project. The future redirection of all Urban and MACI funds will impact other long and short term projects identified in the Transportation Plan now and in the future. The funding sources of long and short range transportation projects currently allocated with Urban and MACI dollars will be redirected to the Billings Bypass project and therefore could delay construction of these projects. Further, consideration of new projects not yet identified also could be affected by allocation of Urban and MACI dollars to complete the Billings Bypass project. The City Council may recommend to the Policy Coordinating Committee to redirect future Urban and MACI funding to fiscally constrain the Billings Bypass project which would require the Billings Urban Area Transportation Plan amendment or the Council may recommend a “no build” of the project and not commit local funding through 2020. FINANCIAL IMPACT: There may be significant financial impacts to other identified short and long term transportation projects during the time frame of obtaining the necessary financing for the Billings Bypass. The future redirection of all Surface Transportation Program (Urban Funds) and Montana Air & Congestion Program (MACI) dollars towards the bypass project until approximately the year 2020 could delay construction of other identified transportation projects. RECOMMENDATION No action is necessary on this item at this time. Formal action on The 2009 Transportation Plan Amendment will be presented at the August 27, 2012 City Council meeting. BACKGROUND The Billings Bypass project has evolved over the course of more than 10 years from a larger project of national significance for transportation infrastructure to a project to provide an additional river crossing and access in and out of the Billings Heights area and the potential to redirect some truck traffic around downtown Billings. The Billings North Bypass Feasibility Study, completed in 2001, investigated a bypass in the Billings area as part of the Camino-Real International trade corridor connecting Canada to Mexico. The study used a five-mile wide corridor north of Billings in order to assess the feasibility of a bypass route connecting the I90/94 interchange area east of Billings with N-53 (MT 3) west of Billings. This study area was selected by a consultant team and approved by the project steering committee. The study concluded that a bypass was feasible from an economic and engineering perspective, and should be advanced for environmental analysis and refinement. MDT in cooperation with the FHWA initiated the preparation of an EIS for a proposed bypass route north of Billings. The proposed project involved the development of a bypass route connecting the I-90/94 interchange area east of Billings with MT 3 northwest of Billings. Subsequently, the project team completed scoping, developed preliminary alternatives, and met with the general public twice to provide opportunities for input. In 2010, due to concerns from several land owners about the long-term plan to create a road corridor across private property between Highway 87 and Highway 3, and due to Federal requirements to fiscally constrain projects, the Policy Coordinating Committee decided to truncate the project and move forward with a local road connection between the I-90/94 interchange area east of Billings and Highway 312 in the Billings Heights. Funding The project initially received $21 million in earmark dollars and approximately $3 million has been spent to complete the Environmental Impact Statement (EIS). The remaining $18 million is dedicated towards engineering, right-of-way acquisition and construction. The Federal Highway Administration (FHA) and the Montana Department of Transportation (MDT) is requesting a firm decision of commitment from the Metropolitan Planning Organization (MPO) for the completion of this project. It is currently estimated that approximately $89.5 million is needed to construct the entire project. Due to FHA’s need for a fiscally constrained project (all funding in place), additional funds need to be identified and allocated prior to construction. Working with MDT, it has been determined that a redirection of allocations of Surface Transportation Program (Urban Funds) and Montana Air & Congestion Initiative Guaranteed Program (MACI) from 2015 to until approximately the year 2020 may fiscally constrain the project. The break-down of funding is as follows to fiscally constrain the project using Urban and MACI funds: $18,000,000 (Remaining Secured Earmarks) $46,500,000 (National Highway, Interstate Maintenance, Highway Bridge Funds) $25,000,000 (Urban, MACI, Local funding)* $89,500,000 Total** * $2.6 million annual Urban Fund allocation, $1.0 million annual MACI allocation – local commitment of funding through 2020 after funding Bench Boulevard Phase II project (2014). Page 2 of 14 ** This funding summary does not account for the possibility of funds from grants or other sources that could develop in the future for the community. This funding summary addresses only known funding sources that are expected to exist into the future. TECHNICAL ADVISORY COMMITTEE RECOMMENDATION On August 14, 2012 the Technical Advisory Committee (TAC) met to discuss the Transportation Plan Amendment. Discussion centered around two main points. The first was from County staff and MDT in regards to the loss of Federal Earmark dollars and dollars committed by MDT if the bypass project wasn’t locally supported. A record of decision must be made by the MPO to move the project forward. Without local support, the earmark dollars could be allocated to a different local project if requested by the MPO and if approved by Congressional action. MDT stated that with the local commitment, physical construction of the project could begin in 2017 with completion in 2022. The second point was a concern from City staff in regards to the re-direction of all Urban and MACI dollars for the period of 2015 through 2020. Although currently there have not been any long or short range transportation projects identified in the Transportation Improvement Plan for Urban and MACI funding after the Bench Boulevard Phase II project (funding complete in 2014), city staff has identified projects that could be a priority for the community after 2014 and would be delayed due to the re-direction of funding. The projects mentioned were: 1. Rimrock Road – Clearview Drive to Ironwood Drive 2. Inner Belt Loop Phase II – Alkali Creek to Zimmerman Trail 3. 6th/Main/Bench Intersection After discussion a motion was made and approved on a 6-4 decision. The motion read: “Recommend to the Policy Coordinating Committee that a minimum of 50% of the MACI and Urban Funds will go to other local projects and the rest to the Billings Bypass project.” At this time, staff is unclear of the ramifications of reducing the Urban and MACI dollars to 50% allocation to the North Bypass project. This reduction of funds would delay the project and could jeopardize the MDT funding commitment as well as potentially increasing overall cost of the project. Staff will work with MDT to determine the impact of this reduction in funds to the bypass project. PLANNING BOARD The Planning Board met on August 14, 2012 to receive information regarding the Transportation Plan Amendment due to the North Bypass project. This was only an information/discussion meeting and no recommendation was made at this meeting. The Planning Board discussed the TAC recommendation and also speculated on what kind of schedule might be developed based on the 50/50 funding split between local projects and the bypass for completion of all projects. The Planning Board will conduct a public hearing at its August 28th meeting to receive public testimony regarding this amendment and make a recommendation to the PCC. Attachment A: Transportation Plan Amendment Amendments include: Page 3 of 14 Table 4.2 – Long Range Transportation Projects Table 4.3 – Long Term Potential Funding Sources Table 4.5 – Short Range Transportation Projects Table 10.4 – Levels Estimated Federal and State Revenues Table 10.5 – Summary of Funding Opportunities Page 4 of 14 Attachment A: Transportation Plan Amendments Table 4.2 Long-Range Plan Project Table (Fiscally Constrained) Priority Rank Project Description Project Type Estimated Cost Potential Funding Sources Reconstruction $1,689,497 8 New Construction $8,078,000 2, 8, 5 Non-intersection Projects NR Lake Elmo Drive – Hansen to Wicks Lane Intersection improvements and multi-use facilities added NR 6th Avenue North/Bench Blvd – Phase I New construction of nonexisting segment/bridge MDT 6th Reconstruction $18,475,000 2, 8, 5 Avenue North/Bench Boulevard – Phase II Preliminary Design Reconstruct to 4-lane (divided with auxiliary lanes at interchange), new signals NR Bench Boulevard North Phase I – Lincoln Lane to Hilltop Road ROW – Construction 2013 Phase I – Reconstruction to 3 lanes (two-way left-turn lane) Reconstruction $7,863,000 1, 2, 8, 5 NR Bench Boulevard North Phase II – Hilltop Road to Highway 87 When fully funded - 2016 Reconstruction to 3 lanes (two-way left-turn lane) Reconstruction $14,927,000 1, 2, 8, 5 NR Rimrock Road – 17th Street West to Forsythia Widen for capacity & safety Reconstruction $4,500,000 1, 5, 8 Reconstruction $9,200,000 1, 5, 8, 10 NR Grand Ave – MDT safety 17th Street West to 24th Street West Capacity Improvements 17th/19th 1 32nd Street West Next Arterial Project - Design Widen from King Avenue West to Gable Road Reconstruction $4,000,000 8, 9, 10 2 Central Avenue – BBWA Canal to 48th Street West Arterial project after 32nd Street West Widen for capacity & safety Reconstruction $7,300,000 1, 5, 8, 9, 10 3 Grand Avenue – Rehberg Lane to Shiloh Road Widen for capacity & safety Reconstruction $3,600,000 1, 8, 9, 10 Prelim Design, mostly dev. driven, not priority 4 Rimrock Road – Clear View Drive to 54th Street West Widen for capacity & safety Reconstruction $5,100,000 1, 8 5 Rimrock Road – Forsythia to Shiloh Widen for capacity & safety Reconstruction $3,000,000 1, 5, 8 Widen for capacity & safety Reconstruction $2,600,000 8 Widen for capacity & safety Reconstruction $1,500,000 8, 10 Design phase – construction 2013 5 Pemberton Road – BBWA to Lake Elmo Drive Long range – not programmed 6 Wicks Lane – Governors Boulevard to High Sierra (part of Inner Belt Loop) 5 Priority Rank 7 Project 1st Ave South – 21st Street to N 13th Street Description Project Type Estimated Cost Potential Funding Sources Widen for capacity & safety Reconstruction $750,000 1, 15 Reconstruction $5,100,000 1, 8 Overlay $6,800,000 4 Slope flatten, guardrail $7,244,100 4 Long range – not programmed Co Old Hardin Road – Lockwood Interchange to Johnson Lane Widen to 3 lanes MDT Pinehills Interchange S.E. Overlay MDT Mossmain Intch-East Slope flattening, guardrail * Zimmerman Trail Add climbing lane for portion of roadway and straighten curve Reconstruction $7,000,000 5 Intersection Capacity & Safety Improvements Reconstruction $4,200,000 1, 8, 10 New highway construction from I90/I94 to Highway 312 New construction $63,000,000 8,9,15,19 $89,000,000 8,9,5,1,2,6,4,11 Intersection Projects 1 North 27th Street/Rimrock Road New Links 1 Billings Bypass 1 Inner Belt Loop ROW/preliminary design 2-lanes from Wicks Lane at High Sierra to Zimmerman Trail with future capacity added as development occurs New construction $14,000,000 8, 10 1 Montana Avenue – North 18th Street to Main Street; 1st North Couplet Improvement to capacity, flow and safety New construction $5,500,000 6, 7, 8, 10 2 36th Street West – Mt. Rushmore to Central Avenue New construction of nonexistent segment New construction $750,000 Co Old Hardin Road – Johnson Lane to Becraft New connection south of existing to eliminate “double intersection” New construction $2,500,000 8, 9 8 $208,676,597 Total $201,265,000 Source: City/County Planning Department, Montana Department of Transportation. Notes: “NR” = Not rated because project is underway; “MDT” = Montana Department of Transportation project; “Co” = Yellowstone County project; “*” = this project is contingent on receipt of congressionally allocated funds. 6 Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional or other Federal actions. Federal program funding availability may impact the scheduling of projects. Funding beyond 2010 will be subject to the obligation limitation set by the annual appropriations process. 7 Table 4.3 Long-Term Potential Funding Sources Index Funding Source 1 STPU – Surface Transportation Program – Urban Funds 2 MACI – Montana Air & Congestion Initiative Guaranteed Program 3 STPS – Surface Transportation Program – Secondary Funds 4 IM – Interstate Maintenance Funds 5 Congressionally Directed Funds (Earmarks) 6 NHS – National Highway System Funds 7 RRX – Highway-Rail Crossing Program 8 State Fuel Tax Funds – City and County 9 Developer Construction 10 Arterial Fee 11 HBRRP – Highway Bridge Replacement and Rehabilitation Program Source: City/County Planning Department, Montana Department of Transportation. Table 4.4 Short-Term and TSM Potential Funding Sources Index Funding Source 1 STPU– Surface Transportation Program – Urban Funds 2 MACI– Montana Air & Congestion Initiative Guaranteed Program 3 MDT Discretionary– Air & Congestion Program 4 CTEP– Community Transportation Enhancement Program 5 IM – Interstate Maintenance Funds 6 HSIP – Highway Safety Improvement Program 7 NHS – National Highway System Funds 8 RRX – Highway Rail Crossing 9 State Fuel Tax Funds – City and County 10 Arterial Fee 11 UPP – Urban Pavement Preservation Source: City/County Planning Department, Montana Department of Transportation. Note: Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional or other Federal actions. Federal program funding availability may impact the scheduling of projects. Funding beyond 2010 will be subject to the obligation limitation set by the annual appropriations process. 8 Table 4.5 Short-Range Projects (Intersection Projects) Priority Rank Project Description Project Type Estimated Cost Potential Funding Sources Reconstruction $759,400 6,9 Signals $225,000 2,9, 10 NR 13th Street West/Parkhill Drive Reconstruct to eliminate “jog” NR Citywide Signal Priority Program* Biennial new signal installation program 1 Main Street/6th Avenue North Striping on SB approach to improve right-turn capacity and geometry Reconstruction, striping $50,000 1,2,3,7,9, 10 2 Main Street/Hilltop Road Intersection Capacity Improvements Reconstruction $500,000 1,2,3,7,9, 10 3 Hilltop Road/Nutter Boulevard Reconstruction, signs, and markings Reconstruction, signs $13,500 1,9, 10 4 North 18th Street/1st Avenue North Improve turn radius for NB to EB turns Reconstruction $100,000 1,6,9, 10 5 South 27th Street/I-90 EB Ramps Reconstruction, signs, and markings Reconstruction, signs $15,300 5,7,9, 10 Study $12,000 6,9 Reconstruction $200,000 1,9, 10 Avenue/8th 6 Lewis Street West Study alternatives to signalization Co Blue Creek Road, South of Jellison Intersection auxiliary lanes Co Highway 312/Dover-Bitterroot Drive Reconstruction Reconstruction, signs $18,000 1,9 Co Highway 87E/North Frontage Road Reconstruction Reconstruction, signs $177,500 7,9 MDT Signal Frontage Road & Zoo Drive Signal Signal $834,000 6 MDT State Avenue – 1st Avenue South to 27th Street Restripe to 3 lanes Striping $695,000 6 MDT Hardin Road/Lockwood 4-way stop islands Intersection modifications $102,000 6 MDT I-90 Lockwood interchange Ramp modifications $143,000 6 MDT Signal-N Frontage Road Intersection upgrade, signal Signal $787,000 6 MDT Billings-Grand-17th Signal Intersection upgrade, signal Signal $120,000 6 Total $4,751,700 $2,403,300 Source: City/County Planning Department, Montana Department of Transportation. Notes: “NR” = Not rated because project is underway; “MDT” = Montana Department of Transportation project; “Co” = Yellowstone County project. 9 Table 4.6 Priority Rank Short-Range Projects (Non-intersection Projects and New Links) Project Description 1 King Avenue West – 20th to 32nd Street West Provide coordinated signal system for corridor 2 Main Street – 1st Ave N to Wicks Lane Signal Timing & Coordination – to be completed AFTER Bench Blvd is extended to Hilltop Rd 3 Lake Elmo Drive – Robertson to Rolling Hills 4 Project Type Potential Funding Sources $430,000 1,2,3,9 Signal System $100,000 1,2,3,6,7,9 Widen for capacity & safety Widen, reconstruction $750,000 2,4,9 North 13th Street – 1st Avenue North to 4th Avenue North Reconfigure to 3 lanes, remove parking, signs, signals Reconstruction, signal $50,000 1,9,10 5 Wicks Lane – Main Street to Bench Boulevard Traffic study Traffic study $15,000 1 6 19th Street West – Central Avenue to Grand Avenue Restripe and add bike lanes TSM $100,000 2,4,9 7 24th Street West – King Avenue West to Grand Avenue Access management plan Signal System $400,000 1,2,9, 10 8 Division Street – Grand Avenue to Montana Avenue Capacity Improvements Signal System $300,000 1,2,6,9, 10 8 Grand Ave – Division Street to 24th Street West Capacity Improvements Signal System $634,000 1,2,6,9, 10 Capacity Improvements Signal System $200,000 1,2,9, 10 24th Signal System Estimated Cost 8 Broadwater Avenue – Division Street to Street West 8 Central Avenue – 6th Street West to Stewart Park Road Capacity Improvements Signal System $350,000 1,2,9, 10 8 15th Street West – Central Avenue to Grand Avenue Capacity Improvements Signal System $200,000 2,9, 10 8 1st Avenue South – State Avenue to Minnesota Avenue Capacity Improvements Signal system $200,000 1,2,9, 10 10 Priority Rank Project Description Project Type Estimated Cost Potential Funding Sources NR Citywide Sidewalk Installation Annual construction program New construction $300,000 2,4,9 NR Citywide ADA Ramp Installation Annual retrofit program – various locations New Construction $500,000 9, 10 MDT Billings-North Pavement Preservation MDT Railroad Crossing – MDT 1st Avenue South – Billings Overlay, S&C $2,700,000 7 Circuitry upgrade Circuitry upgrade $113,000 8 Railroad Crossing – Hesper Road Circuitry upgrade Signals $156,000 8 MDT Flasher/Guardrail – South Billings Flasher/guardrail Safety $166,000 6 MDT SF079 Billings District Spot Safety Improvements Miscellaneous $23,000 6 MDT Grand-Division to 8th – Billings Pavement preservation Mill, overlay $533,000 5 Total $8,220,000 Source: City/County Planning Department, Montana Department of Transportation. Notes: “NR” = Not rated because project is underway; “MDT” = Montana Department of Transportation project; “Co” = Yellowstone County project 11 Federal/State Funding SAFETEA-LU was signed into law in August 2005 replacing Transportation Equity Act for the 21st Century (TEA-21) of 1998. SAFETEA-LU and the Surface Transportation Extension Acts of 2009 include the continuation of many successful TEA-21 and ISTEA programs. SAFETEALU included approximately $244 billion over the six-year authorization period. Congress is currently considering a re-authorization. As the impacts of re-authorization cannot be determined at this time, Federal funding estimates in this plan based on continuance of SAFETEA-LU programs in the Surface Transportation Extension Acts of 2010. Montana has received an average apportionment of about $355 million per year for highways over the six-year SAFETEA-LU period. MDT has estimated the amounts of Federal/state funding that are anticipated to be available for transportation improvements in the Billings Urban Area during the timeframe of this plan based on current funding levels. Billings has had a favorable history receiving federal earmarks. The funding package for the Billings Bypass project includes earmarks, IM, NH, HBRRP, STP-Urban, MACI and local funding sources. To ensure a complete funding package for the Billings Bypass project, the MPO will continue to seek funding and prioritize Surface Transportation Program Urban (STPU) and MACI funds over the next several years until the project is constructed. These estimates are detailed in Table 10.4. Table 10.4 Levels Estimated Federal and State Revenue Carryover (from 2009) Annual Allocation (STPU, CMAQ, STPE) Estimated 20Year Allocation Total Available Surface Transportation Program (Urban) – STPU -$1,459,630 $2,587,036 $51,740,720 $50,281,090 MDT MACI Guaranteed Program (CMAQ) $1,937,149 $835,170 $16,703,400 $18,640,549 N/A N/A $2,600,000 $2,600,000 $16,000,000 $16,000,000 $14,100,000 $14,100,000 $21,000,000 $21,000,000 Funding Source National Highway System Interstate Maintenance STP Enhancements STPE(City & County) N/A N/A $446,897 $628,270 $12,565,400 $13,012,297 Highway Bridge Replacement/Rehabilitation N/A N/A $0 $0 $3,000,000 $3,000,000 Highway Safety Program N/A N/A $3,400,000 $3,400,000 Earmarks (All Categories) $40,978,959 $6,800,000 $68,000,000 $108,978,959 Total $41,903,375 $10,850,476 $169,109,520 $211,012,895 $192,409,520 $234,312,895 Source: Montana Department of Transportation. Notes: The earmark annual allocation is based on earmarks received for the period 2000 to 2009, less rescinded amounts and obligation limitation. This can only be used for the first 10 years of the plan. Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional or other Federal actions. Federal program funding availability may impact the scheduling of projects. Funding beyond 2010 will be subject to the obligation limitation set by the annual appropriations process. 13 Summary of Funding Opportunities/Constraints The total funding opportunities available for this fiscally constrained plan and the candidate list of transportation system (highway, bike, and pedestrian) capital projects is summarized in Table 10.5. Table 10.5 Summary of Funding Opportunities Funding Source Average Annual Funding 20-Year Estimated Funding $10,850,476 $169,109,520 Federal and State Funding $192,409,520 City and County Funding Total $5,600,000 $112,000,000 $16,450,476 $281,109,520 $304,409,520 Source: City/County Planning, Montana Department of Transportation. Note: Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional or other Federal actions. Federal program funding availability may impact the scheduling of projects. Funding beyond 2010 will be subject to the obligation limitation set by the annual appropriations process. This total does not include potential developer contributions that may be available for various transportation system improvements. Projects which are expected to receive developer contributions for design and/or construction have been identified, and project costs for those elements have been reduced by 25 percent to recognize this potential contribution. Further, it should be emphasized that other funding sources are possible, typically as discretionary grants that must be applied for, but the above listed sources reflect the most probably sources for typical projects at this time. 14 Other Items CITY CODE ENFORCEMENT MONTHLY REPORT Month of July 2012 Violation Building Code Clear Vision Commercial General Zoning Graffiti Junk Vehicles Miscellaneous Nuisance Open Storage of Junk & Salvage RV & Trailers Signs Snow & Ice on Sidewalks Weeds Total for Month Received Heights & Southside Central & West End 1 5 6 2 6 33 1 13 44 35 146 Commercial Areas 1 3 2 4 1 10 13 2 10 27 1 3 1 87 159 6 Citations Issued No Code Violations or Unable to Locate Violation Building Code Clear Vision Commercial General Zoning Graffiti Junk Vehicles Miscellaneous Nuisance Open Storage of Junk & Salvage RV & Trailers Signs Snow & Ice on Sidewalks Weeds Year to Date Central & West End 2 29 16 6 12 76 107 5 117 244 28 338 980 Year To Date Heights & Southside Commercial Areas 1 17 5 7 5 30 18 1 2 1 70 1 85 12 15 7 99 15 166 2 1 21 43 1 301 1 811 116 Total Central & West End 2 8 9 4 2 16 46 3 26 72 1 0 122 311 2 2 3 1 10 19 1 26 44 66 174 0 0 Total Jan-July 2011 20 41 51 25 15 147 204 27 231 412 22 72 640 1907 38 30 28 53 86 374 82 170 276 423 40 94 832 2526 Resolved Heights & Southside Commercial Areas Total 0 3 5 2 4 4 7 1 2 10 20 17 36 2 3 21 47 25 69 1 1 0 111 177 197 0 371 MEMORANDUM Date: July 31, 2012 To: Community Development Board Candi Beaudry, Planning & Community Services Director From: Brenda Beckett, Community Development (CD) Manager Denise Bohlman, CD Administrative Support Dina Billington-Harmon, CD Program Coordinator Lynda Woods, CD Program Coordinator Tam Rodier, Seasonal CD Program Coordinator Re: Monthly Report for July - Community Development Division CORE PROGRAMS First Time Home Buyer Program: Staff has fully committed and expended all available funds for fiscal year 2011-2012. A total of 21 households were served in this program and 171 households are on the waiting list to purchase their first home. Home Repair Programs: FY2012-2013 Home Repair Programs: Staff has decided to place the home repair programs on hold until August 1, 2012 in order to allow for budget approval and program development. Housing Rehab: Funding is 90% committed. Three projects are in construction. Minor Home Repair: Funding is 100% committed. Funds 100% expended. All projects completed. Six homeowners are on the waiting list for funding, and these homeowners will be referred to either the Housing Rehab or new Manufactured Home Repair program as of August 1. Affordable Housing Development Program: Kings Green Subdivision, 3rd Filing, Phase IV (Please refer to recent monthly reports for previous work completed): RED anticipates they will begin construction on the first home soon. Homeword’s CHDO Project: Homeword is researching the possibility of a project with Housing Authority of Billings. Homeword would be the developer of the project on land owned by the Housing Authority. The two organizations are currently working out an agreement between the two of them. 1 PARTNERSHIPS Billings Partners for American Indian Homeownership / Affordable Housing Task Force: The Billings Partners met on July 17th and discussed holding an education luncheon at Indian Health Services the end of September/beginning of October. Mayor’s Committee on Homelessness: The Mayor’s Committee met July 12, 2012. Agenda items included a presentation by HRDC on their service array, review of a draft Status of Homelessness report, and a report on the 2012 Montana Housing Partnership conference. Local Continuum of Care (CoC): The local CoC met July 18, 2012 to discuss the release of the Homeless Emergency Assistance and Rapid Transition to Housing Act (HEARTH Act). The HEARTH Act will impact Continuum of Care funding and the statewide process of allocation of federal funds to homeless services. The local continuum discussed structuring priorities that our community would like to see implemented on a state leve.. SPECIAL PROJECTS Neighborhood Stabilization Program (NSP): Staff is working with a few different applicants to get preapproval letters to purchase the Lynn home. An offer was accepted on 648 Conway, a vacant, foreclosed 4-bedroom home located in the Heights. Staff is working through the acquisition process and the close is slated for August 30, 2012. HOME Monitoring: Monitoring continues for the Mental Health Center, Irma House and other HOME projects. Fair Housing Initiative Program (FHIP) Grant: Highlights for the project year include: Support and fair housing education made available to four organizations with an interest in affirmatively furthering fair housing, equal opportunity and housing choice in Billings. These organizations have developed their own fair housing materials and have championed efforts to ensure clients know about their rights! The grant made possible the delivery of specialized fair housing education to several special needs populations, including the disabled; those in recovery from drug/alcohol addiction and those who have been diagnosed with HIV/AIDS. A total of 516 training events were held and 2,779 people received fair housing information! Six newsletters were distributed and 7,839 people received fair housing educational information through both electronic and snail mail. The City of Billings citizens now have access to 37 fair housing educational materials and a total of 10,428 people have received this information! A total of 21,046 people were reached with fair housing information during the project year. This is roughly a quarter of the population in Billings! Billings Metro VISTA Project (MVP): The City has a total of ten VISTA members currently working to impact poverty in Billings. 2 MEMO To: Mayor and City Council CC: Tina Volek, City Administrator From: Michael Whitaker, Director City of Billings Parks and Recreation Department Date: August 14, 2012 Re: August Monthly Report Michael Whitaker Director Administration Yellowstone Family Park: Construction is substantially completed and the park is open for use. Drop by and check it out. The park has many features and was designed to be maintenance friendly and save 30% in irrigation costs. An official grand opening will take place Sunday, August 26th from 3:00 to 5:00 P.M. Please plan to attend. Howard Heights Park: Improvements to this park are nearly completed. We anticipate taking over maintenance operations by the end of August. Sale of Parkland Sub-committee: A list of approximately 38 properties has been identified for potential sale. Further evaluation is being done to determine what properties can be sold or traded. A presentation will be made to Council at the September 4th work session. South Park Gazebo: City Council approved the bid with Fisher Construction on July 23rd. The South Side Neighborhood Task Force has raised $34,000 enabling us to accept alternates 1 and 2 th upgrades to the structure. Construction will begin August 15 with an anticipated completion of October 1st. Rose Park Pool Improvements: The RFP is out on the street. Responses are due August 24th. We hope to be able to add a different type of slide attraction and will consider different options based on the size of the footprint that can fit within our site plan. Consultant Selection and City Council approval is anticipated in September. 390 North 23rd Street Billings, MT 59101 Phone: 406-657-8371 Fax: 406-247-8641 Website: www.prpl.info Dog Park: Drinking fountains (donated by the Friends of Dog Parks Committee) for the dog park have arrived and we are working on lining up help for installation. Also, the mulched trail project is waiting on an Eagle Scout candidate to get approval for his project. The Scout will install 300 lineal feet of trail for us. The 3rd annual Dash for Dog Parks Fun Run was held Saturday August 11th at Sierra Park. This event included a 1.5 mile walk/run at the park, demonstrations, vendors and a raffle for prizes. "We create community through people, parks, and programs" Parks Irrigation Systems: With the heat and drought we are experiencing, irrigation system operations and maintenance has become a large focus of current operations. With a system of approximately 1,000 irrigated acres, there are daily and weekly repairs and issues that arise. The large pump systems in Stewart Park, Castle Rock Park, Rose Park, and Pioneer Park, in particular have had ongoing problems due to siltation from canals and heavy use. For the most part, other parks are operating well and providing the public with green grass. Park Restrooms: Restrooms have been heavily used during July. Large events and high usage of the spraygrounds and wading pools has brought a large numbers of park users. No major problems have occurred this month. The Division purchased a new Rotor Rooter machine which has helped speed effectiveness when needed. The new accessible sidewalks around the Highland Park restrooms and parking are being installed to provide access to the restrooms and the spraygrounds. Turf Mowing: Park mowing is operating according to the weekly schedule with an occasional schedule change due to breakdowns, irrigation issues, etc. Staff mows approximately 1,000 acres of irrigated turf on a weekly schedule. Two older sixteen foot mowers are scheduled to be replaced with new ones at the end of the mowing season. They have been experiencing regular breakdowns. Riverfront Park: The inlet feeding the park lakes was opened in July and the water level raised approximately 3 feet. Evaporation and lack of rain has lowered the lake level. Aquatic weeds have proliferated also. Special Events: During the past month, park staff has helped facilitate events in many parks. Those events include, 4th of July event in Castlerock Park, YAM Summer Fair in Veterans, Big Sky State Games in 7 parks, Faith Chapel's Block Party, Mexican Fiesta, Billings Praise Center fundraiser and the Magic City Blues Fest in South Park and several others. These events brought thousands of people into those parks. Rimpoint and Howard Heights Parks: Rimpoint Park is now being managed and maintained by the Parks Division. Management and maintenance of Howard Heights Park will become the responsibility of the division in mid-August. Rimpoint is a general fund park and Howard Heights is in park maintenance district. Other: Shelter rentals, special events and general park use are at very high levels this summer. We currently are averaging approximately 25 to 30 shelter rentals each week and numerous large events in parks throughout the community. The sound stage is being rented weekly for weekend setups. Urban Forestry Young Tree Care: The Urban Forester has been working with the seasonal arborists on pruning and mulching young trees in all parks. They are pruning them to develop their form and removing dead and broken branches. The seasonal arborists has watered and mulched hundreds of young trees throughout the park system. Montana Avenue: Forestry staff has been pruning trees on Montana Avenue from 22nd Street to 32nd Street. The street trees and concrete planters there are part of the Montana Avenue Park Maintenance District. Work consists of raising the tree crowns over the street and sidewalk, clearance pruning from buildings and traffic signs and removal of dead and hazardous branches. Staff is working with City Engineering and the contractor installing the new water mains. This is being done to prune trees within the street closure areas ahead of the construction to reduce damage from the large excavation equipment. Staff is approximately 60% done with the project. Large Tree Care: Davey Tree Surgery Company was the successful contractor on a large tree pruning and removal project in various parks. They have begun the project and are approximately 75% done. One hundred sixty eight large trees in City Parks were identified as needing major pruning and/or removal in order to eliminate hazards. Staff selected trees for this project that are in high use areas of parks such as playgrounds, picnic shelters, ball fields, etc. Other: Forestry staff worked with volunteers from the Yellowstone River Parks Association to remove and grind/chip piles of brush and remove several large dead cottonwood trees along the new trail that extends from Lake Josephine east to the Washington Street park access site. This portion of trail is now prepared to be paved and serve as another link in the main multi-use trail corridor along the Yellowstone River. Fire Hazards: The drought has created extreme fire hazard in most of our natural area parks such as Riverfront, Phipps, Riverfront, Swords, Alkali Creek, etc. Staff has posted signs warning the public of the fire danger and asking them to use caution. Recreation Summer Programs: Most activities will be winding down within the next several weeks. Overall it was a pretty good summer with some programs increasing in numbers and some decreasing. Each year we evaluate the results and then make changes for the next season. To date we had $66,628 in business from our online registrations and total registrations on our software system of $182,220. Credit card transactions account for about 60% of our total business. Technology Upgrades: This fall we will be installing a new registration database server and upgrading our VSI software to the newest version. Most of our machines are 32bit XP and the newer software will be 64bit Widows 7 compatible. Some of our other software such as graphics programs we use for our brochures will be upgraded as well. Our current registration server will then be used to house our shared department files. The server the shared files currently reside on is over 10 years old. We also will be working on an RFP for a consultant to update our website to the newer standards. Park Use Permits: Most use permits have been issued for the season, only three remain for the paperwork to be completed. August is relatively slow with the Blues Festival and 5K race in South Park the largest event. It picks up again in September with a 5K race in Rose Park; Rubber Duck Regatta, Crohn's and Colitis Foundation, and Alzheimer's Association events at Riverfront Park; Montana Marathon and Saturday Live in Pioneer Park; Suicide Prevention walk at Veterans Park; and Ales for Trails in Dehler Park. Rose and South Pools: As of August 7th, South pool is running almost exactly the same as last year at this time with respect to attendance and revenue; Rose pool however has seen a 25% decrease in attendance and $42,716 in revenue from last year. It appears that the new Oasis facility has had an impact, especially with heights residents. Cemetery Genealogy Requests and Burials: The office has been very busy with grave location and genealogy requests. With all the reunions in town, people are taking the time to find long lost friends and family members. Genealogical requests never really stop any more. It use to slow way down in the winter, but now it is steady most of the year and speeds up in the warmer months. Burials are also occurring at a faster than normal rate. Road Repairs: The plan to cut and paste asphalt was rejected by the contractors as too risky. Instead they tackled the worst areas with a two inch asphalt cap. Next will come some pothole repair and then some chip seal until the funds run out. It looks like we will need to be budget more funds in the future to finish the work started this year. PLANNING DIVISION Planning and Community Services Department 510 North Broadway 4th Floor Billings, MT 59102 406-657-8246 www.ci.billings.mt.us/planning July 2012 Report To: Board of County Commissioners, City Administrator, Mayor and City Council, Planning Board, Zoning Boards and Commissions, Planning and Community Services Department Director From: Wyeth Friday, AICP, Planning Division Manager Date: August 16, 2012 Below is a list of items that the Planning Division has been working on for the past month. This July report is the first monthly report for the new FY2013. Meeting Management and Support Planning staff supported the regular meetings of the following Boards and Commissions in July 2012. Each entity met once unless otherwise noted: • Yellowstone County Board of Planning (2) • City Zoning Commission • City Board of Adjustment • Historic Preservation Board • Policy Coordinating Committee • Bicycle Pedestrian Advisory Committee Long-Range Planning Projects: East Billings Master Plan Implementation – A final draft of the Form Based Code (FBC) for the EBURD was presented to the City Zoning Commission on July 3. This item was delayed at the July 3 meeting for 30 days and will return to the Zoning Commission on August 8. During this delay period, numerous property owner issues were resolved. The Zoning Commission has subsequently forwarded a recommendation of approval to the City Council. An Exposition Gateway Master Plan and a Hospitality Corridor Study are also being coordinated with the City, County, Chamber, and BSEDA. A team comprised of LMN Architects, High Plains Architects, and Sanderson Stewart has been selected by Big Sky ED as the consultant for the Exposition Gateway Master Plan. An RFP for the Hospitality Corridor Study was released in early July and staff is in the process of reviewing submittals. Planning staff has included partial funding of these projects in its 2012 Unified Planning Work Program based on the availability of other funding and staff resources. Please visit www.eburd.com for a description of this and other EBURD projects. 1 South Billings Boulevard Urban Renewal District Master Plan – The City Council adopted the South Billings Master Plan in February for the South Billings Boulevard Urban Renewal District (SBBURD) area. The Board of County Commissioners took final action on the plan in May. The South Billings Urban Renewal Association is now in the process of identifying projects for implementation from the Master Plan. The South Billings Urban Renewal Association Board has voted to fund the Newman Lane project as a FY13 project. Public Works is in the preliminary phase and will likely construct these improvements in early spring 2013. For its next task, the SBURA has identified a major sewer project for the area west of Jackson that is currently not served by sanitary sewer. The group is in the very preliminary stages of information gathering for this project. Please visit www.southbillings.com/ for more information. Infill Policy Development – The City Council approved an Infill Development Policy in December 2011. Staff is now evaluating the best approach to move forward with implementing the strategies in the new Policy. Staff plans to begin implementation of the Policy this summer. Sustainable Communities Challenge Planning Grant – The EBURD Project Steering Committee met on July 12 and is working through a strategic planning process to identify the core mission of the group through development of a mission statement, vision and goals. The group represents more than 20 community partners working to implement the EBURD Master Plan and support projects in the EBURD. More information on the efforts of this group is available on the EBURD website at www.eburd.com Grant Funded Projects • Division staff continues to administer the $1 million Energy Efficiency and Conservation Block Grant on behalf of the other City Department grant recipients. The activities funded by the grant are complete with the exception of the hybrid bookmobile. The hybrid bookmobile contract was awarded in December, 2011 and delivery is expected this fall. The grant will be closed out before October 1, 2012. Community Events/Training The Division hosted two webinars for staff and the public in July. The webinars are advertised via email and on the Division’s website and anyone is welcome to attend. The webinar topics in July were: Embracing New Urbanism in Your Comprehensive Plan; Town Centers: their conditions to success, economic opportunity, and preferences toward inviting, walkable places. Special Projects/Assignments • Billings is the host for the 2012 Western Planner Conference August 8-10 at the Crowne Plaza. Planning Division staff has been working with the Montana Association of Planners and the Western Planner Board to organize this regional event drawing on planning professionals from more than a dozen states. • The US EPA announced that Billings received the Smart Growth Implementation Assistance award in April. US EPA has completed a draft Statement of Work which specifies the deliverables and time frame for the project. The steering committee of six, appointed by the City Council and School District 2 Board of Trustees met in July. Members were introduced to each other and the project. EPA is currently in the consultant selection process and expects to begin the project this fall. • LSC Transportation Consultants are under contract to conduct a feasibility study for a downtown circulator bus. Staff is working with MET Transit, MSU-Billings, the Downtown Partnership, Billings Clinic and St. Vincent Healthcare and other stakeholders to determine the feasibility of a downtown transit circulator bus system to move people from MSU-Billings through the medical corridor to downtown and back. A draft of the final report was reviewed at the steering committee meeting on June 14. The draft will be presented to City Council at the September 17 work session. The steering committee will continue to meet to develop the next steps in the process. • Staff continues to work internally with City IT staff to prepare for initial conversion of the Planning Division’s permits into the new Innoprise project management software system. There have been some 2 • • • • • • • • • • ongoing project delays and challenges. The permit conversion process is expected to take place before the end of 2012. Based on the 2009 Legislative changes and changes in the 2011 Legislature in relation to land use regulations, staff had proposed changes to the City and County zoning regulations. These amendments moved through the public hearing process and are complete. Based on an Attorney General’s Opinion issued in January 2012 in relation to definition of and review procedures for subdivisions for rent or lease, staff is drafting changes to the City and County subdivision regulations. These amendments are expected to be reviewed by Planning Board in August, and presented to governing bodies in September and October for adoption consideration. Serving on Healthy by Design Advisory Committee through Riverstone Health to participate in various grant programs to review implementation of the healthy community strategies in the 2008 Growth Policy, and serving on the Billings Area Food Policy Council with the other community stakeholders on issues relating to healthy food policy and access in the community. Serving on Traffic Control Board Serving on Billings Preservation Society Serving on Billings Depot, Inc. Board Attended Monthly Homebuilders Association Meeting with City staff Facilitated South Billings Boulevard Urban Renewal District Association monthly meeting Facilitated Billings Industrial Revitalization District monthly meeting, as well as the ongoing drafting and adoption process for the Form Based Code (FBC) for the EBURD. Facilitated numerous meetings with EBURD property owners to discuss concerns they had with the final draft of the FBC. Department Relocation Status In June, the Planning and Community Services Department received nine proposals for office space. The proposals ranged from complete remodel of structures with 5 – 10 year leases to move-in ready offices. In July, the Director and Division Managers visited most of the sites. The sites are currently being evaluated for cost, location, accessibility, and parking. A site is expected to be selected by September 1. See Staff Project Priorities and Application Review Activity in FY2012 and FY2013 Below 3 Planning Division Staff Project Priorities 2012 - 2013 Project Completion Priority Date City\School Collaborative Planning - SGIA Grant Adjacent Neighborhood Meeting Facilitation EBURD FBC Adoption** Boarded Up Structure Ordinance FEMA/DNRC PDM West End Flood Grants* ** SBBURD Master Plan Adoption* Community Outreach** Hospitality Corridor Study (Hwy 87 River Bridge - Airport Rd.)* Zoning Text Amendments* Historic Pres. Ordinance Update* Downtown Circulator Pilot Project Subdivision Regulation Amendments for SLR (AG Opinion) Data Imaging System for Transportation Traffic Counts, other* Business License Ordinance** EECBG Administration EBURD Mini-Master Plan -Exposition Gateway Update Records Retention/Review Process** Highway 3/Airport Road Corridor Study* ** Scan County Historical Zoning Maps City and County Web Page Update** MPO Urban Area Boundary Amendment* Complete Streets Checklist** South Billings Master Plan Implementation (District Rezoning?)** PCSD Move 2012 Western Planner Conference Innoprise/ HTE2 Conversion Preparation* Priority Based Budgeting** Residential Zoning District Consolidation** Infill Policy Implementation** Whitewater Park (Coulson Park Area) Newman Lane Improvements** 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 12/31/12 Ongoing 8/1/12 7/1/12 5/1/12 5/1/12 Ongoing 1/1/13 7/1/12 4/13/12 6/1/12 7/1/12 6/1/12 3/1/13 10/1/12 6/1/13 10/1/12 2/1/13 9/1/12 5/1/12 10/1/12 10/1/12 2/1/13 2/1/2013 9/1/2013 2/1/13 2/1/13 2/1/13 2/1/13 2/1/13 2/1/13 Worked on in June Completed * Aligns with 2012 Planning Work Plan ** Aligns with Council/Administration/BOCC Initiatives Priority Index 1 = Next 3 Months 2 = Next 6 Months 3 = Next 12 Months 4 SUBDIVISIONS Pre-Application Meetings July City County Total 1 4 5 City County Total 1 0 1 City County Total 5 1 6 City County Total 4 6 10 City County Total 0 1 1 City County Total 3 0 3 City County 0 0 Aug 0 YTD Totals Sept Oct Nov Dec Jan Feb Mar April May June 0 0 0 0 0 0 0 0 0 0 1 4 5 0 1 0 1 0 5 1 6 0 4 6 10 0 0 1 1 0 3 0 3 Preliminary Plats 0 0 0 0 0 0 0 0 0 0 Final Plats 0 0 0 0 0 0 0 0 0 0 Exempt Plats 0 0 0 0 0 0 0 0 0 0 ZONING Neighborhood Meetings 0 0 0 0 0 0 0 0 0 0 Zone Changes 0 0 0 0 0 0 0 0 0 0 Special Reviews 0 0 5 Total 0 City County Total 2 0 2 0 City County Total Zoning Compliance Permits (YC) Fence Permits City County Total Sign Permits City County Total Temp. Sign Permits City County Total Temp. Use Permits City County Total Building Permit Reviews 4 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2 0 Variances Medical Corridor Zoning Clarifications 16 0 16 8 0 8 1 0 1 0 0 0 90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4 1 0 16 0 16 0 8 0 8 0 1 0 1 0 0 0 0 90 6 C¡ty of Billings Public Works Administration Public Works Department 2224 Montana Avenue - 2no Floor Billings, MT 59101 Office (406) 657-8230 Fax (406) 237-6291 Date: Christina Volek, piçy Administrator D avi d N(ràîùö,%b I ic works D irector August sìþU{T SUBJECT: MONTHLY REPORT - PUBLIC WORKS DEPARTMENT To: From: Public Works "Working for You" The following is the Public Works Department's Monthly Report for July 20T2. Engineering Division 25th. Instrumentation control and pump testing have been completed. Tank was put in service second week of June. Pump station was put into service the first week of July with substantial completion issued July 16. appraisal was received the end of June. Final offer made to land owner with July 3lst deadline. Offer was not accepted, request will be made in August to proceed with Eminent Domain. comments have been returned. Still working on specifications. Right of Way documents have been sent to property owner for signature. DNRC Right of Way should be approved this month. W.O. 09-12 Inner Belt Loop: Final plan W.O. 09-19 Zone 3 East Fox Reservoir Expansíon: Design Ls95Yo complete and is being reviewed by DEQ. Bid opening is scheduled for mid-August. W.O. 09-20 Rimrock-Forsythia to Shiloh: Preliminary design is continuing and properfy owners have been contacted for their input at their individual properties. W.O. 09-28 WTP Backup Power, Phøse2: Construction is underway and site work is complete. Work stoppage was issued until generators are delivered in August/September. W.O. I0-05 2nd & 3'd Ave N. Two-way Conversion: Preliminary design was started for additional bulbout and signage at2no Ave and North 22"o. This project was put on hold due to potential conflict with East End Industrial storm drain design. l4/.O. l0-19 Shiloh Conservation Area: Preliminary design is being completed. W.O. I0-27 Central Sidewalks; Contractor to chip seal Central Avenue in early August. W.O. 10-30 32'd at Broadwater Right Turn Lane: Street is open to traffic and paving repair was completed on July 11'n. Minor cleanup work remains. W.O. 10-31 Central &. 2g'h Trffic Signal: Striping will be completed with W.O. 10-21. Retaining wall was also constructed. W.O. I1-10 25th Street Pedestrian Bridge; Working with Depot Board on options and BID for maintenance options. W.O. 1l-11 llTF Rapid Mixer System Improvemenls: From final study recommendations, chose to proceed by replacing mixers now and reconfiguring channel and putting in a new building in the future. Design is about 50% complete. W.O. I I-12 Household Hazardous Waste Facility: CH2MHILL performing a planning level evaluation of a facility. W.O. I I-19 Landfill Phase 5 Expansion/Phase 3 Closure: Waiting for DEQ to review and approve plans and specs. Decided to put off construction of Phase 5 until 2013 when additional funds may be available. I4/.O. I2-01 Water and Sewer Rehab: COP Construction is well into Schedule 2 work, which generally includes sanitary sewer between 9th and 15th Street West from Avenue C 'Water and sewer replacement in Grand Avenue near Rehberg Lane is to Parkhill Drive. also included in Schedule 2 and is under construction. COP Construction has also started work on Schedule 1 water main replacement in Montana Avenue from N. 18th to N.3l't Street and S. 27th Street from 5th Avenue South to State Ave. W.O. I2-02 Miscellaneous/Developer Related: Contract awarded to J&J Concrete. Project is currently under construction and estimated completion is November 16'h. Project is approximately 50Yo complete. W.O. 12-03 City Chip Seal: Hardrives Construction started chipping on June 2TthProject is anticipated to be complete by August 10th. complete by mid August. summef. W.O. I2-05 Five-Mile Lift Station Replacemezl.' Morrison-Maierle was selected and the preliminary design study is complete. Construction will start this fall. Currently negotiating with Parks and Recreation for project site in Bitterroot Heights Park. :-:r i i,. W.O. 12-10 Broadwater Trail Connectiou Project is currently under construction. Anticipated to be complete by late August. 12-12 Bench Boulevard Sanitary Sewer Extensions.' Castlerock Excavation was awarded a $190K contract on June 25thto build about 1,150 feet of new sanitary sewer in Bench Boulevard between Lincoln Lane and Hilltop Road ahead of the MDT road project. Construction to begin in August. W.O. I2-13 Integrated llater Plan Implementation Reuse and Reclamation Study: HDR was selected and has finished scoping the project. Contract was awarded on July 9'n. W.O. 12-14 IWH Wastewster Collection System Study: DOWL HKM has installed flow monitors and is evaluating data being collected. W.O. I2-l5 IWPI Wastewater Treatment Facility Plan: HDR is working on the plan, primarily collecting existing data. W.O. I2-16IWH W'ater Distribution System Study: Morrison-Maierle is collecting information to begin modeling effort. W.O. 12-17 IWPI Stormwater System Study: Sanderson Stewart was selected and is currently working with staff to scope the project. Should be under contract in August. W.O. I2-18 Canyon Creek Drain- Survey and project is completed. Design alternatives will be developed. Currently working on permits with the railroad. W.O. I2-29 Solid Waste Management Plan: Professional Services Agreement approved by Council on June 25th. Cunently working on Amendment 1 to revise the scope. Great West/HDR has begun preliminary investigations. i ] i I I W.O. I2-31 East End Industrial Area: Working on scope with Monison Maierle and go to Cify Council on August 271h. will l 1. I I I I W.O. 12-34 Northern Sidewalks: Project waiting on bid concuffence from CTEP. Anticipated to bid mid September and start construction in October. I i 1 t. I t W.O. 12-35 2012 Miscellaneous Storm Drain: Proiect is under construction and work to progress throughout the summer. MDT Projects Underway: o Grand, ITth and I9'h: Decision needed on whether signal work will be performed by City crews or MDT will let a construction contract. o Bench North Phase 1: Right of Way negotiations are underway. However Right of 'Way negotiations have progressed slowly. Construction will most likely be delayed until spring of 2013. i' I . Bench North Phase 2.' Street Lighting Technical Memo was submitted for review. . dh to Bench Phase 2.' Sanderson Stewart is under contract with MDT to analyze alternatives for grade separated crossing for Bench at 6th Ave and Main Street. o o o o o o o o o o o o o W.O. 10-29 West Mechanical Building MCC Panel Replacement Project- Action Electric is still working on replacing wire for MCC Panels. Project is on hold until new MCC Panels arrive. W.O. 09-26 Clarifier Infrastructure Improvements.- Working on 3'o Clarifier. W.O. 11,-16 Digester Cleaning- Awarded June 11'n. Contracts are approved and work should start this month. W.O. 12-09 Access Road Rip-Rap- Working on construction estimate to evaluate the budget. Met with FEMA. Submitting a scope change to FEMA. W.O. 12-23 WWTP Headworks Backup Power and West Mechanical Room MLCB-5 Improvements- Awarded June ll'n to Yellowstone Electric. Currently working on getting contracts. W.O. 08-16 Scada Evaluation - WTP Staff will install switches and SLC's. A contractor will be hired to install radios and antennas. Plan to complete SCADA backbone and the Heights with Phase 1. Plan to install Backbone this spring with project going out for quotes in August/September. \ry.O. 10-12 Low Service Pump Station 1 Upgrade - COP has substantial completion and working on punch list. W.O. 10-08 Clearwell Contact Time Improvements - COP has started working on sandblasting and oil/grease removal on new steel. W.O. 11-08 High Service Pump Station 2011 Transfer Pump Replacement - Ace Elechic was low bidder with Star Service contracted as a subcontractor. Stop work order issued until equipment can get here. W.O. 09-28 WTP Backup Power Phase 2 - Construction is underway. W.O. 11-11 WTF Rapid Mixer System Improvements - HDR working on design. W.O. L2-21WTP Chemical Building/Disinfection Improvements - Professional Services Agreement with HDR approved by City Council on June 1lth. Conducted kick-off meeting with HDR. \il.O. 12-28 WTP Transformer Replacement - Colstrip Electric submitting shop drawings and ordering materials. Administration Division League of Cities and Towns to further discuss the numeric nutrient standards. ;'i;iìç: ¡; lri L: Administration Finance Division November. Federal Grant/Loan Funded Proj ects o HUD Backup Power at WTP - Continued administering project. o FEMA - Continued to monitor FEMA grant for various June 2011 storm repairs and work with DES to revise cost estimates. o CTEP - Continued to administer grants for pedestrian bridge, Central Avenue Sidewalks and Broadwater Connection projects. o Continued to administer loans for Zone 4,IJV, and20l0 water rehab projects. Participated in conference call with the DNRC regarding future SRF loans for the 5Mile lift station andZone 3 East project. Began working with DNRC, bond counsel, and Finance to refinance all SRF loans at a lower interest rate SRF - Solid Waste Division were added. that were land filled, 1,441tons for compost, 9 tons for metal and white goods, 97 tons of asbestos, and2,698 tons of soil used as cover material. continue to deliver green barrels as request come in. We have delivered 12,907 green barrels to the residents of Billings. We currently have five trucks picking up the green waste five days a week. up 631 tons of green waste in our green barrels. This comes to approximately 7Yo of the total waste that is picked up by our collection service. have placed and emptied cans at Yellowstone Art Museum on July 5, the Tiny's Tavern on July 12,the Rex on July 19 and the Monte Carlo Casino onJuIy 26. Commercial & Meters Division Distribution & Collection Division and in the allevs in the 700 block of North 22"" Street and North 23'o Street. Environmental Affairs Agreement. project. i'r;ìl':. i r-:i' :,ì lateral. Street-Traffic Division ) Jetting and tving storm lines. Statistics Poles straishtened Feet of 2" pipe Feet of Telspar Street light complaints 6 44 26 Sisns fabricated Sisns reolaced Trees trimmed for stsns Misc (welds.oaint"clean.hdw) Gallons of vellow center line paint Gallons of white Gallons of curb paint Lbs ofbeads Total feet of white Total feet of curb paint Total feet of vellow center line Gallons of white (crosswalk) Manholes repaired Number of disouts & cave-ins External sisnal reouests 25 aa JJ T9 r32 t.612 667 396 13.614 t62.984 40.975 r 93.1 84 206 T7 2 Yards of sweepings Gallons of water Broom hours (sweepers) Animals picked up lntakes cleaned Feet of pipe ìetted Feet of pipe tv'd Line locates Number of allevs sraded Phone calls received Number of times water pumped Number of streets sraded Yards of material (road mix) Yds of material used (sand) Gallons of dust suppressant Tons of material used (AC) Gallons of curb paint Gallons of d-ice used (City) Tons of ice slicer 645 23.200 200.s 7 134 1.381 1,421 ï,196 103 s28 42 24 39.1 00 574.12 Water Treatment Division PRODUCTION SUMMARY: o o o o Total Plant Production: Plant Production - Year to Date: Average Daily Productionz Maximum Daity Production: 1.458.9 MG (million eallons) 5254.0 MG 47.l}IG 51.7 MG the most since 2006. Flows in the Yellowstone River remained below the median during 'We continue to dredge Sedimentation Basin #1 as rapidly as possible in the entire month. preparation for low river conditions during late sufilmer. i.ttlt:, "¡' t:? ',1 The new Ironwood pump station was put online on July 2nd. Affected residents were notified two weeks prior to start up that the water pressure in the system serving their homes would go up substantially. Many homes in this area had individual pressure boosters that needed to be turned offor bypassed. Replacement of the roof on Clearwell #1 was substantially complete in early July. Work to paint the clearwell and install a baffle system was restarted. Problems with the roof support system were discovered during the early stages of the bafflelpainting project and the project was stopped while the roof system was replaced. A kickoff meeting was held with HDR personnel for the Chemical Feed Building and Disinfection Evaluation on July 1I,20I2. Staff worked with Integrated Solutions Engineering to update the control system for Thomas Pump Station, Briarwood Reservoir and Cedar Park Reservoir. There have been reoccurring problems with the programming in that station since it was constructed. The new low service pump L1-5 in the expanded Low Service Pump Station #1 (LSPS#l) was started up and test run through the contract required performance period. The addition of this pump raises the firm capacity of LSPS#I (capacity with the largest pumping unit out of service) to about 60 MGD. Treatment Technicians received training on maintenance and operation of the new low service pump Ll-5. Electricians received training in maintenance and operational programming of the variable frequency drive controlling low service pump L1-5. Staff attended a webinar on the subject of communicating with the public during awater emergency. A walk through inspection of the Low Service Pump Station #1 was conducted by staff, Engineering, HDR and COP Construction at substantial completion of the project. A complaint was received about low water pressure during the early morning hours from a resident in Rehberg Ranch subdivision. This information triggered an evaluation of the pumping capacity of Christensen Pump Station which serves the area. We discovered that two of the largest pumps had excessive impellor wear that was limiting their output. Such wear is extremely unusual for pumps that are only a little over two years old. The parts were replaced which improved the station output. Even with these improvements the pump station is not maintaining setpoint pressure during the heavy moming demand. We are planning to increase station capacity this winter to alleviate the shortfall in capacity. A revised facility flood plan has been prepared visit. The plan is in review. í] r-ti Ç based upon input from the FM Global (SCADA) expansion plan. The expanded SCADA system is intended to provide enough bandwidth for increased security features and back up data transmission from our pump stations and reservoirs. The proposals and quotes are being reviewed. Ironwood Pump Station which generated a punch list of work remaining for phase 2 of the project. Please let me know items. DDM:kf if you have questions or would like additional information about any of these August 2012 SUN Special Event Calendar 5 MON 6 TUE 7 WED THU FRI 1 Farmers Market Wednesday Nights in August 3pm-9pm 2 Pug Mahon’s Alive after 5 3p-9p 3 Spiral Skies Belly Dance Barjon’s Books Downtown 6pm-8pm 4 Farmers Market 6am1pm 8 Farmers Market Wednesday Nights in August 3pm-9pm 9 10 Magic City Blues Festival : Montana Ave Street Closure 9am today through 1pm Sunday 11 Farmers Market 6am1pm 17 18 Farmers Market 6am1pm *Approval Pending For questions or details: wellbrooks@ci.billings.mt.us 12 13 14 SAT 15 Farmers Market Wednesday Nights in August 3pm-9pm 16 Montana Brewing Co Alive after 5 3p-9p Magic City Blues Run 6:30a-1p Southside Quality of Life Run 7am-11am Downtown Area Finish-line 19 20 21 Billings Public Schools 7am-11:30am Downtown 22 Farmers Market Wednesday Nights in August 3pm-9pm 23 DBA Family Fun Night Alive after 5 3p-9p 24 Billings Clinic Classic 12am thru 5am Sunday 25 Farmers Market 6am1pm Billings Clinic Classic 12am thru 5am Sunday 26 27 28 29 Farmers Market Wednesday Nights in August 3pm-9pm 30 31 Burn the Point Downtown 5:30pm-12:30am September 2012 SUN MON TUE WED THU FRI SAT 1 Special Event Calendar 2 3 4 5 6 7 Rimrock Road 7am –11:30am *Stride for Pride 7am-11:30am Rose Park Area *Hope Fest Parade 8am-6pm Southside *Burn the Point Downtown 5:30pm-12:30am *Approval Pending For questions or details: wellbrooks@ci.billings.mt.us 8 Miles of Smiles 9 10 11 12 13 14 Skyview High Homecoming Parade Heights 12-50pm-2pm 15 16 Montana Marathon Molt Mt start Daylis Stadium Finish 6am-1pm 17 18 19 20 21 22 23 24 25 26 27 28 29 * Run for Aurora ON HOLD 30 October 2012 SUN MON TUE WED THU FRI 1 2 3 4 5 6 *Oktoberfest Duathlon 7am-2pm Westend 7 8 9 10 11 12 13 Harvestfest 6am-5pm Downtown 14 15 16 17 18 19 20 (Rain Date ) Harvestfest 6am-5pm Downtown 21 22 23 24 25 26 27 28 29 30 31 Special Event Calendar *Approval Pending SAT For questions or details: wellbrooks@ci.billings.mt.us