bose ikard elementary school
Transcription
bose ikard elementary school
BOSE IKARD ELEMENTARY SCHOOL Bose Ikard Elementary School CAMPUS DATA BOSE IKARD ELEMENTARY SCHOOL 100 Ikard Lane, Weatherford, TX 76087 Year Built 2002 No. of Buildings 1 No. of Portables 0 Approx. Total Square Footage Grades Served 82,917 K through 6th 2013-2014 PEIMS 661 Original Planning Capacity 750 Building Levels 2 NOTICE: Issues designated as non-compliant or code deficiencies may have become non-compliant or deficient as codes have been updated or changes in the site conditions have progressed into non-compliant conformance. Identification of these deficiencies does not indicate the facility was constructed out of code compliance at the time of actual construction, and declaration of certain items may not warrant immediate action. Facility Assessment Report, Weatherford Independent School District 1 Bose Ikard Elementary School MASTER PLAN NOTICE: For the safety and welfare of the faculty, students, and staff, floor plans of this facility have been removed from this report. COLOR LEGEND 2 Administration Circulation Library Athletics Fine Arts Toilets/Support Spaces Cafeteria/Kitchen Computer Lab Resource Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School MASTER PLAN NOTICE: For the safety and welfare of the faculty, students, and staff, floor plans of this facility have been removed from this report. Facility Assessment Report, Weatherford Independent School District 3 Bose Ikard Elementary School CIVIL - SITE Introduction This report provides the results of the Civil/Site assessment of the above referenced school performed by Pacheco Koch Consulting Engineers, Inc. (PKCE) The Civil /Site assessment consisted of: 1) a site visit for a visual evaluation; and 2) a meeting between Weatherford ISD faculty members and PKCE staff, focused on the following items: 1. 2. 3. 4. 5. 6. Paving Surface Drainage Accessible Route / Parking Utilities (no subsurface investigation during site visit) Erosion Retaining Walls Based on observed conditions, recommended improvements for each of the deficiencies identified have been accompanied with estimated quantities and an opinion of probable construction cost, to be used as a budgetary tool. Site Visit: March 17, 2014 On the above date, PKCE personnel visited Bose Ikard Elementary to observe the items discussed above. The table below shows each deficiency found, the photograph number, the deficiency level, an estimated quantity, a unit cost, and a construction cost estimate. Meeting with Weatherford ISD Staff On Tuesday, April 1, 2014, PKCE personnel met with representatives of the School District’s Maintenance Department to learn about any known issues that may not be discovered/visible during the site visit and to gain historical/current knowledge of the site. During the meeting, the following Civil/Site issues were brought up for Bose Ikard Elementary: • Sidewalks settling throughout site, creating tripping hazards. • Roof drain in rear of building is dumping directly onto sidewalk creating pavement damage and erosion. • Erosion issues on downhill side of playground area. • Fencing desired around playground area. Facility Assessment Report, Weatherford Independent School District 5 Bose Ikard Elementary School CIVIL - SITE 84 94 64 184 14 154 104 174 54 124 114 134 24 144 164 3 44 6 74 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School CIVIL - SITE Concrete pavement cracking Concrete pavement cracking Concrete pavement cracking Erosion Erosion HC parking violates maximum slope requirements Facility Assessment Report, Weatherford Independent School District 7 Bose Ikard Elementary School CIVIL - SITE Perimeter fencing bent & settling Concrete curb repair Concrete curb repair Concrete curb repair Cracks in concrete stairs Cracks in concrete stairs 8 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School CIVIL - SITE Cracks in ramp Cracks in ramp Accessible route needs landing Joint sealant repair Joint sealant repair Ramps have no landing throughout site Facility Assessment Report, Weatherford Independent School District 9 Bose Ikard Elementary School CIVIL - SITE SUMMARY OF FINDINGS – BOSE IKARD ELEMENTARY Photo # Description Level Approx. Quantity 2 125 SY 3 2,300 SY 1 70 SY 3 300 LF 2 200 LF 2 2 EA 2 2 EA 1 1 EA 2 500 LF 3 10 EA 3 350 LF Concrete pavement cracking. 1,2,3 Sawcut and replace affected areas. Erosion just south of playground area and along east parking lot. 4,5 Minor grading activity and re-sod. 3 westernmost HC parking spaces in violation of maximum slope regulations. (range = 2.4% to 2.5%) 6 Concrete work to achieve maximum longitudinal/transverse slope of 2%. Perimeter chain link fence damage. Repair isolated locations around site. 7 Concrete curb damage. 8,9,10 Sawcut and replace affected concrete curbs. Minor cracking in concrete stairs. 11,12 Flush cracks in concrete along ramps at perimeter of building. 13,14 Accessible route violates landing requirements at intersection of site sidewalks. 15 Install concrete landing 16,17 Joint sealant replacement at concrete joints throughout site. All ramps on site are without a landing area. 18 * Demo – Replace with ramp and landing. Playground area fence. ** 10 Install new fence around playground at southeast corner of building. Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School CIVIL - SITE * Photo 18 - The site’s accessible route is NOT affected by the lack of landing areas at the ramp locations referenced above. Providing landing areas is NOT a code requirement, but may be desired to improve the ease of access throughout the site. ** Installation of a new fence around the playground area was an item discussed with the Weatherford ISD maintenance department at the meeting on April 1, 2014, and has thus been included in this cost estimate exhibit. Facility Assessment Report, Weatherford Independent School District 11 Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR NOTICE: For the safety and welfare of the faculty, students, and staff, floor plans of this facility have been removed from this report. Facility Assessment Report, Weatherford Independent School District 13 Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Damaged sealant at perimeter of aluminum store front window. Cracked vertical mortar joint above window. Damaged sealant. Raised aluminum window sill. Cracked control joint under aluminum window. Typical. Damaged bottom, 12” of control joint at face brick. Paint damaged and rust at downspout boot. Typical. 14 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Pigeon roosting under canopy. Paint peeling and stained steel beams. Cracked concrete at downspout. Non-compliant 2” raised curb at entry walk. Damage sealant along walk to exterior wall. Debris in dryer vent. Cracked sealant at control joint outside mechanical rooms. Typical. Broken concrete steps. Typical. Facility Assessment Report, Weatherford Independent School District 15 Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Non-compliant railing. No guardrail. Damaged concrete edge at dock area. Detached and cracked sealant along steel lintel and plaster molding. Cracked grade beam at steps. Cracked concrete ramp. Non-compliant walk surface offset by ½” to ¾”. 16 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Damaged sealant at expansion joint. Cracked control joint under aluminum window. Debris and dirt at downspout / gutters. Gaps at aluminum window sill seat. Cracks at split face mortar joints. Typical. Detached downspout brackets. Facility Assessment Report, Weatherford Independent School District 17 Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Non-compliant ramp slop. Loose cable at guardrail. Non-compliant. Broken and missing piece of concrete walk / ramp. Paint damaged railing. Typical. Damaged sealant at expansion joint. Peeling paint and rusted steel beam lintel. 18 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Cracked concrete edge. Damaged concrete grade beam and flaking concrete finish. Damaged fascia at 2nd level plaster corner. Cracks across grade beam. Erosion at exterior door walk. Gap at aluminum window sill to split face sill. Facility Assessment Report, Weatherford Independent School District 19 Bose Ikard Elementary School BUILDING CONDITION: EXTERIOR Gap along fascia to exterior masonry wall. 20 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School BUILDING CONDITION: INTERIOR NOTICE: For the safety and welfare of the faculty, students, and staff, floor plans of this facility have been removed from this report. Facility Assessment Report, Weatherford Independent School District 21 Bose Ikard Elementary School BUILDING CONDITION: INTERIOR Repair wall. In various locations. Replace floor finish - carpet. Replace floor finish - VCT. Repair door finish. Replace ceiling tile. Repair plastic laminate cabinet. 22 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School BUILDING CONDITION: INTERIOR Door frame needs painting. Evidence of roof leaking – water stains. Interior masonry joints need resealing. Replace pipe protection. Facility Assessment Report, Weatherford Independent School District 23 Bose Ikard Elementary School ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Bose Ikard Elementary School was built in 2002. The building is served by a complete fire sprinkler system. The air conditioning systems that serve the building are varied in their arrangement as well as their energy efficiency and operational reliability. The classroom wings, which are two-story, are conditioned by split-system A/C units that utilize hot water heating coils for heating. The hot water for these units is provided by a single boiler. The boiler also serves several package outside air preconditioning units that provide preconditioned fresh air to the classroom wing units, as well as a single package rooftop A/C unit that serves the main entry hall. The remainder of the facility is served by package rooftop A/C equipment with gas heating. The unit that serves the administrative offices is additionally arranged for variable volume operation, and there are several variable volume air terminals that provide individual temperature control in those areas. Building electrical service is 277/480 volt, 3 phase, 4 wire, 2500 amp BPS main switch, served from a 1000 kVA power company pad-mounted transformer. Main switch is manufactured by “Siemens”. The building interior lighting system utilizes predominantly T8 fluorescent lamps. HID light fixtures serve the gym. The entire building is equipped with a fire alarm system that appears to be in good condition and is code-compliant. MECHANICAL: • • • • • • • Replace A/C #3 (serving the main entry hall) with a new package rooftop A/C unit with gas heating, due to the problems inherent with having equipment with water coils located on the roof. Replace all package roof mounted outside air preconditioning units with new energy recovery ventilators, and provide outside air control dampers on all classroom units. The outside air preconditioning units are very high energy users while the energy recovery ventilators utilize exhaust air from the building to air precondition the required ventilation air, thereby saving energy, as well as doing away with more water coils on the roof. Add service/isolation valves in various water and gas piping lines to aid in the maintenance of the systems. This will avoid shutting down entire systems in order to do maintenance on a single piece of equipment or work in a specific area. Paint all existing, exposed gas piping on the roof in order to resist rusting and future failure. In 6 to 10 years (by which time all of the originally installed equipment in this facility will have served its expected useful life), replace all existing classroom split-system A/C units using hot water coils, with new systems of a similar type. Care shall be taken to insure that the cooling and heating coils for the new systems are not in such close proximity as to cause freezing problems, as can be the case with these system types. In 6 to 10 years, replace all existing package rooftop A/C units with new, more efficient equipment. In 6 to 10 years, replace the administrative area variable air volume system with new, more efficient individual package rooftop A/C units arranged to provide similar zone control based on exposure. ELECTRICAL: • • • • • Replace gym HID light fixtures with T5HO fluorescent or LED type for energy savings and easy “ON-OFF”. Provide occupancy sensors in classrooms and offices for automatic lighting shut-off as required by the International Energy Conservation Code (IECG) and for effective energy savings. Replace all downlights with LED type for energy savings. Provide isolation pads at each pad and/or floor type transformer for noise reduction. Replace all exterior lighting with LED type fixtures. Facility Assessment Report, Weatherford Independent School District 25 Bose Ikard Elementary School ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING NOTICE: For the safety and welfare of the faculty, students, and staff, floor plans of this facility have been removed from this report. 26 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Provide isolation pads for noise reduction and remove shipping bolts. (Typical throughout building) Change-out existing HID light fixtures with T5HO fluorescent high output lamps or LED fixtures. Rooftop a/c units nearing the end of their useful life, also gas piping in need of cleaning/ repainting. Facility Assessment Report, Weatherford Independent School District 27 Bose Ikard Elementary School ENGINEERING REPORT - STRUCTURAL Further study is recommended to determine if the unreinforced masonry will have any net axial tension or excessive flexural tension under code required design wind forces, which is not permitted by the code. Retrofitting new structural components may be recommended. Further Study is recommended to determine if the structural unreinforced masonry has cracked behind wall finishes such as interior coverings and exterior veneers due to foundation movement. Repair of such cracks or retrofitting new structural components may be recommended. Repairing all known cracks in all structural unreinforced masonry due to foundation movement is recommended. Further study is recommended to determine the design and condition of the connectors between wythes. Installing new connectors may be recommended after study. Further Study is recommended to determine if there is sufficient lateral anchorage at the top of all exterior unreinforced masonry walls that are parallel to roof joists. Installing lateral restraints may be recommended after further study. If any modification to the Unreinforced Masonry is desired, Special Analysis will be required and significant Architectural and Structural limitations may be required. Further Study is recommended to determine if installation of new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is required. Installing new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is recommended when an opportunity presents itself such as a building remodel. Facility Assessment Report, Weatherford Independent School District 29 Bose Ikard Elementary School FOOD SERVICE NOTICE: For the safety and welfare of the faculty, students, and staff, floor plans of this facility have been removed from this report. Facility Assessment Report, Weatherford Independent School District 31 Bose Ikard Elementary School FOOD SERVICE Floors are stained. Washer/Dryer has rust. Beverage merchandiser located on cart. Dishmachine is in poor condition. Hood overhang does not meet code. Ansul drops are rusting. 32 Facility Assessment Report, Weatherford Independent School District Bose Ikard Elementary School SECURITY NOTICE: For the safety and welfare of the faculty, students, and staff, the security portion of the assessment report has been removed from this report. Facility Assessment Report, Weatherford Independent School District 33