Optimiz - ProTrans
Transcription
Optimiz - ProTrans
Optimiz Training Guide IT Training 10/9/2012 Optimiz Table of Contents General Information ......................................................................................................................... 3 Accessing Optimiz .......................................................................................................................... 4 Additional Information ..................................................................................................................... 5 Entities .............................................................................................................................................. 6 Searching for an Entity ................................................................................................................... 7 Adding a New Entity ....................................................................................................................... 8 Editing an Entity ........................................................................................................................... 11 Adding a New Entity Type ............................................................................................................ 16 Adding a Contact .......................................................................................................................... 18 Managing Entity Contacts............................................................................................................. 20 Exercises ...................................................................................................................................... 21 Load Entry ...................................................................................................................................... 22 Load Entry .................................................................................................................................... 23 Accessing the One-Time Load Entry Page................................................................................... 24 Select Date, Plan and Add Shipments ......................................................................................... 25 Adding a New Entity ..................................................................................................................... 28 Editing or Deleting Shipments ...................................................................................................... 30 Generating Segments .................................................................................................................. 32 Editing or Deleting Stops .............................................................................................................. 34 Adding Load Details ..................................................................................................................... 36 Editing Load Details ..................................................................................................................... 40 Saving the One-Time Load Plan .................................................................................................. 42 Exercises ...................................................................................................................................... 43 Logistics Plan Entry ...................................................................................................................... 46 Accessing the Logistics Plan Entry Page ..................................................................................... 47 Adding Shipments ........................................................................................................................ 48 Editing or Deleting Shipments ...................................................................................................... 51 Generating Segments .................................................................................................................. 53 Editing or Removing Stops ........................................................................................................... 55 Adding Load Details ..................................................................................................................... 57 Editing Load Details ..................................................................................................................... 61 Saving the Logistics Plan ............................................................................................................. 63 Exercises ...................................................................................................................................... 64 Page 1 Optimiz Creating a New Route from an Existing Route ............................................................................. 67 Exercises ...................................................................................................................................... 68 Planning Management ................................................................................................................... 71 Accessing Planning Management ................................................................................................ 72 The Planning Management Page ................................................................................................. 73 Approving, Declining, or Adding a Message to a Load ................................................................. 74 Editing a Logistics Plan ................................................................................................................ 76 Exercises ...................................................................................................................................... 77 Load Management ......................................................................................................................... 78 Accessing Load Management ...................................................................................................... 79 Tendering, Accepting, Rejecting, Canceling, or Adding a Message to a Load ............................. 82 Adding a Check Call ..................................................................................................................... 84 Editing a Load .............................................................................................................................. 85 Resending a Tender ..................................................................................................................... 86 Exercises ...................................................................................................................................... 87 Load History Search ...................................................................................................................... 88 Searching for a Load on the Load History Page ........................................................................... 89 Viewing or Editing a Load ............................................................................................................. 93 Exercises ...................................................................................................................................... 94 Logistics Plan Search .................................................................................................................... 95 Accessing Logistics Plan Searches .............................................................................................. 96 Searching for a Logistics Plan ...................................................................................................... 97 Editing a Logistics Plan ................................................................................................................ 99 Creating a New Logistics Plan.................................................................................................... 100 Exercises .................................................................................................................................... 101 Carrier Portal ................................................................................................................................ 102 Accessing the Carrier Portal ....................................................................................................... 103 The Carrier Portal Landing Page ................................................................................................ 104 Accepting or Rejecting a Tender ................................................................................................ 106 Tender Request Email Sample................................................................................................... 108 Tender Request Rejected Sample Email ................................................................................... 110 Adding a Check Call ................................................................................................................... 111 EDI Activities Log Entries ........................................................................................................... 114 Adding a Message ...................................................................................................................... 115 Searching for a Load .................................................................................................................. 116 Exercises .................................................................................................................................... 117 Page 2 Optimiz General Information Page 3 Optimiz Accessing Optimiz 1. Open Mozilla Firefox. If you don’t have Firefox, go to: http://www.mozilla.org/en-US/ Click the Firefox free download button to get the latest version. 2. In your browser, go to optimiz.protrans.com ** 3. Type in your Optimiz username and password 4. The Optimiz landing page appears. **During training/rollout/testing, use the following address to access Optimiz: stag.optimiz.protrans.com or, for remote users (not at corporate) use http://12.68.83.35 Page 4 Optimiz Additional Information The environment you access during rollout/training is a staging environment. The data in the environment can change at any time, without notice, and you may lose entered data if the system is updated. The environment may contain bugs and you may receive unexpected error messages when entering data. This is normal when working in a staging environment. The screens may vary slightly from those that appear in the final production version of Optimiz. Again, this is normal when working in an environment that is still undergoing development. If you have any questions regarding training, the system or the processes covered in this guide, please contact a member of the IT training team: Loren Elks elksl@protrans.com 317-240-4100 x 1206 Patrick L. Vogt vogtp@protrans.com 317-240-4100 x 1210 Leah Wine winel@protrans.com 317-240-4100 x 1532 If you have questions regarding the rollout of the live system or operations, please contact the Project Manager: Amber Swails Swailsa@protrans.com 317-240-4100 x 1246 Page 5 Optimiz Entities Page 6 Optimiz Searching for an Entity 1. From the top menu, click Entity > Entity Search. 2. The Entity Search page appears. 3. Enter the desired criteria in the available fields and click Search. 4. The Search Results appear at the bottom of the page. Page 7 Optimiz Adding a New Entity 1. To add a new entity, click + Add New Entity. The Create New Entity page opens. 2. Click the arrow to the right of the Add a type for this entity field, and then select the desired entity type from the dropdown list. 3. Enter the Entity Name, Display ID (ProTrack ID), City, State, and Postal Code. Note: The Optimiz Display ID is the same as the ProTrack ID. All new entities must be entered into ProTrack first. Once the new entity is assigned a ProTrack ID, enter this number into the Display ID field in Optimiz. Page 8 Optimiz 4. Follow the specific formatting rules listed to the right when entering the entity’s name, address, hours of operation, and other information. Formatting Rules: General Rules • All names / words should be spelled out completely-do not abbreviate company names or street addresses. • Do not use all caps, unless the entity is specifically incorporated with all caps (e.g. ALCOA); only the first letter of each word should be capitalized. • Use spaces before AND after special characters (&, -, / ). • Always confirm with suppliers before entering entities that seem to be duplicates. Name • If a c/o is used, BOTH entities must be entered separately with their own unique display IDs. • Do not add descriptions or comments to the Name field. • All words should be spelled out completely with the exception of the following: o Licensed Limited Corporation (use LLC) o SA de CV (use S.A. de C.V.) o RL de CV (use R.L. de. C.V.) • Use a comma before each of the abbreviations listed above. Address • The proper way to indicate a post office box in a mailing address is: P.O. Box. • P.O. Box, suite, building, or dock code information included in a mailing address should be placed in the Address 2 field, UNLESS there is no street address included. Use the Address 1 field in those cases. Page 9 Optimiz 5. Click Create New Entity to add the new entity to Optimiz. 6. Optimiz enters the entity editing mode. Page 10 Optimiz Editing an Entity To edit an entity’s address: 1. Click the Edit link below the address. 2. Make the necessary changes in the text fields that appear on the page. 3. Click Save. Page 11 Optimiz To edit an entity’s hours of operation: 1. Click the Edit link next to Hours of Operation. 2. The Hours of Operation dialog box opens. Page 12 Optimiz 3. To change the hours of operation for a day that already has hours listed: • Click Delete to remove current hours for that day • Click Add New Hours. • Select the day of the week to add new hours to • Enter the new hours of operation • Click Add. NOTE: If this information is not given, Optimiz assumes the following: - Entity is open M-F - Entity opens at 0800 - Entity closes at 1700 Optimiz automatically saves changes after you click Add. 4. To add hours for a day currently not listed: • Click the Add New Hours button • Select the day of the week to add new hours to • Enter the new hours of operation • Click the Add button NOTE: Hours of operation are saved as you enter them. Page 13 Optimiz To change an entity’s status: 1. Click the gear icon in the upper right corner of the Entity Type Details section of the page. 2. Change the Entity status by selecting Active, Inactive, or Pending. Note: Entity types can only be set to Inactive when they have not been used Page 14 Optimiz To update Entity Details: 1. Make the necessary updates in the text fields in the Entity Type Details section of the page. 2. Click Save. NOTE: The text on the save button will vary based on the tab you are on. Example: Save ShipFrom appears on the ShipFrom tab. Page 15 Optimiz Adding a New Entity Type 1. To add a new entity type to an entity that already exists in Optimiz, first search for, and open the record for the existing entity. 2. Click the arrow to the right of the Add a new type for this entity field in the Types section. 3. Select an entity type from the list. Page 16 Optimiz A tab for the new Entity type appears at the bottom of the page. 4. Enter all required information into the fields associated with the new tab. 5. Click the Save button. NOTE: The text on the save button will vary based on the tab you are on. Example: Save ShipFrom appears on the ShipFrom tab. Page 17 Optimiz Adding a Contact To add a contact to an entity: 1. Begin typing the contact’s name into the Primary Contact field. 2. Suggestions for matching names appear in a list below the field. If none of the suggestions match, click Create New Contact. Page 18 Optimiz 3. Complete the fields in the Create New Contact dialog box. 4. Click Create to add the Contact. Page 19 Optimiz Managing Entity Contacts To edit entity contacts: 1. Click Manage Contacts. The Contact Manager dialog box opens. 2. Select the record for the contact you wish to edit. 3. Make all the necessary changes and click Save to return to the Entity page. Page 20 Optimiz Exercises Create an entity: 1. Open the Entity menu. 2. Click Add new entity in the upper right corner of the page 3. Enter the following information into the required fields in the Create New Entity dialog box: • Entity Type: Select one of the following entity types: o Ship From o Ship To o Bill To • Entity Name: Your first and last initials, followed by the word shipping, receiving, or billing • Display ID: Enter 5 random numbers • Country: Defaults to United States. Leave this as is. • Postal Code: Enter your postal code into the postal code field. • City, State, and Address 1: Enter your home address into these fields. • Click the Save Ship From, Save Ship To, or Save Bill To button to add the new entity to Optimiz. Add a Contact: 1. Open the Entity menu. 2. Search for the Entity you created earlier and select an entity type if you added more than one. 3. Place the cursor in the Primary Contact field and begin typing your first name. 4. When the suggestion box appears, click Create New Contact. 5. Enter the following information into the required fields in the Create New Entity dialog box: • Type: Select any type from the list • First Name: Enter your first name • Last Name: Enter your last name • Country: Leave as United States • Phone/Ext: Enter a phone number • Fax: Leave blank • Email: Enter your email address • Comments: Leave Blank 6. Click Create button to add the contact. 7. Click Save on the Entity page to update the record for the entity. Page 21 Optimiz Load Entry Page 22 Optimiz Load Entry In the TMS, you can perform a One Time Load Entry (also called a “One Off”), or create a Logistics Plan Entry. Both entries are very similar. The main difference is that a One Time Load is just that; and occurs once on a specific date. A logistics plan is configured to repeat based on a certain number weeks and days of the week. 1. Open the Loads menu. 2. Click Create. 3. Select the type of entry. Page 23 Optimiz Accessing the One-Time Load Entry Page To access the One – Time Load Entry or Logistics Plan Entry screens: 4. Open the Loads menu. 5. Click Create. 6. Select One Time Load Entry 7. The Load Entry page opens. Page 24 Optimiz Select Date, Plan and Add Shipments 1. To add a shipment, click inside the Create for field and select the starting date for this load. 2. If copying from a logistics plan, type the name of the plan and select it from the list. 3. Click + Add New Shipment. Page 25 Optimiz 4. Enter shipment information into the fields in the Details section of the dialog box: • Origin • Destination • Bill To • Customer • Payor Term Type • NMFC • Pickup From and To • Delivery From and To Each shipment must also contain at least one handling unit before the shipment can be saved. To add a handling unit: 5. Click Add Handling Unit. 6. Enter the width, height, and length of the unit (if known) 7. Enter the quantity and weight. Note: When a shipment for a Ship From/Ship To combination contains more than one type of handling unit, repeat this process to add additional handling units. 8. Use the Additional Information Page 26 Optimiz section to enter information such as: • Pickup Authorization Number • BOL 9. If the shipment is in-bond, select In-Bond. 10. If the shipment contains hazardous materials, select Hazmat. 11. Once all the handling units for a particular shipment are entered, click Save Shipment. Page 27 Optimiz Adding a New Entity Note: If the entity name you are searching for does not appear in the suggestions box, you can add a new entity through the Add/Edit Shipment dialog box. 1. To add an entity, click Create New Entity, below the field. 2. Enter details for the new entity into the fields in the Create New Entity form. NOTE: Optimiz suggests records that resemble the data you enter into the form and appear at the bottom. Page 28 Optimiz 3. Click Create. The Create New Entity Form closes and you return to the Add/Edit Shipment dialog box. Page 29 Optimiz Editing or Deleting Shipments 1. To edit shipments, click Edit, in the shipment record you wish to edit. The Add/Edit Shipment dialog box opens. 2. Edit the shipment details and click Save Shipment. Page 30 Optimiz 3. To delete a shipment, click Delete in the shipment record you wish to edit. 4. Optimiz removes the shipment record from the Load Entry page. Page 31 Optimiz Generating Segments Once you add a shipment to the Load Entry page, you’ll use the stop information to generate the specific segments of the load plan. 1. To generate the segments of a load plan, click Manage Stops in the Segments section of the page. The Add/Edit Stop dialog box opens. 2. Double check the information in the Stops section of the box. 3. If the information is correct, click Save Segments. Page 32 Optimiz The Manage Stops dialog box closes and the Load Entry page re-opens with Segments section populated with stops. Page 33 Optimiz Editing or Deleting Stops 1. To edit specific details for a stop, click the Manage Stops button to open the Manage Stops dialog box. 2. Click the Edit link for the stop you need to edit. 3. Enter the updated details into the Stop Details section of the box. The Add/Edit Stop dialog box opens. Note: To change the order of the stops in a load, simply click a stop and drag it to where it belongs in the stop order. Page 34 Optimiz 4. To remove a stop, click the Remove link next to the stop you wish to remove. 5. Optimiz removes the stop from the load plan. 6. Click Save Segments to update the load plan. NOTE: If you add a stop, a shipment needs to exist with the stop in it. The Manage Stops dialog box closes and the Load Entry page reopens with Segments section populated with stops. Page 35 Optimiz Adding Load Details 1. To add load details, click Edit Details in the Load Details section. The Edit Load Details dialog box opens. Page 36 Optimiz 2. The Edit Load Details dialog box contains three tabbed pages: • General • Carrier • Comments 3. Use the remaining fields under the General tab to enter: • Request ID • Responsible Party • Responsible Party Location • Equipment Type 4. Use the checkboxes to flag the load as Auto Approved, or Hot, or to suppress the tender. Note: Select the Auto Approve checkbox when a load can skip “planned” status and automatically pass into Load Management. Page 37 Optimiz 5. Use the Carrier tab to enter the following information about the selected carrier: • Name • Interline Carrier (If needed) • Mode • Service • Rate • Rate Comments • Check Call frequency 6. Select the Auto Confirm checkbox if the carrier will automatically accept the tender. Page 38 Optimiz 7. Type any comments applicable to the route into the Comments field on the Comments page. NOTE: Internal and external comments appear in the Load Details section of the Load Management page. External comments also appear in the Load Details section of the Carrier Portal. Internal comments do not. 8. Click Save Details to save the load details. Page 39 Optimiz Editing Load Details 1. To edit load details, click Edit Details in the Load Details section. The Edit Load Details dialog box opens. Page 40 Optimiz 2. Select the tabbed page that contains the load details you need to edit. 3. Edit the load details and click Save Details. Page 41 Optimiz Saving the One-Time Load Plan Once you have added all shipments, segments, and load details, click Save Load. Page 42 Optimiz Exercises Add a Shipment 1. Open the Loads menu and select Load Entry. 2. Click Add New Shipment. 3. Enter the following information into the required fields in the Add/Edit Shipment dialog box: a. Ship From – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components b. Ship To – Select one of the following: i. Walter’s Widgets ii. Testa Assembly iii. Covington, LLC iv. Allied Assembly c. Customer – Select one of the following: i. Emerson Trading ii. Bass Components d. Bill To – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components e. Pickup – Enter a 2 hour time frame during normal business hours 4. Enter the following information into the fields at the bottom of the dialog box to add a handling unit to the shipment: a. Type: Pallet b. Use defaults for Length, Width, and Height c. Quantity: 4 d. Weight: 6000 5. Click Add Handling Unit to add the handling unit to the shipment 6. Click Add Shipment to add the shipment to the Load Plan. Page 43 Optimiz Add Load Details 1. Click Add new stop. 2. Enter the following information into the General Page: a. Custom Route Name: Enter your last name and the word “Route” b. Customer: i. Emerson Trading ii. Bass Components c. Responsible Party – Select one of the following: i. Cass ii. Nolan and Cunnings d. Responsible Party Location – Use the bill to entity that matches the Responsible Party. e. Click the Auto Approve checkbox to remove the checkmark 3. Enter the following information into the Primary Carrier page: a. Carrier – Select from the following: i. CCS Trucking ii. Redhawk Frieght b. Mode: Select Less Than Truckload c. Equipment Type: i. Select 53 Foot Dry Van d. Service: Use the defaults e. Est. Cost: Leave blank f. Check Calls: iii. Stop: Arrival and Departure iv. Interval: Every 60 minutes 4. Skip the secondary carrier page-no secondary carrier is needed (This option will not exist if you are entering a one-off shipment.) 5. Enter the following information into the Recurrence page: a. Select the Weekly radio button, select the checkbox that corresponds with the current day (i.e. Select Monday for Monday, etc.) b. In the Start Date field, select Today’s date c. In the End After field, enter 26 (This option will not exist if you are entering a one-off shipment.) 6. No comments are needed. 7. Click Save Details. Page 44 Optimiz Edit Stops 1. Click Edit for the second stop in the load 2. Update the transit time to 2 to indicate that it will take two days to get from stop 1 to stop 2. 3. Click Save Stop. Edit a Shipment 1. Click Edit for the shipment in this load. 2. Add a new handling unit to the shipment by completing the following: a. Type: Roll b. Length: 60 inches, Use defaults for Width and Height c. Quantity: 2 d. Weight: 1500 3. Click Add Handling Unit. 4. Click Save Shipment. Save the Load Plan Click Save Load. Page 45 Optimiz Logistics Plan Entry Page 46 Optimiz Accessing the Logistics Plan Entry Page To access the Logistics Plan Entry screen: 1. Open the Loads menu. 2. Click Create. 3. Select Logistics Plan Entry. 4. The Logistics Plan Entry page opens. Page 47 Optimiz Adding Shipments 1. To add a shipment, click + Add new shipment. The Add/Edit Shipment dialog box opens. 2. Enter shipment information into the fields in the Details section of the dialog box: • Origin • Destination • Bill To • Customer • Payor Term Type • NMFC • Pickup From and To • Delivery From and To • Time Zone Page 48 Optimiz Each shipment must also contain at least one handling unit before the shipment can be saved. To add a handling unit: 3. Click Add Handling Unit. 4. Enter the width, height, and length of the unit (if known) 5. Enter the quantity and weight. Note: When a shipment for a Ship From/Ship To combination contains more than one type of handling unit, repeat this process to add additional handling units. 6. Use the Additional Information section to enter information such as: • Pickup Authorization Number • BOL 7. If the shipment is in-bond, select the In-Bond checkbox 8. If the shipment contains hazardous materials, select the Hazmat checkbox. Page 49 Optimiz 9. Once all the handling units for a particular shipment are entered, click Save Shipment. Page 50 Optimiz Editing or Deleting Shipments 1. To edit shipments, click the Edit button in the shipment record you wish to edit. The Add/Edit Shipment dialog box opens. 2. Edit the shipment details and click Save Shipment. Page 51 Optimiz 3. To delete a shipment, click Delete in the shipment record you wish to edit. 4. Optimiz removes the shipment record from the Load Entry page. Page 52 Optimiz Generating Segments Once you add a shipment to the Logistics Plan Entry page, you’ll use the stop information to generate the specific segments of the load plan. 1. To generate the segments of a load plan, click Manage Stops in the Segments section of the page. The Manage Stops dialog box opens. Page 53 Optimiz 2. Double check the information in the Stops section of the box. 3. If the information is correct, click Save Segments. The Manage Stops dialog box closes, revealing the Logistics Plan Entry page. Page 54 Optimiz Editing or Removing Stops 1. To edit specific details for a stop, click Manage Stops to open the Manage Stops dialog box. 2. Click the Edit link for the stop you need to edit. 3. Enter the updated details into the Stop Details section of the box. The Add/Edit Stop dialog box opens. Note: To change the order of the stops in a load, simply click a stop and drag it to where it belongs in the stop order. 4. To remove a stop, click the Remove link next to the stop you wish to remove. 5. Optimiz removes the stop from the load plan. Page 55 Optimiz 6. Click Save Segments to update the load plan. Note: If you are adding a stop, your shipment must exist with a stop in it. Page 56 Optimiz Adding Load Details 1. To add load details, click the Edit Details button in the Load Details section. The Edit Load Details dialog box opens. 2. The Edit Load Details dialog box contains five tabbed pages: • General • Primary Carrier • Secondary Carrier • Recurrence • Comments Page 57 Optimiz 3. Use the Plan Name field to link the one time load and assign a name to the logistics plan. 4. Use the remaining fields under the General tab to enter: • Responsible Party • Responsible Party Location • Equipment Type 5. Use the checkboxes to flag the load as Auto Approved, or Hot, or to suppress the tender. Note: Select the Auto Approve checkbox when a load can skip “planned” status and automatically pass into Load Management. 6. Use the Primary Carrier tab to enter the following information about the selected carrier: • Name • Interline Carrier (if needed) • Mode • Service • Rate • Rate Comments • Check Call frequency 7. Select the Auto Confirm checkbox if the carrier will automatically accept the tender. NOTE: The Secondary Carrier tab is only required to be completed if the customer requires a secondary carrier. Page 58 Optimiz 8. Use the recurrence tab to identify how often loads should generate from the logistics plan you’re creating. 9. For a weekly recurrence, select Weekly: • Use the Recur every field to identify whether the load runs every week or not. If, for example, the load runs every other week, enter 2 in this field. If the load runs monthly, select 4. • Use the weekday checkboxes to identify the days of the week the load will run. 10. For a single occurrence, do not use One Time. Rather, use Create > One Time Load Entry from the Loads menu item. NOTE: The No Recurrence option is solely intended for use by route engineers. Page 59 Optimiz 11. Type any comments applicable to the route into the Comments field on the Comments page. NOTE: Internal and external comments appear in the Load Details section of the Load Management page. External comments also appear in the Load Details section of the Carrier Portal; internal comments do not. 12. Click Save Details to save the load details. Page 60 Optimiz Editing Load Details 1. To edit load details, click Edit Details in the Plan Details section. The Edit Load Details dialog box opens. Page 61 Optimiz 2. Select the tabbed page that contains the load details you need to edit. 3. Edit the load details and click Save Details. Page 62 Optimiz Saving the Logistics Plan 1. Once you have added all shipments, segments, and load details, click Save Logistics Plan. Page 63 Optimiz Exercises Add a Shipment 1. Open the Loads menu and select Load Entry. 2. Click Add New Shipment. 3. Enter the following information into the required fields in the Add/Edit Shipment dialog box: a. Ship From – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components b. Ship To – Select one of the following: i. Walter’s Widgets ii. Testa Assembly iii. Covington, LLC iv. Allied Assembly c. Customer – Select one of the following: i. Emerson Trading ii. Bass Components d. Bill To – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components e. Pickup – Enter a 2 hour time frame during normal business hours 4. Enter the following information into the fields at the bottom of the dialog box to add a handling unit to the shipment: a. Type: Pallet b. Use defaults for Length, Width, and Height c. Quantity: 4 d. Weight: 6000 5. Click Add Handling Unit to add the handling unit to the shipment 6. Click Add Shipment to add the shipment to the Load Plan. Page 64 Optimiz Add Load Details 1. Click Add new stop. 2. Enter the following information into the General Page f. Custom Route Name: Enter your last name and the word “Route” g. Customer: iii. Emerson Trading iv. Bass Components h. Responsible Party – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components i. Responsible Party Location – Use the bill to entity that matches the Responsible Party. j. Click the Auto Approve checkbox to remove the checkmark 3. Enter the following information into the Primary Carrier page: g. Carrier – Select from the following: v. CCS Trucking vi. Redhawk Frieght h. Mode: Select Less Than Truckload i. Equipment Type: ii. Select 53 Foot Dry Van j. Service: Use the defaults k. Est. Cost: Leave blank l. Check Calls: vii. Stop: Arrival and Departure viii. Interval: Every 60 minutes 4. Skip the secondary carrier page-no secondary carrier is needed 5. Enter the following information into the Recurrence page: b. Select the Weekly radio button, select the checkbox that corresponds with the current day (i.e. Select Monday for Monday, etc.) c. In the Start Date field, select Today’s date d. In the End After field, enter 26 6. No comments are needed. 7. Click Save Details. Page 65 Optimiz Edit Stops 1. Click Edit for the second stop in the load 2. Update the transit time to 2 to indicate that it will take two days to get from stop 1 to stop 2. 3. Click Save Stop. Edit a Shipment 1. Click Edit for the shipment in this load 2. Add a new handling unit to the shipment by completing the following: a. Type: Roll b. Length: 60 inches, Use defaults for Width and Height c. Quantity: 2 d. Weight: 1500 3. Click Add Handling Unit. 4. Click Save Shipment. Save the Load Plan Click Save Load. Page 66 Optimiz Creating a New Route from an Existing Route 1. To use the stops, load details, and shipments from an existing route for a new route, enter the route name into the Copy from existing route field. NOTE: This function only exists in the logistics plan entry and one time load entry. 2. Select the desired route name from the drop-down list. All stops, load details (except custom route name), and shipments for the selected route populate the Load Planning page. Note: You can add a new custom route name and edit stops, shipments, and load details as needed. 3. Click Save Logistics Plan to save the new plan. If creating a one time load from a logistics plan, click Save Load. Page 67 Optimiz Exercises Add a Shipment 1. Open the Loads menu and select Load Entry. 2. Click Add New Shipment. 3. Enter the following information into the required fields in the Add/Edit Shipment dialog box: a. Ship From – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components b. Ship To – Select one of the following: i. Walter’s Widgets ii. Testa Assembly iii. Covington, LLC iv. Allied Assembly c. Customer – Select one of the following: i. Emerson Trading ii. Bass Components d. Bill To – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components e. Pickup – Enter a 2 hour time frame during normal business hours 4. Enter the following information into the fields at the bottom of the dialog box to add a handling unit to the shipment: a. Type: Pallet b. Use defaults for Length, Width, and Height c. Quantity: 4 d. Weight: 6000 5. Click Add Handling Unit to add the handling unit to the shipment 6. Click Add Shipment to add the shipment to the Load Plan. Page 68 Optimiz Add Load Details 1. Click Add new stop. 2. Enter the following information into the General Page k. Custom Route Name: Enter your last name and the word “Route” l. Customer: v. Emerson Trading vi. Bass Components m. Responsible Party – Select one of the following: i. Bob’s Pieces Parts ii. McCallum’s Auto Parts iii. Emerson Trading iv. Crego Components n. Responsible Party Location – Use the bill to entity that matches the Responsible Party. o. Deselect the Auto Approve checkbox to remove the checkmark. 3. Enter the following information into the Primary Carrier page: m. Carrier – Select from the following: v. CCS Trucking vi. Redhawk Freight n. Mode: Select Less Than Truckload o. Equipment Type: iii. Select 53 Foot Dry Van p. Service: Use the defaults q. Est. Cost: Leave blank r. Check Calls: vii. Stop: Arrival and Departure viii. Interval: Every 60 minutes 4. Skip the secondary carrier page-no secondary carrier is needed 5. Enter the following information into the Recurrence page: e. Select the Weekly radio button, select the checkbox that corresponds with the current day (i.e. Select Monday for Monday, etc.) f. In the Start Date field, select Today’s date g. In the End After field, enter 26 6. No comments are needed. 7. Click Save Details. Page 69 Optimiz Edit Stops 1. Click Edit for the second stop in the load. 2. Update the transit time to 2 to indicate that it will take two days to get from stop 1 to stop 2. 3. Click Save Stop. Edit a Shipment 1. Click Edit for the shipment in this load 2. Add a new handling unit to the shipment by completing the following: a. Type: Roll b. Length: 60 inches, Use defaults for Width and Height c. Quantity: 2 d. Weight: 1500 3. Click Add Handling Unit. 4. Click Save Shipment. Save the Load Plan Click Save Load. Page 70 Optimiz Planning Management Page 71 Optimiz Accessing Planning Management 1. Open the Planning menu. 2. Click Planning Management. The Planning Management Page opens. Page 72 Optimiz The Planning Management Page 1. The top of the Planning Management page contains a list of all logistics plans scheduled within the next seven day rolling window that are awaiting approval. 2. To review details for a specific load in the grid, select the load to highlight it. The details for the selected load appear at the bottom of the Planning Management page. 3. The Load Details tab contains the load details created for the load when it was entered into Optimiz. 4. The Event Log shows all activity on the selected load. Expected items are displayed with a gray clock. Completed items are displayed with a green check mark. Exceptions, if any, are displayed with a red cross box. Page 73 Optimiz Approving, Declining, or Adding a Message to a Load 1. To approve a load, click Approve. A dialog box appears to confirm that the load has been approved. When a load is approved: • The load record moves from the Planning Management page to the Load Management page. • The load status updates to “Ready to be Tendered”. 2. To decline a load, click Decline. A dialog box appears to confirm that you declined the load. When you decline a load: • The load record is removed from the Planning Management page. • The load status updates to “Declined”. Note: Declined loads can be viewed on the Load History Search page. 3. To add a message to a load, click Message. Page 74 Optimiz 4. Enter your comments into the dialog box that appears. Page 75 Optimiz Editing a Logistics Plan 1. To edit a logistics plan, select it from the list and click Edit Selected. 2. The Edit Load page for the selected logistics plan appears. 3. Make any necessary updates and click Save Load to save the updated Logistics Plan. Page 76 Optimiz Exercises Planning Management: Accept a Load 1. Open the Planning menu, and select Planning Management. 2. Find the logistics plan you created during the Load Entry section of the presentation. Click on the record for that load. 3. Click Accept. Page 77 Optimiz Load Management Page 78 Optimiz Accessing Load Management 1. Open the Loads menu. 2. Click Load Management. The Load Management Page opens. 3. When the Load Management page initially opens, it is blank. Access the Search Panel by clicking the triangle noted in the screenshot. Then, search for your desired loads. Page 79 Optimiz 4. The top of the Load Management page contains. A list of all approved loads that are scheduled for pickup within the next seven days. NOTE: Loads in the following statuses appear on the Load Management page: • Ready to Tender-These are loads that have been approved, but tenders have not been sent. • Tendered – These are loads that have been approved and tendered. Loads with rejected tenders are still in tendered status. • In-Transit – The load has been checked in, verified, and loaded. 5. The bottom of the Load Management page has two tabs. 6. Select a load from the grid to view the information contained within these tabs. 7. The Load Details tab displays information about the load. Page 80 Optimiz 8. The Event Log shows all activity on the selected load. Page 81 Optimiz Tendering, Accepting, Rejecting, Canceling, or Adding a Message to a Load 1. Tenders are sent on loads in “Ready to Tender” status on the Load Management page. To tender a load, click Tender. The status of the load updates to “Tendered.” 2. To re-send a tender email to the primary carrier for any reason, click Resend Tender. A copy of the last accepted tender for the load is emailed to the carrier. If there is not an accepted tender, nothing will be sent. 3. To accept a tender, click Accept. The load status remains at “Tendered”. Page 82 Optimiz 4. To reject a tender click Reject. The load status remains “Tendered.” NOTE: If the load has a secondary carrier associated with it, the load can be re-tendered to the secondary carrier. If no secondary carrier is identified, the load remains in Tendered status and a tendering exception notification (green T) appears next to the load record on the Load Management page. 5. To cancel a tender, click Cancel Load. The load status updates to “Cancelled.” NOTE: When a load is cancelled, the load record no longer appears on the Load Management screen. The load record can be viewed through the Load History screen. If there is a pending tender on the load, the cancel button will read cancel tender. If you select the button, the tender will be cancelled but the load will still be valid. If the load is in ready to tender status, the button will read cancel load. If the load is in transit, the button will be disabled. 6. To add a message on a load, click Message. Page 83 Optimiz Adding a Check Call Carriers usually add check calls through the Carrier Portal unless they are set up for EDI. In the event that a carrier cannot access the Carrier Portal, internal ProTrans users can manually add check calls through the Load Management page. 1. To add a check call to a load, click Check Call. The Add Check Call dialog box opens. 2. Select the check call from the left. Enter check call information into the fields in the Add Check Call dialog box. To add an intransit check call, click + Add Intransit Check Call. 3. Click the Save Check Call button to add the check call to the load. Page 84 Optimiz Editing a Load 1. To edit a load, select it from the list and click the Edit Selected button. 2. The Load Edit page for the selected load appears. 3. Make any necessary updates and click Save Load to save the changes. To re-tender the load, click Save & Tender Load. The revised tender is issued and the carrier is notified by email. This tender is auto-confirmed by the system and the tender automatically assigned an “Accepted” status as a default. Page 85 Optimiz Resending a Tender If a tender was sent to the primary carrier and the carrier calls to say they’ve never received it, or they need an additional copy, the tender can be re-sent. To resend a tender: 1. Select the appropriate load from the list on the Load Management page. 2. Click the Resend Tender button. The tender that will be sent is the LAST ACCEPTED tender. If nothing has been accepted, nothing will be sent. 3. A dialog box appears asking if you wish to re-send the tender. Click OK. Page 86 Optimiz Exercises Load Management: Tender a Load and then Accept the Tender 1. Open the Loads menu and select Load Management 2. Find the logistics plan you approved in the previous activity. Click on the record for that logistics plan. 3. Click Tender. 4. Click Accept. Load Management: Add a Check Call 1. Click Add Check Call. 2. Complete the fields in the Add Check Call dialog box: a. Check Call Type: Stop Departure b. Date: Use the date of the first occurrence of the plan. c. Time: Enter the current time. d. Last Known Location: Enter your current City, State, and Zip. e. ETA Date: Two days after the check call date f. ETA Time: Select 2:00 pm g. Leave the Comments field blank. 3. Click Add Check Call. Edit Load Details 1. Click Edit Details. 2. Open the Carrier page a. Carrier: Change the carrier to either of the following (whichever carrier you did not use during initial load entry): a. CCS Trucking b. Redhawk Freight 3. Click Save Details. 4. When the dialog box appears asking if you would like to re-tender the load, click Save and Tender. 5. Click Save Load. Page 87 Optimiz Load History Search Page 88 Optimiz Searching for a Load on the Load History Page 1. Select the Loads menu. 2. Click Load History. The Load History Search Page opens. NOTE: The Load History page only displays loads in Closed, Delivered, Declined or Cancelled status. Active loads appear on the Load Management page. 3. Create a custom search to view loads on the Load History page. 4. Use the Search By field to select your specific search criteria. To use the field: • • • Click the arrow to the right of the field Select criteria from the list. Click +Add. Once you’ve selected your criteria, additional fields appear below the Search field. 5. Identify how you wish to narrow the data by entering information into these additional fields. Note: This example is for a search by Load ID. Type the Load ID number into the Search By field. 6. Click Add. 7. If you want to further narrow Page 89 Optimiz the search, add additional search criteria. 8. You can also use the checkboxes at the bottom of the search panel to include Modes and Load Statuses in the search. 9. To include these criteria, select the appropriate checkbox. Page 90 Optimiz 4. Give your custom search a name. Enter this name into the Name field. 5. If this is the most common search you run, identify this custom search as primary by selecting the Primary checkbox. Page 91 Optimiz 6. To Clear search criteria, click Clear. 7. To save a custom search, click Save Search. 8. To display all loads in the history panel, click Show All. Clicking this button removes all criteria and shows everything that is declined, cancelled, and closed. Page 92 Optimiz Viewing or Editing a Load 1. To edit a load listed in your custom search, select the load you wish to edit. 2. Click Edit Selected. Additionally, you can resend the most recently accepted tender (Resend Tender), and enter a comment on a load as well (Message button). 3. The Edit Load page for the selected plan appears. 4. Make any necessary updates and click Save Load to save the changes. Page 93 Optimiz Exercises Create a Load History Search 1. Open the Loads menu and select Load History. 2. Click the arrow to the right of the Search By field. 3. Select Route Name. 4. Type the name of the route you created during the Load Entry section into the Search By field. 5. Click the Approve button. Page 94 Optimiz Logistics Plan Search Page 95 Optimiz Accessing Logistics Plan Searches 1. Open the Loads menu. 2. Click Logistics Plan Search. The Logistics Plan Search Page opens. Page 96 Optimiz Searching for a Logistics Plan 1. Use the fields at the top of the Load Search page to narrow your search by: • • • Route Name Primary Carrier Secondary Carrier 2. Once you’ve selected your criteria, click Search. Page 97 Optimiz 3. Logistics plans that match your search criteria appear at the bottom of the page. 4. To further refine your search results, you can select a column header and drag it into the bar above the search results to group results based upon the selected header. For example, if you choose to group the results by Destination, all the loads with the same destination will appear together. Page 98 Optimiz Editing a Logistics Plan 1. To edit a plan, select it from the list and click Edit Selected. 2. The Logistics Plan Edit page for the selected plan appears. 3. Make any necessary updates and click Save Logistics Plan to save the updated Logistics Plan. Page 99 Optimiz Creating a New Logistics Plan 1. To add a new logistics plan, click Add New Logistics Plan. 2. The Logistics Plan Entry page opens. 3. Enter the new logistics plan. 4. Click Save Logistics Plan to save the plan when you are finished. Page 100 Optimiz Exercises Logistics Plan Search 1. Open the Loads menu and select Load Search. 2. Enter the name of the route you created during the Load Entry section into the RouteName field. 3. Click Search. 4. Review the results. Page 101 Optimiz Carrier Portal Page 102 Optimiz Accessing the Carrier Portal To access Optimiz: 1. Open your browser and navigate to: optimiz.protrans.com 2. Type in the Optimiz carrier username, password, and click Log On. The Optimiz Carrier Portal Landing Page appears. Page 103 Optimiz The Carrier Portal Landing Page 1. The top of the Carrier Portal Landing Page displays information from the carrier profile including address, contact information, and hours of operation. If carriers need any of this carrier profile information updated, they have to contact ProTrans. 2. The middle of the Carrier Portal Landing Page has two columns: • The Load column contains information about the current status of your accepted loads. • The Tender status column contains information about the status of your tenders. 3. The numbered link indicates the number of items in a particular status. Click the link to view this information. Page 104 Optimiz 4. The bottom of the Carrier Portal Landing Page enables carriers to search for specific loads or tenders. Page 105 Optimiz Accepting or Rejecting a Tender 1. To accept or reject a tender request, click the numbered link next to Sent The Tender Requests page opens. The Tender Requests page opens. To view a sample of an emailed tender request, see the following pages. 2. Click Accept Selected to accept the tender. NOTE: When carriers accept a tender request, the load record is removed from the Tender Requests page. The status of the load updates to Scheduled, and the load tally moves from Tender Request Pending to Scheduled AND to Tender Request Accepted. Page 106 Optimiz 3. Click Reject Selected to reject the tender. NOTE: When carriers reject a tender, the load record is removed from the Tender Requests page. The status of the load updates to Rejected, and the load tally moves from Tender Request Pending to Rejected. Then, they will receive an email from ProTrans. To view an a sample of an emailed rejected request, see the following pages. Tender Request Notes: • The time limit to accept a tender once carriers are notified by email is 30 minutes. • If carriers do not accept the tender request within 30 minutes, it automatically is rejected. If they require more time to accept tenders, carriers must contact ProTrans. • In an instance where there is a primary and secondary carrier, the load will be tendered to the secondary carrier automatically if it is rejected by the first carrier, or when the first carrier exceeds the time limit to respond to the tender request. Page 107 Optimiz Tender Request Email Sample Page 108 Optimiz Page 109 Optimiz Tender Request Rejected Sample Email Page 110 Optimiz Adding a Check Call 1. To add a check call, click a numbered link beside the desired load status. For this example, we clicked beside Tendered. The Carrier Check Calls page opens. 2. The top of the Carrier Check Calls page contains status information about loads that have been accepted. 3. The bottom of the page has two tabs: • The Load Detail tab contains information about the selected load. • The Load Activities tab detail events in chronological order. 4. Click a load to select it. 5. Click Check Call. The Check Call dialog box opens. Page 111 Optimiz 6. Select the Date and Time for the check call event. 7. Enter the city, state and zip code for the current check call event. NOTE: These fields auto populate when you enter a Stop Arrival or Departure check call. 8. Enter the estimated time of arrival (ETA) for the next stop. 9. Enter the name of the person reporting this check call event into the Contact field. 10. Add any comments and click Add Check Call. 11. The check call appears in the Load Activities tab. Check Call Notes: • • • The default time to enter a check call is anytime within the scheduled stop time. For example, if the first stop departure is scheduled between 8-9 am, carriers should enter your check call within those times. If the check call is based on a time interval, carriers need to enter their next scheduled check call at 3pm. If the carrier misses a check call for a stop, an exception icon (blue phone) will appear in the Check Call Exceptions column on the Carrier Page 112 Optimiz • • Portal Carrier Check Calls page. If the carrier misses a check call for an intransit stop, an exception icon (clock) will appear in the Check Call Exceptions column on the Carrier Portal Carrier Check Calls page To correct a missed check call, the carrier should enter the check call as soon as they realize it was missed. This removes the exception icon. Page 113 Optimiz EDI Activities Log Entries EDI (Electronic Data (Interchange) enables a carrier to pass check call and status information electronically from your system to Optimiz without using the Carrier Portal to enter this information. The entry in the log appears with the user ID, that was given to the carrier by ProTrans, for their company with the extension EDI. In the example below, ZingExpress is the user ID with EDI attached to it in the User column.This indicates this entry was entered through EDI. Page 114 Optimiz Adding a Message 1. To add a message, click a numbered link beside the desired load status. For this example, we clicked beside Tendered. The Carrier Check Calls page opens. 2. Click a load to select it. 3. Click Message. The Add Message dialog box opens. 4. Enter the message and click Add Message. 5. The message that was entered appears in the Load Activities tab. Page 115 Optimiz Searching for a Load 1. To search for a Load or Tender, click the appropriate radio button in the search section of the Carrier Check Call page. 2. Further narrow the search using the Load Id, Status, Load Begin Date or Load End date fields. NOTE: The status selections will change based on the selection of Load or Tender. 3. Click Search. 4. If the carrier selects Load as the search type, the Carrier Check Calls page opens. If the carrier selects Tender, the Tender Request page opens. On either page, only the records that match the selected search criteria appear. NOTE: If the carrier does not find the load/tender they need, they should adjust search parameters and search again. Page 116 Optimiz Exercises Accept a Tender 1. Login the Optimiz Carrier Portal using the login and password given by your trainer. 2. Click the numbered link next to the Tender Request Pending status. 3. On the Tender Requests page, select a load. 4. Click Accept Selected to accept the tender. Note the status change to the load and the entry on the Event Log tab. 5. Write down the Load ID for your load. You will use this later in the exercises. Add a Check Call 1. On the Carrier Portal Landing page, click the numbered link next to the Scheduled status. 2. Select the load from the exercises above, if not already selected. 3. Click Add Check Call. The Add Check Call dialog box opens. 4. Complete dialog box with the following information: a. Check Call Type: Stop Departure b. Stops: Choose stop 1 c. Date and Time: Choose the current date and time d. ETA for Next Stop: Enter two hours from the current time 5. Click Add Check Call. The dialog box will close. Note the new entry on the Event Log tab. Add a Message 1. Select the load from the exercises above, if not already selected. 2. Click Message. The Add Message dialog box opens. 3. Type a message of your choosing. 4. Click Add Message. The dialog box closes. Note the new entry on the Event Log tab. Search for a Load 1. Access the Carrier Portal Landing Page. 2. Scroll to the Load Search section, if necessary. 3. Click the Load radio button. 4. In the Status section, check the In-Transit status. 5. For Load Begin Date, select the current date. 6. For Load End Date, select tomorrow’s date. 7. Click Search. 8. Review your results. You should see the load listed with the Load ID you noted earlier in these exercises. Page 117