Springbank Aquatic Center - Iprm Construction Management In
Transcription
Springbank Aquatic Center - Iprm Construction Management In
Springbank Aquatic Center MAF Developments (Avanti and Ocean Atlantic) AQUATIC $6.8 Million Dollar Aquatic Center for new upscale subdivision in Plainfield, IL The construction delivery method was as General Contractor Time-line was fast tracked to construct entire aquatic center in less than 7 months. Project Scope Challenges This project scope included a completely new Aquatic Center for a new upscale subdivision development in Plainfield. The new center offered a 941 bather pool and large water slide features. There were numerous recreational activities such as bocce courts, a gazebo with barbecue grills, shade structures, a sand volleyball area, sand play and an interactive spray ground. The comprehensive plan was to create a family oasis including a clubhouse with locker rooms and amenities. Pool filtration houses were constructed along with other required site related utilities. The Owner’s schedule called for the Springbank Family Aquatic Center to open on June 15, 2006. With an undeveloped site, all utility extensions had to be constructed. Since the pool permit was not received until November 2005, the construction schedule was condensed into 7 months. Intelligent Solutions Comprehensive scheduling and coordination of all trades and intense supervision of the project enables the project to be completed in time for the grand opening in June 2006. Project Name: Springbank Aquatic Center Project Location: 607 Chicago Street, Suite 101 Plainfield, Illinois Project Type: New Construction Delivery Method: General Contractor Total Project Budget: $6,865,906 Total Project Cost: $6,584,946 Owner: MAF Developments (now Avanti and Ocean Atlantic) Owner Contact: Bernice Ellis , Vice President (retired) Project Architect: PHN Architects Project Contact Person: Jim Leppert, Project Manager www.iprmanage.com Springbank Aquatic Center MAF Developments (Avanti and Ocean Atlantic) New pool house featuring all new pumps, filtration equipment, storage with a similar look to the Aquatic Center clubhouse. One of the shade structures built (as well as shade canopies) to offer rest and eating areas to escape the hot sun. Large scale water slides both open and enclosed with platform for a fun and safe adventure for patrons. Small park as one of the many recreation features built at Springbank Aquatic Center. www.iprmanage.com
Similar documents
NGD-259C 20% Promo
you’ve always dreamed of, like countertops, appliances and more!
More informationCamp Manitoqua Aquatic Center - Iprm Construction Management
a new aquatic center. The new aquatic center featured; a fully accessible four-foot, zerodepth leisure pool, a plunge area for two water slides, a large deck with large
More information