Turn Key Buildings 928-778-7043
Transcription
Turn Key Buildings 928-778-7043
Turn Key Buildings 928-778-7043 www.MetalBuildingsAz.com Prescor Builders is a licensed, bonded and insured contractor serving Northern Arizona. We are your “One Stop Shop” for your building project needs - whatever they may be. We offer complete design-build services including: l l l l l l l l l Architecture and Engineering Permitting Site Work Foundations and Concrete Framing, Insulation and Sheeting Interior Improvements (Drywall, Paint, Flooring, etc) HVAC Plumbing Electrical Prescor Builders is a general contractor specializing in quality residential and commercial projects. We are a complete design build firm designing and constructing all types of buildings from wood or steel framed to precast concrete for residential, commercial and industrial uses. If you can envision it, we can build it! Customer service is our # 1 priority; we have built our business on it. The majority of our projects are referrals from satisfied clients, and we appreciate each and every one. To see more of our projects, visit us at www. PrescorAz.com and www.MetalBuildingsAz.com. Prescor Builders Prescott, Arizona We are also a proud dealer and builder of Versa Tube steel building systems. VersaTube® Building Systems was founded in 1994 and is a privately-owned nationally recognized manufacturer of pre-engineered steel framing components and systems for residential, agricultural, commercial and light industrial building and shelter applications. VersaTube® Building Systems brought innovation to the steel tube framing industry, inventing a machined process known as “swaging” that creates “Slip-Fit” frame connections, allowing steel frame components to easily fit together without the use of insert tubes. Building frame assembly was dramatically simplified and construction time was significantly reduced. VersaTube® Building Systems was named to the 2007 Inc. 5000 — Inc. Magazine’s list of “The Fastest Growing Private Companies in America” based on revenue growth from 2003 through 2006. GARAGES & WORKSHOPS Primary framing uses 2” x 3” steel tubing for structures engineered up to 30’ wide. Standard packages include frame system, sheet metal & trim package, framing for one gable-end garage door opening, framing for one side entry pedestrian door opening, and concrete anchor bolts. Available Widths Available Heights Available Lengths Options/Accessories 12’, 20’, 24’ and 30’ 8’, 10’, and 12’ exterior side heights 20’ minimum length Length extensions based on 4’, 4.5’ or 5’ on-center truss spacing Garage Doors, Side Entry Pedestrian Frames and Doors, Window Frame and Windows, Insulation Package BARNS & STABLES Primary framing uses 2” x 3” steel tubing for structures engineered to two available widths, with 13’H center aisle eave and 8’H outside eave heights. 12’W and 16’W center aisle widths. Standard package includes frame system, sheet metal & trim package, framing for one center aisle 12’W x 8’H door opening and concrete anchor bolts. Available Widths Available Height Available Length Options/Accessories 36’ and 40’ 13’ center aisle sidepost height; 8’ exterior side height 12’ minimum length – Add length in 12’ increments Stall System, Front Sliding Doors & Track System, Dutch Doors, Cupolas & Weathervanes, Ridge Vents, Vent Doors COMMERCIAL & INDUSTRIAL Primary framing uses 2” x 4” steel tubing for structures engineered up to 52’ wide. Standard packages include frame system, sheet metal & trim package, framing for one gable-end garage door opening, framing for one side entry pedestrian door opening and concrete anchor bolts. Available Widths Available Heights Available Lengths Options/Accessories 30’ up to 52’ 10’, 12’, 14’ and 16’ exterior side heights 20’ minimum length. 4’, 4.5’ or 5’ on-center truss spacing. Gable End & Eave Side Door Framing, Overhead Doors, Side Entry Pedestrian Door Frame, Pedestrian Doors, Window Frame, Windows, Insulation Package CARPORTS & SHELTERS Primary framing uses 2” x 3” steel tubing for shelters engineered up to 30’ wide. Standard packages include frame system, sheet metal package, and ground anchors. Classic Series Available Widths Available Heights Available Lengths Options/Accessories 12’, 14’, 18’, 20’, 24’ and 30’ 7’, 8’, 10’, and 12’ exterior side heights 20’ minimum roof coverage (18’ minimum frame length) 4’, 4.5’ or 5’ on-center truss spacing Additional Side Sheet Metal Panels Suburban Series New “A” frame design and an extra foot WIDER than other standard single-wide carports. Available Widths Available Heights Available Lengths Options/Accessories 13’, 19’, and 25’ 6’, 9’, and 12’ exterior side heights 20’ minimum roof coverage (18’ minimum frame length) Back Enclosure & Side Panel Kit, Front Enclosure Kit THE VERSATUBE ADVANTAGE VersaTube® Building Systems designs and manufactures tubular steel framed metal building packages for residential, agricultural, commercial and light industrial applications. VersaTube initially developed the concept of a structural framing system incorporating primarily tubular steel components. The key element was to offer a range of building frame sizes using ® Colorfast45 prefabricated components that could be easily and efficiently delivered andMS assembled on the work site. This was accomplished by developing and patenting a “swaging” process in which ends of square and rectangular tubing are reduced in size to slide inside like-sized tubes. These unique “Slip-Fit” connections allow for relatively small and light frame components to be assembled into a substantial, structurally sound frame system. And no insert tubes are required. Paint Sys Color Gui Polar White (80) ® System incorporates primarily 2” x 3”SR or=2” x 4”TErectangular The fact MS that the VersaTube® Building 0.58 = 0.87 SRI = 68 Colorfast45 Paint System galvanized, high-strength 14- and 15-gauge steel tubing, combined with triple-layer FLO-COAT finishing and superior bending methods, provides the customer with a product which is unmatched in strength and durability. Unlike square or round tubing, the extra wall dimension gives more resistance to stress failure. The maximum wind and snow loads attainable with the system meet or exceed building requirements in most areas. Polar White (80) TE = 0.87 Light Stone (63) SRI = 68 SR = 0.50 T Color olor uide ColorG uide CG olor Cuide olor Color Guide Gui Gu COLOR OPTIONS ast45®® Paint System ® ast45 olorfast45 Paint Paint System System® ® ® MS Colorfast45 MS Colorfast45 MS Colorfast45 Paint Paint System Paint System System SR = 0.58 Light Stone (6 SR = 0.50 TE = 0.88 SRI = 58 Mocha Tan (22) Taupe (74) SR = 0.52 Antique Bronze (D4) Ash Grey (25) TE = 0.87 SRI = 60 SR = 0.36 TE = 0.88 SR = 0.44 TE = 0.87 SRI = 49 SR = 0.37 T Color Guide Light Stone (63)(74) Mocha Tan (22) Antique Bronze (D4) Taupe Ash Grey (25) Charcoal (17) Brown (12) te (80)SRI = 68 Light Stone Light (63) Stone (63) = 58 Mocha Tan Mocha (22) =Tan (22) Antique Bronze Antique (D4) Bronze (D4) Dark Brown (44) Forest Green .87 SR = 0.50 SRTE = 0.88 TESRI 0.87 TE SRI = 60 SRI =SR = 0.88 TE SRI = 39 SRI = 31 = 0.44 = 0.87 SRI =SR 49= 0.52 SR TE = 0.37 = 0.88 40= 0.36 SR TE = 0.30 = 0.87 SR = 0.31 TE = 0.87 Polar White Polar (80) White Polar (80) White (80) Light Stone Light (63) Stone Light (63) Stone (63) Mocha Tan Mocha (22) Tan Mocha (22)SRI Tan= (22) Antique Antique Bronze (D4) Bronze Antique (D4) Bron LIGHT TAN ®WHITE 87 TESRI = 0.87 = 68 SRI =SR 68= 0.50 SR TE = 0.50 = 0.88 TESRI = 0.88 = 58 SRI =SR 58= 0.52 SRTE = 0.52 = 0.87 TESRI =STONE 0.87 = 60 SRI =SR 60= 0.36 SRTE = 0.36 = 0.88 = 0.88 39TE SRI = 39 SRI = 27 SR = 0.27 T SRTE = 0.27 = 0.87 MS Colorfast45 Paint System SR = 0.58 SR TE = 0.58 = 0.87 SRTE = 0.58 SRI = 0.87 = 68TESRI = 0.87 =SR 68= 0.50 SRI =SR 68TE = 0.50 = 0.88 SRTE = 0.50 SRI = 0.88 = 58TESRI = 0.88 =SR 58= 0.52 SRI =SR 58TE = 0.52 = 0.87 SRTE = 0.52 SRI = 0.87 = 60TESRI = 0.87 =SR 60= 0.36 SRI =SR 60TE = 0.36 = 0.88 SRTE = 0.36 SRI = 0.88 = 39T (25) Brown (17) Green (44) (26) Fern Green (07) Bronze (D4) Sierra Green (20) Polar White (80) Ash GreyDark Light Stone (63) CharcoalForest Mocha Tan (22) Brown (12) Antique ) Ash Grey Ash (25)TE Grey (25) SRI = 40 Charcoal Charcoal (17)TE = CHARCOAL (17) SRI = 31 Brown (12) Brown (12) OceanSRI Blue (35) Red (24) ASH GREY BLUE .87 SRI = 49 SR = SRI 0.37 = 0.88 0.30=SR 0.87 0.31=SR TE = 0.87 = 32 = 0.27 TE = 0.87 TE SRI =SR 27= SRI = 0.30 TE = 0.88 SRI = 31 SRI =SR TE = 0.87 SR = 0.27 TE = 0.87 TE SRI =SR 27= SRI SR = 0.58 TE = 0.87 = 68 SR = 0.50 = 0.88 58 SR = 0.52 = 0.87 60 SR = 0.36 TE = 0.88 39= 0.38 Taupe (74) Taupe (74) Taupe (74) Ash GreyAsh (25)=Grey Ash (25)Grey (25) Charcoal Charcoal (17)= 0.31 Charcoal (17) = 0.87 (17) Brown (12) Brown (12) Brown (12) .87 TESRI = 0.87 = 49 SRI =SR 49= 0.37 SRTE = 0.37 = 0.88 TESRI = 0.88 = 40 SRI =SR 40= 0.30 SRTE 0.30 = 0.87 TESRI = 0.87 = 31 SRI =SR 31= 0.31 SRTE = 0.87 TESRI = 32 SRI = 32 SR = 0.30 TE = 0.88 SRI = 31 SR = 0.30 T SR = 0.44 SR TE = 0.44 = 0.87 SRTE = 0.44 SRI = 0.87 = 49TESRI = 0.87 =SR 49= 0.37 SRI =SR 49TE = 0.37 = 0.88 SRTE = 0.37 SRI = 0.88 = 40TESRI = 0.88 =SR 40= 0.30 SRI =SR 40TE = 0.30 = 0.87 SRTE = 0.30 SRI = 0.87 = 31TESRI = 0.87 =SR 31= 0.31 SRI =SR 31TE = 0.31 = 0.87 SRTE = 0.31 SRI = 0.87 = 32T ® Forest Green (26) Fern Green Sierra Green (20)Coated Ocean Blue Red(07) (24) Charcoal Acrylic (41)¹ Ash(35) Grey (25) BrownGalvalume (12)BROWN GREEN RED(17) Forest Green Forest (26) Green (26) Fern Green Fern (07) Green (07) Sierra Green Sierra (20) Green (20) SR = SRI 0.27=SR TE = 0.87 SRI = 27 0.30=SR TE = 0.88 SRI = 31 0.38=SR TE = 0.87 SRI = 41 = 0.30 TE = 0.88 SRI =SR 31= SRI = 0.30 TE = 0.86 SRI =SR 30= SRI = 0.67 TE = 0.14 SRI = 56 SRI = 32 SR = 0.44 TE = 0.87 49 SR = 0.37 TE = 0.88 40 SR = 0.30 TE = 0.87 31 SR = 0.31 TE = 0.87 Dark Brown Dark(44) Brown Dark (44) Brown (44) Forest Green Forest (26) Green Forest (26) Green (26) Fern Green Fern (07) Green Fern (07) Green (07) Sierra Green Sierra (20) Green Sierra (20) Green ( = 0.27 = 0.87 TESRI = 0.87 = 27 SRI =SR 27= 0.30 SRTE = 0.30 = 0.88 TESRI = 0.88 = 31 SRI =SR 31= 0.38 SRTE = 0.38 = 0.87 TESRI = 0.87 = 41 SRI = 41 .87 TESRI = 0.87 = 27 SRI =SR 27= 0.27 SRTE aupe (74) wn (44)SRI = 27 .87 0.27 = 0.27 = 0.87 SRTE = 0.27 SRI = 0.87 = 27TESRI = 0.87 =SR 27= 0.30 SRI =SR 27TE = 0.30 = 0.88 SRTE = 0.30 SRI = 0.88 = 31TESRI = 0.88 =SR 31= 0.38 SRI =SR 31TE = 0.38 = 0.87 SRTE = 0.38 SRI = 0.87 = 41T SR = 0.27colors, SR TE = 0.27 = 0.87 SRTE = 0.27 SRI = 0.87 = 27TE SRI = 0.87 =SR 27=available SRI =SR 27TE Custom profiles and finishes Color selections are close representations but are limited by printing and viewing conditions. Actual samples are available by request. ® (41)¹ Dark Brown (44) Red (24) Forest Green (26) Acrylic Coated Galvalume Fern Green (07) Sierra Green (20) ® ue (35) Red (24) Red (24) Acrylic Coated Acrylic Galvalume Coated Galvalume (41)¹ ® (41)¹ .88 SRI = 31 SR = SRI 0.30= 27TE = 0.86 SRI = 30 SR = SRI 0.67= 27TE = 0.14 SRI = 56 SR = 0.27 TE = 0.87 SR = 0.30 TE = 0.88 SRI = 31 SR = 0.38 TE Galvalume = ®0.87 SR = 0.27 TE = 0.87 ® ® = 41 Ocean Blue Ocean (35) Blue Ocean (35)=Blue (35) Red (24) Red (24) Red (24) Acrylic Coated AcrylicGalvalume Coated Acrylic Galvalume Coated (41)¹ (41)¹ SRI (41)¹ .88 TESRI = 0.88 = 31 SRI =SR 31= 0.30 SRTE = 0.30 = 0.86 TESRI 0.86 = 30 SRI =SR 30= 0.67 SRTE = 0.67 = 0.14 TESRI = 0.14 = 56 SRI = 56 SR = 0.30 SR TE = 0.30 = 0.88 SRTE = 0.30 SRI = 0.88 = 31TESRI = 0.88 =SR 31= 0.30 SRI =SR 31TE = 0.30 = 0.86 SRTE = 0.30 SRI = 0.86 = 30TESRI = 0.86 =SR 30 = SRI 0.67=SR 30TE = 0.67 = 0.14 SRTE = 0.67 SRI = 0.14 = 56TESRI = 0.14 = 56 SRI = 56 ¹ All Colors Meet or Exceed S ENERGY STAR® Requireme ¹ Non-Painted Finish steel framing & engineering There are many reasons why steel framing represents a superior building material and has quickly become a smart and feasible alternative to wood frame construction. The unparalleled strength and durability of steel framing produces a strong, long lasting, maintenance-free structure – offering greater dimensional stability than wood and resistance to warping, fire, termites, mold/ mildew and general deterioration from weathering. Consider these additional advantages: Feature Advantages over Wood & Concrete Cost Effective · Virtually no waste – Pre-engineered and cut frame components · Reduced labor time and associated costs · Steel framing may lower insurance premiums Easier To Install · Patented “Slip Fit” frame connections and erector-set like construction · Pre-engineered and cut frame components · Generally simpler to erect than wood systems and requires fewer workers to install Strong, Durable & Lightweight · One of the highest strength-to-weight ratios of any construction material · Will never rot, warp, twist, buckle, split, crack, splinter, creep, settle or burn · Reduced seismic load and probability of damages from earthquakes or high winds · Can be configured to meet high snow, wind and seismic load specifications · Easier on-site handling of frame components Improved Construction Quality & Less Maintenance · Manufactured to strict standards of strength and consistency · Corrosion resistant, dimensionally stable and remains straight and true · Steel structures do not age or deteriorate like a wood structure · Stronger connections – Screws do not loosen over time (vs. nails) Added Safety & Resistance · Fire resistant – Non-combustible steel frame components · Impervious to termites, insects, rodents, mold, fungi or other destructive organisms · Does not require pesticides or other chemicals used to treat wood framing Design Flexibility/ Easy To Modify · Multiple frame dimensions for a variety of structures · Availability of various tubular steel dimensions and thickness · Greater strength for longer floor spans and higher sidewalls · Frame components allow for structural expansion or add-ons Energy Efficient · Allows for greater insulation values · Does not expand or contract with humidity changes · No air leakage caused by expansion cracks as with wood and concrete Recyclable · Steel is the most recycled material on Earth and more abundant than wood · More than 100 billion pounds recycled annually · Little waste and no trees are sacrificed for framing STEEL FRAMING & ENGINEERING Engineered Easy. VersaTube’s unique “Slip-Fit” design and standard frame components dramatically simplify the installation process. It’s a proprietary and patented swaging manufacturing process and building framing system developed, engineered, and owned by VersaTube® Building Systems. Strong & Durable Steel. VersaTube uses only the highest quality domestic heavy-duty galvanized steel tubing. Triple Layer Protection. This triple layer of corrosion protection – zinc bonding, conversion coating, and clear polymer coating – provides a smooth, shiny end product appearance that is unmatched in strength and durability. Salt spray tests prove this triple coat sealing process resists rust two times longer than any pre-galvanized or electroplated tubing product. And let’s not forget the obvious termite and rot resistance advantages over wood. Smooth Mandrel Bend. VersaTube uses a mandrel bending system for a cleaner look and a stronger bend transition. Framing systems for most primary structures and complete packaged kits include frame components that feature mandrel bends. Roof Pitch. All VersaTube structures have a standard 3:12 pitch. Ground Snow & Wind Loads. The VersaTube® framing system and structures are engineered and configured to address local area ground snow and wind load requirements. Ground snow PSF (pounds per square foot) and wind velocity & exposure level (MPH @ B or C exposure) help determine the appropriate size and configuration of a VersaTube building package. In most cases, a VersaTube structure can be customized to accommodate higher snow loads (reduced on center spacing, truss bracing, 26 gauge sheet metal, etc.) and anchoring can be increased to address higher wind load levels. Ground Snow Wind @ C Level Exposure Maximum Garages & Buildings Contractor Series Carports & Shelters Loafing Sheds 70 - 20 PSF * 100 - 42 PSF * 77 - 20 PSF * 30 PSF 90 MPH 90 MPH 90 MPH 80 MPH 140 MPH, V3s, with 20 PSF Live Load 90-140 MPH, V3s, with 20 PSF Live Load 140 MPH, V3s, with 20 PSF Live Load 90 MPH, V3s, with 10/20 PSF Live Load * Varies by structure size and use of truss bracing. All standard complete building kits are designed and configured to be code compliant. Many Jurisdictions will require stamped structural engineering drawings for permitting and this service is available for all of our products. 3200 Lakeside Village Dr. #201 l Prescott, AZ 86301 AZ ROC# 263578, 264626, 270327 Call us today for a free quote! 928-778-7043 or visit us at www.MetalBuildingsAz.com www.PrescorAz.com We’ve Got You Covered!!