Indonesia - Geothermal Resources Council
Transcription
Indonesia - Geothermal Resources Council
Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Indonesia Geothermal Potential; Status in 2014, and Opportunities for Medium‐Low‐Enthalpy Resources Development Suryantini suryantini@gc.itb.ac.id Institut Teknologi Bandung Member of Indonesia Geothermal Association Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Outline • A quick overview of the region and the overall potential; • Projects in the construction stage; • Projects in the discovery or confirmation phases; • Project associated with non‐conventional geothermal resources. Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution The Region, Prospects and Potency Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution GEOTHERMAL POTENTIAL MAP (Geological Agency, MEMR, 2011, Statistik EBTKE 2013, BAPPENAS 2014) RESOURCES (MWe) % Speculative Hypothetical 7,247 4,886 RESERVE (MWe) % Possible Probable Proven 43% 13,373 823 2,288 57% Note: Preliminary Survey Detail Survey Ready to Developed Existing Plant Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Indonesian Geothermal Development Stage and the Type of Potency Note: - GWA : Geothermal Working Area (concession) Determination of GWA Tender Process IUP Issuance Government/ Local Gov./ Business Entities Preliminary Survey Exploration Feasibility Study Exploitation Utilization Proven Reserve Probable Reserve Possible Reserve Hypothetic Resources Geothermal Business Permit (IUP) Speculative Resources Geothermal Potential Business Entities Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Geothermal Working Areas (GWA or WKP) • Until 2013, there are 58 WKP (Statistik EBTKE, 2013) • In 2014, additional 9 WKP has been tendering (MEMR News, 2014) • 9 existing field with total Instaled Capacity 1320 Mwe mostly in expansion program (Statistik EBTKE, 2013; BAPPENAS 2014) • Other status include; Preparation for tendering, Exploration and Preliminary Survey (BAPPENAS 2014) Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution ACEH 2 WKP Jaboi: 70 MW Seulawah Agam: 130 MW NORTH SUMATERA 5 WKP Sibayak – Sinabung: 130 MW Sibual – Buali: 750 MW Sipaholon Ria-ria: 75 MW Sorik Marapi: 200 MW Simbolon Samosir : 155 MW NORTH SULAWESI 2 WKP Kotamobagu: 410 MW Lahendong-Tompaso: 358 MW GORONTALO 1 WKP Suwawa: 110 MW JAMBI 1 WKP Sungai Penuh: 70 MW SOUTH SUMATERA & LAMPUNG 1 WKP Danau Ranau: 210 MW SOUTH SUMATERA 2 WKP Lumut Balai: 250 MW Rantau Dedap: 106 MW WEST SUMATERA 4 WKP Bukit Kili: 83 MW Gn Talang: 35 MW Liki Pinangawan: 400 MW Bonjol: 200 MW BANTEN 2 WKP Kaldera Danau Banten: 115 MW G. Endut: 80 MW BENGKULU 2 WKP Tmbg Sawah-Hululais: 873 MW Kepahiyang : 180 MW LAMPUNG 4 WKP Gn.Rajabasa: 91 MW Suoh Sekincau: 230 MW Waypanas – Ulubelu: 556 MW Way Ratai :105 MW NORTH MALUKU 2 WKP Jailolo: 75 MW Songa Wayaua: 140 MW WEST JAVA 10 WKP Ciater - Tgkban Perahu: 60 MW Cibeureum–Parabakti: 485 MW Cibuni: 140 MW Cisolok Cisukarame: 45 MW Gn. Tampomas: 50 MW Gn. Tgkuban Perahu: 100 MW Kamojang-Darajat: 1465 MW Karaha Cakrabuana: 725 MW Pangalengan: 1106 MW G. Ciremai: 150 MW Source MEMR 2014, IIGCE 2014 BALI 1 WKP Tabanan: 276 MW CENTRAL JAVA 5 WKP Baturaden: 175 MW Dataran Tinggi Dieng: 780 MW Guci: 79 MW Gn. Ungaran: 100 MW Umbul Telomoyo : 72 MW CENTRAL SULAWESI 2 WKP Marana: 35 MW Bora Pulu : 152 MW MALUKU 1 WKP Tulehu: 100 MW WEST NUSA TENGGARA 2 WKP Hu'u Daha: 65 MW Sembalun : 100 MW EAST JAVA 3 WKP Blawan – Ijen: 270 MW Gn. Iyang Argopuro: 295 MW Telaga Ngebel: 120 MW CENTRAL JAVA & EAST JAVA 1 WKP Gunung Lawu : 195 MW EAST NUSA TENGGARA 5 WKP Atadei: 40 MW Sokoria: 30 MW Ulumbu: 199 MW Mataloko: 63 MW Oka Ile Ange : 40 MW 7 Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Existing Operating Geothermal Project as of October 2013 Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Projects in the construction stage Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution 3 Power Plant Development : 1. Patuha 1x55 MW, which is scheduled to start commercial operation in 2014, (Geodipa, 2014) Patuha Power Plant Suryantini Construction 20/05/2014 Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution 3 Power Plant Development : 2. Sarulla 330 MW (World’s largest geothermal plant), where the 1st phase (3x60 MW) is scheduled to start operation in 2016. (Asian Developmen Bank, 2014, Medco 2014). 1st well /drilling started 23 September 2014. The plan is to drill 34 production and injection wells. Development of infrastructure is in progress. 3. Lumut Balai unit 1, 55 MW will be ready for commercial operation in 2015, while unit 2 is in progress and is expected to be ready for commercial operation in 2016 (PGE Annual Report 2012) Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution 2 Steam Field Development : Ulubelu unit 3 and 4, 2x55 MW and Lahendong unit 5 and 6, 40 MW (expansion of existing plant) (World Bank, 2014 ) Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Project in Construction Phase by September 2014 Sarulla 330 MW (North Sumatera) Power Plant Development Lahendong 5&6 (North Sulawesi) 2x20 MW Steam Field Development Lumutbalai (S. Sumatra) 2x55 MW Power Plant and Steam Field Development Ulubelu 3 & 4 (Lampung) 2x55 MW Steam Field Development Patuha 55 MW (West Java) Power Plant Development Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Projects in the discovery or confirmation phases Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution • Muara Laboh (Supreme Energy) : 6 exploration wells (www.supreme‐energy.com) • Tompaso (PGE) : 8 production wells to support 2x20 MW, currently is targeting injection well. (pge.pertamina.com) • Hululais‐Tambang Sawah (PGE) : to develop 2x55 MW, 2 exploration well (PGE Annual Report, 2012) • Lumut Balai (PGE) : to develop 2x55, 18 delineation wells (WWW.jica.go.jp, www.tambangnews.com/; PGE Annual Report 2012) • Karaha Bodas (PGE): to develop 2x30 MW, >5 wells have been drilled (PGE Annual Report 2012) Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Project associated with non‐conventional geothermal resources. Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution 1. Hot Sedimentary Aquifer for Geothermal Cooling 2. Binary Plant for medium enthalpy resources 3. Direct Use Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Hot Sedimentary Aquifer for Geothermal Cooling LAPI ITB‐IF Technology, 2014 • Preliminary Study • Initiated by Pertamina Corporate in 2014 • To provide cooling for skyscraper building with “zero energy” in the heart of Jakarta • The potential resources seems to be promising • The major concern are the environmental and social community Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Binary Plant for Medium Enthalpy Resources • Current study are conducted in Lahendong and Wayang Windu, the study is carried out in collaboration with German Institutions • Jailolo (Star Energy) are being studied. • Other interest coming from Japanese Company to study the possibility of binary plant in some prospect located in West Java Province. Personal Communications from various sources Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Direct Use • In the phase of Desk Study • Geothermal low enthalpy for manufacturing facilities at Karawang City, a centre for industry • Study of direct use for various purpose; milk sterilization, hotel cooling, etc. Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Concluding Remark • Indonesia is a country with large geothermal potential but the utilization, mostly for generating electricity with conventional plant, is still low. • Exploitation of low to medium enthalpy is still in the phase of desk (literature) study • There are still plenty opportunity for expanding geothermal energy utilisation Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Thank you for your attention Suryantini Institut Teknologi Bandung Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Reference • • • • • • • • • • • • http://www‐ wds.worldbank.org/external/default/WDSContentServer/WDSP/EAP/2014/06/27/090224b08253ba69/1_0/Re ndered/PDF/Indonesia000Ge0Report000Sequence004.pdf http://www.adb.org/projects/42916‐014/main www.geodipa.co.id apecenergy.tier.org.tw/.../2_Pertamina_Geothermal_Activities_Current_Status http://www.tambangnews.com/berita/utama/1639‐jica‐danai‐proyek‐pertamina‐lumut‐balai.html http://medcopower.co.id/node/24 www.supreme‐energy.com pge.pertamina.com MEMR 2013, Statistik EBTKE 2013 PGE, Annual Report 2012. LAPI ITB 2014, Report on Quick Scan: Early Investigation into Hot Sediment Aquifer Resource for Geothermal Cooling System Application in PERTAMINA Energy Tower Building BAPPENAS, 2014, Geothermal Hand Book of Indonesia Suryantini Institut Teknologi Bandung
Similar documents
Energy and Mineral Resources for Peolple`s Prosperity
Sibayak – Sinabung: 130 MW Sibual – Buali: 750 MW Sipaholon Ria-ria: 75 MW Sorik Marapi: 200 MW Simbolon Samosir: 155 MW
More informationPT PLN (Persero) - MCA
Minihidro: 1,394.6 MW will be developed by the IPP with appropriate FIT price. 112.3 MW phase in operation, 246.9 MW under construction, 221.0 MW in
More informationGeothermal Power Generation in the World
Alaska, Idaho, New Mexico, Oregon, and Wyoming. In the last five years, about 350 MWe have been added. California is the most important state, with the two major productive poles of The Geysers and...
More information