RoCK WP1 I3_CEM Hasselt inv 3
Transcription
RoCK WP1 I3_CEM Hasselt inv 3
Progress (1) • On 18th of December 2012 the City council of Maastricht approved the tram project (‘projectbesluit’), including: – track design (existing cargo track and city track) – Index linked budget (VAT, 66 mio. in Euros of 2012) – Cost estimation – Cost benefit analysis – Risk including risk management – Mandate to sign Long term agreement with De Lijn > http://www.tramvlaanderenmaastricht.nl/bibliotheek Progress (2) • Detailed track design (January – June 2013): – With extra focus some hot spots (esthetical aspects, traffic safety (bicyclist), combining tramway on the bus station, tram stop Belvédère. – Traffic management and phasing during construction within city centre. Progress (3) • Safety Case (January – Ongoing) – Changes in Dutch legislation and regulation introduced uncertainty about the admittance of tram-trains on mainline cargo track. – Possible fall-back: change of status from mainline to regional line. This transition eliminates many restrictions but has possibly impact on the project planning Progress (4) • Tendering fase (January – Ongoing): – Tendering strategy > DB&M(?) – Tender external engineers (selection this summer) > tender specification – Contractor (2nd half of 2014) • Zoning plan (January – December): – Environmental impact study (MER).