Addendum 1
Transcription
Addendum 1
ADDENDUM 1 INVITATION FOR BIDS PDT-431-IFB-2015 DIRT ROAD PAVING JOUSTER STREET FROM ROBIN HOOD RD. TO BOWMAN AVE. Richland County Government will not accept liability for any incidental or consequential damages arising from or as a result of the electronic transmission of this document, acknowledgements, or other data hereunder. In the event of receipt of an electronic document that is garbled in transmission or improperly formatted the authorized representative must be notified immediately. AUTHORIZED REPRESENTATIVE Dale Collier SIGNATURE ADDENDUM 1, PAGE 1 TITLE Procurement Manager DATE November 6, 2015 TABLE OF CONTENTS Sections Description No. of Pages Return with Submittal 1 NO 1 YES 1 NO COVER PAGE TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT SECTION – A CHANGES TO THE CONTRACT DOCUMENTS SECTION – B PRE-BID CONFERENCE AGENDA 1 NO SECTION – C PRE-BID MEETING MINUTES 5 NO SECTION – D QUESTIONS AND ANSWERS 2 NO SECTION – E PRE-BID CONFERENCE SIGN IN SHEETS 3 NO APPENDIX 1 REISSUED BID FORM SHEETS 3 NO APPENDIX 2 REISSUED PLAN SHEETS 1 NO Returned sections will be incorporated with executed agreement Acknowledgement of Addenda Addenda # Date 1 11/06/15 Offeror acknowledges receipt of the amendment(s) to this solicitation. (show amendment(s) sign and date of each) ADDENDUM 1, PAGE 2 Signature Date Section – A Changes to the Contract Documents ADDENDUM 1, PAGE 3 CHANGES TO THE CONTRACT DOCUMENTS Item #1 – Replaced Line Item # 6241025: 24” White Solid Lines (Stop/Diag Lines)Perm.Pvmt.Marking with Line Item # 6271025: 24” White Solid Lines (Stop/Diag Lines)-Thermo.-125MIL – NO CHANGE IN QUANTITY. Item #2 – REVISED QUANTITY for Line Item # 8152004: Inlet Structure Filter – Type F (Weighted) to 96 LF. Item #3 – Plans Revisions: Sheet 1: “Index of Sheets” revised to show Erosion Control Plan Sheet (EC1) Sheet 2: See items #1-2 above Sheet 5: Added “Construction Sequence” and General Note #3 (regarding date of topographic survey). Sheet EC1: Removed Erosion Control Data Sheet and replaced with Erosion Control Plan Sheet. ADDENDUM 1, PAGE 4 Section – B Pre-Bid Conference Agenda ADDENDUM 1, PAGE 5 MANDATORY PRE-BID MEETING DIRT ROAD PAVING Invitation for Bid No. PDT-431-IFB-2015 Agenda Items November 4, 2015, 10:00 A.M. 1. Introductions 2. DBE/SLBE Participation – Gloria Cyprian Tanner 3. Project Description & Performance Period 4. Contract Requirements/Documents 5. a. IFB Documentation b. No allowance c. Site Visit d. Bond Requirements Special Provisions a. Quality Assurance Testing 6. Utility Coordination 7. Project Safety 8. Questions ADDENDUM 1, PAGE 6 Section – C Pre-Bid Meeting Minutes ADDENDUM 1, PAGE 7 DIRT ROAD PAVING JOUSTER STREET FROM ROBIN HOOD RD. TO BOWMAN AVE. Project Bid No. PDT-431-IFB-2015 Pre-Bid Conference Minutes November 4, 2015 - 10:00 A.M. THOSE IN ATTENDANCE: Sign-In Sheets are attached 1. INTRODUCTIONS The Purpose of this meeting was to provide a general overview of the project and to allow potential bidders to ask questions prior to the bid opening. The minutes of the meeting are included herein. At the start of the meeting, Dale Collier allowed members present from the project team to introduce themselves. This included representatives of the Program Development Team, Richland County representatives and the Design Team. 2. DBE / SLBE PARTICIPATION Collier directed all contractors’ attention is directed to Richland County’s SLBE (Small Local Business Enterprise) Program encouraging the use of County Approved local businesses. He noted this project is specifically targeted for Certified SLBE’s and thanked the number of SLBE vendors in attendance for their participation in the project. Collier introduced Richland County SLBE Coordinator, Gloria Cyprian Tanner, and afforded her the opportunity to address the group to give an overview of the County’s SLBE Program. She also thanked those in attendance and highlighted the following for the record. Tanner acknowledged the presence of other SLBE Department staff in the meeting as noted that she could also be reached for assistance at 803-733-1607. • The Jouster Street project has been designated as a Sheltered Market Project specifically set aside for Certified SLBE Firms in accordance with Richland County Ordinance. • Only Certified SLBE firms can be prime contractors for this project. • A listing of Certified SLBE Firms can be found on the County’s website at : http://www.rcgov.us/Government/Departments/BusinessOperations/SmallLocalBusi nessEnterprises.aspx • Bids will be opened at 2PM on November 18, 2015 ADDENDUM 1, PAGE 8 • • • The SLBE Participation Goal for the project is 83%. 83% of the work must be completed by the SLBE prime and SLBE subcontractors, leaving 17% participation available to Non-SLBE’s. Contract documents are available as noted in the Invitation for Bids at: o The Print Machine (for purchase) o The Richland Penny Website (for electronic download) o The Richland Penny PDT Office (hard copies for viewing only) Tanner continued by noting bidding requirements contained in the Specifications of the Project Manual. She indicated that a number of forms are included and are required to be submitted with each bid. Tanner highlighted the following with regard to several required forms that should be presented on bid day. She stressed that all forms be submitted as a bid may be deemed non-responsive if necessary information is not provided. Dirt Road Paving Jouster Street from Robin Hood Rd. to Bowmen Ave. Spec. Page Form Comments No. SLBE 27 Required Participation Also required as the County is required DBE Participation 28 contractually to monitor this participation Illegal For Information only, but firms should be aware of 30 Immigration this requirement For Information Only; however, subs must be paid within 7 days of GC payment for satisfactory Prompt Payment work. 10% retainage can be held on subs, but 22 Clause should be released when satisfactory work is completed Listing of 31 Required Subcontractors Not required; however bidders should review this Bidders Checklist 32 list to insure that all bidding requirements have been addressed. • • • • All sub-contractors must be legitimate and provide a commercially useful function for the project. All contractors should be fully licensed to complete the work being performed. Richland County has entered into a relationship with McCartha Cobb & Associates of Columbia, SC to assist bidders who may have bonding concerns when contracting with the County. McCartha Cobb can be reached via phone at 803-799-3474. Bidders must submit their current SLBE Certification Certificate with their bids Only companies with current SLBE Certifications will be counted as Certified SLBE firms. Firms with pending certifications should make every effort to insure their applications are finalized prior to the bid opening. ADDENDUM 1, PAGE 9 3. PROJECT DESCRIPTION AND PERFORMANCE PERIOD Matthew Hines of the Dennis Corporation introduced himself as the Engineer of Record for the project and describe the work as the paving of Jouster Street in Richland County. He noted that the work includes paving the approximate 600-ft roadway with shoulders as indicated on either side in the project documents. Hines noted that specifications required 8” soil-cement base material underlayment below a 2” layer of Type C Asphalt. He added that storm drain piping with drop inlets are required near Archer Street. Hines clarified that they would be preparing Addendum information to change fast-dry paint to thermo-plastic type (per SCDOT) and to include erosion control devices (per Richland County). Hines updated for the record that all required easements and permits are in place for the project to allow work to start upon contract approval. Collier directed all bidders to the Project Manual for Construction and noted that the project performance is that all work be completed approximately 90 days after a Notice to Proceed is issued (February 1, 2016 through April 30, 2016). He noted that the County’s procedure with regard to issuing a Notice to Proceed has been to reach consensus with the successful bidder prior to establishing this date. Collier also directed each contractor’s attention to Project Manual clauses noting $250.00 per day Liquidated Damages to be assessed for late completion of the work. 4. CONTRACT REQUIREMENTS / DOCUMENTS Collier gave a general overview of Contract Requirements and noted the following in accordance with the provided meeting agenda. a. IFB Documentation: Collier gave the following update of bidding requirements • Bid Date: November 18, 2015. Bids will be accepted at 2:00PM. • Bid Location: Richland County Procurement Office, 2020 Hampton Street, Third Floor; Columbia, South Carolina 29201. Bidders should allow ample time to enter the facility as parking is metered in the area and limited. • All bids must be enclosed in a sealed opaque envelope, bearing the name, address of the bidder, South Carolina Contractors License number, identification of contract being bid and the name of project. • Along with the Bid, provide a Bid Bond or Cashier’s Check for 5% of the Bid, Acknowledgement of Receipt of Addenda, Performance Bond and Labor and Material Bonds in the amount of one hundred percent (100%) of the Contract Amount will be required. • The Bid Form should be filled out in its entirety to avoid being deemed nonresponsive. • The Bid must be signed and comply with all South Carolina laws. • Bids received after the noted time will be rejected and returned to the bidder unopened. • Contractors will be required to hold their bid pricing for 120 days • All contractors should be properly licensed for the work being contracted • All required taxes should be included in contractor bidding ADDENDUM 1, PAGE 10 • • • • • The sample contract to be executed with the low bidder is included in the project specifications. Questions should be forwarded in writing to the attention of PDT Procurement Manager, Dale Collier at dcollier@richlandpenny.com. The last day for questions will be November 11, 2015, seven (7) days prior to the bid. At least one addendum will be issued to include the minutes of the current meeting and designer clarifications. Contractors should check the County and PDT websites for addenda. Include all required checklists and forms with bids as required Insurance and Bonding requirements should be provided by contractors per specification requirements b. Allowances: Collier noted that as of the meeting, there were no Allowances or Alternate Pricing included in the project. c. Site Visit: When offered a formal site visit by Collier, contractors present agreed that a formal site visit will not be necessary for this project. Collier specifically stated that the submission of a bid by a contractor will be deemed as evidence that the contractor has visited the site and is fully aware of project site conditions. 5. SPECIAL PROVISIONS Collier reminded all contractors that the work is in a public area of Columbia and that the safekeeping of all materials and equipment will be the responsibility of the contractor(s). It is noted that contractors should not engage with the public or take direction from anyone other than the PDT. Watson and King of the PDT noted that PDT CEI Inspectors will be monitoring the progress of the work and will be responsible for Quality Assurance Testing to include compaction and asphalt testing. King said that the successful contract will be required to provide a QC Plan and be responsible for asphalt placement and testing. Specific paragraphs are also provided in the specifications noting holiday restrictions when work hours are to be modified accordingly. 6. UTILITY COORDINATION With regard to Utility Coordination, it was noted that all light poles are outside of the project grading limits. Phone and Cable TV lines are in the area so the contractor will be required to contact PUPS to coordinate actual locations of below ground utilities prior to beginning work. 7. PROJECT SAFETY All bidders were advised that a Safety Plan will be required of the low bidder for review by the Program Development Team. It was noted that safety will be paramount on the project as the work will be in a very active area of the city. Collier said that coordination with residents and visitors will be a contractor requirement to insure that the public is not adversely affected. It is stressed that the contractor(s) will be required to remove debris so as to limit concerns from the public. ADDENDUM 1, PAGE 11 8. QUESTIONS See Questions and Answers provided during the meeting at Section D of Addendum #1 CLOSING REMARKS Collier thanked all for their attendance and encouraged contractors to submit their questions to the PDT office as the goal of the County is to assist interested bidders as much as possible. All questions must be in writing as previously noted. ADDENDUM 1, PAGE 12 Section – D Questions and Answers ADDENDUM 1, PAGE 13 QUESTIONS AND ANSWERS Q: A: What percentage of the work must be completed by an SLBE if the SLBE has other subcontractors? 51% as noted in the County’s SLBE Ordinance. Q: A: Are bonds required for this project? Yes. Q: A: Please clarify the extent of fencing to be provided for the project? This will be clarified via Addendum. Q: A: Will the Addendum replace all drawings or individual sheets? Only individual drawing sheets will be replaced if deemed necessary. Q: A: How will soil stabilization be determined? Testing will be conducted by the PDT after fine grading is completed. Q: A: Has the project area been affect by recent flooding? No. Q: A: Is traffic control required for the project? Yes. Requirements are consistent with those of SCDOT and are outlined in the project documents. Q: A: Will weekend work be allowed? Weekend work will be reviewed on a case-by-case basis and allowed only when prior notification is given by the contractor so advance notice can be given to residents. Q: A: What testing will be required of the contractor? Asphalt testing is to be completed by the contractor. Q: A: Will the contract construction time be extended if utility relocations area encountered? Yes. Time adjustments would be made accordingly for this type of situation. Q: A: Who will be monitoring SWPPP and erosion control measures? PDT Inspectors. ADDENDUM 1, PAGE 14 Q: A: Has the PDT considered that soil-cement stabilization material cannot be provided by any SLBE vendors? Yes. This particular bid item led to the adjustment of the required SLBE percentage. Q: A: Are there any SLBE Firms that can provide required thermoplastic paint. No Q: A: Is the Haley-Ray Company certified as an SLBE vendor. Not at this time. See latest listing of certified vendors on the SLBE Website. ADDENDUM 1, PAGE 15 Section – E Pre-Bid Conference Sign-In Sheet ADDENDUM 1, PAGE 16 ADDENDUM 1, PAGE 17 ADDENDUM 1, PAGE 18 ADDENDUM 1, PAGE 19 APPENDIX 1 Reissued Bid Form Sheets ADDENDUM 1, PAGE 20 Jouster Street - Dirt Road Paving Pay Item Description Quantity 1031000 Mobilization 1 1032010 Bonds and Insurance 1 1050800 Construction Stakes, Lines and Grade 1 Traffic Control 1 Clearing and Grubbing within Roadway 1 Clearing and Grubbing Drainage Easement 1 Removal and Disposal of Existing Concrete 0.25 Unclassified Excavation 180 Fine Grading 2,036 1071000 2012000 2012050 2027000 2031000 2081001 3050104 3069900 3071080 3072000 4011004 4030340 Graded Aggregate Base Course (4" uniform) Maintenance Stone 268 10 Cement Stabilized Earth Base Course (8" uniform) Portland Cement for Cement Stab. Earth Base Course Liquid Asphalt Binder PG64-22 1,295 Hot Mix Asphalt Surface Course Type C 207 Unit LS LS LS LS LS LS CY CY SY SY TON SY 33 TON 13 TON TON ADDENDUM 1, PAGE 21 Cost/Unit Total Pay Item 6051120 6271025 6301100 6510105 6531210 7101852 7143618 7149999 7191250 7192205 8072000 8091010 8100001 8152004 8153000 8156490 Description Permanent Construction Signs (Ground mounted) 24" White solid lines (Stop/Diag lines) Thermo. 125 Mil Permanent Yellow Pavement Markers BiDir. - 4" x 4" Flat Sheet, type III, fixed size & msg. sign Quantity 96 U-section embed & post for sign support 3P Concrete key thickened edge 12 18" Smooth wall pipe 448 Cleaning existing pipe 300 SF 12 7 73 3 24" x 24" Junction box 1 Right of Way marker (rebar and cap) Permanent Vegetation Inlet Structure Filter type F (weighted) LF 14 Catch basin - Type 9 MH Reset Chain-Link Fence Unit 240 11 0.81 96 Silt fence 700 Stablilized Construction Entrance 550 EA SF LF LF LF LF EA EA LF EA MSY LF LF SY TOTAL BASE ESTIMATE ADDENDUM 1, PAGE 22 Cost/Unit Total Contractor: Representative: Date: ADDENDUM 1, PAGE 23 APPENDIX 2 Reissued Plan Sheets ADDENDUM 1, PAGE 24 ADDENDUM 1, PAGE 25