UTILITIES STATEMENT
Land at Mill Lane, Taplow
Prepared for: Berkeley Homes (Three Valleys) Limited
Issue 5: 15 May 2015
Ref: HH4130693/JR/045
Document History
Issue
Date
Description
Prepared By
Checked By
1
2
3
4
5
14 Aug. 14
19 Aug. 14
02 Mar. 15
25 Mar.15
15 May.15
Issue 2
Issue 3
Issue 4
Text Amendments
Jay Rao
Jay Rao
Jay Rao
Jay Rao
Jay Rao
Paul Whitlock
Paul Whitlock
Howard Gell
Howard Gell
Howard Gell
Glanville
Glanville Consultants is a multi-disciplinary consultancy with the following expertise:
−
−
−
−
−
−
−
Civil and Structural Engineers
Building Surveyors
Highway and Traffic Engineers
Transport Planners
Land Surveyors
Building Investigation Experts
CDM Co-ordinators
For further advice contact:
3 Grovelands Business Centre
Boundary way
Hemel Hempstead
Hertfordshire
HP2 7TE
Telephone:
Fax:
Offices also at:
01442 835999
01442 258924
Cornerstone House
62 Foxhall Road
Didcot
Oxfordshire OX11 7AD
Telephone:
Fax:
01235 515550
01235 817799
postbox@glanvillegroup.com
www.glanvillegroup.com
 Glanville Consultants Ltd. All rights reserved.
This report contains confidential information intended solely for the recipient. No part of this report may be copied, reproduced
or stored electronically without prior written permission from Glanville Consultants Ltd. This report has been prepared in
accordance with the commissioning brief and is for the client’s exclusive use unless otherwise agreed in writing. Glanville
Consultants Ltd does not accept liability for any use of this report, other than for the purposes for which it is was originally
prepared and provided. Third parties should not use or rely on the contents of this report without written permission from
Glanville Consultants Ltd.
Ref: HH4130693/JR/045
Issue 5: 18 May 2015
Contents
1.0
2.0
3.0
4.0
5.0
Introduction ................................................................................................................. 1
Water .......................................................................................................................... 3
Electricity .................................................................................................................... 4
Gas ............................................................................................................................. 5
Telecommunications ................................................................................................... 6
Tables
Table 1:
Summary of Existing Substations
Figures
Figure 1:
Site Location Plan
Appendices
Appendix A:
South East Water Asset Plans and Thames Water Asset Plans and Report
Appendix B:
Scottish and Southern Energy Asset Plans and Budget Estimate
Appendix C:
National Grid Asset Plans and Disconnection Plan
Appendix D:
BT and Virgin Media Asset Plans
Ref: HH4130693/JR/045
Issue 5: 18 May 2015
1.0
Introduction
Purpose
1.1
This Utilities Statement has been prepared by Glanville Consultants Ltd on behalf of
Berkeley Homes (Three Valleys) Ltd. Its purpose is to provide an assessment of the
development impact on existing utilities serving the site and in the vicinity of the site,
and how the development will be served by utilities on its completion. This statement
is to accompany planning applications for re-development at Mill Lane, Taplow.
1.2
Issue 5 of this report is produced to accompany new planning applications, following
the refusal of the previous applications in December 2014. The principle changes
relate to the scale and form of buildings and therefore have only a minor impact on
the Utilities Statement (HH4130693/KJ/045 Issue 2) which was agreed with the
relevant authorities prior to the December 2014 planning refusal.
Proposed Development and Planning Application
1.3
The proposed development consists of four parts forming four separate planning
applications. These are referred to as A (full site), B (Glen Island House), C
(footbridge) and D (gas holder), these are explained below.
Application A: A Full application for planning permission and an application for
Conservation Area consent for the demolition of the existing mill buildings,
warehouses, associated structures and the former Skindles hotel to provide 141 new
dwellings and 40 senior living apartments and
a restaurant; retention
and refurbishment of historic buildings on site to provide 18 further dwellings;
improvements to the existing boatyard to include boat chandlery; enhanced open
space, new pedestrian footway and cycle links, car parking, enhanced biodiversity,
flood mitigation measures, removal of TPO trees with re-provision on-site,
landscaping; , new road junction, and associated works.
Application B: An application for Listed Building consent for the conversion of the
Grade II listed Glen Island House into 2 two storey dwellings and 2 apartments. This
application was approved subject to conditions by notice dated 18th December 2014
Application C: A Full application for planning permission and an application for
Conservation Area consent for the construction of a footbridge over the Thames from
Mill Island to Ray Mill Island and associated works.
Application D: A Full application for planning permission and an application for
Conservation Area consent to provide 941m2 of commercial space, car parking, a
café cart, landscaping and associated works.
Format
1.4
This report describes the entire site including applications A, B, C and D. The
existing conditions of each utility are documented and the proposals then presented.
Ref: HH4130693/JR/045
1
Issue 5: 18 May 2015
Site Location & Description
1.5
The site is located between the River Thames and River Jubilee, adjacent to the
eastern edge of Maidenhead. The site is bordered by the A4, Bath Road to the
south. Within the site, Mill Lane connects a number of existing buildings including
the main development areas which consist of the Taplow Mill and the former
Sevenside recycling centre buildings.
Data Sources
1.6
Data collected for this report is as follows:
•
•
•
Internet searches
Utility company asset records
Correspondence with utility companies
Ref: HH4130693/JR/045
2
Issue 5: 18 May 2015
2.0
Water
Existing Network and Diversions
2.1
Existing assets in and around the site are owned and operated by South East Water
and Thames Water. Their asset plans can be found in Appendix A of this report.
2.2
South East Water’s services terminate on the eastern end of Maidenhead Bridge.,
and serve the development to the west of the River Thames.
2.3
Thames Water’s services extend eastward from the Maidenhead Bridge. There is a
4” distribution main that runs within Mill Lane, serving the Skindles restaurant and
other developments along Mill Lane. There are also water mains supplying the old
mill site, running under the Jubilee River.
2.4
The proposed development will require resurfacing of Mill Lane and surrounding
developments. The excavation depths are likely to impact on the existing distribution
main. The water main will need to be diverted within the site to allow this.
2.5
Consultation with Thames Water to determine costs and timescales for the removal
of the existing connections will be required.
Proposed Network
2.6
Thames Water has undertaken a study to identify the possible connection points for
the development. The report on this study can be found in Appendix A. The report
modelled three scenarios, A, B and C, these being the following:
•
•
•
A: Point of Connection 1 to the 6” CI main off 12” CI main west of Paper
Mills, and east of Jubilee River.
B: Point of Connection 2 to the 4” CI main on Mill Lane.
C: Point of Connection 3 to the 3” CI main on Bath Road.
2.7
All scenarios have been modelled for their respective base models, base model plus
the proposed development and the base model plus development and reinforcement
where necessary.
2.8
Scenarios A and B will use supplies from the Dropmore Flow Monitoring Zone, whilst
Scenario C utilises the Stokewood Flow Monitoring Zone. Scenario A does not
require reinforcement, but investigations are required to ascertain the integrity of the
existing pipelines that cross the Jubilee River. Scenarios B and C both require
reinforcement, 750m and 1400m respectively.
2.9
Thames Water has confirmed that the existing pipelines under the Jubilee River can
be reused, as per Scenario which is their preferred option. Thames Water’s
correspondence on this matter can be found in Appendix A.
Ref: HH4130693/JR/045
3
Issue 5: 18 May 2015
3.0
Electricity
Existing Network and Diversions
3.1
Scottish and Southern Energy (SSE) are the local operators of the electricity
network. Their asset plans can be found in Appendix B of this report.
3.2
The existing assets within the site include an 11kV underground cable network and
associated substations as outlined in the table below. This infrastructure mostly lies
within or adjacent to Mill Lane.
3.3
SSE has been contacted regarding the disconnection of the existing Paper Mill site,
for which they have provided a fee estimate for their necessary work.
Table 1 - Summary of Existing Substations
Substation
Location
Ref.
Gasworks
Fenn & Woods
Mill Lane
Taplow Paper
Mills
3.4
Mill Lane near Boat House
The Old Boathouse (off Mill Lane)
Mill Lane (entrance to Paper Mill)
Paper Mill Power House
Status
after
development
re-
Retained
Retained
Retained
Removed (and associated
equipment)
The re-development work around Mill Lane throughout the site will potentially affect
the existing high voltage cables, which will be diverted within the site.
Proposed Network
3.5
It is proposed to connect the development to the existing high voltage network
running within Mill Lane.
3.6
SSE has been contacted regarding a feasibility study and budget estimates, their
correspondence can be found in Appendix B. The site has been estimated to have a
peak load of 700kVA, and that reinforcement would not be required to connect the
development.
Ref: HH4130693/JR/045
4
Issue 5: 18 May 2015
4.0
Gas
Existing Network and Diversions
4.1
National Grid is the local distributor of gas. Their asset plans can be found in
Appendix C of this report.
4.2
The existing assets within the site include several low pressure mains and a medium
pressure main that crosses the lower half of the site, with a branch feeding a
governor.
4.3
National Grid has been contacted regarding the abandonment of their medium and
low pressure mains on the site. The plan of their proposals can be found in Appendix
C of this report. Essentially, this involves the abandonment of the infrastructure
associated with the old paper mill.
4.4
The re-development work around Mill Lane throughout the site will potentially affect
the existing gas mains. Once detailed plans for the development are known, further
consultation with National Grid can be made to determine the extent of diversion
works required.
Proposed Network
4.5
The proposed development will connect to the existing low pressure network running
within the site; this is subject to there being enough capacity within the network,
which will be confirmed by National Grid.
Ref: HH4130693/JR/045
5
Issue 5: 18 May 2015
5.0
Telecommunications
Existing Network and Diversions
5.1
BT and Virgin Media both have assets within the site. Their asset plans can be found
in Appendix D of this report. The assets are concentrated around Mill Lane, with
junction boxes located adjacent to properties.
5.2
Virgin Media assets within the site include a network of underground ducts, whilst BT
have underground plant within Mill Lane and some overground plant connecting the
old paper mill site.
5.3
The re-development work around Mill Lane throughout the site will potentially affect
the existing ducts. Once detailed plans for the development are known, further
consultation with the two companies can be made to determine the extent of
diversion works required.
Proposed Network
5.4
The availability of telecommunications infrastructure in the vicinity of the site allows
the developer the opportunity to provide the development with connections. Details of
the proposed network shall be provided following further investigation.
5.5
Standard, high speed and fibre optic broadband are all available at speeds of up to
80Mb (download speed).
Ref: HH4130693/JR/045
6
Issue 5: 18 May 2015
Figures
Ref: HH4130693/JR/045
Issue 5: 18 May 2015
Key
For Continuation See Extract
Existing Survey
Site Application A
Site Application B (Previously approved)
Site Application C
Site Application D
Proposed Site Area
Post Code SL6 8NZ
Continuation
Grid Reference, Centre of Site
X = 490385.000 Y = 181931.000
Key Plan
NTS
P5
APPLICATION AREAS REVISED
19.05.15
HG
P4
APPLICATION D AREA REVISED
19.08.14
HH
P3
APPLICATION AREAS REVISED
14.08.14
HG
P2
SITE BOUNDARY REVISED
31.07.14
HH
27.03.14
HH
P1 FIRST ISSUE
Glanville
Project Engineer :
PW
Scale :
As shown @ A3
Project Director :
HG
Date :
Aug 2014
Status :
Proposed Site Development Location Plan
Scale 1:4000
Rev
Appendices
Ref: HH4130693/JR/045
Issue 5: 18 May 2015
Appendix A
South East Water Asset Plans and Thames Water Asset Plans and Report
Ref: HH4130693/JR/045
Issue 5: 18 May 2015
ts
Emme
SV
ROAD
12
34
6
25
St Nicholas's
Church
(site of)
RAY
MEAD
1
25
11
3in
HURST ROAD
CI WOOD
Fn
LB
East
Bapsey
Glen Island Garage
Memorial Cross
WO
Eriska
MP
Tumulus
West
Bapsey
(u
m)
Pa
th
15
Tanks
CHASE
CEDAR
HILL
UE
AVEN
PARK
May
age
Cott
54
RAY
Landing
Stage
Inglenook Cottage
El Sub
Sta
BERRY
n
Drai
Claylands
Cottage
Poplars
17
56
58
Tennis Court
100mm
age
Cott
DRIVE
RTH
LONGWO
7
War Memorial
Glen Island House
th
Pa
FH
3
8
11
New
House
Woodhurst
North
9
Swimming Pool
Tennis
Court
Tank
El
Sub Sta
12
Tanks
1
3in
10
44
El Sub Sta
5
9
1
20
SV
Castalia
Firs
SV
CES
AVEN
UE
Woodhurst
Lodge
5
Well
Path
(um)
Whitehaven
FRAN
WO
Bapsey
Pond
Springfield
Cottage
7
Springfield House
SV
6
5a
42b
Fn
Glenburn
7
Springfield
Stables
1
8
1
42a
FH
m
80m
Calcutts
FH
5
57
GA
RD
EN
S
1
5
42c
3in
all
Whiteh
AVE
FRANCES
SV
HTON
LEIG
The Mill
Island
Grass
Eyot
Carabella
St Fillans
ENS
GARD
SA
XO
N
2
1
3in
SV
Path
21
4
3
Bowery House
Apple Arch
Claverhouse
Tank
6
20
14
3in
am
Stre
5
SV
Mill
12
STOCKWELLS
1
1 to
23
Woodhurst South
Kingfisher
Suncourt
6
WN
The New Taplow Paper Mills
Power House
WO
DO
ER
MP
CA
Upper Lodge
Upper Bumbles
Topley
The Barn
The
Ne
Pape w Ta
r Mi plow
lls
The Barn
T
Kilchurn
The Oaks
Cottage
Charlotte Cottage
AD
RO
Fawley
Jingles
Woodwind
FH
Lauriston
Littlemead
3in
Mariners
The Mill
Island
40
Meadowend
Path (um)
Upper Bumbles
Derek Mead
HURS
5
42
Mullawn
3in
CI
The Ninth
House
WOOD
1 to
The Bungalow
Tudor Heights
Topley
El Sub Sta
Tank
Redwood
Lodge
Foxwell
WB
ROAD
Woodlands
Path
DEREK
The
Courtyard
SV
47
SV
Weir
38a
Landing Stage
Cedar
House
Lissiam
Lodge
Alveston
The Coach
House
5
6
Camelot House
Lysander Mead
Four Bears
South Lodge
Eskaheen
Pippins
4
The Hollies
Kedidi
Carkins
5
3
Burton
Mead
Orchardlea
Colleton
1 to
Kent House
Drain
Conkers
1
2
MILL LANE
3in
El Sub Sta
38
The
Thatched
Cottage
Grass Eyot
MILL LANE
1 to
9
Barbicus
36
Court
Crazy Golf Course
37
Jubi
Landing
Stage
Riverside Gardens
WO
Ice House
(disused)
Taplow House Hotel
lee
16
Rive
r
11
WO
LB
3in
n
Drai
31
Posts
Car Park
m
9
100mm
80m
8
34
17 to
Playground
7
6
IN THE RAY
Well Cottage
100mm
2
SV
2
4
ield
1
1
1
1
3
Rayf
3
5
24
23
1 to 6
Stratfield Court
4
36 to 54
WO
White
Gables
th
Pa
Dunloe
Lodge
Waterside
Lodge
3in
7
El Sub
Sta
6
1 to
17
1 to 6
5
FH
18
WO
Crawshays
8
GROSVE
FH
MEAD
NOR
DRIVE
T
COUR
SV
to
1
Path
The New Boathouse
MILL
River
16
8
7
UE
LANE
Warehouse
Stage
Thames
26
3in
AV
CIEN
35
17 to
9
10
Warehouse
Driftwood Cottage
15
1 to
PARK
BERRY HILL
RAY
WO
The Bungalow
The Studio
FB
2
1
18
Landing
PTON
16
BRAM
Homewood
RAY
12
7 to
16
15
SV
3in
ROAD
Zetland Court
3in
Drain
Al Fresco
19
Slipway
El
The Old Boathouse
Sub Sta
SV
RFOR
OS
D CL
1 to 13
15
1 to
E
SOME
3in
CI
7
LOCKBRIDGE COURT
n
olto
Kimb
Victoria House
El Sub Sta
Jubile
1
The Courtyard
14 to 38
er
e Riv
FH
6
re
Nyasa
oombe
Timbersc
Gas Holder
22
West View
The
Sycamo
22a
CI
3in
Breydon
er
Old Riv
Midhurst
Drain
FH
Woodcote
Thames
Hotel
Isis
e
n
rs
fto
Cor
Conife
Rhodos
1
t
Cour
Lea
by South East Water Ltd by permission of Ordnance
Pa
The Twelfth House
CI
3in
ric
Kene
t
Cour
t
Cour
Tall Trees
Greendale
C
Crown Copyright South East Water Ltd 10018341
Stable Cottage
The position of the water mains shown on this plan
Holly Cottage
should not be relied upon as being precise. South
Bridge Eyot
26
1 to
6
1 to
2
FH
1
Westcoign
House
Chestnut
House
The Wheel
House
East Water accept no responsibility in the event of
Berry Hill
Farm
Arosfa
inaccuracy
10
an
Harwood
House
use
e Ho
3
4
1to4
3in
it
Serv
9
Mooring
Upper Littlebrook
SV
2
Stationery Office
Mooring
Posts
Posts
1
id
Sher
Survey on behalf of the controller of Her Majesty's
th
Curacao
SV
SV
10
This plan is based upon the Ordnance Survey map
Redwood
Fieldon House
2
Flint
Lodge
Gas Meter
House
FH
100mm
RAY PARK ROAD
3
4
FH
Darjeeling
Cottage
Little
ee
Raintr
Cottag
Greengates
4
3
SV
Avonmoor
WO
The Ninth House
Ray
House
1 to 12
ROAD
Issues
SV
FB
El Sub Sta
Bryn
plan please contact South East Water Ltd
17
This plan (or part) may not be reproduced in any form
9
1 to
Boat House
without the permission of South East Water Ltd
WO
i
20
orth
Keamar
Kenilw
Swanway House
Tafwys
SV
The Tower
Boat House
3in
16
18
h
t
Pa
Water Main
(regardless of colour)
Creek Lodge
FB
FH
FH
1 to 12
Chandlers Quay
14b
13
TS Iron Duke
Grenfell Lodge
Pond
FB
The House on the Creek
8
Abandoned Main
(regardless of colour)
6
Bridge
Eyot
WO
View
9
6
Court
ge
Court
The Tower
Mallards Reach
Brid
WO
7
to
SV
Jasmay Cottages
SV
AV
SV
DM
FH
D
South East Water
Mains Fittings
1
Ray Lodge
8
Post
th
Pa
Boathouse
Path
Lassell
Tower
House
5
1 to
10
Lambourne
Pages Wharf
4
Chandlers Quay
SV
2
1
33
1
Ray Lodge Mews
3
4
Jubilee River
14 to 18
7
1
1
2
Pages Wharf
14a
Broadclyst
Cottage
5
FH
SV
DRAWING TITLE
8a
Surgery
7
Balmacara
Westfield House
1 to 11
8
5a
Site at Mill Lane,
MILL LANE
Greenways
26
Topo Gigio
ROAD
RAY PARK
Pond
RAY
MEAD
5
AVEN
4
River
View
Lodge
White
Lodge
Landing Stage
Tr
2
ac
k
UE
Landing Stage
Bandstand
Bridge
26/09/2013
Plot Date
Gardens
Drain
Garage
11
1
Landing Stage
12
Grid Reference
Playing Field
El Sub Sta
17
13
Sewage
Pumping
Station
TCB
Maidenhead Bridge
El
Sub
Sta
th
Pa
8
Boat House
133
FH
CI
3in
BATH ROAD
LB
FH
Pa
(u
m
Scale
GP
1:
Pavilion
)
AV
WO
SV
su9081
th
SV
141
BERR
Y HI
LL
Lansdowne
Court
9
10
7
SV
RAY DRIVE
SV
BRID
CI
3.000in
Reference
3in
SV
SV
3in
TCB
SV
13
15
17
Bol
WO
14
1
3
5
Jubi
lee
Rive
r
Red Roofs
26
Bol
Danehurst
2
River
4in
14
Pendeen
Ellington
Cottage
Tall Trees
20
22
24
154
Taplow Quay
Bridge Cottage
160
Bridge Court
Landing Stage
Thames Riviera
Hotel
Bridge End
19
21
23
SV
Farthings
2
4
6
8
10
12
16
18
PC
The Gatehouse
Arcalaur
4in
CI
AD
GE RO
SV
SV
Little Dene
The Croft
1
5
ELLING
3
7
2
6
TON COU
RT
Chelsea Court
4
8
2
4
CI
4in
100mm
SV
CI
4in
1
3
Garage
(Water Mapping)
PO Box 105
Snodland, Kent ME6 9DW
Corner Cottag
e
38
Arden
Thames
El Sub Sta
The Coach
House
3in
12
156
The Hermitage
Cottage
Lower Lodge
Pond
Thames
Bank
Morcroft
GP
Telephone: 01634 276282
River Close
1
SV
Oldfield
Hermitage House
Rowing Club
BATH ROAD
Norfolk House
Cherry
House
Boat House
5
Lodge
12c
4in
GUARDS
ALES
FARTHING
17
SV
4in
E
TH
FH
19
23
PARK
Drain
RAY
Berry Hill Court
For further information about the contents of this
Email : watermaps@southeastwater.co.uk
Marta Villa
ELLINGTO
The Dumb Bell
N GARDENS
(PH)
Poynings
Kanellan
Silchester
Manor Schoo
l
Website : www.southeastwater.co.uk
2500
D
CLUB ROA
s
Race
Mill
er
st
FH
e
Fo
d
or
sf
Th
FH
re
Be
SV
LB
Playing Field
MEAD
21
SV
CI
4in
22
SV
Rosn
24
eath
CLIVEDEN
43
45
11
1
39
41
9
7
5
3
1a
44
Maidenhead Court
20
GROV
E
Post
1
FH
35
SV
PO
PL
AR
S
11
CI
4in
18
9
CI
4in
37
28
Shangri-la
1
Posts
33
11
13
15
10
12
14
11
2
9
10
Mill
7
4
8
5
1
2
6
10a
CI
3
6
FH
Pond
3in
Boat House
Weir
10
Inglenook
Sluice
Path
ASHL
8
Tudor Lodge
Lock
Redfern
Talbot Keep
Glen Island
Rive
Cut
PARK
20
FH
EY
Weir
r Th
ames
7
ng
UP
.75i VC
n
n
ai
Dr
Mill Head
ROAD
13
Ashley
Lodge
COOKHAM
1
COURT
TUDOR
FH
Meadend
To
wi
4
LOWER
3
Mead Cottage
7
Pa
th
1
CLIVEDEN ROAD
20
22
5
Race
24
4
14
WO
Haze
Mead
POPLARS
16
E
OV
GR
3
MEAD
LOCK
Orchard House
Track
CI
3in
CI
3in
Works
1 to 6
Glen Island
CI
4in
Swimming Pool
CI
3in
Rivermead
House
Swimming
Pool
.75in
UPVC
2
Orchard Lea
Blim
Pumping
Station
UPVC
.75in
Orchard
Gardens
Orchards
Boat House
WO
.75in
UPVC
SV
El Sub Sta
Newgate
UPVC
.75in
14
LOCK
Lock End
AVEN
UE CI
3in
Lavington
The
Playroom
Root
Ho
7
Boat House
Boat
House
SV
.75in
UPVC
FH
Woodland View
Mill
Race
Pond
Pond
Landing
Stage
Boat
House
Meridi
FH
Taurmead
Trac
Rippledene
k
CI in
4
AM
E
S
UPVC
.75in
TH
Post
CR
32
Boulter's
Island
ES
NT
9
WO
Pond
SV
CE
Horsham Reach
Pond
1 to 5
90mm
HSPE
Elmwood
Drain
FH
Croquet Green
6
Lane End
FH
Ray Mill Island
Car Park
FB
sh
Fi
BOULTERS
Pippins
nd
Po
THAMES CRESC
ENT
Pumping
Station
.75in
UPVC
Coogee Bay
House
LANE
17
Path
3in
CI
.75in
UPVC
Rosebank
FB
17
Satis
7
3in
CI
9
Putting Green
19
20
Telma
.75in
UPVC
Vineyard
The Barn
3
2
4in
CI
WO
The Barn
7
Putting
Green
MP
5
Boulters Lodge
WO
16
Ray Mill
1
Wickenden
Island
C
3in I
Path
1
FH
Mead Cottage
The Willows
6
CI
3in
22
WO
3in
CI
way
26
Sl
WO
SV
GARDENS
MP
Cricket Ground
WO
BOULTERS
8 10 12
7 9 11
2 4 6
DA
Boulters Inn
(PH)
C
31
1 3 5
FB
Tk
HSPE
63.000
mm
COURT
AD
GO
ME
TCB
Bollards
PA
SV
CLIVEDEN ROAD
3in
CI
E
TH
SV
FBs
Boulter's
Lock
LB
SV
10
18
14
CI
3in
Cn
This plan is based upon the Ordnance Survey map
by South East Water Ltd by permission of Ordnance
AC
3in
BOULTERS LANE
Slip
4
Lock
House
Bollards
ROAD
FB
Sl
Cn
9
Wisteria Cottage
SV
CI
6in
MEADOW
3
2
Inn
CI
3in
WO
CI
3in
FH
RAY
Boat
House
Ray Mill
Cn
25
13
4
1
1
Cottages
HAM
LOWER COOK
23
18
17
5
14
8
MPs
5
CLAPPERS
FB
Boulter's
11
Vineyard
Byways
Rivers Reach
Drai
n
Boulter's Island
MP
CL
WO
Stone
E
OS
Fish Pond
Golden Ways
13
BOULTERS
PCs
1 to 4
10
MEADOW
SV
Lock Cut
FH
Path
4
Magpie Cottage
CLAPPERS
Survey on behalf of the controller of Her Majesty's
SV
Langholm
SV
SV
Pontoon
SC
C
FH
Crofters
SV
SV
CI
3in
Path
SV
RAY MILL ROAD EAST
C
SV
SV
The position of the water mains shown on this plan
SV
Squires Lodge
Horton Lodge
Path
should not be relied upon as being precise. South
Pavilion
SV
2
SV
1
Cygnet House
3in
House
3in
CI
1 to 14
SV
CLOS
E
8
1 to 5
SV
C
Ebor
FH
Pavilion
Glen Island
inaccuracy
Tennis Court
For further information about the contents of this
2
Nash House
1
RT3in
CO
IN
Horton
Grange
HO
Pump House
East Water accept no responsibility in the event of
th
Pa
The Larch
House
Wynnstay
3in
CI
Crown Copyright South East Water Ltd 10018341
Bols
SV
CI
3in
1
Stationery Office
Bol
CI
3in
FH
Maidenlow
plan please contact South East Water Ltd
Bungalow
106
108
This plan (or part) may not be reproduced in any form
Mill Rac
e
3in
2
1
6 to 12
El Sub Sta
Slipway
16
18
12
10
es
8
WO
FH
2
Tham
El Sub Sta
UL
CO
TE
7
RS
Glen Cottage
Glen House
CI
3in
BO
UR
T
Elibank
House
Rive
r
COUR
T
4
BOULTERS
3in
7
BOULTERS
COURT
without the permission of South East Water Ltd
The Lodge
FB
The Old
Coach
House
Elibank Court
Fn
Fn
Pond
3
24
BOULTERS COURT
1 to 7
MP
Claires Court
School
WO
9
WO
Water Main
(regardless of colour)
Dower
House
Abandoned Main
(regardless of colour)
Avior
El Sub Sta
15
17
Taplow Court
MP
The Wickets
The Old
Malt House
10
Queen Anne
House
RECTORY
ROAD
9
ROAD
SV
12
SV
RAY
6
3in
HURST ROAD
CI WOOD
34
Hill House
19
AV
25
St Nicholas's
Church
(site of)
MEAD
1
25
11
SV
DM
FH
D
Fn
LB
South East Water
Mains Fittings
East
Bapsey
Glen Island Garage
Memorial Cross
Claylands
Cottage
Eriska
MP
Tumulus
West
Bapsey
m)
CEDAR
DRAWING TITLE
(u
Tanks
HILL
May
age
Cott
Landing
Stage
Site at Mill Lane,
Pa
th
15
Inglenook Cottage
El Sub
Sta
BERRY
Poplars
CHASE
17
WO
n
Drai
Tennis Court
100mm
age
Cott
MPs
WO
DRIVE
RTH
LONGWO
1
ts
Emme
Landing
Stage
7
War Memorial
Glen Island House
th
Pa
FH
3
8
11
New
House
Woodhurst
North
9
Tennis
Court
Swimming Pool
Tank
El
Sub Sta
26/09/2013
Plot Date
12
Tanks
3in
10
El Sub Sta
5
9
AVE
Reference
Bapsey
Pond
Springfield
Cottage
Springfield House
5
Glenburn
EN
5a
Fn
S
SV
6
St Fillans
The Mill
Island
SA
XO
N
8
1
5
Grass
Eyot
Carabella
ENS
GARD
HTON
GA
RD
7
Springfield
Stables
Calcutts
FH
m
Upper Lodge
LEIG
Upper Bumbles
Topley
Upper Bumbles
Derek Mead
T
HURS
5
Ne
Pape w Ta
r Mi plow
lls
The Barn
Kilchurn
The Oaks
Cottage
AD
RO
Jingles
Woodwind
FH
3in
Lauriston
Littlemead
40
The Mill
Island
The
Charlotte Cottage
Mariners
Path (um)
WOOD
1 to
The Ninth
House
3in
CI
The Barn
Mullawn
1:
7
1
80m
su9082
1
Path
Woodhurst
Lodge
WO
FRANCES
Scale
Well
(um)
Firs
FRAN
CES
AVEN
UE
SV
SV
6
20
14
Castalia
Whitehaven
Claverhouse
Path
21
Bowery House
3in
Grid Reference
5
12
Apple Arch
STOCKWELLS
Tank
1
am
Stre
6
1 to
23
Suncourt
Mill
The New Taplow Paper Mills
Power House
Woodhurst South
Kingfisher
Tudor Heights
Telephone: 01634 276282
Email : watermaps@southeastwater.co.uk
El Sub Sta
Tank
Redwood
Lodge
Foxwell
WB
ROAD
Path
DEREK
(Water Mapping)
PO Box 105
Snodland, Kent ME6 9DW
Topley
Woodlands
Website : www.southeastwater.co.uk
2500
1
4
Pag es Wharf
Tower
House
5
Br id
ge V
i ew
1 to
The
Tower
Boathouse
Malla rds Reac h
1
8
to
7
Lambourne
Court
3"
6
Chandlers Quay
SU9081SW
¤
14 to 18
Asset Location Search Water Map - ALS/ALS Standard/2013_2584734
Bd
y
5
t&
!
Co
C
RO
A
D
on
s
23.4m
Topo Gigio
MILL LANE
UA
Westfield House
24.0m
EAD
RAY
M
River
View
Lodge
Bandstand
White
Lodge
Landing Stage
Landing Stage
Bridge Gardens
¤
Garage
Landing Stage
3"
Lansdowne
Court
Sewage
Pumping
Station
¤
Boat House
TCB
Maidenhead Bridge
3"
!
CR
D
¤!
¤
¤
Tal l Trees
Dane hurst
Pe ndee
El lin gto nn
Co tta ge
Little De ne
The Cro
ft
Tha mes
12
Thames
Bank
Cherry
House
5
Hermitage House
Rowing Club
¤
!
OAD
CL UB R
eH
Poynings
23.1m
Norfolk House
Ridgeway
Wedgewood
Acacias
rb
an
k
t
ea
h
2
4
6
hit
W
Ne wlands
So uthlea
30
ge
Rive r Co tta
e
Ashb ro ok
1
3
5
22
River Court
Ashling
3
1
NS
Laurel
Cottage
Br
ia
4
2
Morcroft
Fausto
El Sub Sta
UR T
Chelsea Court
Marta Villa
N GARDE
63 m m
Rowan
Trees
Rosemead
4
8
Arden
¤
S
GU ARD
24.2m
1
15 7
Chungate House
30
28
26
29
27
25
18
16
14
!
23.9m
¤
¤
!
The Mews
12
Cornerways
23.3m
Ho use
B ee ch
ay
Rive rw
Maranoa
Co pp er
ood
Ra ven sw
e
Rive rn er
st
The Re
Landing Stages
Ellington Lodge
Bouree
h
Pa t
Riverlea Old Stocks
House
38
White Tower
Cottage
Tham es
ga te
e
it
h
W
rside
ie w
Wate
tta V
Re ga
Guards Club Park
gta ge s
La nd inS
38
Two Bridges
Marlborough
Appletree
Cottage
Littlemere
mouth
WeyLo
dg e
Surge ry
in
Ma nd ar
Ho use
Rippledene
Halfacre
3"
Thames
House
Cosy Cott age
34
FB
Yew Tree
Cottage
Summercroft
EL LIN G
OAD
TON R
Rive rl ea
& U A B dy
32
38
Boat House
8
a
12
10
st
Co C on
RIVE RROAD
!
Oldfield
LB
36
EL LIN G TO
3
7
2
1
Boat House
1
2
5
6
ELL IN G
TON C
O
Co rn er Co
tta ge
The Hermitage
Cottage
23.4m
3"
1
Rive r Close
Rive r
Bol
Sh elter
3"
Bridge Cottag e
20
22
24
2
Taplow Quay
Thames Riviera
Hotel
Arcalaur
Bridge Court
3"
Landing Stage
Red Roofs
¤
1
3
5
Bridge End
1
219
1
23
1 4
186
CR
2
4
6
!
8
10
12
125a
1
17
Bol
PC
14
3"
!
TCB 24.6m
12
!
23.5m
¤
3" MSW CO.
3"
3"
¤!
%
BR
D
R OA
ID GE Def
BATH RO
A
3"
25.3m
26.8m
26.4m
War d Bdy
Ryslaw Troldhaugen
Sanders Yard
Bungalow
The Nutshell
23.8m
1 to 6
.25
MP 2 3
3"
57
59
Car Park
r el
Lattua ge
Co
La ttice
Co tta ge
Archways
t
Via d uc
Briar
Cottage
Crosswinds
April
Cottage
SL
SL
The Summer House
23.9m
Landing Stage
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 490250,181250
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of
any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
Page 19 of 25
Asset Location Search Water Map - ALS/ALS Standard/2013_2584734
he Ninth
House
Derek Mead
SU9081NW
The Barn
Kilchurn
Cottage
Woodwind
Jingles
Lauriston
Littlemead
The Mill
Island
T ER
WA
T ER
R AW
24 " W
R AW
24 "
The Oaks
Tank
WB
DEREKROAD
Weir
Landing Stage
Lysander Mead
5
Eskaheen
Pippins
The Hollies
1 to
Burton
Mead
Colleton Four BearsOrchardlea
Kedidi
24.5m
23.3m
¤
El Sub Sta
4"
_<
MILL LA NE
125 mm
25.7m
Grass Eyot
Crazy Golf Course
ee
Jub il
Landing
Stage
Riverside Gardens
r
Rive
Car Park
Playground
23.2m
st & U
AB
dy
Crawshays
Co C o
n
The Studio
!
o1
FB
Pa th
6
Driftwood Cottage
The New Boathouse
Slipway
Warehouse
MIL
L
23.4m
Drain
La nd in
River T
h
g Sta ge
am e s
CR
35
17 to
Warehous e
24.0m
LA N
E
1t
RAY
ME
ENOR
DRIVE
4"
Dunloe
Lodge
AD R
OA D
1 to 6
El Sub
Sta
GR OS
V
Waterside
Lodge
1 to 6
36 to 54
LOCKBRIDGE COURT
1 to 13
The Old Boathous e
El Sub Sta
14 to 38
Dra in sco om be
Ti mb er
Gas Holder
Thames
Hotel
29.3m
Gas Meter
House
RAY PAR K ROAD
Curacao
t
Pa
Mo or in
g
P o sts
Mo or in
g
Chestnut
he Wheel
House House
Tall Trees
h
P o sts
The Twelfth House
Bridge Eyot
10
Arosfa
The Ninth House
Drain
23.9m
El Sub Sta
Swanway House
Boat House
The Tower
23.1m
16
Creek Lodge
TS Iron Duke
4"
FB
!
6
8
Pag es Wharf
The House on the Creek
1 to 12
Chandlers Quay
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 490250,181750
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of
any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
Page 20 of 25
¤
Asset Location Search Water Map - ALS/ALS Standard/2013_2584734
SU9081SE
24
"
R
24
"
AW
R
W
AW
W
AT AT
ER ER
24" RAW WATER
!
¤
(
¤
Dra in
Tr a
ck
Pond
24.2m
L
Playing Field
h
(u
m
Y HIL
GP
Pavilion
)
4"
Jub il
ee
h
BE R
R
t
Pa
El
Sub
Sta
Pa
t
Rive
r
3"
¤!
Garage
23.6m
23.5m
!¤
Lower Lodge
3"
90mm
¤
24.0m
180 mm PO
L
BATH ROAD
90 m m
!¤
24.0m
3"
The Dumb Bell
(PH)
¤
Silch ester Ma
nor Sc ho ol
¤ ¤
Kanellan
GP
!
!
Bucksgrove
The Cedars
Hawthorns
LB
The
Walnuts
3"
24.2m
- ->
3"
PR
3"
MS
¤
Filling Station
Tank
3"
The Orchard
24.0m
3" ->
3"
Cottage
Walnut Tree
Chels ton
Neuk Hou se
Beechwood
MP 23
NL
RDE
AM E
ANE
Wey Lodge
E
2a
Arch Cottages
N C LOS
¤
!
1 2
White Place Lodge
otta ge
Lakeside
Cottage
Track
Angel Cottage
AM ERDE
Ho rs
ess C
e H ar n
!
Joe's Folly
Kennels and Cattery
ck
Tr a
3"
FB
FB
Pontoon
Slipway
!
Lake
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 490750,181250
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of
any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
Page 21 of 25
Asset Location Search Water Map - ALS/ALS Standard/2013_2584734
SU9081NE
46.3m
4'' CI
Tudor Heights
Topley
¤
¤
El Sub Sta
Redwood
Lodge
Foxwell
Woodlands
Cedar
House
Lissiam
Lodge
The
Courtyard
Alveston
The Coach
House
3'' CI
South Lodge
!
Carkins
¤
!
41.4m
The
Thatched
Cottage
42.7m
MILL LANE
W AT
¤
ER
4' '
C
¤
4'' CI
¤ ¤!
R AW
24 "
¤!
I
Ice House
(disused)
Taplow House Hotel
39.6m
¤ ¤¤
Well Cottage
¤
White
Gables
;
¤
!¤
h
!
t
Pa
!
BERRY HILL
35.6m
34.2m
¤
Rive r
Jub ile e
ER
W AT
R AW
24 "
Redwood
Fieldon House
33.1m
Stable Cottage
Holly Cottage
4'' CI
1 to 12
FB
!
Issues
Berry Hill Court
Berry Hill
Farm
32.4m
Boat House
t
Pa
h
FB
27.7m
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 490750,181750
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of
any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
Page 22 of 25
Asset Location Search Water Map - ALS/ALS Standard/2013_2584734
SU9082NE
45 0 m
m
30 0 m
m
65.8m
É
El Sub Sta
7
¤
!±
¤
¤
Pumping Station
12 " T
R U NK
¤
¤
65.8m
¤
%
±
65.5m
Playing Field
Mil l R
a
ce
Track
¤
CLIVEDEN ROAD
Path
12 " T
R U NK
24 " R
AW
W AT
ER
64.6m
3NTC PHA
¤
¤
¤
¤¤
¤
¤
24 " RAW W
AT ER
%
;¤
É
É
El Sub Sta
±
¤
¤¤
¤
¤
¤
±
DR
A
48"
48"
10"
7
10 "
¤
±
Pumping
Station
64.6m
Root
Ho
¤
¤
IN
É
16 00 mm
16 00 mm
%
¤
¤ ¤
±±
65.2m
Tr ac
k
¤
¤
±
¤
¤
¤
¤
Pa th
¤
TO DORNEY VIA BUFFINS
65.2m
(
600 mm
.
¤
¤ !¤
¤
¤
±
±
80 m m
!
±
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 490750,182750
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of
any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
Page 23 of 25
ALS Water Map Key
4”
16”
3” SUPPLY
3” FIRE
3” METERED
Valves
Operational Sites
DistributionMain: The most common pipe shown on water maps.
With few exceptions, domestic connections are only made to
distribution mains.
Trunk Main: A main carrying water from a source of supply to a
treatment plant or reservoir, or from one treatment plant or reservoir
to another. Also a main transferring water in bulk to smaller water
mains used for supplying individual customers.
Metered Pipe: A metered main indicates that the pipe in question
supplies water for a single property or group of properties and that
quantity of water passing through the pipe is metered even though
there may be no meter symbol shown.
Booster Station
Air Valve
Other
Pressure ControlValve
Other (Proposed)
Customer Valve
Pumping Station
Service Reservoir
Hydrants
Supply Main: A supply main indicates that the water main is used
as a supply for a single property or group of properties.
Fire Main: Where a pipe is used as a fire supply, the word FIRE will
be displayed along the pipe.
General PurposeValve
Shaft Inspection
Single Hydrant
Treatment Works
Meters
Unknown
Meter
Water Tower
End Items
Symbol indicating what happens at the end of a water main.
Other Symbols
L
Water Pipes (Operated & Maintained by Thames Water)
Data Logger
Blank Flange
Transmission Tunnel: A very large diameter water pipe. Most
tunnels are buried very deep underground. These pipes are not
expected to affect the structural integrity of buildings shown on the
map provided.
Capped End
?
Emptying Pit
C
Manifold
Customer Supply
F
ProposedMain: A main that is still in the planning stages or in the
process of being laid. More details of the proposed main and its
reference number are generally included near the main.
Undefined End
Fire Supply
Other Water Pipes
PIPE DIAMETER
DEPTH BELOW GROUND
Up to 300mm (12”)
900mm (3’)
300mm - 600mm (12” - 24”)
1100mm (3’ 8”)
600mm and bigger (24” plus)
1200mm (4’)
(Not Operated or Maintained by Thames Water)
Other Water Company Main: Occasionally other water company
water pipes may overlap the border of our clean water coverage
area. These mains are denoted in purple and in most cases have
the owner of the pipe displayed along them.
Private Main: Indiates that the water main in question is not owned
by Thames Water. These mains normally have text associated with
them indicating the diameter and owner of the pipe.
Page 24 of 25
Search Code
IMPORTANT CONSUMER PROTECTION INFORMATION
This search has been produced by Thames Water Property Searches, Clearwater Court, Vastern Road,
Reading RG1 8DB, which is registered with the Property Codes Compliance Board (PCCB) as a subscriber to
the Search Code. The PCCB independently monitors how registered search firms maintain compliance with
the Code.
The Search Code:
• provides protection for homebuyers, sellers, estate agents, conveyancers and mortgage lenders who
rely on the information included in property search reports undertaken by subscribers on residential
and commercial property within the United Kingdom
• sets out minimum standards which firms compiling and selling search reports have to meet
• promotes the best practise and quality standards within the industry for the benefit of consumers and
property professionals
• enables consumers and property professionals to have confidence in firms which subscribe to the
code, their products and services.
By giving you this information, the search firm is confirming that they keep to the principles of the Code. This
provides important protection for you.
The Code’s core principles
Firms which subscribe to the Search Code will:
• display the Search Code logo prominently on their search reports
• act with integrity and carry out work with due skill, care and diligence
• at all times maintain adequate and appropriate insurance to protect consumers
• conduct business in an honest, fair and professional manner
• handle complaints speedily and fairly
• ensure that products and services comply with industry registration rules and standards and relevant
laws
• monitor their compliance with the Code
Complaints
If you have a query or complaint about your search, you should raise it directly with the search firm, and if
appropriate ask for any complaint to be considered under their formal internal complaints procedure. If you
remain dissatisfied with the firm’s final response, after your complaint has been formally considered, or if the
firm has exceeded the response timescales, you may refer your complaint for consideration under The
Property Ombudsman scheme (TPOs). The Ombudsman can award compensation of up to £5,000 to you if
he finds that you have suffered actual loss as a result of your search provider failing to keep to the Code.
Please note that all queries or complaints regarding your search should be directed to your search
provider in the first instance, not to TPOs or to the PCCB.
TPOs Contact Details
The Property Ombudsman scheme
Milford House
43-55 Milford Street
Salisbury
Wiltshire SP1 2BP
Tel: 01722 333306
Fax: 01722 332296
Email: admin@tpos.co.uk
You can get more information about the PCCB from www.propertycodes.org.uk
PLEASE ASK YOUR SEARCH PROVIDER IF YOU WOULD LIKE A COPY OF THE SEARCH CODE
Page 25 of 25
Jay Rao
From:
Sent:
To:
Subject:
Attachments:
Karl Tuchscherer <karl.tuchscherer@thameswater.co.uk>
19 November 2014 14:47
Hemanti Bhatia
RE: Taplow mill final modelling report
taplow millf.pdf
Dear Hemanti,
Please find the attached plan water mains were laid under the Jubilee River when it was constructed to supply the
mill, these will be reused to supply the redevelopment therefore no reinforcement to the existing network is
required. The Green line on the plan running down the River Thames is the boundary between Thames Water and
South East Water, as you can see we show apparatus on our side but not their side.
Hope this clarifies the situation.
Regards
Karl
From: Hemanti Bhatia [mailto:Hemanti.Bhatia@berkeleygroup.co.uk]
Sent: 19 November 2014 14:38
To: Karl Tuchscherer
Subject: RE: Taplow mill final modelling report
Thanks Karl
But that is strange as I’m trying to get drawing of where the supply is fed from for the PaperMill – and I called TW
and they said GIS only shows sewage and that clean is SEWater – even Vistec for postcode SL6 0AF
When I spoke to SEWater they confirm they are feeding the clean water.
Can you confirm – and if it is TW – can you send me drawing showing where the mains is coming in from in case they
need to be diverted when we do demolition works?
Thanks
Hemanti
Hemanti Bhatia
Utilities Co-Ordinator
Berkeley Homes (Oxford & Chiltern) Ltd
Berkeley House, Farnham Lane, Farnham Royal, SL2 3RQ
DD: 01753 784 451
M: 07920 548372
Telephone. 01753 784 400 | Fax. 01753 646855
www.berkeleygroup.co.uk
Think before you print. Save energy and paper. Do you really need to print this email?
Can you print it double sided?
1
Appendix B
Scottish and Southern Energy Asset Plans and Budget Estimate
Ref: HH4130693/JR/045
Issue 5: 18 May 2015