AGENDA REGIONAL COUNCIL 10.00am Tuesday 30 JUNE 2009 for further information regarding this agenda, please contact: Julie Kennedy, 06 952 2800 CONTACT 2 4hr Freephone 0508 800 800 help@horizons.govt.nz www.horizons.govt.nz Palmerston North 11-15 Victoria Avenue Levin 11 Bruce Road Kairanga Cnr Rongotea & Kairanga-Bunnythorpe Rds Palmerston North SERVICE CENTRES Marton Hammond Street Taumarunui 34 Maata Street REGIONAL HOUSES DEPOTS Wanganui 181 Guyton Street Taihape Torere Road Ohotu Woodville Cnr Vogel (SH2) & Tay Sts POSTAL ADDRESS Horizons Regional Council, Private Bag 11025, Manawatu Mail Centre, Palmerston North 4442 | F 06 9522 929 Notice is given of a meeting of Horizons Regional Council to be held on Tuesday, 30 June 2009 at 10.00am in the Tararua Room, Horizons Regional Council offices, 11-15 Victoria Avenue, Palmerston North. ORDER PAPER Regional Council Agenda Pages 10.00 am Tuesday, 30 June 1 - 141 To be held in Public Excluded Presentation - CentrePort Wellington - March 2009 Quarterly Report Mr Warren Larsen and Mr William Gorrie (approximately 11.30am) RECOMMENDATIONS IN REPORTS ARE NOT COUNCIL POLICY UNTIL ADOPTED BY COUNCIL NEWS EMBARGO Items in this agenda may be subject to amendment or withdrawal at the meeting. Items are embargoed until two days before the date of the meeting. Reporters who do not attend the meetings should seek confirmation of the agenda material or proceedings from the Chief Executive prior to any media reports. COUNCIL MEMBERS Cr GP Murfitt (Chairman) Cr L Bailey Cr LR Burnell Cr VJF Chettleburgh QSM ED Cr EB Gordon Cr MC Guy Cr AK Main Cr DB Meads Cr MW Plowman Cr PW Rieger QSO Cr RG Walker JP Cr J White AGENDA 30 June 2009 10.00am PART ONE Pages PROCEDURAL ITEMS 1. 2. Apologies Public Speaking Rights Notification to speak is required by 4pm on the working day prior to the meeting. Further information is available on www.horizons.govt.nz or by phoning 0508 800 800 3. Late Items: To consider, and if thought fit, to pass a resolution to permit the Committee to consider any further items relating to items following below which do not appear on the Order Paper of this meeting and/or the meeting to be held with the public excluded. Such resolution is required to be made pursuant to Section 46A(7) of the Local Government Official Information and Meetings Act 1987, and the Chairperson must advise: (i) (ii) 4. The reason why the item was not on the Order Paper, and The reason why the discussion of this item cannot be delayed until a subsequent meeting. Members’ Conflict of Interest Members are reminded of their obligation to declare any conflicts of interest they might have in respect of the items on this Agenda. 5. Confirmation of Minutes 6. Petitions/Deputations 7. Chairman’s Report 8. Chief Executive’s Report 9. Members’ Reports 1 - 14 - 26 May 2009 COMMITTEE REPORTS 10. Endorsement and Adoption of Committee and Advisory Group Resolutions and Recommendations: Manawatu River Users’ Advisory Group Strategy & Policy Committee Deliberations on Draft Community Plan Environment Committee Regional Land Transport Committee 2 June 2009 9 June and 16 June 2009 15 - 18 19 - 36 10 June 2009 23 June 2009 37 - 42 43 - 48 MATTERS FOR CONSIDERATION 11. Final Consideration of Submissions to Draft Community Plan 2009-19 49 - 50 Report No: 09-96 File No: OMS 10 02 09 12. Regional Land Transport Programme 2009-12 Report No: 09-92 (Incl Annex A) File No: TTP 1 03 13. One Plan Hearing Committee Report No: 09-94 (Incl Annex A) File No: OMS 10 13 123 - 126 14. Electronic Media Clipping Service Report No: 09-95 (Incl Annex A) File No: OIM 5 00 127 - 132 15. Affixing of the Common Seal Report No: 09-93 File No: OMS 5 00 133 - 134 16. Members’ Questions 51 - 122 PART TWO - PUBLIC EXCLUDED SECTION The public is to be excluded from the remainder of the Council meeting as the general subject matter to be considered while the public is excluded, the reason for passing this resolution in relation to each matter, and the specific grounds under section 48 (1) of the Local Government Official Information and Meetings Act 1987 for the passing of this resolution is as follows: General subject of each matter to be considered PX1 Confirmation of Minutes of 26 May 2009 Pgs 135 - 138 PX2 Endorsement and adoption of the Strategy and Policy Committee (Deliberations on Draft Community Plan) resolutions and recommendations of 16 June 2009 Pgs 139 - 141 PX3 CentrePort Wellington – March 2009 Quarterly Report (appproximately 11.30am) Reason for passing this resolution As disclosure would not be in the public interest because of the greater need to enable Council to carry on without prejudice or disadvantage commercial negotiations. As disclosure would not be in the public interest because of the greater need to enable Council to carry on without prejudice or disadvantage commercial negotiations. Grounds under section 48 (1) for passing this resolution That the exclusion of the public from that part of the meeting is necessary to prevent the disclosure of information for which good reasons for withholding exist. That the exclusion of the public from that part of the meeting is necessary to prevent the disclosure of information for which good reasons for withholding exist. As disclosure would not be in the public interest because of the greater need to enable Council to carry on without prejudice or disadvantage commercial negotiations. That the exclusion of the public from that part of the meeting is necessary to prevent the disclosure of information for which good reasons for withholding exist. PX4 Councillors to consider moving the Public Excluded minutes of the Council meeting of 26 May 2009 into the Public domain. M J McCartney CHIEF EXECUTIVE 1 Minutes of the Twentieth meeting of the seventh triennium of Horizons Regional Council held at 10.05am on Tuesday, 26 May 2009, in the Tararua Room, Regional House, 11-15 Victoria Avenue, Palmerston North. PRESENT Crs G P Murfitt (Chair), L Bailey, L R Burnell, V J F Chettleburgh QSM ED, E B Gordon, A K Main, D B Meads, P W Rieger QSO, R G Walker JP, and J White. IN ATTENDANCE Chief Executive Mr M McCartney Group Manager Corporate and Governance Mr C Grant Committee Secretary Mrs J Kennedy ALSO PRESENT Mr G Carlyon (Group Manager Regional Planning and Regulatory to 11.40am and from 11.58am), Mr G Shirley (Group Manager Regional Services and Information from 10.12am to 11.40am and from 11.58am to 2.43pm), Mr A D Cook (Group Manager Operations from 10.12am to 11.32am and from 12.17pm to 2.00pm), Mr C Mitchell (Group Manager Environmental Management to 11.32am), Dr J Roygard (Manager Science from 10.17am to 10.49am and from 1.15pm to 3.00pm), Ms F Maseyk (Senior Environmental Scientist from 10.17am to 10.49am), Ms A Russell (Manager Compliance from 2.20pm), Mr G Doull (Senior Design Engineer from 1.55pm to 2.12pm), Mr B Duffy (Mayor Horowhenua District Council) and Mr D Ward (Chief Executive Horowhenua District Council) from 12.05pm to 12.30pm, Mr and Mrs G Paton (from 1.05pm to 2.12pm). APOLOGIES 09-386 Moved Murfitt/Walker that an apology be received from Crs Plowman and Guy (Leave of Absence). CARRIED PUBLIC SPEAKING RIGHTS The Chairman advised that Mr and Mrs Paton would be speaking in regard to Item 13, Report No. 09-80, Manawatu River – Foxton Loop. LATE ITEMS There were no Late Items advised. MEMBERS’ CONFLICTS OF INTEREST There were no Conflicts of Interest. 2 CONFIRMATION OF MINUTES 09-387 Moved Murfitt/Burnell that the Minutes of the meeting held on 28 April 2009, as circulated, be confirmed as a correct record. CARRIED PETITIONS / DEPUTATIONS There were no Petitions / Deputations. CHAIRMAN’S REPORT The Chairman presented his report and highlighted that Horizons Regional Council had received a major Green Ribbon National Award for the WaterMatters Website, and extended congratulations from Council to Dr Roygard (Manager Science), Mr C Veale (Project Coordinator-Catchment Information), and staff involved in the project. 09-388 Moved Murfitt/Main that the Council congratulates Dr Roygard, Mr Veale, and the team for their success in being awarded a Green Ribbon National Award for the WaterMatters Website. CARRIED Members discussed the acquisition of a painting of the Rangitikei River mouth at Tangimoana, by Hilary Robson. Donations from Councillors and Executive went to purchasing the painting. 09-389 Moved Murfitt/Bailey that the Chairman’s report be received. CARRIED CHIEF EXECUTIVE’S REPORT The Chief Executive (CE) spoke to his report and referred to a positive and constructive meeting held with One Plan hearing panel members, noted the positive response received in regard to the Territorial Authority Forum held on 14-15 May 2009, and gave an update on Catchment Operations activities. Mr Cook, Group Manager Operations, answered members questions of clarification around consent issues in regard to the City Reach Project and the Kopane Bridge Project. The CE advised discussions were continuing with the Ministry of Agriculture and Forestry in regard to future funding for the Sustainable Land Use Initiative, reported that the Audit, Risk & Investment Committee would be looking at the first draft valuation assessment of the Port of Napier Shareholding at their next financial briefing, commented on regulatory business, and gave an update on progress in regard to Phase 1 and Phase 2 of the Resource Management Act Amendment Bill. Mr Grant, Group Manager Corporate and Governance gave an update on progress with Shared Services, and answered Members questions of clarification. The CE advised he had received a resignation from Ms Meryl Ram, Chief Financial Officer. He acknowledged her efforts over the the last three years, and wished her well for the future. 3 09-390 Moved Murfitt/Rieger that the Chief Executive’s report be received. CARRIED MEMBERS’ REPORTS Cr Bailey attended the Ohau/Manakau, and Makerua Annual Scheme Meetings, an Audit, Risk & Investment Financial Briefing, One Plan Coast and Te Ao Maori deliberations, the Councillor workshop on 4 May, the Manawatu Estuary Trust monthly meeting, Catchment Operations Committee meeting, Territorial Authorities’ Forum on 14/15 May, spoke to the Waitarere Beach Progressive Association Annual General Meeting, attended the Foxton Community Board meeting, the Passenger Transport Sub-Committee meeting, the Dairy Industry Forum on 21 May, day one of the Community Plan Submissions Hearing on 25 May, and Council meeting on 26 May. Cr Burnell attended the usual meetings, the Territorial Authorities’ Forum on 14/15 May, and One Plan Te Ao Maori deliberations. Cr Chettleburgh attended the Territorial Authorities’ Forum on 14/15 May, the International Pacific College commencement ceremony, the Massey Graduation function in the Square, a meeting in regard to the Palmerston North Airport, the Palmerston North City Council submissions, the usual Council/Committee meetings, commented on a Rotary Club charity event, a ‘Reach for the Stars’ talent show, and a Monet Exhibition held in Wellington. Cr Gordon attended the usual Council/Committee meetings, the Territorial Authorities’ Forum, chaired the Regional Transport Committee submissions hearing on the Draft Regional Land Transport Programme, and advised he would be attending a transport summit in Auckland on 3/4 June. Cr Main attended One Plan deliberations, a Bushy Park Trust meeting, spoke to several groups in regard to the Long-term Council Community Plan, and attended the Territorial Authorities’ Forum on 14/15 May, and the usual Council/Committee meetings. Cr Meads attended the Ohau/Manakau, and Makerua Annual Scheme Meetings, the Manawatu Drainage Liaison Committee meeting in conjunction with the Taonui Basin landowners, a Councillor workshop on 5 May, chaired the Catchment Operations Committee meeting on 13 May, attended the Territorial Authorities’ Forum on 14/15 May, and chaired the Dairy Industry Forum held on 21 May. Cr Rieger attended the usual Council/Committee meetings. Cr Walker advised of two meetings held with constituents in Wanganui, and attended the usual Council/Committee meetings. Cr White advised she had spent a considerable amount of time on One Plan deliberations, attended the Massey Graduation ceremony, advised of a comment made by a member of the public in regard to the difficulty of reading ‘Across the Region’ publication, when colour wording was printed on colour background. She attended part of the Territorial Authorities’ Forum, outlined the timetable for upcoming One Plan Hearings, and requested Leave of Absence from 14 August to 14 September 2009. 4 09-391 Moved Rieger/Chettleburgh that Cr White be granted Leave of Absence from 14 August to 14 September 2009. CARRIED 09-392 Moved Murfitt/Bailey that the public is to be excluded from this portion of the Council meeting as the general subject matter to be considered while the public is excluded, the reason for passing this resolution in relation to the matter, and the specific grounds under section 48(1) of the Local Government Official Information and Meetings Act 1987 for passing of this resolution is as follows: General subject of each matter to be considered PX2 Port of Napier – Half Yearly Shareholder Presentation Reason for passing this resolution As disclosure would not be in the public interest because of the greater need to enable Council to carry on without prejudice or disadvantage commercial negotiations. Grounds under section 48 (1) for passing this resolution That the exclusion of the public from that part of the meeting is necessary to prevent the disclosure of information for which good reasons for withholding exist. CARRIED The meeting adjourned to the Public Excluded part of the meeting at 11.30am and resumed at 12.05pm. ENDORSEMENT AND ADOPTION OF COMMITTEE AND ADVISORY GROUP RESOLUTIONS AND RECOMMENDATIONS CATCHMENT OPERATIONS COMMITTEE 09-393 Moved Meads/Waker that the Council endorses and adopts the resolutions and recommendations of the Catchment Operations Committee meeting, held on 13 May 2009. CARRIED There was discussion and questions of clarification asked in regard to an application to the Manawatu District Council from MC2 Group Limited for a plan change for Flygers Line, and any associated resource consent applications. 09-394 Moved Chettleburgh/White that the Council receives regular updates on information in regard to MC2 Group Limited, in regard to an application to the Manawatu District Council for a plan change for Flygers Line, and any associated resource consent applications. CARRIED 5 MEMORANDUM OF UNDERSTANDING FOR REGULATORY BUSINESS WITH DISTRICT COUNCILS Report No. 09-76 This report was to advise Councillors of an initiative in relation to regulatory business between District Councils and Horizons Regional Council. The Chairman welcomed Mayor B Duffy, Horowhenua District Council and Mr D Ward, Chief Executive, Horowhenua District Council (HDC) to the meeting. Mr McCartney, Chief Executive Horizons Regional Council (HRC) commented on the significance of the Memorandum of Understanding (MOU), and applauded the Mayor and Chief Executive of HDC for their participation and approach in working together with HRC to provide a more stable working relationship between HDC and HRC. Mayor Duffy, HDC commented on the tremendous value in working harmoniously together with HRC, and was confident that an improved working relationship could be achieved. He referred to the Territorial Authorities’ Forum held in July 2008 and May 2009, and noted that HDC held the Forum in very high regard. He acknowledged the efforts of Mr Carlyon, Group Manager Regional Planning and Regulatory for his part in assisting with the MOU. Councillors acknowledged the importance of the MOU and congratulated those involved for their efforts. Several punctuation errors were identified as requiring attention. The MOU between HRC and HDC was signed at the meeting by Mr Brendan Duffy, Mayor, HDC, Mr David Ward, Chief Executive, HDC, Mr Garrick Murfitt, Chairman, HRC, and Mr Michael McCartney, Chief Executive, HRC. 09-395 Moved Bailey/Burnell that the Council: a. receives the report in relation to the Memorandum of Understanding for Tararua District Council and Horowhenua District Council; and b. endorses the approach taken to cooperatively engage in the statutory obligations Horizons Regional Council and the District Councils have. CARRIED The meeting adjourned at 12.30pm The meeting reconvened at 1.05pm MANAWATU RIVER – FOXTON LOOP Report No. 09-80 The purpose of this item was to provide Council with an indication of the scope of investigation and design work involved in assessing options for increasing permanent river flow around the Foxton Loop. Mr Cook, Group Manager Operations (GMO) introduced the report and referred to an aerial map to outline available options. The Save Our River Trust (SORT) had made an approach to Council at the April Strategy & Policy meeting and asked for assistance with the project. Their objective was to increase the permanent river flow into the old loop, in order that it could be navigated by small craft. 6 The GMO elaborated on the options and cost estimates available to permanently increase river flows around the Foxton Loop, without compromising the operation of the floodway, and features of the Lower Manawatu Scheme which were all very important to the protection of large rural areas upstream, and for the protection of the beach community. The impact of the possibility of lower quality river water being introduced to the Loop, as a result of any work undertaken, was an issue that would need to be addressed. The issue of resource consents would also need to be addressed. Horizons Regional Council was opposed to anything that would compromise the functionality of the Lower Manawatu Scheme. The Chairman welcomed Mr and Mrs Paton to the meeting. He advised they had ten minutes to speak in regard to Item 13, Report No. 09-80, Manawatu River – Foxton Loop. Mr and Mrs Paton – Manawatu River - Foxton Loop Mrs Paton spoke in regard to the item and supplied Members with a copy of her speaking rights. She was opposed to any involvement from Council in regard to plans for the development of recreational and tourist attractions at Foxton, and plans for restoring the River Loop, as presented by the Save Our River Trust at the April 2009 Strategy & Policy meeting. Mrs Paton believed that opening up the Loop would exacerbate any future flood event in the area. She was opposed to further costs being imposed on ratepayers and believed any costs associated with the proposal should be covered by SORT. Mr Paton was not convinced that the problem of sedimentation in the Loop could be addressed, and questioned how the proposed project would be funded. He did not believe it was realistic to expect ratepayers to fund the project. Members asked questions of clarification around the history, water quality, and impacts of the Whirikino Cut on the Foxton Loop. There was comment made around gauging the level of support from the Horowhenua District Council (HDC) and community for the project. Cr Bailey noted that historically there had been support from HDC for beautification of the land around the Loop, and commented on a multi-purpose facility that was currently being investigated by HDC. It was noted that a written submission from SORT had been made to the Draft Community Plan 2009 2019 Submissions Hearing scheduled for 25, 27, and 28 May, and the submission would be considered at the Draft Community Plan Deliberations. It was therefore recommended that the matter be given further consideration at the conclusion of the Draft Community Plan Submissions Hearing and Deliberations. Recommendations (e) and (f) were proposed to reflect the discussion. 09-396 Moved Chettleburgh/Walker that the Council: a. receives the information contained in this report; b. notes that present commitments preclude the involvement of Horizons Regional Council Design staff in any substantial investigation of flow diversion into the Foxton Loop, for at least the next two years; c. notes that in the event that an investigation was undertaken by external consultants, Horizons’ staff would need to be key participants in a Project Control Group, but would have difficulty fulfilling that role for the next 12 months; d. notes that the minor diversion option is much less likely to be problematic than a major diversion in terms of design and operational support; 7 e. notes that a submission has been made to the Draft Community Plan 20092019 process, and the matter will be considered further at the appropriate time; and f. advises Save Our River Trust of the above recommendations. CARRIED WATER SCIENCE PROGRAMME Report No. 09-59 This report was to inform Councillors about the current programme relating to water science work being undertaken by or on behalf of Horizons Regional Council. Dr Roygard, Manager Science introduced the presentation. The Chairman and Members commended Dr Roygard on his impressive presentation, and asked questions of clarification. The Chairman requested that additional information on the Water Science Programme be provided to Council as it became available. 09-397 Moved a. Murfitt/Burnell receives the information contained in the presentation,and provides additional information as it comes to hand. CARRIED AFFIXING OF THE COMMON SEAL Report No. 09-81 This paper reported on documents to which Horizons Regional Council’s Common Seal had been affixed. 09-398 Moved Chettleburgh/White that the Council acknowledges the affixing of the Common Seal to the following documents: • Lease Agreement: Horizons Regional Council and Parewanui Farms • Warrant Card – Blair Sowman • Lease Agreement: Horizons Regional Council and Potaka Station Limited CARRIED WORKSHOP ATTENDANCE Members noted the Workshop Attendance 19 February 2009 – 20 May 2009. MEMBERS’ QUESTIONS The Chairman advised that the Chief Executive, Cr Main, and himself would be meeting with the Minister of Local Government at 1.00pm on 18 June 2009. 8 09-399 Moved Murfitt/Walker that the public is to be excluded from this portion of the Council meeting as the general subject matter to be considered while the public is excluded, the reason for passing this resolution in relation to the matter, and the specific grounds under section 48(1) of the Local Government Official Information and Meetings Act 1987 for passing of this resolution is as follows: General subject of each matter to be considered PX1 Confirmation of Minutes of 28 April 2009 Reason for passing this resolution As disclosure would not be in the public interest because of the greater need to enable Council to carry on without prejudice or disadvantage commercial negotiations. Grounds under section 48 (1) for passing this resolution That the exclusion of the public from that part of the meeting is necessary to prevent the disclosure of information for which good reasons for withholding exist. CARRIED The meeting adjourned to the Public Excluded part of the meeting at 3.00pm and resumed at 3.19pm. The meeting closed at 3.20pm. Confirmed. __________________________________ CHIEF EXECUTIVE ______________________________ CHAIRMAN 9 ANNEX A Chairman’s Report May 2009 MAY 2009 CHAIRMANS REPORT To Council Meetings: Council Meeting – Pukaha Mount Bruce Tararua Federated Farmers AGM – Dannevirke Tararua District Council Meeting Regional Affairs Committee Wellington (2 Days) (Attached Minutes of Meeting) Pukaha Mount Bruce – Board Meeting Tainui Basin Meeting – Kairanga Council Workshop – Installment Rating RMA Submission to Select Committee – Wellington International Airport Function Palmerston North HRC & HDC joint meeting – Mayor & CE Ruapehu District Council – Taumarunui Strategic Session (Chairs of Committee) TA Forum Meeting with ratepayers (Whanganui) Passenger Transport Meeting Regional Transport Committee – Submissions Hearings Dairy Forum – Palmerston North Meeting with Jill and Tim, - Hi Tini Awa Various Executive Meetings Community Plan Hearings Matters to bring to the attention of Council 1. 2. 3. 4. 5. 6. 7. 8. 9. Chairman’s mid term Performance Review – underway – timeline out shortly Queens Birthday 1 June 2009 Green Ribbon Awards 4 June 2009 Wellington Community Plan Deliberations – 9 June 09 CentrePort invitation to evening social function 11 June 09 Wellington Rod Titcombe - Farewell Councillor Strategy Forum – 17-18 June 09 Meeting with the Minister 25 June – Wellington Community Plan – Final Adoption – 30 June 09 Garrick Murfitt CHAIRMAN Encl RAC Minutes 30/4 – 1/05 10 11 ANNEX B Chief Executive’s Report May 2009 MAY 2009 Chief Executive Report To Council Planning and Policy LTCCP • The LTCCP hearings commenced yesterday. A total of 117 submissions were received which compares to approximately 170 submissions received on last years annual plan. • The hearing of submissions concludes later this week. • Last week hearings took place on submissions to the Regional Roading Programme. Approximately 40 submissions were received to the draft programme. One Plan • With hearings about to resume informal meetings with key submitters continue. • Currently we are meeting weekly with the TLA collective and remain hopeful that a number of the issues raised by TAs can be refined before the hearings. • Without doubt though the main event is the water hearing later this year. TA Forum • The recent TLA Forum was very well received with some positive feedback from a number of Councils. The forum reinforced the desire for Councils to work together on issues. • The forum also echoed the need for local authorities to hold on to local determination. There was concern expressed about the fashion around reform arising out of the Auckland model as well as implications around Govt assuming more influence over local decisions. • The consensus is that the Forum was a success with all but one of our TAs present. I would like to acknowledge the effort of Horizons staff for helping make the event run smoothly. Catchment Operations • As winter approaches ground conditions will mean that construction works with respect to flood upgrades will abate. • Overall the construction season has been productive. We would have wished to make more progress with the Wanganui Scheme however the consent appeal and Historic Places Trust requirements have interrupted plans slightly. Pleasingly the appeal has been withdrawn and now the only process issue needing resolution is the historic places assessment. • The major consent issues ahead are the LMS consent in the city and the Oroua consent (Taonui). We anticipate active participation by a number of landowners and 12 interested parties. We are hopeful that their issues can be resolved. If they cannot there is a real risk that we could lose the 2009/10 construction season. • We remain contract with the SLUI programme delivering 80 farm plans for this year. With the cooler weather approaching we are gearing up for the planting season. • Pleasingly despite the tough economic conditions farmers are still committing to the implementation works meaning that we now have 1815 hectares under SLUI management. • We have commenced discussions with MAF around future funding as well as implications around govt funding for our adjusted targets. • Given the economic conditions at present as well as the govt budget cutting agenda there will need to be a concerted effort to resell the Sustainable Hill Country Erosion Package. • This fund (set up in 2007) allocated $10 million over 4 years. It is imperative that we ensure that programme continues beyond that 4 year period. To that end the chairman and I will be seeking meetings with key MAF officials in the near future. Audit, Risk and Investment • The ARI committee will be meeting later this week. In addition to the normal monthly financial report the committee will be discussing the first draft valuation assessment of the Port of Napier Shareholding. • CentrePort has released its draft Statement of Corporate intent. I have asked that they attend the next S&P or Council meeting as there are some possible changes to the dividend payment arrangements. Regulatory • The Call In hearing on the Turitea Windfarm is set down for next month. We will be in attendance speaking to our submission. • The consents team, remain busy with steady numbers of consent in process. • Currently we are in mediation on a number of appeals and objections to costs. • The most significant event last week was the sentencing of Mr Ken Thurstson (and company) over illegal discharges at a dairy farm and at the Longburn Industrial premises. The $180,000 fines were the largest imposed in the region and amongst the biggest nationally. • This sentence bought to a close a lengthy process and staff should be applauded for their professionalism in dealing with the challenging issues and personalities related to these proceedings. • The PAC is meeting this week to consider a number of possible prosecution recommendations. RMA Amendments • My understanding is that the Minister for the Environment has directed officials to progress Phase 2 of the RMA changes. 13 • Members may recall that Phase 1 changes dealt with a number of the administrative matters aimed at streamlining several RMA processes. • We filed a submission to the Bill that related to Phase 1 changes and the Chair, Policy/Consent Manager and I appeared before the Select Committee and spoke to our submission. • The Minister is hoping to have the Phase 1 Bill passed into Law in July. • As significant proposal likely to appear in the Phase 2 Bill is around the establishment of an Environmental Protection Authority. Depending on the scope of an EPA there could be significant consequential impacts on the role and function of Local Govt. • There is a Regional Affairs Committee Subgroup set up to look into the EPA issues and the outcome of that is likely to be an EPA thinkpiece paper released to the sector and MFE. • Indications are that the Minister wishes to have the Phase 2 Bill available by the end of the year. Shared Services • The Directors of LASS met recently to consider proposals for joint Insurance Brokerage. • The due diligence that preceded the determination included seeking proposals from several brokerage agencies. • The outcome is that LASS has recommended to the parent entity that brokerage services be supplied by Anon. • The resultant regional savings shared amongst the parent entities of LASS (i.e the regions Councils excl PNCC) is between $400k and $500k on current spend. This saving would be more as increases in insurance costs were signaled for next year. Waitangi Tribunial • The hearings of Wanganui Land claims before the Waitangi Tribunal resume this week. • Horizons will be appearing before the Tribunal this Friday. Staff/General • I have received the resignation from Meryl Ram our Chief Financial Officer. Meryl is leaving us after three years. During her time we have greatly lifted the financial reporting accuracy of our business. I wish to acknowledge her effort and wish her well for the future. • Horizons, has received the Technology Green Ribbon Award for the Water matters Website. This award is given out by the Minister for the Environment recognizes the improvements in technology in the environmental space. • Horizons won this award last year for the Green Rig. 14 • The Chairman and relevant staff will receive the award at a function in Wellington next month. 15 Report of a meeting of the Manawatu River Users’ Advisory Group of Horizons Regional Council held in the Tararua Room of Regional House at 11-15 Victoria Avenue, Palmerston North, at 7.30pm on Tuesday, 2 June 2009. PRESENT Crs L Burnell (Chairman), L Bailey, Messrs D Booth (Manawatu Freshwater Anglers’ Club), B Culley (Manawatu Marine Boating Club), R Anderson, G Hyde, and B Eccles (Jet Boating New Zealand), K Lane (from 7.47pm Water and Environment Care Association), M Wheatley (Manawatu Four Wheel Drive Club), D Stella (Manawatu Coast Guard), T Murdoch (Foxton Community Board). IN ATTENDANCE Area Engineer Harbourmaster Maritime New Zealand Committee Secretary Mr D McKee Mr E Lloyd Mr A Thomson Mrs J Kennedy The Chairman welcomed everyone to the meeting. APOLOGIES Apologies were received from Cr G Murfitt, Messrs B Vertongen (Foxton Community Board), A Wakeling, J Storey (Manawatu Marine Boating Club), I Taylor (Manawatu Fresh Water Anglers Club). Moved Bailey/Burnell that the apologies of Cr Murfitt, Messrs Vertongen, Wakeling, Storey, and Taylor, be accepted. CARRIED CONFIRMATION OF MINUTES Moved Bailey/Booth that the minutes of the meeting of the Manawatu River Users’ Advisory Group held on 2 December 2008, as circulated, be confirmed as a correct record. CARRIED HARBOURMASTER’S REPORT Report No: 09-82 The purpose of this item was to provide Members of the Manawatu River Users’ Advisory Group (MRUAG) with an update on matters relating to the Office of the Harbourmaster. 16 The Harbourmaster outlined the key points in the report and was available to answer questions on points raised. Mr Booth, Manawatu Freshwater Anglers’ Club, commented on the excellent news around expected budgeting for interpretative information for the turbidity charts on the Horizons website. It was expected that it would be completed in the first half of the new financial year. Moved Bailey/Booth that the Manawatu River Users’ Advisory Group a. receives the information contained in Report No. 09-82. CARRIED LOWER MANAWATU RIVER MANAGEMENT ISSUES Report No: 09-85 The purpose of this item was to inform Members of the Manawatu River Users’ Advisory Group (MRUAG) of Lower Manawatu Scheme (LMS) management issues, that may have some impact on the recreational use of the river during the period June to December 2009. Mr Derek McKee, Area Engineer spoke to the report and answered Members questions of clarification in regard to Lower Manawatu River Management Issues. The Chairman congratulated Mr McKee on the impressive work that has been undertaken as part of the City Reach Upgrade Programme. The Area Engineer advised of a number of structures (groynes) uncovered on the bank of the River. The structures have been sandblasted and preserved, and it was intended that a plaque, detailing the history of the structures, would be attached. Moved Bailey/Burnell that the Manawatu River Users’ Advisory Group a. receives the information contained in Report No. 09-85. CARRIED REVIEW OF MANAWATU RIVER AND TRIBUTARIES NAVIGATION AND SAFETY BYLAWS 2004 Report No 09-84 The purpose of this item was to provide members of the Manawatu River Users’ Advisory Group (MRUAG) with an overview of review process for the Manawatu River and Tributaries Navigation and Safety Bylaws 2004, and to introduce discussion on comments received to date. The Harbourmaster gave a presentation outlining the timeline and background to the Bylaw Review. There was discussion and consideration given in regard to the comments received by Members on the current Bylaws, and issues that could be considered in the Review. In regard to the proposed timeline, and the suggested consultation period of 19 December 2009-31 January 2010, it was suggested that February 2010 would be a more suitable date. 17 At the end of discussions, the Harbourmaster summarised the following action points: • • • • • • Provide feedback to submitters who were not at the meeting on their submissions and discussions to date. Discuss Jet Boating New Zealand submission with Palmerston North City Council and kayak clubs. Define exact position for placement of a five knot speed signs in The Loop. Continue discussions with Fish and Game in regard to five knot speed restriction in the Manawatu Estuary during duck shooting season. Further discuss with Palmerston North City Council their desire for the review to consider future commercial boat operations. Consider a change of wording in Clause 3.7.1 – Reserved Areas. Moved Burnell/Bailey that the Manawatu River Users’ Advisory Group a. discusses the written comments; b. provides guidance to the Harbourmaster on proposed amendments to the Manawatu River and Tributaries Navigation and Safety Bylaws; and c. requests the Harbourmaster to draft amendments to Manawatu River and Tributaries Navigation and Safety Bylaws, and present at the December meeting of the Manawatu River Users’ Advisory Group. CARRIED CALENDAR OF EVENTS Report No: 09-83 The purpose of this report was to present the Manawatu River Calendar of Events to the Manawatu River Users’ Advisory Group for information. Moved Bailey/Booth that the Manawatu River Users’ Advisory Group a. receives the information contained in Report No. 09-83, and notes that no upcoming events have been notified to the Harbourmaster. CARRIED GENERAL BUSINESS Mr Booth commented that the Manawatu Freshwater Anglers’ Club had missed the deadline for submissions to the Feilding Wastewater consent. Mr Lane advised that the Water and Environment Care Association, Manawatu Estuary Trust, and Fish and Game had made submissions. There was discussion around the consent conditions. 18 NEXT MEETING The next meeting of the Advisory Group was provisionally scheduled for 1 December 2009. The Chairman thanked the Group for their attendance and input. The meeting closed at 9.25pm. Confirmed. CHAIRPERSON HARBOURMASTER 19 Report of the public meeting of the Strategy and Policy Committee to deliberate on submissions made to the Draft Community Plan 2009-2019 held in the Tararua Room of Council’s offices at 11-15 Victoria Avenue, Palmerston North on Tuesday, 9 June at 10.05am, and Tuesday, 16 June 2009 at 10:02am. PRESENT 9 June 2009 Crs G P Murfitt (Chair), L Bailey, L R Burnell, V J F Chettleburgh QSM ED, E B Gordon (to 5.10pm), M C Guy (until 12.34pm, from 2.56pm to 3.56pm), A K Main (until 5.44pm), D B Meads, M W Plowman, P W Rieger QSO, R G Walker JP (until 5.45pm) and J J White. 16 June 2009 Crs G P Murfitt (Chair), L Bailey, L R Burnell (until 11.12am), V J F Chettleburgh QSM ED, E B Gordon, M C Guy, A K Main, D B Meads, M W Plowman, P W Rieger QSO, R G Walker JP, and J J White. Tuesday, 9 June 2009 IN ATTENDANCE Group Manager Regional Planning & Regulatory Committee Secretary Mr G Carlyon Ms K Booth ALSO PRESENT: Mr E Duggan (Strategic Projects), Mr C Mitchell (Group Manager Environmental Management), Mr A Cook (Group Manager Operations), Mr C Grant (Group Manager Corporate & Governance), Mr G Shirley (Group Manager Regional Services & Information), Mr A Beveridge (Environmental Manager, Biodiversity), Ms M Ram (Chief Financial Officer), Ms F Maseyk (Senior Environmental Scientist, Mrs C Atkinson (Communications Manager), and Mr P Burke (Communications Adviser), at various times throughout the meeting, and Mr J Philpott (from 12 noon to 12.34pm). Tuesday, 16 June 2009 IN ATTENDANCE Chief Executive Group Manager Regional Planning & Regulatory Committee Secretary Mr M McCartney Mr G Carlyon Ms K Booth ALSO PRESENT: Mr E Duggan (Strategic Projects), Mr C Mitchell (Group Manager Environmental Management), Mr A Cook (Group Manager Operations), Mr C Grant (Group Manager Corporate & Governance), Mr G Shirley (Group Manager Regional Services & Information), and Mr J Watson (Manager Catchment Information/Data), at various times throughout the meeting. 20 Tuesday, 9 June 2009 APOLOGY An apology was noted from the Chief Executive, Mr M McCartney, who was in Auckland. Cr Guy advised he would be leaving the meeting to attend another meeting at 1.00pm. DCP 09-08 Moved Murfitt/White That an apology be received from the Chief Executive. CARRIED LATE ITEMS There were no Late Items. Cr Guy asked for clarification on his ability to vote on recommendations, as he had not attended the Hearings. There was discussion on the Chairman’s comments prior to the Hearings that if Members had not heard a submission, then they could not deliberate on it. The Chairman noted that this meeting would be making interim decisions which would be voted on by all Councillors at the Council meeting on 30 June 2009. Members expressed their views as to whether or not Members could deliberate on submissions which they had not heard, and whether there was a difference between voting at the Deliberations meeting and voting at the Council meeting on 30 June. A motion was then put. DCP 09-09 Moved Chettleburgh/Meads That all Councillors present have the right to debate and vote on deliberations of the Draft Community Plan. Against: Crs White, Walker, Plowman, Bailey Abstain: Crs Gordon, Main CARRIED CONFLICTS OF INTEREST Cr White noted a conflict of interest with Regional Archives. The Chairman advised that the meeting would make interim decisions during the day, which would be ratified at the June Council meeting. CONFIRMATION OF MINUTES Members commented positively about travelling to hear submissions at Ohakune and Wanganui and the value of mixing with ratepayers at those venues. They expressed concern that some submitters appeared to have misinformation about Horizons’ activities and the possible rates increases, and requested that the letters to submitters at the end of the process, clearly explain the situation. The theme from Ohakune submitters was that they could not afford ongoing rate increases that would compound up to 19% over three years, however it was noted the rating impacts on that community would be much less than that. The Chairman explained that media releases had been prepared by the Communications team to explain the situation. 21 The Chairman asked Members for comments on the minutes. Page 3, submission of Tararua District Council (TDC), where Mayor Reynolds said the shares in Port of Napier were originally held by TDC. The Chairman advised that the shares were not originally held by TDC and he had discussed that comment with Mayor Reynolds. Page 4, submission of Ruapehu District Council (RDC). Cr Plowman advised the RDC had asked for a full section 32 analysis of the proposed One Plan, and also asked for an economic analysis to be carried out for hill country in the Ruapehu district with the likely effects of the One Plan, and this was not clear in the minutes. Page 6, Mr Gordon McKellar’s oral submission. The Chairman and Chair of Catchment Operations Committee advised that there was no intention of further investigation into the total contributor rating of the Lower Manawatu Scheme (LMS), and trusted Mr McKellar had not received the wrong impression. The Chairman asked for the wording to be deleted. Page 10, submission of Mr and Mrs Sivyer. Amendment to last sentence. Replace “One Plan” with “Sustainable Land Use Initiative (SLUI)”. The Chairman confirmed that it was SLUI that was voluntary, not the One Plan. Page 11, submission of Mr Matthews. Amend “Mr Fraser” to read “Mr Matthews”. DCP 09-10 Moved Murfitt/Gordon That the minutes of the Strategy and Policy Committee meetings to hear submissions on the Draft Community Plan 2009-2019 held on 25. 27, 28 May and 2 June 2009, as circulated and with the following amendments, be confirmed as a correct record: ‘Mangone’ to be corrected to Mangaone. Page 4, Ruapehu District Council, 3rd sentence to finish at “…One Plan.” New 4th sentence “They asked for a full section 32 analysis of the proposed One Plan, and an. economic analysis in order to give sufficient guidance for the future of hill country environment.” Delete “…and noted there would be further investigation into the total contributor rating of the LMS.” from report on Mr Gordon McKellar’s oral submission as this was not the intention. Mr Chris Teo-Sherell be amended to Dr Chris Teo-Sherell. Page 10, Mr and Mrs Sivyer, last sentence. Replace “One Plan” with “Sustainable Land Use Initiative”. Page 11, submission of Mr David Matthews. Amend “Mr Fraser” to read “Mr Matthews”. Page 11, Peoples of Uenuku. ‘peoples’ to read “Peoples”. CARRIED CONSIDERATION OF SUBMISSIONS TO THE DRAFT COMMUNITY PLAN 2009-2019 Report No: 09-89 The report provided management responses and recommendations regarding submissions made to the Draft Community Plan 2009-19. Members then discussed the annexed Submissions summary and asked questions of clarification. 22 SIGNIFICANT ISSUES AND RECOMMENDATIONS Rate Increase Affordability Members commented on submitters’ genuine appeal for affordability, and observed that many ratepayers were unfortunately confused about their possible rates increases through the way that information was communicated, whereas the intention was to be clear and transparent. Members expressed their concern that people had received the wrong message and said they would reconsider how to communicate this in the future. They noted that some submitters also asked the Council to concentrate on its core business. Tb Vector Funding & Biosecurity Activity Some Members spoke in support of restoring the funding to the Animal Health Board (AHB) to $500,000, without impacting on the general rate but instead funding through a surplus in the targeted rate. Other Members spoke against increasing AHB funding. It was noted by Members that some submitters had not understood that Horizons undertook possum control once the AHB stepped down. Moved Meads/Plowman That the Committee recommends to Council: a. That the Council restores the funding to the Animal Health Board from $400,000 to $500,000. Following comments about the motion, and discussion about a possible targeted rate surplus, Cr Chettleburgh proposed an Amendment to the motion. (Interim Decision) DCP 09-11 Moved Chettleburgh/Gordon That the Committee recommends to Council: a. That the $400,000 for Animal Health Board funding be increased by the amount of surplus funds available from the Possum Control targeted rate collection up to a maximum of $100,000. Against: Crs Walker, White, Main, Bailey, Murfitt CARRIED The Amendment became the substantive motion and was put to the meeting. Members continued discussing the work of the AHB, and the request of many submitters for this work to carry on. The Group Manager Environmental Management (GMEM) provided clarification on the funding. (Interim Decision) DCP 09-12 Moved Chettleburgh/Gordon That the Committee recommends to Council: a. That the $400,000 for Animal Health Board funding be increased by the amount of surplus funds available from the Possum Control targeted rate collection up to a maximum of $100,000. Against: Crs Walker, White, Main, Bailey Abstained: Crs Guy, Murfitt CARRIED 23 Lower Manawatu Scheme (LMS) Rating The Group Manager Operations (GMO) tabled a spreadsheet identifying differential options for rural flood protection categories. He clarified the columns in the spreadsheet, and explained why Option 1 was the preferred option. The GMO advised that this suggested redistribution would have no impact on rates. Both the GMO and Cr Meads (Chair of Catchment Operations Committee) clarified Members’ questions. Members discussed the management recommendation which was amended. (Interim Decision) DCP 09-13 Moved Meads/Burnell That the Committee recommends that Council: a. acknowledges the scientific validity of the proposed Lower Manawatu Scheme Rating system in its Draft Community Plan form, but modifies the differentials for the rural flood protection categories to reflect Option 1 (as outlined below) of the Options dated 8 June 2009, to recognise issues of fairness, reasonableness and affordability: Rating Category Description Original differentials Amended differentials (Option 1) 100% 75% 50% 25% 5% 80% 70% 45% 20% 100% 80% 60% 40% 10% 85% 75% 50% 25% Flood Protection 1 Flood protection 2 Flood Protection 3 Flood Protection 4 Flood Protection 5 Flood protection Spillways A Flood Protection Spillways B Flood protection Spillways C Flood Protection Spillways D CARRIED River and Drainage Scheme Activity Pages 12- 20. The Chairman asked Members to consider the other recommendations in the Rivers and Drainage – Scheme Activity. The GMO clarified Members’ questions as each recommendation was discussed, and undertook to clarify issues, where appropriate, in his responses to submitters. Scheme Rating changes (Interim Decision) DCP 09-14 Moved Meads/Murfitt That the Committee recommends to Council: a. That Council adopts the proposed scheme rating changes, as scheduled in the table distributed at the meeting and outlined below. 24 SCHEME CHANGE Manawatu Drainage Reduce rate increase to 3.5% and modify reserves drawdown to maintain scheme account balance Reduce rate increase to 3% for maintenance, plus what is required for capex. Transfer savings to principal repayment Reduce rate increase to 3%, utilizing interest savings and transfer any residual to reserves. Apply interest savings to reducing rate increase Reduce rate increase to 8% utilizing interest savings Maintain proposed rates and apply interest savings to principal reduction Add $5k to reserves, reduce closing balance. Reduce rates to reflect savings in interest costs. Reduce rates increase to 10% utilizing interest savings Maintain proposed rates and apply interest savings to principal reduction Maintain proposed rates and apply interest savings to principal reduction Reduce rates increase to zero , any residual interest savings to scheme balance Maintain proposed rating level per consultation, increase principal repayment Transfer additional $80 from scheme balance to reserves. Reduce rate increase to 15% using interest savings. Increase works expenditure $30k for silviculture Makerua Drainage Koputaroa Drainage Moutoa Drainage Te Kawau Drainage Rangitikei Lower Whanganui Whangaehu/ Mangawhero Upper Manawatu Matarawa Upper Whanganui Lower Manawatu Pohangina-Oroua Lower Kiwitea Akitio SER Upper Whanganui Tutaenui Ohau-Manakau Lower Manawatu Special Project Makirikiri Pakihi Ashhurst Foxton East Hokio Whirikino TOTALS Reduce rates increase to nil utilizing interest savings Reduce rates increase to nil utilizing interest savings and scheme balance Maintain proposed rates and apply interest savings to principal reduction Reduce rates increase to zero, any residual interest savings to scheme balance Reduce rates increase to reflect interest savings Maintain rates per recent consultation, apply interest savings to principal reduction Hold rates at 2008-09 level utilizing interest savings Reduce rates to reflect interest savings Maintain proposed rate increase – apply to principal reduction Maintain proposed rate increase – apply to principal reduction Reduce rates to reflect interest savings Reduce rates to reflect interest savings Reduce rates to reflect interest savings CARRIED COMMENT Transfer to reserves will be addressed in prep for Annual Report. Silviculture expend. Will require transfer from reserves – won’t attract Gen. Rate Scheme review pending – increased costs anticipated Increased project costs anticipated SCHEME RATE IMPACT -$9,573 GENERAL RATE IMPACT -$2,100 -$5,918 Nil -$4,131 -$1,751 -$8,666 -$2,410 -$3,863 -$77 Nil Nil Nil -$9,671 -$2,232 Nil Nil Nil Nil Nil -$3,318 -$1,010 Nil Nil -$12,780 -$1,885 -$6,629 -$742 -$1000 -$191 Nil Nil -$3,318 -$1,010 -$829 -$207 Nil Nil -$42,446 -$19,889 -$305 Nil -$77 Nil Nil Nil -$126 -$406 -$813 -$105,548 -$32 -$102 -$203 -$41,357 25 Funding Impact Statement changes (Interim Decision) DCP 09-15 a. Moved Main/Meads That the Funding Impact Statement in the Draft Community Plan be amended to reflect the corrected rating information in respect of the Ohau-Manakau and Upper Whanganui Schemes. CARRIED Pohangina-Oroua Scheme (Interim Decision) DCP 09-16 a. Moved Meads/Burnell That landowner contribution on erosion protection work to a maximum cost of $100,000 attracts 20% General Rate. (Additional rating impact of $15,000). CARRIED Ohau-Manakau Scheme (Interim Decision) DCP 09-17 Moved Bailey/Burnell a. That the new rating system for the Ohau-Manakau Scheme, as included in the Draft Community Plan be confirmed for adoption; b. That the Ohau-Manakau Scheme flood protection upgrade proposals, as included in the Draft Community Plan, be confirmed. CARRIED The meeting adjourned at 12.34pm The meeting resumed at 1.15pm. Lower Manawatu Scheme The GMO clarified Members’ questions in regard to the progress and timeframes of this proposed realignment, and communication to the public about the project. (Interim Decision) DCP 09-18 a. Moved Chettleburgh/Gordon That the proposals for realignment of the Manawatu River in the vicinity of Anzac Park Cliffs, as included in the Draft Community Plan, be confirmed. CARRIED 26 Lower Whanganui Scheme Cr Plowman advised he did not support the Scheme. (Interim Decision) DCP 09-19 a. Moved Main/Walker That Council’s position as regards the development/consultation process for Stages 2 & 3 of the Lower Whanganui Scheme Flood Protection proposals, as explained in the Draft Community Plan be confirmed, and that Wanganui District Council’s desire to be involved as a partner in that process be noted and welcomed. CARRIED The GMO distributed, for Members’ information, a model providing for recreational/amenity enhancement works for the Lower Whanganui River Scheme. He clarified Members’ questions in regard to funding, and commented that good feedback had been received from the community on the enhancement project. Members discussed the level of funding for both the Lower Whanganui and Lower Manawatu Scheme enhancement projects, with the option for a review of the programme. The management recommendation was amended. (Interim Decision) DCP 09-20 a. Moved Meads/Bailey That Council approves the special general rate assistance to the Lower Whanganui Scheme and the Lower Manawatu Scheme enhancement projects for the first three years of the Community Plan to a total of $50,000 per Scheme. The programme will be reviewed at the end of this period. CARRIED (Interim Decision) DCP 09-21 a. Moved Murfitt/Burnell That no other changes are made to the Community Plan in regard to submissions on the River and Drainage - Scheme Activity. CARRIED Rangitikei Environment Group Cr Gordon spoke in support of funding being reinstated to the Rangitikei Environment Group (REG) so they could continue with their pest plant control in the Rangitikei area. Members discussed funding through a targeted rate, and working together with the REG on focus areas. The motion was amended. (Interim Decision) DCP 09-22 Moved Gordon/Meads That the Committee recommends to Council: a. that funding of $85,000 is reinstated for the Rangitikei Environment Group as a targeted rate. 27 b. that the programme be developed on sites of significance in agreement with the Rangitikei Environment Group. CARRIED The Chairman then asked Members to consider a new motion in regard to funding. Mr Duggan tabled funding options for Members to discuss. (Interim Decision) DCP 09-23 Moved Gordon/Meads That the Committee recommends to Council: a. that the $85,000 for the Rangitikei Environment Group be funded through a differentiated uniform charge - 50% funding from properties 4ha and over and 50% of funding from properties under 4ha. CARRIED Note: Resolution DCP 09-23 was revisited at 3.17pm after new information was provided by Mr Duggan on rate options ‘by capital value’, ‘by differentiated UAC’, and by ‘UAC’. In accordance with Standing Orders, 75% of the members then present and voting, resolved to move a new resolution (see DCP 09-29 – copied below for ease of viewing). Copy of (Interim Decision) DCP 09-29 Moved Main/Bailey That the Committee recommends to Council: a. that the $85,000 for the Rangitikei Environment Group be funded through a differentiated uniform charge - 70% funding from properties 4ha and over and 30% of funding from properties under 4ha for properties in the Rangitikei district area. Against: Crs Chettleburgh, Guy, Plowman CARRIED Pest Plant and Living Heritage Level of Service and Funding Cr White spoke in support of reinstating funding for the Living Heritage activity, and the GMEM clarified that the funding would be applied to pest plant control in priority habitat sites. Crs Burnell and Walker did not support the motion as they were against rates increases. Mr Duggan clarified the rating impacts of this proposed funding. (Interim Decision) DCP 09-24 Moved White/Main That the Committee recommends to Council: a. That in 2009-10 it reinstates funding of $125,000 and $125,000 ($250,000 in total) in 2010-11 into the Living Heritage Activity. The focus for this will be pest plant control in priority habitat sites. Against: Crs Walker, Burnell CARRIED 28 One Plan Cr Plowman said that he did not support the One Plan, and put a motion to abandon the One Plan. (Interim Decision) DCP 09-25 Moved Plowman/Walker That the Committee recommends to Council: That it abandons the One Plan. For the Motion: Cr Plowman LOST (Interim Decision) DCP 09-26 Moved Main/Murfitt That the Committee recommends to Council: a. to reduce the interest payments on the One Plan and the corresponding internal interest income; b. That no other changes are made to the Community Plan in regard to submissions on the Strategic Management activity. Against: Cr Plowman CARRIED Port of Napier (PoN) Shares and Investment Interest rate The Chairman spoke to this matter. (Interim Decision) DCP 09-27 Moved Bailey/Rieger That the Committee recommends to Council: a. To reduce the provision for interest earned on deposits and increase the General Rate correspondingly; b. that Port of Napier share sale be investigated and proceeded with if Council decides sale is in the best interests of the Region; c. That no other changes are made to the Community Plan in regard to submissions on the Investment activity. CARRIED The meeting adjourned at 3.00pm. The meeting resumed at 3.17pm. Members expressed a desire to revisit the Resolution passed in respect of funding for the Rangitikei Environment Group in regard to the effect on lower income ratepayers. The Chairman advised that in accordance with Standing Orders, if new information was received 29 concerning a matter already resolved at the meeting, the previous resolution could be altered or revoked by the consent of 75% of the members then present and voting. As requested by Councillors, Mr Duggan presented Members with rate options for properties of differing land sizes, for their consideration. They fully discussed the options and signalled a willingness to amend the previous resolution. (Interim Decision) DCP 09-28 Moved Murfitt/Main That the Committee would like to revisit the interim decision DCP 09-23. Against: Two Councillors For the Motion: Nine Councillors CARRIED (Interim Decision) DCP 09-29 Moved Main/Bailey That the Committee recommends to Council: a. that the $85,000 for the Rangitikei Environment Group be funded through a differentiated uniform charge - 70% funding from properties 4ha and over and 30% of funding from properties under 4ha for properties in the Rangitikei district area. Against: Crs Chettleburgh, Guy, Plowman CARRIED Iwi Budget reduction and Inclusion of the Peoples of Uenuku as an iwi Cr Plowman advised he would abstain as he had not received the Agenda in time to read all of the annexed management replies and recommendations. (Interim Decision) DCP 09-30 Moved Murfitt/Bailey That the Committee recommends to Council: a. To alter the wording of the Maori Land Rate Remission (MLRR) policy on page 266 of the Draft Community Plan to allow the Chief Executive to consider and approve or decline all MLRR applications and to report annually to the Council; b. To add the Peoples of Uenuku as an iwi to the Community Plan on page 19 of the Plan; c. That no other changes are made to the Community Plan in regard to submissions on the iwi activity. Abstained: Cr Plowman CARRIED 30 Green RIG, Waste and Environmental Education Members asked questions about sponsorship of the Green RIG and about its re-theming project. They asked to see more information on the Green RIG activity in the Community Plan. Comment was made that these were difficult economic times to achieve sponsorship, and Members discussed funding of the Green RIG should sponsorship not be realised. In reference to page 52 of the Agenda, Members said they were not happy with the comment in the 2nd bullet point under Environmental Education (management reply). It was agreed to delete the wording “I am unsure what UN Agenda 21 is but”. Members amended (a) of the recommendations, and included a new (b). (Interim Decision) DCP 09-31 Moved Murfitt/White That the Committee recommends to Council: a. To make changes to the Draft Community Plan and reporting of the Green RIG to better reflect funding, and performance; b. that the Green RIG be reported separately in the Community Plan. c. That no other changes are made to the Community Plan in regard to submissions on the Environmental Reporting and Education Activity. Against recommendation (c) – Cr Plowman CARRIED Emergency Management – Flood Mapping in Tararua District (Interim Decision) DCP 09-32 Moved Chettleburgh/Murfitt That the Committee recommends to Council: a. To increase emergency management funding for flood modelling in Tararua District by: • • b. Year 1 - $101,000 CAPEX with an additional operational commitment of $10,100/year (from year 2) for 10 years, being Pahiatua modelling and Woodville LiDAR. Year 2 - $71,000 CAPEX with an additional operational commitment of $7,100/year (from year 3) for 10 years, being Woodville modeling; That no other changes are made to the Community Plan in regard to submissions on the Emergency Management Activity. CARRIED 31 Transport Group of Activities: (Interim Decision) DCP 09-33 Moved Gordon/Chettleburgh That the Committee recommends to Council: a. To add participation in a joint strategic transport study to its list of activities, with the cost to be met from the existing budget; b. That no other changes are made to the Community Plan in regard to submissions on the Transport Planning activity. CARRIED Cr Bailey amended recommendation (a) to include an investigation into any other anomalies. (Interim Decision) DCP 09-34 Moved Bailey/Chettleburgh That the Committee recommends to Council: a. To classify Waitarere Beach as rural for the purposes of passenger services transport rating and investigate whether similar anomalies exist; b. That no other changes are made to the Community Plan in regard to submissions on the Passenger Services activity; c. That no changes are made to the Community Plan in regard to submissions on the Road Safety and Sustainability activity. CARRIED Long Term Financial Strategy (LTFS) Building up of Reserves Members discussed whether or not to build up cash reserves, and agreed to review the situation again in Year 4 of the Community Plan. Cr Rieger amended the recommendation. (Interim Decision) DCP 09-35 Moved Rieger/Meads That the Committee recommends to Council: a. that Council does not build up any more cash reserves for emergency purposes and Council is to review this position in Year 4 of the Community Plan and the Community Plan be amended accordingly. CARRIED 32 Revenue and Financing Policy In response to Members’ questions about the Council’s rate collection process, the Chief Financial Officer advised that staff worked sympathetically with those ratepayers who were having financial difficulties. Members asked further questions of clarification. (Interim Decision) DCP 09-36 Moved Rieger/Burnell That the Committee recommends to Council: a. To reduce the admin fee for direct debits for instalment payments from 3% to 2% in the Community Plan; b. Reinsert the rate remission policy for Environmental Works into the rate remissions policies in the Community Plan; c. That no other changes are made to the Community Plan in regard to submissions on the Revenue and Financing Policies. CARRIED Resource Consents, Multi Inspection Compliance Fees and Dam PIMs Mr Duggan spoke to this activity. (Interim Decision) DCP 09-37 Moved Bailey/Main That the Committee recommends to Council: a. To set Consent Hourly rates at the 2008-09 level in the Community Plan; b. That the multi inspection fees be added to the Draft Community Plan as suggested in the staff submission; c. That additional words be inserted into the Draft Community Plan to clarify charging for PIMs as suggested in the staff submission; d. That no other changes are made to the Community Plan in regard to submissions on the Resource Consent and Pollution Management Activity. CARRIED Foxton River Loop Cr Bailey referred Members to the submission from Save Our River Trust Incorporated on page 282 of the Submissions Hearing Agenda, and said the submitters were asking Council to fund a feasibility study. The GMO explained that there was no funding currently available, nor staffing resources available for several years, however he and the Group Manager Regional Planning and Regulatory (GMRPR) said there was an opportunity to better understand the scope of the project. Members discussed the matter and made a recommendation. 33 (Interim Decision) DCP 09-38 Moved Meads/Burnell That the Committee recommends that Council: a. offers management discussions with the Save Our River Trust to better understand the project scope and issues over the next twelve months. CARRIED Sustainable Land Use Initiative (SLUI) and Land Management Cr Plowman advised he did not support SLUI. (Interim Decision) DCP 09-39 Moved Main/White That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to submissions on Land Management Activity, including the Sustainable Land Use Initiative. Against: Cr Plowman CARRIED OTHER ISSUES AND RECOMMENDATIONS General Comments Cr White did not agree with a submitter suggestion that Horizons was not involved with economic development in the Region, and asked that the response letter to the submitter clarify how involved the Council was. (Interim Decision) DCP 09-40 Moved White/Walker That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to general submissions. Against: Cr Plowman CARRIED Climate Change (Interim Decision) DCP 09-41 Moved Rieger/Meads That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to submissions on Climate Change. CARRIED 34 Water Quality and Quantity Activity (Interim Decision) DCP 09-42 Moved Main/Chettleburgh That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to submissions on Water Quality and Quantity Activity. CARRIED River and Drainage General (Interim Decision) DCP 09-43 Moved Burnell/Bailey That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to submissions on River and Drainage – General Activity. CARRIED Community Relationship Activity Members noted comments from submitters on Horizons’ publications, about using black and white for wording, in preference to coloured wording on coloured backgrounds. (Interim Decision) DCP 09-44 Moved Bailey/Walker That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to submissions on the Community Relationships activity. Against; Cr Plowman CARRIED Information Activity (Interim Decision) DCP 09-45 Moved White/Rieger That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to submissions on the Information activity. CARRIED 35 CAPEX: Mr Duggan clarified Members’ questions in regard to CAPEX budgets and depreciation. (Interim Decision) DCP 09-46 Moved Chettleburgh/Rieger That the Committee recommends to Council: a. That no changes are made to the Community Plan in regard to the CAPEX (excluding the changes made to flood mapping in Tararua District DCP 09-32 above). CARRIED The Chairman mentioned he had received requests for rating invoices to show funding to the Animal Health Board on a separate line to ordinary possum control programme. (Interim Decision) DCP 09-47 Moved Rieger/Plowman That the Committee recommends to Council: a. That there is separation of the Animal Health Board funding on rates invoices from Possum Control funding. CARRIED The GMRPR advised Members that a note had been received from CentrePort Limited while he was in the meeting, but that further and fuller information would be distributed to Members once it was received. Mr Duggan presented a summary of the rates position following the interim decisions at the meeting and he clarified Members’ questions. The Chairman suggested he arrange another meeting prior to the Council meeting on 30 June 2009 to consider further, the rates position as summarised by Mr Duggan. The Chairman thanked Members and staff for their input into the meeting. The meeting adjourned at 6.06pm on 9 June 2009. The meeting resumed at 10.02am on 16 June 2009. Tuesday, 16 June 2009 APOLOGY There were no apologies. LATE ITEMS There were no Late Items. The Chairman advised a letter had been received from National MP, Nicky Wagner (DeputyChair of the Local Government and Environment Committee and a Member of the Emissions 36 Trading Scheme Review Committee), congratulating Horizons Regional Council for winning the Ministry of Environment Green Ribbon Award – Innovative Solutions for the Environment - for its Water Matters website. The Chairman reminded Members that at the end of the Deliberations meeting on 9 June 2009, they were considering the results of their interim decisions on the proposed rates percentages for Years 1, 2 and 3 of the Community Plan (Long-term Council Community Plan [LTCCP]). Management had since discussed the outcomes and the Chief Executive would put forward their suggestions for Members’ consideration. Following the Chief Executive’s explanation that the presentation included some confidential information, Members agreed to hear, and discuss, all of the presentation in Public Excluded. Moved Chettleburgh/Burnell DCP 09-48 that the public is to be excluded from this portion of the Council meeting as the general subject matter to be considered while the public is excluded, the reason for passing this resolution in relation to the matter, and the specific grounds under section 48(1) of the Local Government Official Information and Meetings Act 1987 for passing of this resolution is as follows: General subject of each matter to be considered PX1 Presentation and deliberation on submissions to the Draft Community Plan 2009-19 Reason for passing this resolution As disclosure would not be in the public interest because of the greater need to enable Council to carry on without prejudice or disadvantage commercial negotiations and to protect the privacy of natural persons. Grounds under section 48 (1) for passing this resolution That the exclusion of the public from that part of the meeting is necessary to prevent the disclosure of information for which good reasons for withholding exist. CARRIED The meeting adjourned to the Public Excluded part of the meeting at 10.08am and resumed at 1.59pm. The Chairman referred to his comments in the Public Excluded part of the meeting where he asked Members to consider the interim decisions made on 9 June 2009 relating to the AHB funding (DCP 09-12), and funding for plant pests (DCP 09-24), as some Councillors had expressed a wish to revisit these at the Council meeting on 30 June 2009. Throughout discussions on the submissions to the Draft Community Plan, Members expressed their preference that submitters receive letters giving clear and explanatory responses to their submissions, which would also clarify statutory and legislative requirements where appropriate. The meeting closed at 2.00pm. ______________________________ CHIEF EXECUTIVE ______________________________ CHAIRMAN 37 Report of the ninth meeting, seventh triennium, of the Environment Committee of Horizons Regional Council held in the Tararua Room, Regional House, 11-15 Victoria Avenue, Palmerston North, commencing at 10.00am on Wednesday 10 June 2009. PRESENT Crs AK Main (Chair), J White (Deputy Chair), L Bailey, L Burnell, VJF Chettleburgh QSM ED, and GP Murfitt (ex officio). IN ATTENDANCE Crs EB Gordon (to 3pm), MC Guy and DB Meads. Chief Executive Group Manager Regional Planning & Regulatory Group Manager Environmental Management Committee Secretary Mr M McCartney (to 12.20pm) Mr G Carlyon (from 11.15am) Mr C Mitchell (to 1.45pm) Mrs L Carter ALSO PRESENT Mr G Cooper (Manager-Land, from 10.00am to 10.10am and from 11.25am to 12.20pm), Mr R Munneke (Manager-Policy), Ms F Maseyk (Senior Environmental Scientist – Ecology,to 1.45pm), Mr J Roygard (Manager – Science), Ms A Russell (Manager Environmental Compliance, from 1.00pm), Mr P Taylor (Plan Implementation Coordinator, from 1.40pm), Mr T Hynes (Animal Health Board from 1.00pm to 1.17pm), Mr A Innes (Animal Health Board from 1.00pm to 1.17pm). The Manager-Land introduced SLUI scholarship recipients to the meeting. Eight scholarships were awarded although not all recipients were present due to Massey exams. Those present were: Joel Perry, Bridget Telfer, Shane Brownlie, James Lawn, and Amy Taylor. Other recipients not present were Stuart Standen, Andrew Gray and Helen Free. The students told members where they came from and why they had chosen to attend Massey University. The students and Manager-Land then left the meeting. Council Chair addressed the meeting to advise that the Strategy session set down for 16/17 June 2009 was to be rescheduled for a later date to be advised. There would be a meeting on the morning of 16 June to continue discussions on the Long-term Council Community Plan (LTCCP). APOLOGIES An apology was received from Cr M Plowman. LATE ITEMS There were no late items. MEMBERS’ CONFLICT OF INTEREST There were no Members’ conflict of interest issues. 38 CONFIRMATION OF MINUTES ENV 09-63 Moved Burnell/White that the minutes of the Environment Committee meeting held on 15 April 2009, as circulated, and with the spelling of Wanganui changed to Whanganui in the comments on Environmental Management Progress Report, be received and confirmed as a correct record. CARRIED ENVIRONMENTAL MANAGEMENT PROGRESS REPORT Report No: 09-88 The purpose of this item was to inform the Environment Committee of progress made towards outputs listed in the following activity areas of the 2006-16 Long-term Council Community Plan. • • • • • Land Management Activity Water Quantity and Quality Management Activity Habitat Protection Strategic Management Activity Biosecurity The report covered the period to 22 May 2009. Members asked questions of clarification and staff provided additional background information where required. Regional Land Initiatives: A brief verbal report on the Emissions Trading Scheme workshop was requested. It was agreed the Manager-Land would give this when he returned to the meeting. The Group Manager Environmental Management (GMEM) noted a proposed workshop to be hosted by Horizons (presented by MAF) on emissions trading was not yet on the calendar as MAF was waiting for answers from Central Government before finalising their presentation. Land Monitoring Research: In response to a question the Manager-Science advised there was growing interest on the part of farmers in the outcome of projects. The Chief Executive noted it would be appropriate to publicise funding received from Envirolink and other sources apart from rates at the time of the release of the LTCCP. Water Quantity and Quality Management Activity: Two members noted they had received negative feedback re the telephone survey conducted on water quality. It was agreed the questions asked and the results obtained in the survey would be provided to the next meeting of the Committee. Groundwater Monitoring and Research: The Manager-Science provided additional information on the investigation into potential sources of groundwater for the Waituna West Rural Water Scheme, noting results and recommendations of the investigation had been forwarded to the Manawatu District Council. Water Quality and Aquatic Habitat Improvement: In response to a question re the willow clearance programme on the Moawhango River, the GMEM advised this work was funded by Genesis. 39 Bush Remants: A map showing the various native habitat and biodiversity sites was tabled for members’ information. Community Biodiversity: The Chief Executive elaborated on the preparation of draft Totara Reserve Management Plan prepared by Manawatu District Council and the lack of engagement with Horizons as principal funding partner, noting the opportunity was now belatedly available for this Council to have input. A meeting had been arranged to talk about future ongoing management issues. Strategic Management: The Manager-Science gave an update on plans to secure a monitoring site in Taumarunui, noting the Baptist Church site was the option decided on. The Manager-Land gave a brief overview of the workshop he attended on the emission trading scheme in relation to forestry. Environmental Education: In response to a question, the GMEM advised the Genesis sponsorship of the Green RIG was for a period of 10 years. It was noted that the costs associated with the Green RIG’s attendance at Mystery Creek National Field Days was shared with Genesis. The site cost was paid by Genesis. New Projects/Emerging Issues: The Manager-Policy advised the Upukongaro site was progressing very well. It was noted that there were several potential partners who could become involved in the continued development of the walkway/cycleway from this site. It was mentioned that the Transport Committee needed to be aware of the implications in view of Central Government’s plans for a national network of cycleways. Strategy Reviews: It was noted that the date in para 124 should read 2009-2019. Biosecurity Progress Report: The GMEM agreed to add historical information to the graph depicting Frontline enquiries. The GMEM updated members on possum control operations. A map was provided showing the status of various operations. The Chief Executive verbally reported on his attendance at the Reform in Paradise Conference held annually by the Environmental Defence Society (EDS). He noted the two main drivers of the Conference were keen to see the development of an environmental protection authority for New Zealand similar to European models. However, the Chief Executive felt there was considerable support at the Conference for the subsidiary concept which was making decisions at local levels. The Regional Council sector felt an EDS model could add value in some areas and potentially provide a national monitoring role on the state of New Zealand resources. The meeting adjourned at 12.20pm. The meeting resumed at 1.00pm. 40 VECTOR MANAGEMENT, ANIMAL HEALTH BOARD, AND TB FREE COMMITTEE REPORT Report No. 09-86 This report informed the Environment Committee of the Vector Management, Animal Health Board, and TB Free Committee activity for the Region, for the period April-May 2009. Animal Health Board staff provided updates to the report and answered questions of clarification. Mr T Hynes advised the Bovine Tb Strategy Review consultation document had now been approved for public release. Copies of the Review were provided to members. ENV 09-64 Moved White/Bailey that the Committee recommends that Council: a. receives the information contained in Report No. 09-86 and Annex. CARRIED It was agreed that the GMEM should prepare a submission on the Animal Health Strategy (closing date 30 June 2009) for perusal by the Environment Committee Chair and Council Chair. ENVIRONMENTAL MANAGEMENT PROGRESS REPORT - (Continued) Report No. 09-88 Pest Plant Biosecurity: Concern was expressed about the spread of weeds by mowers and whether appropriate attention was paid to this issue by contractors. There was discussion on the unsatisfactory appraisal in regard to pest plants in the KiwiRail corridor. The Council Chair agreed to raise with local Members of Parliament the matter of KiwiRail having insufficient funds to deal with this problem. Progress on Zero Density and Containment Species: It was noted the issue of control of Purple loosestrife at Lake Horowhenua was still not resolved. ENV 09-65 Moved Burnell/White That the Committee recommends that Council: a. receives the information contained in Report No. 09-88 and Annexes. CARRIED 41 REGULATORY MANAGEMENT ACTIVITY REPORTS Report No. 09-87 This report presented three items for the information of Members: a. b. c. Watertake Monitoring Report Environmental Team Report – 1 April to 31 May 2009 Consents Granted – April and May 2009 A brief presentation was made on the Watertake Monitoring Report. Members asked questions of clarification. A presentation was made on the Environmental Team Report – 1 April to 31 May 2009. Members asked questions of clarification. Staff provided updates as required. Members discussed the difficulties being experienced in relation to the old landfill located at Levin. The Group Manager Regional Planning & Regulatory (GMRPR) noted there was a considerable sum outstanding in unpaid fines across the Consents and Compliance departments, and he intended to bring a paper to the next Strategy and Policy Committee meeting seeking formal support for the measures to be put forward to deal with this issue. It was noted that the comments on page 78 of the agenda relating to the Levin Landfill Review should read …dialogue between Horowhenua District Council and the affected parties, not Horizons Regional Council and the affected parties. ENV 09-66 Moved Chettleburgh/Burnell that the Committee recommends that Council: a. receives the information contained in Report No. 09-87 and Annexes. CARRIED MEMBERS’ QUESTIONS A question was asked about Manawatu District Council plan change proposals relating to land in Flygers/Rangitikei Line. The Manager-Policy advised this Council was working through issues with Manawatu District Council. An informal briefing on this matter would be provided before commencement of the next Environment Committee. It was noted that Councillors on the One Plan General Hearing would need to exclude themselves from any such briefing. The meeting closed at 3.35pm. Confirmed _________________________________ ____________________________ CHIEF EXECUTIVE CHAIRPERSON 42 43 Report of the seventh meeting, seventh triennium, of the Regional Transport Committee held at 1.00pm on Tuesday 23 June 2009, in the Tararua Room, Horizons Regional Council, 11-15 Victoria Avenue, Palmerston North. PRESENT Crs EB Gordon (Chair), GP Murfitt (ex officio from 1.04pm), Mayor B Duffy (Horowhenua District Council), Mayor M Reynolds (Tararua District Council), Mayor S Morris (Ruapehu District Council), Cr G Cruden (Palmerston North City Council), Cr M Bell (Manawatu District Council), Mr RW Smith (Access & Mobility, Dr C Cheyne (Environmental Sustainability), Ms L Tamehana (Public Health), Inspector N Wynne (Safety and Personal Security). IN ATTENDANCE Group Manager Regional Services Mr GP Shirley (from 1.06pm) and Information Manager Transport Services Mrs A Redgrave Committee Secretary Mrs JA Kennedy ALSO PRESENT Crs M Guy, M Plowman, Ms K Lowe (Transport Planner), Mr W Wallace (Transport Planner), and various other interested groups. APOLOGIES Apologies were received from Crs Chettleburgh (Leave of Absence), Brown, Anderson, and Ms Chetwynd. LT 09-68 Moved Duffy/Bell that the Committee accepts the apologies of Crs Chettleburgh (Leave of Absence), Brown, Anderson, and Ms Chetwynd. CARRIED PUBLIC SPEAKING RIGHTS No requests for public speaking rights had been notified. LATE ITEMS There were no Late Items notified. MEMBERS’ CONFLICTS OF INTEREST There were no conflicts of interest noted. 44 CONFIRMATION OF MINUTES LT 09-69 Moved Bell/Wynne that the minutes of the Regional Land Transport Committee held on 9 March 2009, as circulated, be received and confirmed as a correct record. CARRIED ENDORSEMENT AND ADOPTION OF MINUTES Passenger Transport Subcommittee Meeting – 17 February 2009 LT 09-70 Moved Bell/Cruden that the Minutes of the Passenger Transport Subcommittee meeting held on 19 May 2009, as circulated, be received and confirmed as a correct record. CARRIED REGIONAL LAND TRANSPORT PROGRAMME (RLTP) 2009-12 Report No: 09-91 This report was to approve the draft Regional Land Transport Programme 2009-12. Ms Lowe, Transport Planner (TP) drew Members attention to the recommended amendments to submissions responses which had been agreed to at the workshop held earlier that morning. The TP outlined the background and main points in the report. She reminded Members that a number of local authorities were still in the process of signing-off on their Long-term Council Community Plans, and any changes made after the Regional Land Transport Programme was approved would be reflected in the document before it was forwarded to the New Zealand Transport Agency. Members should also be aware that as Councils did not know the final criteria the New Zealand Transport Agency would use in assessing the priority of projects identified, there could be changes to the regional priorities when the National Land Transport Plan was released. Members asked questions of clarification around Regional funding, and the criteria used for assessing where projects would fit on the priority list. There were a number of formatting and grammatical changes noted, and the Manager Transport Services undertook to amend these. Recommendation (a) was amended to include the changes as agreed at the workshop held earlier that morning. 45 LT 09-71 Moved Duffy/Reynolds that the Committee recommends that Council: a. approves the officers’ recommendations regarding submissions on the draft Regional Land Transport Programme with amendments to submission responses as follows: P96: DC Parham: • • Response to submitter to include explanation of strategic study and the possible consequences of the outcomes on statehighway routes. Roberts Line and James Line will be considered in the strategic study and will try to estimate what future demand will be. All suggested options for improvement will be considered. Strategic study will help to clarify future demand and desired outcomes. P102: Palmerston North City Council, in relation to increased financial assistance rate for Upstream Crossing: • RTC notes that a request for its support for this application for increased financial assistance will be presented in due course. P10: Rangitikei District Council: • The RTC notes that an application for funding has been made for an open drain between Ruatangata Road and Whangaehu Rive.; • Noted that Mayor Leary’s preference is for the stock effluent facility to be located at Hunterville (verbal submission). • RTC to ask NZTA to take Rangitikei’s view re site of facility into account. P 108: Belinda Howard: • NZTA has been investigating sites for stock effluent facilities for a number of years; this has not been without difficulty but a suitable site has recently been confirmed. • RTC notes that the crash reduction study is now complete and requests that Rangitikei send results of the crash reduction study to submitter. P108-111: Lindsay Burnell, Rural Women NZ, J and S Cohen, M Cohen: • This section of the network is part of the Levin to Wellington Airport Corridor, now designated a route of national significance and improvements will form part of a major upgrade. P111, 112: Jenny Olsson, Noel Olsson: • The RTC notes that this has now been included in the PNCC Long-term Council Community Plan; 46 b. receives and confirms the minutes of the Submissions Hearing to hear submissions on the Draft Regional Land Transport Programme 2009-12 held on 20 May 2009, as a correct record; c. approves the Regional Land Transport Programme 2009-12 with any amendments; d. agrees that any changes in local authority Long-term Council Community Plans that are made after the Regional Land Transport Programme 2009-12 is approved will be reflected in the Regional Land Transport Programme before the document is forwarded to NZTA; and e. lodges the Regional Land Transport Programme 2009-12 to the Horizons Regional Council for approval on 30 June 2009. CARRIED REGIONAL LAND TRANSPORT STRATEGY REVIEW Report No: 09-90 This report was to outline a proposed process and timeline for the review of the Regional Land Transport Strategy (RLTS). Mrs Redgrave, Manager Transport Services (MTS) introduced the item and highlighted that Palmerston North City Council, Manawatu District Council, Horizons Regional Council and the New Zealand Transport Agency had agreed to participate in a joint transport study of the Manawatu-Palmerston North area. It was intended that the Study would be included in the draft Regional Land Transport Strategy Review (RLTS). As discussed at the workshop held earlier that morning, the timeline for the draft RLTS, which had been included in the March Regional Transport Committee agenda, may need to be extended in order for the Study to be included. Members were asked to express their thoughts and to advise the MTS of any transport issues they would like to see captured in the draft Issues paper. Mr Smith, representing Access and Mobility advised he would like to see more detail around improving access to strategic roading. Mayor Morris thanked the MTS for a well presented paper. Mayor Reynolds commented she did not agree that routes which functioned as alternatives in times of State Highway closure, were doing so adequately. Cr Cruden asked that wording relating to the Environment Court Hearing into the road stopping process for Milson Line be amended to better reflect the parties positions. The MTS took note of the comments made. LT 09-72 Moved Duffy/Morris that the Committee recommends that Council: a. receives the report on the commencement of the Regional Land Transport Strategy review; and b. approves the draft Issues paper for release for public consultation, with any agreed amendments. CARRIED 47 MEMBERS’ QUESTIONS There were no Members’ Questions. The meeting closed at 1.40pm. ___________________________________ MANAGER TRANSPORT SERVICES ______________________________ CHAIRMAN 48 49 A Significant decision? If Yes Do recommendations meet Significance Policy (contained within the LTCCP) Item No: 11 Date: 30/06/2009 Report No: 09-96 File No: OMS 10 02 09 Y Y FINAL CONSIDERATION OF SUBMISSIONS TO DRAFT COMMUNITY PLAN 2009-19 PURPOSE 1. This report provides Council with information regarding final considerations regarding the Community Plan (CP) 2009-19 FINANCIAL IMPACT 2. If the CP attached is adopted the rate impacts will be: Year 2008-09 AP as adopted 2009-10 CP 2010-11 CP 2011-12 CP 3. General Rate 10,225 Scheme Rates 7,620 10,708 4.72% 11,335 5.86% 12,373 9.16% 7,996 4.93% 8,565 7.12% 9,207 7.50% Other Rates Total Rates 10,203 28,048 11,070 8.50% 11,742 6.07% 12,187 3.79% 29,774 6.16% 31,642 6.27% 33,767 6.72% A more detailed summary of rate changes is provided on page 12 of the attached CP. BACKGROUND 4. The Draft CP was released for public consultation on Wednesday 8 April 2009 and submissions closed at 5.00 pm Friday 8 May 2009. 5. At hearing meetings held in Palmerston North (25 May and 28 May 2009), Ohakune (27 May 2009), and Wanganui (27 May 2009) Council heard oral submissions and viewed some of the written submissions. On 2 June 2009 Council viewed the remaining written submissions. 6. On 9 June Council meet to consider the submissions. During this meeting some additional items were added to the CP by Council. Also Council received an indication from management regarding investment income which would have seen further rates increases. At the end of the meeting Council was concerned at the level of rates rises, particularly regarding years 2 (2010-11) and 3 (2011-12) of the CP and decided to adjourn the meeting until 16 June 2009. 7. The resumption of the meeting on 16 June was held as public excluded, as management suggested to Council a number of service level reductions to lessen the rate requirement from year 2 onwards. Council made interim decisions to accept these cuts but also indicated they wished to revisit two items on which they had made interim decisions. These items were Animal Health Board (AHB) expenditure and funding in year 1 (200910), and the increase in pest plant management on high priority habitats from year 2 onwards. The Chairman took a straw poll to indicate possible Council positions on these items and the attached CP has been amended to include these position. 50 8. For the AHB Tb vector management funding the straw poll position was to reduce expenditure to $400,000 in the 2009-10 year. In addition the $100,000 targeted pest animal rate surplus (previously used to offset the increased Tb funding) has been transferred to year 3 of the plan, to offset the targeted rate portion of Councils own pest animal management programme. 9. For pest plant management on high priority sites the straw poll position was to keep the increase over the draft plan sent out for consultation, to $125,000 for the ten year life of the plan. 10. It should be noted that all changes have now been processed through our budgeting system, and that the results are slightly better than originally suggested. It should also be noted that the Chairman’s report has been amended to let the community know the reasons why we have not met the statutory deadline (30 June 2009) for the adoption of the CP. COMMENT 11. Council now needs to finalise its position for the adoption of the CP. The document has been to Audit New Zealand but cannot be hot reviewed by the Office of the Auditor General until it is finalised by Council. Management has booked this review for 1 July 2009 but will be forced to delay this review if Council makes any changes to the document, other than have been included in the attached CP. This delay would mean we will have difficulty in adopting the CP on July 7 2009, which will result in the delay of sending the rate notices out to ratepayers. The late posting of rate notices will have significant implications on public relations, Councils cashflow, and interest income. RECOMMENDATIONS 12. Management recommends to Council that: a. the Animal Health Board TB vector management expenditure is reduced to $400,000 in the 2009-10 financial year. In addition the $100,000 targeted pest animal rate surplus (previously used to offset the increased Tb expenditure) is transferred to year 3 (2011-12) of the Plan to offset the targeted rate portion of Councils own pest animal management programme; b. the increase in pest plant management expenditure on high priority sites be kept to an increase of $125,000 over the Draft Community Plan sent out for consultation, for the ten year life of the Plan; and c. the attached Community Plan 2009-19 be sent to the Office of the Auditor General for hot review and eventual adoption by Council on 7 July 2009 Ed Duggan ACTING CHIEF FINANCIAL OFFICER ANNEX A Community Plan 2009-19 (Attached as a separate document for Councillors and available for inspection at Regional House, Palmerston North) 51 A Significant decision? If Yes Do recommendations meet Significance Policy (contained within the LTCCP) N Item No: 12 Date: 30/06/2009 Report No: 09-92 File No: TTP 1 03 REGIONAL LAND TRANSPORT PROGRAMME (RLTP) 2009-2012 PURPOSE 1. To formally approve the Regional Land Transport Programme 2009-2012. FINANCIAL IMPACT 2. No financial impact to Horizons Regional Council as a result of this decision. Horizons Regional Council’s activities in the Regional Land Transport Programme have been included in the 2009-19 Community Plan (LTCCP) budgets. BACKGROUND 3. Major amendments to the Land Transport Management Act (LTMA) came into effect on 1 August 2008. These require the preparation of a three-year Regional Land Transport Programme (RLTP) which combines all the programmes of transport works and services of approved organisations1 in the Region which receive subsidies from the National Land Transport Fund (NLTF) managed and allocated by the New Zealand Transport Agency (NZTA). 4. While the Regional Transport Committee (RTC) must prepare the three-year programme, this does not duplicate the work of the district and city councils and NZTA (State Highways) who develop detailed plans and costings for the roading and other transport improvements in the programme, and implement all activities once funding is approved. The RTC’s role is one of coordination, assessment and prioritisation, and other than for its own activities (such as passenger transport) the Regional Council does not contribute rate funding. The administrative cost of preparing the programme has been met by NZTA. 5. This programme has been prepared by the Regional Transport Committee (RTC) and has undergone a full Special Consultative Procedure (SCP) in accordance with the Local Government Act 2002. The SCP was undertaken at the same time as Council’s draft Community Plan 2009-2019. The first programme must be completed by 30 June 2009. LEGISLATIVE PROCESS FOR APPROVAL OF RLTP 6. The Act prescribes the process of approving the programme prepared by RTC’s. Once the RTC has approved the programme, which took place at its meeting of 23 June 2009, it must be lodged with the Regional Council for approval. 7. After considering the programme the Council may either: • 1 Approve the programme without modifications and forward it to the NZTA ready for inclusion into the National Land Transport Programme (NLTP); or Approved organizations in the Manawatu Wanganui region-all district and city councils, Horizons Regional Council and the New Zealand Transport Agency (State Highway Division). These organisations all receive funding from the National Land Transport Fund. 52 • Refer the programme back to the RTC requesting that the RTC reconsider one or more aspects of the programme. 8. Should the Council decide to refer the programme back to the RTC, the RTC may, after reconsidering the aspects referred back to it, forward to the Council an amended programme (a repeated SCP process is only needed if the amendments sought by the Council were deemed significant under the RTC’s Significance Policy2); and/or forward to the council any additional information that the Council has requested of it, or that the RTC considers will help the Council with its decision. 9. Once the Council has received the amended programme it can then either: • Approve the programme or amended programme and forward to the NZTA; or • Forward the programme or amended programme to the NZTA stating that it is not approved and the reasons why it has not been approved. 10. When the NZTA receives the programme or amended programme it must treat it as approved by the Council and it must also consider the Council’s statement of reasons why it was not approved. 11. Copies of the programme must be forwarded to the NZTA by 15 July 2009. Should the programme not be approved at this time it will be lodged with NZTA as a draft and once the programme is finalised it will be submitted to NZTA by way of a review item. 12. The NZTA will adopt the NLTP on 31 August 2009. THE REGIONAL LAND TRANSPORT PROGRAMME FOR 2009-12 13. Every three years the regional council must ensure that the RTC prepares a Regional Land Transport Programme. This is the first time the programme has been prepared. 14. The programme allows all approved organisations in the Region and the NZTA to recommend funding for activities or combinations of activities that contribute to the Region’s outcomes as identified in its current Regional Land Transport Strategy and any outcomes, objectives and impacts identified by the government in any national land transport strategy or the relevant Government Policy Statement. 15. The programme must include, in order to seek payment from the National Land Transport Fund: 16. • the proposed activities and combinations of activities for the three financial years it relates to; • an indication of significant activities for the following three years; • a 10-year financial forecast. The RTC is required to prioritise certain projects in the programme. The purpose of prioritising projects is that funding will be used for the highest priority projects should funding be limited. As part of the process to develop an RLTP, the RTC was required to develop a policy on significance for any changes to the programme during the three years it is in place. 2 53 17. The prioritised list of activities must contain: • all state highway activities • major local road improvements over $4.5 million and/or on regional arterial routes3 • new public transport services or activities • projects recommended for Regional (R) funding by the RTC • community activities (eg. travel plans and road safety education) 18. In order to prioritise these activities and combination of activities, the RTC was required to determine its key transport priorities for the Region. Activities or combinations of activities to be included in the programme would therefore be prioritised according to which of the transport priorities the project proposes to address. Therefore, in general, projects that address the highest priority are to be ranked higher than projects addressing a lower priority. The full prioritisation process is explained in the programme on page 40. 19. The three priorities the RTC determined for this programme are: Priority 1: Maintaining a safe transport system . The RTC has given the highest priority to those activities which make a significant contribution to maintaining the current standard of the transport network and addressing road safety. This will be achieved through such activities as: • maintenance, operations and renewals programmes • minor safety improvements • improvements to remedy crash blackspots • education activities to change driver behaviour and thereby reduce road crashes Priority 2: Managing travel demand and improving accessibility The second key priority for the RTC is to address issues of the sustainability and accessibility of our transport system. This will be achieved through activities which: • make the best use of our existing transport network and systems • promote the uptake of public transport by all sectors of the community • promote walking and cycling trips, either through engineering improvements or by promotional methods • encourage travel behaviour change • improve access and mobility for sectors of the community which are transport disadvantaged, in a cost-effective and appropriate 3 The RTC was required to define minor and major capital works. Any projects with a total cost of less than $4.5 million are therefore deemed minor capital works and are not required to be prioritised. 54 Priority 3: Improving route security and efficiency. The third priority for the RTC is to address regional issues of network security and efficiency. This will be achieved through activities which: • improve the efficiency of strategic inter-district and inter-regional links • protect the function of these links by providing viable alternatives where necessary 20. The draft Regional Land Transport Programme 2009-12 was publicly notified for submissions on 8 April 2009, with submissions closing on 8 May 2009. 21. Total proposed transport expenditure (including rates funding) for the period 2009-12 is $467.9 million. A copy of the final programme is attached at Annex A. 22. It is important to note that transport activities included in the programme must be consistent with each Council’s LTCCP. This means the programme cannot include a project if the Council’s own LTCCP does not, as there is no provision for the local share of the cost of this project. However, the converse can apply, in that the RTC may decide it does not wish to include a project which is being promoted by one of the approved organisations. 23. The list of activities featured in Figure 5 of the proposed programme is current at the time of writing this report. As some Councils have not yet adopted their final LTCCPs, any projects that are later confirmed to have been removed from LTCCP’s will be removed from the list of activities appearing in the programme, before final submission to NZTA. 24. The projects at the top of the list, with priority 0, are those that are already under construction or where funding has been committed to the project. These are included in the list to present a complete picture of activities underway in the Region. Transport studies to inform future investment have also been given priority 0. 25. The prioritised list reflects the importance the RTC would like to see placed on the various transport activities when NZTA allocates transport funding. However it is important to note that the Region’s priority lists will be assessed against national priorities; it is therefore possible that some projects cannot be funded (or cannot be funded as early as liked). In other cases projects may need to be funded from different funding sources (such as the Regional (R) fund) if they are to proceed. GOVERNMENT POLICY STATEMENT ON LAND TRANSPORT FUNDING (GPS) 26. In August 2008 the then Labour Government released the first Government Policy Statement on Land Transport Funding (GPS). The purpose of the GPS is to describe what the government wants to achieve through funding in the land transport sector, how much funding will be provided for the sector, what areas of transport will be funded, and how funding will be raised. The programme has to be consistent with the current GPS. 27. The aim of this first GPS was to reduce travel by single occupancy vehicles, increase the amount of freight moved by coastal shipping and rail, reduce fatalities and hospital admissions from road crashes, increase the use of public transport, and have more people travelling on foot or by cycle. 28. The funding ranges for all types of transport activities reflected this desire in the GPS. The draft programme released for consultation reflected this desire by allocating funding according to the regionalised funding ranges indicated by the GPS. 55 29. However the new National Government has amended the GPS and released a new version of it in May 2009. The new GPS reflects the current government’s main priority for land transport which is for investment to support national economic growth and productivity, including increased investment in state highway construction. 30. This is reflected in the GPS by increasing the amount of funding available for state highway maintenance, renewal and construction from the previous GPS and, in relative terms, decreasing funding in other activity classes that was proposed in the original GPS. However in real terms most activity classes will have increased funding from previous years. 31. Regionalised funding ranges that were included in the draft programme have therefore been omitted as these were not produced in the updated GPS due to the short timeframe for developing it. Regionalised funding ranges will be reproduced when the final NLTP is released in August 2009. ROADS OF NATIONAL SIGNIFICANCE 32. As part of the new GPS, the government has listed seven initial Roads of National Significance (RONS) as a statement of national development priorities. This serves as a focus for transport investment to achieve economic growth and productivity. The seven roads are: • Puhoi to Wellsford – State Highway 1 • Completion of the Auckland Western Ring Route – State Highway 20/16/18 • Auckland Victoria Park bottleneck – State Highway 1 • Waikato Expressway – State Highway 1 • Tauranga Eastern Corridor – State Highway 2 • Wellington Northern Corridor (Levin to Wellington) – State Highway 1 • Christchurch motorway projects 33. The purpose of listing roads as nationally significant is to ensure that these priority roading developments are fully taken into account when NZTA develops the NLTP. Future planning of the transport network needs to reflect the importance of these roads from a national perspective. 34. Of importance for the Region is the Wellington Northern Corridor project as the area from Otaki to Levin is part of the Horizons Region. The largest project on this stretch of road in this Region to be included in the programme is the Levin Bypass project with a total cost of $154.9 million. The investigation phase of the project will commence in 2009-10 with construction due to begin in 2012-13. 56 RECOMMENDATIONS 35. It is recommended that the Council: a. receives the officer’s report on the Regional Land Transport Programme 2009-12; b. approves the Regional Land Transport Programme 2009-12; and c. lodges the Regional Land Transport Programme 2009-12 with the New Zealand Transport Agency for inclusion in the National Land Transport Programme 2009-12. W Wallace TRANSPORT PLANNER ANNEX A Regional Land Transport Programme 2009-2012. 2009–2012 ANNEX A TO ITEM 12 Report No. 09-92 The Regional Land Transport Programme 57 58 1 2 2 3 3 3 3 3 4 4 4 Introduction 1.2 Area covered by the programme 1.3 National Context 1.3.1 NZ Transport Agency’s role 1.4 Regional Context 1.4.1 Regional Land Transport Strategy 1.4.2 Horizons Regional Transport Committee (RTC) 1.4.3 Horizons Regional Council’s role 1.4.4 Territorial Authorities’ role 1.4.5 Regional Land Transport Programmes 1.4.6 Long Term Council Community Plans The Regional Land Transport Programme (RLTP) 2009-12 5 2.1 Process adopted and consultation 5 2.2 Statement of regional transport issues, problems and opportunities 6 2.2.1 Government Policy Statement on Land Transport Funding 6 2.3 Statement of regional transport priorities 11 2.4 Proposed RLTP activities 11 2.5 Prioritisation process 39 2.6 Activities with inter-regional significance 39 2.6.1 Standard and capacity of State Highway 1 40 2.6.2 Standard of Napier-Taihape Road 40 2.7 Nationally or regionally significant activities 40 2.8 Activities proposed to be varied, suspended or abandoned. 40 2.9 Activities approved for funding but not yet completed 40 2.10 Contribution of RLTP activities to regional and national transport priorities 40 2.11 Assessment of the relationship of Police activities to the RLTP 45 1. 2. THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 iii Foreword Contents i CONTENTS Appendix 4 Appendix 1 Appendix 2 Appendix 3 Glossary of terms and acronyms Legislative Requirements Summary of Significance Policy for variation to the RLTP 10-year forecast expenditure profiles Funding the RLTP 3.1 Anticipated expenditure across funding ranges 3.2 Statement of significant expenditure to be funded from other sources 3.3 Monitoring of the RLTP Appendices 3. 54 55 51 52 49 49 47 49 59 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 ii FOREWORD 60 the maintenance, operation, renewal and improvement of local roads, including any new roads or road sections the maintenance, operation, renewal and improvement of state highways, including any new roads or road sections public transport services public transport infrastructure walking and cycling facilities community focused activities transport planning · · · · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 maintenance, operations and renewals programmes minor safety improvements improvements to remedy crash blackspots education activities to change driver behaviour and thereby reduce road crashes The RTC wishes to attribute the highest priority to those activities which make a significant contribution to maintaining the current standard of the transport network and addressing road safety. This will be achieved through such activities as: Priority 1: Maintaining a safe transport system The RTC has identified its main priorities for the transport system over the next three years and has assessed how well the programme of activities addresses these. The three main priorities are: · · · · · · · The RLTP is composed of the land transport programmes of the seven territorial authorities in our Region, the New Zealand Transport Agency and Horizons Regional Council. It requests funding for: This Regional Land Transport Programme (RLTP) has been prepared by the Regional Transport Committee (RTC) for the Horizons Region. It brings together all the proposed transport activities for which this Region is seeking national funding between July 2009 and June 2012. Foreword iii make the best use of our existing transport network and systems promote the uptake of public transport by all sectors of the community promote walking and cycling trips, either through engineering improvements or by promotional methods encourage travel behaviour change improve access and mobility for sectors of the community which are transport disadvantaged, in a cost-effective and appropriate manner improve the efficiency of strategic inter-district and inter-regional transport links protect the function of these links by providing viable alternatives where necessary FOREWORD The RTC has prepared a priority list which sets out the order of importance the Committee has placed on the various activities in the programme. In accordance with its main priority issues for the Region, the RTC has given the highest priority to maintenance and operational activities on the state highways, and projects which will be highly effective in addressing road safety. (The list of regional prioritised activities is to be found in Section 2.4 in this document) The transport issues which make up these broad priority areas are important regionally, nationally or both. In preparing the programme the RTC must ensure that it contributes to the New Zealand Transport Strategy objectives and is consistent with the Government Policy Statement on Land Transport Funding (GPS) and our own Regional Land Transport Strategy. · · The third priority for the RTC is to address regional issues of network security and efficiency. This will be achieved through activities which: Priority 3: Improving route security and efficiency · · · · · The second key priority for the RTC is to address issues of the sustainability and accessibility of our transport system. This will be achieved through activities which: Priority 2: Managing travel demand and improving accessibility 61 E B Gordon (Bruce) Chair of the Regional Transport Committee I would like to take this opportunity to thank all those individuals and organisations that have contributed to the preparation of this document. We believe the RLTP represents an important step forward in developing a truly regional approach to transport planning and programming, and that it will help us to deliver better transport outcomes. In May 2009 the Government released an updated version of the Government Policy Statement on Land Transport Funding (GPS) setting out its priorities for transport over the next three years and allocating funding to transport activities in accordance with those priorities. The Government’s highest priority for land transport is to increase economic productivity and growth in New Zealand. Due to the time of release of the document it has not been possible to incorporate the changes in priorities into the Programme in any significant way; however, the Regional Transport Committee recognises that the new direction may have an impact on what transport activities can be funded in the Region over the 2009-12. This programme is estimated to cost a total of $467 million over the 2009-12 period, including funding from both local and regional rates and the National Land Transport Fund. THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 iv FOREWORD 62 Introduction Horizons Regional Councillor, Chair of the Committee Horizons Regional Councillor, Deputy Chair of the Committee Horowhenua District Council Manawatu District Council Palmerston North City Council Rangitikei District Council Ruapehu District Council Tararua District Council Wanganui District Council New Zealand Transport Agency Environmental Sustainability representative Safety and Security representative Economic Development Representative Public Health representative Access and Mobility representative Cultural representative Bruce Gordon Vern Chettleburgh Brendan Duffy Matt Bell Gordon Cruden Don Brown Sue Morris Maureen Reynolds Allan Anderson Jenny Chetwynd Christine Cheyne Neil Wynne Richard Forgie Lauren Tamehana Bob Smith Position vacant THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 This programme sets out our funding applications for the 2009-12 financial years. It provides an indication of the significant activities for 2012-15 and a 10-year forecast of anticipated expenditure and revenue. The RTC’s main task is to prioritise these funding applications so that if there is insufficient funding to carry out all the projects, the most important ones are The RTC is required to prepare a programme covering transport activities undertaken in the Manawatu-Wanganui (Horizons) Region for which funding is sought from Central Government. The programme describes land transport priorities for the Region and how the proposed transport projects will address these. The legislative requirements relating to the RLTP are summarised in Appendix 2. Position Name This Regional Land Transport Programme (RLTP) has been prepared by the Horizons Regional Transport Committee (RTC). 1. 1 the issues and outcomes that are identified in the Regional Land Transport Strategy 2006 · INTRODUCTION The prioritisation process is described in further detail in Section 2.5. The RTC must also assess the programme to determine how well it addresses regional and national transport issues. the outcomes and objectives of the New Zealand Transport Strategy 2008 and the Government Policy Statement on Land Transport Funding 2009-10 to 2018-19; and · given priority. This prioritisation is based on the identification of the issues facing Horizons’ transport system and how each transport activity will contribute to: 63 Area covered by the programme The programme covers the 10 shown territorial authorities that are fully or partly within our Region’s boundaries and have chosen to be included in the Horizons Region. 1.2 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 2 Horowhenua District Council Palmerston North City Council Ruapehu District Council Wanganui District Council · · · Manawatu District Council Rangitikei District Council Tararua District Council National Context Stratford District Council (Taranaki) Taupo District Council (Waikato) Waitomo District Council (Waikato) Three-year regional and national land transport programmes instead of annual. The Government has set out, in the Government Policy Statement on Land Transport Funding (GPS), its priorities, funding forecasts and the short to medium-term outcomes it wishes to achieve through the allocation of land transport funding. Regional transport committees now have greater responsibilities and functions. They need to identify which projects are to be prioritised for funding from national funds in their region. · · · Some other changes include: One of the key changes for transport planning and funding under the Act was the establishment of a new Crown entity, the NZ Transport Agency, which took over the functions of Land Transport New Zealand and Transit New Zealand from 1 August 2008. The amendments to the Land Transport Management Act 2003 took effect on 1 August 2008. Their provisions have a significant impact on the way the transport sector operates. 1.3 · · · Three other territorial authorities that are partly within the Horizons Regional Council boundary have chosen not to be included in the Horizons Region for programme matters. These councils and their regions are: · · · · These territorial authorities are the: INTRODUCTION 64 NZ Transport Agency’s role · · · · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 assists and advises approved organisations in the preparation of three- year regional land transport programmes; provides guidance on the development and assessment of activities in the programmes. is represented on each RTC; and decides which activities that are listed in a Regional Land Transport Programme will be included in the National Land Transport Programme, and whether to approve funding for those activities when they are ready to progress The NZ Transport Agency has several other roles. It: In developing the National Land Transport Programme (NLTP), the NZ Transport Agency allocates funds so that outcomes are consistent with the national targets set in the GPS. 1.3.1 The New Zealand Transport Strategy sets the long-term direction for all parts of the transport sector and for the activities of transport Crown entities and local authorities. The strategy has five transport objectives: ensuring environmental sustainability, assisting economic development, assisting safety and personal security, improving access and mobility, and protecting and promoting public health. The NZ Transport Agency must give effect to the GPS when allocating funding from the National Land Transport Fund. It can only allocate funding to activities listed in a regional land transport programme or to national activities. The GPS released in May 2009 sets out the funding available for the next 10 years for transport activities, with a particular emphasis on the 2009-12 and 2012-15 periods. The GPS aims to allocate transport funding according to the government’s main priority for land transport investment – to increase economic productivity and growth. The GPS replaces an earlier version released in August 2008, which set targets for the performance of the transport system and funding ranges for particular types of activities. The purpose of developing a three-year programme is to bring a longer term regional perspective to land transport planning. 3 Regional Land Transport Strategy 1.4.1 Horizons Regional Transport Committee (RTC) Prepare a Regional Land Transport Programme Prepare a Regional Land Transport Strategy Prepare any regional fuel tax scheme that it may propose Provide advice on transport matters requested by the regional council · · · INTRODUCTION ensure that the RTC prepares a Regional Land Transport Programme consider and approve a Regional Land Transport Programme by 30 June 2009 vary the Regional Land Transport Programme in accordance with statutory requirements Horizons Regional Council’s role with regard to this programme is to: Horizons Regional Council’s role Two representatives of the Regional Council One representative of each local council in this Region One representative of the NZ Transport Agency One cultural representative One representative of each of the five objectives listed in the New Zealand Transport Strategy 2008. 1.4.3 · · · · · The RTC membership comprises: · · · · The RTC’s role is to: 1.4.2 While the New Zealand Transport Strategy sets the national direction of the transport sector, the Regional Land Transport Strategy sets the direction within the Horizons Region for the short to medium term. The Regional Land Transport Strategy identifies the major land transport issues that are to be addressed through the activities described in this programme. These issues are outlined in detail in Section 2.2. Regional Context 1.4 65 Territorial Authorities’ role Regional Land Transport Programmes the maintenance, operation, renewal and improvement of local roads, including any new roads or road sections the maintenance, operation, renewal and improvement of state highways, including any new roads or road sections public transport services public transport infrastructure walking and cycling facilities community focused activities transport planning Long Term Council Community Plans A Long Term Council Community Plan (LTCCP) is prepared by each council every three years and contains planning and financial information for the next 10 years. Councils prepare and consult on their LTCCPs in the first half of 2009 and these present outcomes agreed with their local communities, the level of rates expected for the next 10 years and other relevant information. 1.4.6 Minor variations may be made to the programme at any time in accordance with the policy for significance adopted by the RTC. A summary of this policy is contained in Appendix 3. The RTC must give a priority order to all activities except local road maintenance and renewals, existing public transport services and minor capital work. However, the NZ Transport Agency decides whether to include activities of any grouping in the National Land Transport Programme. · · · · · · · Regional Land Transport Programmes consist of activities for which funding is sought from the National Land Transport Fund. These include: 1.4.5 The territorial authorities control the roads in their districts or cities and are responsible for their upkeep and improvement. Horizons has developed close relationships with the territorial authorities and provides advice on how their plans fit with regional objectives. 1.4.4 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 4 This programme has an impact on every LTCCP in the Region because the level of Government subsidy received will affect the size of each transport programme and the amount of income required from city, district or regional rates. For an activity to be included in the RLTP it must first appear in an LTCCP. The reason for this is that the Government funding is a partial subsidy which can only be approved once the regional council or territorial authority has confirmed its share of the project cost (known as “local share”). The RLTP is consulted on during the same time period as the LTCCPs and it is important that the final RLTP reflects adopted LTCCPs throughout our Region. INTRODUCTION 66 The Regional Land Transport Programme 2009-12 Process adopted and consultation THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 The Regional Transport Committee prepares the draft Programme. The development process involves meetings and workshops with key partners and the Regional Advisory Group. Key projects are prioritised in accordance with the process outlined in Section 2.5. Approved organisations submit their draft activities, together with 10 year budgets and supporting information, to NZ Transport Agency by 14 November 2008. Figure 1. Summary of the process used to develop the programme A consultation process was undertaken using the special consultative procedures specified by the Local Government Act 2002 in conjunction with Horizons Regional Council’s Long Term Council Community Plan process. The development of this Regional Land Transport Programme has involved assessment, analysis and input by stakeholders. The RTC oversees this process with the assistance of the Regional Advisory Group, which is made up of officers from Horizons Regional Council, the seven territorial authorities and the NZ Transport Agency. 2.1 This chapter outlines the key transport issues and priorities for the Region and proposes a programme of transport activities. Section 2.10 contains an assessment of the programme which evaluates how these activities will address the issues and contribute to meeting regional and national transport sector targets. 2. 5 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 NZ Transport Agency prepares and releases the National Land Transport Programme by 31 August 2009. Implementation of the Programme begins 1 July 2009. Horizons Regional Council forwards the approved Programme to the NZ Transport Agency and other parties identified in the Land Transport Management Act 2003. Horizons Regional Council approves the Programme, including regional recommendations on the use of regional (R) funds by 30 June 2009. The Regional Transport Committee prepares a final Programme and recommends its adoption to Horizons Regional Council by 23 June 2009. The Regional Transport Committee holds a public Hearing of Submissions (20 May 2009). Public consultation on the draft Programme is undertaken, using the special consultative procedures specified by the Local Government Act 2002 (8 April - 8 May 2009). The Regional Transport Committee approves the draft Programme for public consultation by 9 March 2009. 67 Statement of regional transport issues, problems and opportunities Government Policy Statement on Land Transport Funding · Improvements in journey time reliability Easing of severe congestion More efficient freight supply chains Better use of existing transport capacity · · · · Improvements in the provision of infrastructure and services that enhance transport efficiency and lower the cost of transportation through: Impacts that contribute to economic growth and productivity The new GPS sets out the specific impacts the government wishes to achieve through the use of the National Land Transport Fund. Short to medium term impacts are: The Government Policy Statement on Land Transport Funding (GPS) released in May 2009 provides a direction for the Government’s funding priorities for improving the land transport sector. The GPS is for the 10 year period 2009-10 to 2018-19. 2.2.1 Most of the issues, problems and opportunities identified in this section have been identified through the current Regional Land Transport Strategy (adopted in 2006). The first Government Policy Statement on Land Transport Funding, released in August 2008, identified three specific targets for the Horizons Region which were also taken into consideration in identifying the issues that we should address. National objectives and targets from the New Zealand Transport Strategy and the National Energy Efficiency and Conservation Strategy have also been considered. The Horizons Region is at the centre of many road, rail and air links connecting us with neighbouring regions and facilities. However, with the exception of Palmerston North City, the Region is not experiencing population growth and does not have many of the transport issues affecting other regions. 2.2 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 6 Better access to markets, employment and areas that contribute to economic growth A secure and resilient transport network Reductions in deaths and serious injuries as a result of road crashes More transport choices, particularly for those with limited access to a car where appropriate Reductions in adverse environmental effects from land transport Contributions to positive health outcomes Figure 2 below identifies the Region’s land transport issues from the Regional Land Transport Strategy (RLTS). It establishes links between regional issues, the objectives of the Land Transport Management Act, the GPS impact statements and the National Energy Efficiency and Conservation Strategy (NEECS) target of reducing carbon dioxide emissions. It highlights that the resolution of regional issues is contributing to key national land transport objectives and targets. Of these, the section of State Highway 1 from Levin to Otaki forms part of the Horizons Region. These are: · Puhoi to Wellsford – State Highway 1 · Completion of the Auckland Western Ring Route – State Highway 20/16/18 · Auckland Victoria Park Bottleneck – State Highway 1 · Waikato Expressway – State Highway 1 · Tauranga Eastern Corridor – State Highway 2 · Wellington Northern Corridor (Levin to Wellington ) – State Highway 1 · Christchurch Motorway Projects The GPS gives particular emphasis to seven Roads of National Significance (RoNS), which will serve as a focus for investment to achieve economic growth and productivity. · · · · Other Impacts · · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 68 Regional crash targets are unlikely to be achieved. Significant improvements in fatalities have reached a plateau in recent years and serious injury rates may be deteriorating Annual growth in traffic on this section of SH1 is 2-3% since 1990. Substandard curves, restricted sightlines and side traffic access points are contributing to safety issues Possible growth at Ohakea Air Base may cause increased pressure on this stretch of the highway. Ongoing monitoring is required. Road safety – further improvements required in order to meet Road Safety to 2010 targets The safety and capacity of State Highway 1 between Levin and Otaki Standard and capacity of State Highways 1 and 3 between Bulls and Sanson – while recent measures have postponed the need for increased capacity, regular monitoring is required Assisting economic development √ √ √ √ √ 7 Improving access and mobility √ √ √ Protecting and promoting public health Improvements in infrastructure and services that enhance transport efficiency and lower the cost of transportation √ √ √ √ Better access to markets, employment and areas that contribute to economic growth √ √ √ √ THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 √ A secure and resilient transport network Other Impacts More transport choices, particularly for those with limited access to a car where appropriate Impacts that contribute to economic growth and productivity Reductions in deaths and serious injuries as a result of road crashes Links with national objectives and targets Government Policy Statement impacts Reductions in adverse environmental effects from land transport Land Transport Management Act objectives Assisting safety and personal security Ensuring environmental sustainability THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Current Situation Regional Land Transport Issue Contributions to positive health outcomes √ NEECS Target √ Reduced CO 2 emissions Figure 2. Links between national and regional issues and targets 69 Current Situation Prone to slips and has experienced a number of serious road crashes, also extremely windy Many east-west vehicles bypass Palmerston North using a network of roads between Manawatu Gorge and Mt Stewart Such links are important alternative routes whenever State Highways are closed and improvements could facilitate economic development in these areas Regional Land Transport Issue Safety and level of service issues on State Highway 4, a key link between the Wanganui and Ruapehu Districts, and as an alternative to State Highway 1 Re-designation and rationalisation of State Highway 3 route between Mt Stewart and Manawatu Gorge – need to remove this from the urban area of Palmerston North Need for improvements to secondary strategic links that are playing an increasing role as east-west links and alternative routes (Pahiatua Track and Saddle Road, Napier-Taihape Road, Route 40) and for tourism/economic development purposes (Whanganui River Road) Ensuring environmental sustainability Assisting economic development √ Assisting safety and personal security √ √ √ Improving access and mobility √ Protecting and promoting public health √ √ Improvements in infrastructure and services that enhance transport efficiency and lower the cost of transportation √ √ √ Better access to markets, employment and areas that contribute to economic growth √ √ √ √ √ √ A secure and resilient transport network Impacts that contribute to economic growth and productivity √ Other Impacts More transport choices, particularly for those with limited access to a car where appropriate Land Transport Management Act objectives Reductions in deaths and serious injuries as a result of road crashes Links with national objectives and targets Government Policy Statement impacts THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Reductions in adverse environmental effects from land transport 8 NEECS Target √ Reduced CO2 emissions THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 70 Contributions to positive health outcomes Current proposition to close Milson Line, which carries most of the Feilding to Palmerston North traffic, will increase flows on a number of routes which would otherwise not have needed upgrading for some time Significant declines in walking and cycling rates in urban areas. 13% of trips to work in Palmerston North were by bike in 1986; by 2006 this had declined to 5% Only 1.5% of commuters in Palmerston North travel by public transport, a halving of the rate since 1986 Redefinition and rationalisation of strategic links between Feilding and Palmerston North. Need to cater for future growth of PN in the Eastern Growth corridor Declining walking and cycling activity Declining use of the public transport system in urban areas by commuters Ensuring environmental sustainability √ √ Assisting economic development √ √ √ √ √ 9 Improving access and mobility √ √ Better access to markets, employment and areas that contribute to economic growth √ √ A secure and resilient transport network THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Protecting and promoting public health √ Improvements in infrastructure and services that enhance transport efficiency and lower the cost of transportation √ √ √ More transport choices, particularly for those with limited access to a car where appropriate Other Impacts √ √ Reductions in adverse environmental effects from land transport Impacts that contribute to economic growth and productivity Reductions in deaths and serious injuries as a result of road crashes Links with national objectives and targets Government Policy Statement impacts Contributions to positive health outcomes √ √ NEECS Target √ √ √ Reduced CO 2 emissions Land Transport Management Act objectives Assisting safety and personal security THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Current Situation Regional Land Transport Issue 71 Current Situation An ageing population and the closure of commercial, health and social services in small towns create a demand for public transport which cannot be met with conventional scheduled services Increased road maintenance and renewal costs for territorial authorities Regional Land Transport Issue The need to provide costeffective and appropriate public transport in small towns and rural areas Pressure on rural networks by forestry and agricultural traffic √ Ensuring environmental sustainability Assisting economic development √ √ Assisting safety and personal security √ Improving access and mobility √ Protecting and promoting public health √ √ Better access to markets, employment and areas that contribute to economic growth √ √ √ A secure and resilient transport network Improvements in infrastructure and services that enhance transport efficiency and lower the cost of transportation Impacts that contribute to economic growth and productivity Other Impacts √ More transport choices, particularly for those with limited access to a car where appropriate Land Transport Management Act objectives Reductions in deaths and serious injuries as a result of road crashes Links with national objectives and targets Government Policy Statement impacts THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 √ Reductions in adverse environmental effects from land transport 10 Contributions to positive health outcomes √ NEECS Target √ Reduced CO2 emissions THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 72 Statement of regional transport priorities maintenance, operations and renewals programmes minor safety improvements improvements to remedy crash blackspots education activities to change driver behaviour and thereby reduce road crashes · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 make the best use of our existing transport network and systems The second key priority for the RTC is to address issues of the sustainability and accessibility of our transport system. This will be achieved through activities which: Priority 2: Managing travel demand and improving accessibility · · · · The RTC wishes to attribute the highest priority to those activities which make a significant contribution to maintaining the current standard of the transport network and addressing road safety. This will be achieved through such activities as: Priority 1: Maintaining a safe transport system The region’s priorities for transport activities over the next six years are: The RTC recognises that the government’s priorities for transport funding have since changed (as reflected in GPS May 2009). However, as the RLTP must be adopted by the Regional Council by 30 June 2009, it was not possible to determine how this might influence the region’s statement of regional priorities and re-prioritise all the activities in the programme accordingly, especially as the draft programme had already been consulted on. The RTC recognises however, that the NZ Transport Agency (when developing the National Land Transport Programme) must give effect to the GPS. Therefore there may be some differences in the priority order NZ Transport Agency assigns to the region’s funding requests. The RTC acknowledges that the programme may be less consistent with the new GPS than it was with the earlier version; however it does not consider that it is inconsistent. Figure 2 in part demonstrates this, and the assessment of the RLTP against the requirements of Section 14 of the Land Transport Management Act 2003 in Figure 6 also supports this conclusion. After analysis of the regional and national transport issues and priorities, the RTC determined its key priorities for transport activities over the next six years. In doing so, it took into account the need to be consistent with the GPS dated August 2008. 2.3 11 promote the uptake of public transport by all sectors of the community promote walking and cycling trips, either through engineering improvements or by promotional methods encourage travel behaviour change improve access and mobility for sectors of the community which are transport disadvantaged, in a cost-effective and appropriate manner Proposed RLTP activities improve the efficiency of strategic inter-district and inter-regional links protect the function of these links by providing viable alternatives where necessary do not use Crown (C) or R funds · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Figure 3 contains the list of prioritised activities for 2009-12, major projects from this list are also shown on the map in Figure 4. The projects at the top of the list, with priority 0 are those that are already under construction or where funding has been committed to the project. These have been included on the list in order to present a complete picture of activities underway in the region during the three-year programme period. Transport studies to inform future investment have also been given priority 0. Any proposed activities which meet these criteria therefore do not have to be included in the prioritised list. are not on a regional arterial route have a capital cost of less than or equal to $4.5 million · · The Land Transport Management Act 2003 requires the RTC to assign an order of priority to all state highway activities, new public transport services and all local road capital improvements not classified as “minor”. For the purposes of determining what should be in this list, the RTC has agreed that minor capital works are capital projects associated with local roads, including associated property purchase, that meet all the following criteria: 2.4 · · The third priority for the RTC is to address regional issues of network security and efficiency. This will be achieved through activities which: Priority 3: Improving route security and efficiency · · · · 73 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 MDC MWSH Study Study Study Study Investigation, Design, Property purchase & Construction State Highways Construction Construction Construction Palmerston North Manawatu Joint Transport Study Palmerston North Manawatu Joint Transport Study Palmerston North Manawatu Joint Transport Study Palmerston North Manawatu Joint Transport Study North of Levin to Otaki (Levin Bypass) Maintenance, Operations & Renewals 2009/12 Emergency Works West Wanganui SH 4 Okura Stream Bridge South Emergency Works Braeburn Riverbank West Wanganui SH 4 Emergency Works West Wanganui SH 4 657,300 746,100 MWSH 4,414,400 5,076,000 2,472,200 2,550,000 700,000 28,482,482 400,000 62,500 62,500 62,500 62,500 5,064,900 Total cost 2009 ($) 26,648,532 2,975,000 3,250,000 Total cost 2010 ($) 27,061,400 5,482,000 Total cost 2011($) Rangitikei District Council Ruapehu District Council Tararua District Council Wanganui District Council 26,108,000 Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 RanDC RuaDC TDC WDC Total cost 2008 ($) 12 MWSH MWSH MWSH PNCC HRC MWSH MWSH Construction Ohingaiti-Makohine Realignment SH 1 Org Phase name Project name Key to Organisations: DOC Department of Conservation HDC Horowhenua District Council HRC Horizons Regional Council MDC Manawatu District Council MWSH NZ Transport Agency Manawatu–Wanganui Highway and Network Operations PNCC Palmerston North City Council Figure 3. Prioritised list of activities 0 61,223,000 Total cost 2013 ($) 58,716,000 Total cost 2014 ($) 0 0 0 0 0 0 0 0 0 0 RLTP priority 74 MWSH MWSH Study Study Construction Construction Construction Construction Construction Construction Study Construction Property purchase, Design & Construction Construction Design & Construction Manawatu-Wanganui Kiwirap Black Route Safety Study Manawatu-Wanganui safe, sustainable and efficient routes study Railway Road Improvement Taihape Napier Road Seal Extension Foxton South Curves SH 1 (Manawatu-Wanganui Road safety group) River Rd / Raetihi-Pipiriki Road River Rd / Raetihi-Pipiriki Road Makerua Intersection SH 56/57 (ManawatuWanganui Road safety group) Urban Wanganui Transportation Study Duddings Lake North Passing Lane SH 3 (Manawatu-Wanganui Roading route efficiency group) Papatawa Realignment SH 2 Preventative Maintenance 9/12 (ManawatuWanganui Route security and environmental group) Wikitoria Intersection SH 3/4 (ManawatuWanganui Road safety group) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 MWSH MWSH WDC MWSH WDC RuaDC MWSH RanDC PNCC MWSH MWSH MWSH State Highways Minor improvements 2009/12 Org Phase name Project name 13 85,000 889,918 889,918 5,700,000 1,682,000 Total cost 2008 ($) 211,000 226,600 4,872,000 55,000 750,000 750,000 33,000 33,000 2,083,772 Total cost 2010 ($) 1,640,000 226,600 2,948,000 395,817 395,817 33,000 33,000 2,116,362 Total cost 2011($) Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 20,000 2,086,626 1,890,200 200,000 100,000 120,000 750,000 750,000 60,000 5,154,922 1,100,000 34,000 34,000 2,170,600 Total cost 2009 ($) Total cost 2013 ($) Total cost 2014 ($) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RLTP priority 75 Phase name Group allocation Construction Design & Construction Design & Construction Construction Construction Construction Investigation & Design Group allocation Design & Construction Design & Construction Design & Construction Investigation Investigation Community Advertising 9/12 - ManawatuWanganui Whakaruatapu Stream Bridge Replacement & Realignment SH 2 Linnet-Huia St Curve Improvement SH 1(Manawatu-Wanganui Road safety group) Millrick-Kendall Realignment SH 57 (ManawatuWanganui Road safety group) Wilson Road South Curve Improvements SH 56 (Manawatu-Wanganui Road safety group) Muhunoa Road Intersection SH 1 (ManawatuWanganui Road safety group) Passing Lane Merge Treatments (ManawatuWanganui Road safety group) Levin-Makerua Passing Lanes SH 57 (ManawatuWanganui Road safety group) Community Programmes 2009/12 Waiauti Bridge Realignment SH 1 (ManawatuWanganui Road safety group) Hapokopoko Stream North Realignment SH4 (Manawatu-Wanganui Road safety group) Mangaweka South Realignment SH 1 Tahoraiti Railway Crossing SH 2 Waitarere Road Realignment SH 1(ManawatuWanganui Road safety group) MWSH MWSH MWSH MWSH MWSH HRC MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Project name 0 Total cost 2008 ($) 14 53,000 52,000 25,000 1,084,627 669,000 541,000 103,000 31,000 53,000 Total cost 2009 ($) 249,000 2,643,765 74,000 1,121,504 85,000 637,000 456,000 556,000 106,000 318,000 1,858,224 60,000 Total cost 2010 ($) 22,000 3,288,370 1,863,000 1,151,784 55,000 764,000 664,000 1,863,679 70,000 Total cost 2011($) 261,000 3,262,483 1,125,000 1,908,000 2,476,000 1,736,566 Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 1,740,000 1,962,000 Total cost 2013 ($) Total cost 2014 ($) 2 2 2 2 1 1 1 1 1 1 1 1 1 1 RLTP priority 76 MWSH MWSH Design & Construction Design & Construction Investigation & Design Investigation, Design & Construction Design & Construction Construction Construction Property purchase Construction Construction Construction Property purchase & Construction Construction Old West Road (North) seal widening SH 57 Cobham Bridge South - Wikitoria SH 3 Ratana Hill SH 3 (Manawatu-Wanganui Road safety group) Manawatu River Bridge SH3 Ashhurst Cycle/walkway Turitea Stream Bridge Widening SH 57 Strategic Plan Initiatives 9/12 (ManawatuWanganui Road safety group) Safety Retrofit 9/12 (Manawatu-Wanganui Road safety group) Property Acquisitions 9/12 (Manawatu-Wanganui Road safety group) Pavement Smoothing 9/12 (Manawatu-Wanganui Road safety group) Scour Investigation 9/12 (Manawatu-Wanganui Road safety group) Seismic Retrofit 9/12 (Manawatu-Wanganui Road safety group) Manawatu Hill Realignment SH 2 Pahiatua Track Route Realignment 2009/12 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 TDC MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH Design Corby Road South Curves SH 2 (ManawatuWanganui Road safety group) Org Phase name Project name 15 20,000 Total cost 2008 ($) 4,000,000 77,000 274,000 175,000 288,956 441,304 862,618 690,094 51,500 103,000 21,000 525,000 Total cost 2010 ($) 1,700,000 2,253,000 2,064,000 180,000 266,556 454,544 888,496 710,797 636,540 1,113,945 55,000 287,100 Total cost 2011($) 4,511,000 546,364 1,092,727 Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 3,000,000 150,000 61,000 170,000 479,439 428,451 837,493 669,994 50,000 80,000 10,000 1,100,000 20,000 Total cost 2009 ($) 5,770,000 Total cost 2013 ($) Total cost 2014 ($) 5 5 5 5 5 5 5 5 4 4 3 3 2 2 RLTP priority 77 Phase name Investigation & Design Design & Construction Design & Construction Construction Design & Construction Design Design & Construction Construction Investigation Construction Investigation Design & Construction Construction Gorge Woodville Seal Widening SH 3 (Manawatu-Wanganui Improved traffic management group) Drainage Safety Profiling SH 56/57 (ManawatuWanganui Improved traffic management group) Golf Road South Passing Lane SH 1 (ManawatuWanganui Improved traffic management group) Hansen Line and Taonui North Curves SH 3 (Manawatu-Wanganui Improved traffic management group) Lismore Corner SH 4 (Manawatu-Wanganui Improved traffic management group) Carlton / Alma / Jackson Intersection SH 3 (Manawatu-Wanganui Improved traffic management group) London Street High School Safety Improvements Package SH 3 (Manawatu-Wanganui Improved traffic management group) Mount Stewart North Passing Lane SH 3 (Manawatu-Wanganui Improved traffic management group) Piriaka Rail Bridge Approaches SH 4 (ManawatuWanganui Improved traffic management group) Improved Driver Information 9/12 (ManawatuWanganui Improved traffic management group) Concord Line Curve Realignment SH 3 (Manawatu-Wanganui Improved traffic management group) Bulls Bridge Cycleway SH 3 Rehabilitation Seal Widening 9/12 (ManawatuWanganui Roading route efficiency group) MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH MWSH Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Project name 0 Total cost 2008 ($) 16 279,164 100,000 20,000 223,331 927,000 30,000 435,000 41,000 66,000 41,000 Total cost 2009 ($) 287,539 1,081,500 230,031 265,000 21,000 307,000 414,000 796,000 1,487,000 42,000 Total cost 2010 ($) 296,165 1,052,413 236,932 22,000 328,000 1,582,000 Total cost 2011($) Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Total cost 2013 ($) Total cost 2014 ($) 8 8 8 8 8 8 8 8 7 7 7 6 6 RLTP priority 78 MWSH PNCC PNCC Investigation, Design & Construction Implementation Group allocation Construction Investigation & Design Construction Construction Construction Construction Construction Property purchase, Design & Construction Design Investigation, Design & Construction Investigation, Design & Construction Rauma Railway Walkway SH 1 Palmerston North Bus Service Improvements Travel Planning 2009/12 Passenger Transport - Bus terminal Manawatu River Bridge Whirokino Cycle/Walkway SH 1 Rangitikei Line / Tremaine Ave Intersection Improvement SH 3 (Manawatu-Wanganui Improved traffic management group) Rangitikei Line / JFK Drive SH 3 (ManawatuWanganui Improved traffic management group) Rangitikei / Tremaine Signal Upgrade - Local share Strategic Roading Network - Feilding to Palmerston North Strategic Roading - North Eastern Link New Bridge - Manawatu River Sanson South Passing Lane SH 1 (ManawatuWanganui Roading route efficiency group) Mangamahu - Bridge Renewal - Wylies Bridge No.46 Mangamahu - Bridge Renewal - Wylies Bridge No.46 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 RanDC WDC MWSH MDC PNCC MWSH MWSH MWSH PNCC PNCC HRC Org Phase name Project name 17 Total cost 2008 ($) 42,000 1,482,000 515,000 2,500,000 823,000 636,000 61,800 1,500,000 63,000 364,485 61,800 Total cost 2010 ($) 155,000 155,000 1,525,000 529,000 3,500,000 127,308 4,500,000 63,000 374,002 159,135 Total cost 2011($) 1,365,000 1,365,000 21,272,000 800,000 4,000,000 404,309 Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 2,800,000 75,000 200,000 515,000 619,000 114,000 352,500 40,000 Total cost 2009 ($) 21,761,000 200,000 Total cost 2013 ($) 11,120,000 Total cost 2014 ($) 13 13 13 13 12 12 12 12 12 11 10 10 9 9 RLTP priority 79 MWSH MWSH Construction RuaDC Construction Construction Okahukura Saddle Road Seal Extension RanDC MWSH Construction Turakina Valley Rd Seal Extension MWSH MWSH Construction Design Dalvey Road South Passing Lane SH 2 (ManawatuWanganui Roading route efficiency group) Woodville Stock Effluent Disposal Facility SH 2 (Manawatu-Wanganui Route security and environmental group) Taihape Stock Effluent Disposal Facility SH 1 (Manawatu-Wanganui Route security and environmental group) National Park Stock Effluent Disposal Facility SH 4 (Manawatu-Wanganui Route security and environmental group) Investigation, Design & Construction SH 3 / 54 Intersection (Manawatu-Wanganui Roading route efficiency group) MWSH Design & Construction MWSH MWSH Construction Marangai Road South Passing Lane SH 3 (Manawatu-Wanganui Roading route efficiency group) MDC Org Design Construction Kopane Bridge Replacement Oroua Road North Passing Lane SH 3 (Manawatu-Wanganui Roading route efficiency group) Otamaraho Curve Passing Lane Extension SH 2 (Manawatu-Wanganui Roading route efficiency group) Phase name THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Project name 0 25,000 Total cost 2008 ($) 18 206,000 1,054,378 113,000 85,000 41,000 1,000,000 Total cost 2009 ($) 212,000 53,000 531,000 21,000 422,000 Total cost 2010 ($) 219,000 655,000 1,088,000 1,095,000 Total cost 2011($) 800,000 1,130,000 Total cost 2012 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 800,000 1,449,000 Total cost 2013 ($) 400,000 Total cost 2014 ($) 16 16 16 15 15 15 14 14 14 14 13 RLTP priority 80 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Figure 4. Location of key prioritised activities 19 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 81 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 20 En R S In Special Purpose Road (SPR) Annual allocation Minor improvements 2009/12 Maintenance, Operations & Renewals 2009/12 Administration support - Roading 2009/12 Maintenance, Operations & Renewals 2009/12 Community Programmes 2009/12 Group allocation Local Roads Annual allocation Administration support - Roading 2009/12 Demand management & community programmes New & improved infrastructure for local roads New & improved infrastructure for local roads Activity class SS Objectives HRC HDC HDC HDC DOC DOC DOC Org Total cost 2008 ($) 1,084,627 4,091,502 150,000 48,200 430,000 34,400 10,470 Total cost 2009 ($) 1,121,504 4,177,819 150,000 50,100 430,000 34,400 10,470 Total cost 2010 ($) 1,151,784 4,298,292 150,000 52,100 260,000 20,800 6,330 Total cost 2011 ($) Total cost 2012 ($) Total cost 2013 ($) Total cost 2014 ($) 3,357,915 12,567,613 450,000 150,400 1,120,000 89,600 27,270 Total project cost to 2014 ($) 1 RLTP priority 36 36 36 36 36 36 36 Expected duration (months) Minor improvements 2009/12 Phase name Project name Environmental Sustainability Responsiveness Sustainability Integration THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 All transport activities proposed for inclusion in the programme are detailed in Figure 5, grouped by organisation. Key to Objectives: SS Safety and security AM Access and mobility ED Economic development PH Public health Figure 5. Full list of activities 0 82 RTC support for R funding Construction Construction Local Roads Construction Kopane Bridge Replacement Minor improvements 2009/12 Stewart Road/Awahuri Feilding Road Intersection Improvement MDC MDC MDC New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads Studies and Strategies Public transport services SS AM ED In AM 21 200,000 920,318 1,000,000 200,000 510,285 157,000 4,031,076 62,500 352,500 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 12 MDC HRC MDC HRC HRC HRC Total cost 2008 ($) 966,908 3,500,000 579,296 206,000 4,474,573 374,002 Total cost 2011 ($) 800,000 Total cost 2012 ($) 200,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 250,000 943,325 2,500,000 530,421 190,000 4,185,371 364,485 Total cost 2010 ($) Total cost 2014 ($) 450,000 2,830,551 1,000,000 7,200,000 1,620,002 553,000 12,691,020 62,500 1,090,987 Total project cost to 2014 ($) 13 12 0 9 R R RTC support for R funding Strategic Roading Network - Feilding to Palmerston North 36 36 Annual allocation 12 Administration 2009/12 Administration support - Roading 2009/12 Study Palmerston North Manawatu Joint Transport Study Expected duration (months) 36 Activity class Objectives 36 Implementation Palmerston North Bus Service Improvements Org RLTP priority Passenger Transport Programme 2009/12 Phase name Project name 83 Construction 36 MWSH MWSH Construction 5,076,000 746,100 Emergency Reinstatement SS 657,300 Emergency Reinstatement New & improved infrastructure for State Highways 4,414,400 Emergency Reinstatement SS SS Walking and cycling facilities Demand management & community programmes In Studies and Strategies Total cost 2008 ($) 5,064,900 2,472,200 2,550,000 700,000 53,000 1,182,828 11,639,533 57,000 62,500 Total cost 2009 ($) 22 3,250,000 60,000 1,218,312 11,927,643 58,000 Total cost 2010 ($) 70,000 1,254,862 12,222,947 60,000 Total cost 2011 ($) 61,000 Total cost 2012 ($) 63,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 64,000 Total cost 2014 ($) 13,390,900 3,218,300 3,207,300 5,114,400 183,000 3,656,002 35,790,123 363,000 62,500 Total project cost to 2014 ($) 0 0 0 0 1 0 R RTC support for R funding Ohingaiti-Makohine Realignment SH 1 MWSH Construction MWSH MWSH MDC MWSH 36 36 36 MDC Construction Annual allocation Maintenance, Operations & Renewals 2009/12 Administration support - Roading 2009/12 5 MDC Emergency Works West Wanganui SH 4 Okura Stream Bridge South Emergency Works Braeburn Riverbank West Wanganui SH4 Emergency Works West Wanganui SH4 Construction Cycleway Construction Expected duration (months) 12 Activity class Objectives Group allocation Study Palmerston North Manawatu Joint Transport Study Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 RLTP priority Community Advertising 9/12 - ManawatuWanganui Phase name Project name 0 84 36 36 State Highways Construction Construction Property purchase, Design & Construction Construction Design & Construction Minor improvements 2009/12 Makerua Intersection SH 56/57 (ManawatuWanganui Road safety group) Duddings Lake North Passing Lane SH 3 (Manawatu-Wanganui Roading route efficiency group) Papatawa Realignment SH 2 Preventative Maintenance 9/12 (Manawatu-Wanganui Route security and environmental group) Hapokopoko Stream North Realignment SH4 (Manawatu-Wanganui Road safety group) MWSH MWSH MWSH MWSH New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways SS R AM SS 85,000 Total cost 2008 ($) 23 2,086,626 1,890,200 200,000 120,000 2,170,600 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 36 New & improved infrastructure for State Highways New & improved infrastructure for State Highways Objectives MWSH New & improved infrastructure for State Highways Activity class 226,600 2,948,000 2,116,362 Total cost 2011 ($) Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 74,000 226,600 4,872,000 2,083,772 Total cost 2010 ($) Total cost 2014 ($) 74,000 2,539,826 9,795,200 200,000 120,000 6,370,734 Total project cost to 2014 ($) 2 0 0 0 0 0 R R R RTC support for R funding 36 MWSH Org RLTP priority 36 Phase name Expected duration (months) Project name 85 36 36 36 36 Investigation, Design, Property purchase Construction Construction Design & Construction Design & Construction Construction Construction North of Levin to Otaki (Levin Bypass) SH1 Foxton South Curves Realignment SH 1 Whakaruatapu Stream Bridge Replacement & Realignment SH 2 Linnet-Huia St Curve Improvement SH 1(Manawatu-Wanganui Road safety group) Millrick-Kendall Realignment SH 57 (Manawatu-Wanganui Road safety group) Wilson Road South Curve Improvements SH 56 (ManawatuWanganui Road safety group) Muhunoa Road Intersection SH 1 (Manawatu-Wanganui Road safety group) MWSH MWSH MWSH MWSH MWSH New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways SS SS SS SS SS ED Total cost 2008 ($) 541,000 103,000 31,000 60,000 400,000 Total cost 2009 ($) 456,000 556,000 106,000 318,000 1,858,224 2,975,000 Total cost 2010 ($) 664,000 1,863,679 5,482,000 Total cost 2011 ($) 2,476,000 1,736,566 26,108,000 Total cost 2012 ($) 1,962,000 61,223,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 58,716,000 Total cost 2014 ($) 456,000 1,097,000 5,311,000 349,000 5,458,469 60,000 154,904,000 Total project cost to 2014 ($) 1 1 1 1 1 0 0 R RTC support for R funding MWSH New & improved infrastructure for State Highways Objectives MWSH Activity class 24 RLTP priority 36 Phase name Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Expected duration (months) Project name 0 86 Phase name Construction Investigation & Design Design & Construction Design & Construction Investigation Investigation Design Project name Passing Lane Merge Treatments (ManawatuWanganui Road safety group) Levin-Makerua Passing Lanes SH 57 (Manawatu-Wanganui Road safety group) Waiauti Bridge Realignment SH 1 (Manawatu-Wanganui Road safety group) Mangaweka South Realignment SH 1 Tahoraiti Railway Crossing SH 2 Waitarere Road Realignment SH 1(Manawatu-Wanganui Road safety group) Corby Road South Curves SH 2 (Manawatu-Wanganui Road safety group) Expected duration (months) MWSH MWSH MWSH MWSH MWSH MWSH New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways SS SS SS SS SS Total cost 2008 ($) 25 20,000 53,000 52,000 25,000 669,000 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 36 96 60 36 36 New & improved infrastructure for State Highways Objectives MWSH Activity class 22,000 3,288,370 1,863,000 55,000 764,000 Total cost 2011 ($) 261,000 3,262,483 1,908,000 Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 249,000 2,643,765 85,000 637,000 Total cost 2010 ($) Total cost 2014 ($) 20,000 22,000 563,000 9,246,618 3,796,000 140,000 2,070,000 Total project cost to 2014 ($) 2 2 2 2 1 1 1 RLTP priority 36 Org 87 RTC support for R funding Phase name Investigation & Design Design & Construction Construction Construction Property purchase Construction Construction Project name Ratana Hill SH 3 (Manawatu-Wanganui Road safety group) Wikitoria Intersection SH 3/4 (ManawatuWanganui Road safety group) Strategic Plan Initiatives 9/12 (ManawatuWanganui Road safety group) Safety Retrofit 9/12 (Manawatu-Wanganui Road safety group) Property Acquisitions 9/12 (ManawatuWanganui Road safety group) Pavement Smoothing 9/12 (ManawatuWanganui Road safety group) Scour Investigation 9/12 (Manawatu-Wanganui Road safety group) 0 Expected duration (months) 36 36 36 36 36 MWSH MWSH MWSH MWSH MWSH MWSH SS SS New & improved infrastructure for State Highways New & improved infrastructure for State Highways SS SS New & improved infrastructure for State Highways New & improved infrastructure for State Highways SS SS SS Total cost 2008 ($) 170,000 479,439 428,451 837,493 669,994 20,000 Total cost 2009 ($) 175,000 288,956 441,304 862,618 690,094 211,000 21,000 Total cost 2010 ($) 180,000 266,556 454,544 888,496 710,797 1,640,000 55,000 Total cost 2011 ($) Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Total cost 2014 ($) 525,000 1,034,951 1,324,299 2,588,607 2,070,885 1,871,000 76,000 Total project cost to 2014 ($) 5 5 5 5 5 0 3 R RTC support for R funding 36 New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways Objectives MWSH Activity class 26 RLTP priority 36 Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 88 209 36 36 Construction Property purchase & Construction Investigation & Design Design & Construction Seismic Retrofit 9/12 (Manawatu-Wanganui Road safety group) Manawatu Hill Realignment SH 2 Gorge Woodville Seal Widening SH 3 (Manawatu-Wanganui Improved traffic management group) Drainage Safety Profiling SH 56/57 (ManawatuWanganui Improved traffic management group) 36 Design & Construction MWSH MWSH MWSH PH New & improved infrastructure for State Highways New & improved infrastructure for State Highways PH PH New & improved infrastructure for State Highways PH PH SS SS 20,000 Total cost 2008 ($) 27 435,000 41,000 66,000 41,000 150,000 61,000 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 Construction Hansen Line and Taonui North Curves SH 3 (Manawatu-Wanganui Improved traffic management group) Lismore Corner SH 4 (Manawatu-Wanganui Improved traffic management group) 36 Design & Construction Golf Road South Passing Lane SH 1 (Manawatu-Wanganui Improved traffic management group) MWSH MWSH MWSH New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways Activity class Objectives MWSH Org 1,582,000 2,253,000 2,064,000 Total cost 2011 ($) 4,511,000 Total cost 2012 ($) 5,770,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 307,000 414,000 796,000 1,487,000 42,000 77,000 274,000 Total cost 2010 ($) Total cost 2014 ($) 742,000 414,000 837,000 3,135,000 83,000 12,781,000 2,399,000 Total project cost to 2014 ($) 7 7 7 6 6 5 5 RLTP priority 36 Phase name Expected duration (months) Project name 89 RTC support for R funding 36 Design Design & Construction Construction Investigation Construction Investigation Carlton / Alma / Jackson Intersection SH 3 (Manawatu-Wanganui Improved traffic management group) London Street High School Safety Improvements Package SH 3 (ManawatuWanganui Improved traffic management group) Mount Stewart North Passing Lane SH 3 (Manawatu-Wanganui Improved traffic management group) Piriaka Rail Bridge Approaches SH 4 (Manawatu-Wanganui Improved traffic management group) Improved Driver Information 9/12 (Manawatu-Wanganui Improved traffic management group) Concord Line Curve Realignment SH 3 (Manawatu-Wanganui Improved traffic management group) 36 36 36 MWSH MWSH MWSH MWSH MWSH PH PH New & improved infrastructure for State Highways New & improved infrastructure for State Highways PH PH New & improved infrastructure for State Highways New & improved infrastructure for State Highways PH New & improved infrastructure for State Highways PH New & improved infrastructure for State Highways Total cost 2008 ($) 20,000 223,331 927,000 30,000 Total cost 2009 ($) 230,031 265,000 21,000 Total cost 2010 ($) 236,932 22,000 328,000 Total cost 2011 ($) Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Total cost 2014 ($) 20,000 690,294 22,000 1,192,000 349,000 30,000 Total project cost to 2014 ($) 8 8 8 8 8 8 RLTP priority MWSH Objectives Activity class 28 R R RTC support for R funding 36 36 Phase name Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Expected duration (months) Project name 0 90 Construction Design Marangai Road South Passing Lane SH 3 (Manawatu-Wanganui Roading route efficiency group) Oroua Road North Passing Lane SH 3 (Manawatu-Wanganui Roading route efficiency group) Construction Design 36 Construction Rangitikei Line / Tremaine Ave Intersection Improvement SH 3 (Manawatu-Wanganui Improved traffic management group) Rangitikei Line / JFK Drive SH 3 (ManawatuWanganui Improved traffic management group) MWSH MWSH MWSH New & improved infrastructure for State Highways AM AM New & improved infrastructure for State Highways PH New & improved infrastructure for State Highways AM PH New & improved infrastructure for State Highways New & improved infrastructure for State Highways AM New & improved infrastructure for State Highways Total cost 2008 ($) 29 41,000 515,000 619,000 279,164 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 36 36 MWSH MWSH MWSH Objectives Activity class 1,095,000 296,165 Total cost 2011 ($) Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 21,000 422,000 42,000 636,000 287,539 Total cost 2010 ($) Total cost 2014 ($) 62,000 1,517,000 42,000 515,000 1,255,000 862,868 Total project cost to 2014 ($) 14 14 13 12 12 8 R R RTC support for R funding Sanson South Passing Lane SH 1 (ManawatuWanganui Roading route efficiency group) 36 Construction Rehabilitation Seal Widening 9/12 (Manawatu-Wanganui Roading route efficiency group) Org RLTP priority 36 Phase name Expected duration (months) Project name 91 36 Investigation, Design & Construction Design Construction Construction SH 3 / 54 Intersection (Manawatu-Wanganui Roading route efficiency group) Dalvey Road South Passing Lane SH 2 (Manawatu-Wanganui Roading route efficiency group) Woodville Stock Effluent Disposal Facility SH 2 (ManawatuWanganui Route security and environmental group) Taihape Stock Effluent Disposal Facility SH 1 (Manawatu-Wanganui Route security and environmental group) 36 36 Construction State Highways 36 MWSH MWSH MWSH MWSH MWSH MWSH Renewal of State Highways R R New & improved infrastructure for State Highways New & improved infrastructure for State Highways R AM AM AM New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways New & improved infrastructure for State Highways Objectives MWSH Activity class Total cost 2008 ($) 28,482,482 206,000 113,000 85,000 Total cost 2009 ($) 26,648,532 212,000 53,000 531,000 Total cost 2010 ($) 27,061,400 219,000 655,000 1,088,000 Total cost 2011 ($) 1,130,000 Total cost 2012 ($) 1,449,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Total cost 2014 ($) 82,192,414 219,000 206,000 212,000 53,000 1,299,000 3,752,000 Total project cost to 2014 ($) 0 16 16 16 15 14 14 RLTP priority National Park Stock Effluent Disposal Facility SH 4 (ManawatuWanganui Route security and environmental group) Maintenance, Operations & Renewals 2009/12 36 Design & Construction Otamaraho Curve Passing Lane Extension SH 2 (ManawatuWanganui Roading route efficiency group) Org 30 R R RTC support for R funding 36 36 Phase name THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Expected duration (months) Project name 0 92 Phase name Study Study Study Design & Construction Design & Construction Investigation, Design & Construction Design & Construction Design & Construction Investigation, Design & Construction Project name Palmerston North Manawatu Joint Transport Study Manawatu-Wanganui Kiwirap Black Route Safety Study Manawatu-Wanganui safe, sustainable and efficient routes study Old West Road (North) Seal Widening SH 57 Cobham Bridge South Wikitoria SH 3 Manawatu River Bridge SH3 Ashhurst Cycle/walkway Turitea Stream Bridge Widening SH 57 Bulls Bridge Cycleway SH 3 Rauma Railway Walkway SH 1 Expected duration (months) MWSH MWSH MWSH MWSH MWSH MWSH Walking and cycling facilities Walking and cycling facilities Walking and cycling facilities Walking and cycling facilities Walking and cycling facilities Walking and cycling facilities Transport planning Transport planning SS SS In 10,000 Total cost 2008 ($) 31 40,000 100,000 50,000 80,000 525,000 1,100,000 34,000 34,000 62,500 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 48 71 45 48 24 43 MWSH MWSH Studies and Strategies Objectives MWSH Activity class 159,135 1,052,413 636,540 1,113,945 33,000 33,000 Total cost 2011 ($) 404,309 546,364 1,092,727 Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 61,800 1,081,500 51,500 103,000 287,100 33,000 33,000 Total cost 2010 ($) Total cost 2014 ($) 665,244 2,233,913 1,284,404 2,389,672 822,100 1,100,000 100,000 100,000 62,500 Total project cost to 2014 ($) 9 8 4 4 3 2 0 0 0 RLTP priority 12 Org 93 RTC support for R funding 36 36 Investigation & Design Annual allocation Group allocation Construction Construction Construction Property purchase, Design & Construction Property purchase Manawatu River Bridge Whirokino Cycle/Walkway SH 1 Administration support - Roading 2009/12 Travel Planning 2009/12 Railway Road Improvement Rangitikei / Tremaine Signal Upgrade - Local share Strategic Roading North Eastern Link New Bridge Manawatu River Featherston Street widening 1 36 30 4 PNCC PNCC PNCC PNCC PNCC New & improved infrastructure for local roads ED In In New & improved infrastructure for local roads New & improved infrastructure for local roads ED New & improved infrastructure for local roads New & improved infrastructure for local roads S 1,682,000 Total cost 2008 ($) 2,800,000 75,000 1,100,000 114,000 122,000 Total cost 2009 ($) 1,235,000 1,482,000 515,000 823,000 63,000 131,000 61,800 Total cost 2010 ($) 1,525,000 529,000 63,000 146,000 127,308 Total cost 2011 ($) 21,272,000 Total cost 2012 ($) 21,761,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 11,120,000 Total cost 2014 ($) 1,235,000 59,960,000 1,119,000 823,000 2,782,000 240,000 399,000 189,108 Total project cost to 2014 ($) 13 12 12 0 10 11 R R R R RTC support for R funding 26 Demand management & community programmes Walking and cycling facilities Objectives PNCC PNCC MWSH Activity class 32 RLTP priority 48 Phase name Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Expected duration (months) Project name 0 94 Phase name Construction Construction Construction Construction Construction Local Roads Construction Construction Project name Ashhurst Street Improvements Ferguson Street Widening (Linton to Pitt ) Grey / Albert Roundabout Pahiatua Aokautere Road Realignment & Reconstruction James Line reconstruction - stage II Minor improvements 2009/12 Ferguson / Ruahine Intersection upgrade Grey St Clearway Expected duration (months) 3 6 PNCC PNCC PNCC PNCC PNCC PNCC PNCC New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads R SS In SS SS R Total cost 2008 ($) 33 257,000 636,778 250,000 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 9 24 4 4 PNCC Activity class Objectives 9 Org 678,670 Total cost 2011 ($) 54,000 379,000 217,000 325,000 Total cost 2012 ($) 444,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 641,683 772,000 290,000 Total cost 2010 ($) 1,440,000 1,077,000 340,000 Total cost 2014 ($) 1,957,131 1,151,000 1,440,000 290,000 1,738,000 915,000 Total project cost to 2014 ($) 95 RTC support for R funding RLTP priority Phase name Construction Construction Construction Construction Study Study Investigation & Construction Construction Project name Walding St safety upgrade Park Rd / Cook St intersection upgrade Passenger Transport Bus terminal Passenger Transport Road Improvements Palmerston North Manawatu Joint Transport Study Aokautere Bypass Study Pedestrian & Cycle Bridge Cycling / walking improvements 09/12 0 Expected duration (months) 12 10 12 6 PNCC PNCC PNCC PNCC PNCC PNCC PNCC R Transport planning Walking and cycling facilities S In Studies and Strategies Walking and cycling facilities S In SS Public transport infrastructure Public transport infrastructure New & improved infrastructure for local roads New & improved infrastructure for local roads Total cost 2008 ($) 88,000 62,500 118,000 300,000 Total cost 2009 ($) 34 144,000 48,000 1,500,000 Total cost 2010 ($) 52,000 4,500,000 Total cost 2011 ($) 108,000 70,000 4,000,000 Total cost 2012 ($) 3,327,000 72,000 444,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 3,400,000 74,000 Total cost 2014 ($) 88,000 6,835,000 62,500 434,000 10,000,000 Total project cost to 2014 ($) 9 0 10 RLTP priority 8 4 PNCC Activity class Objectives 4 Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 96 RTC support for R funding Construction Cycling / walking improvements 09/12 Construction Local Roads Investigation, Design & Construction Annual allocation Turakina Valley Rd Seal Extension Minor improvements 2009/12 Mangamahu - Bridge Renewal - Wylies Bridge - No.46 Maintenance, Operations & Renewals 2009/12 Administration support - Roading 2009/12 RuaDC RanDC RanDC RanDC RanDC RanDC New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads S S 5,700,000 35 251,520 10,815,721 865,250 5,154,922 246,400 7,867,600 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 36 12 36 36 36 Walking and cycling facilities Walking and cycling facilities Total cost 2008 ($) 264,100 11,443,928 155,000 865,250 178,200 12,683,300 1,556,000 Total cost 2011 ($) 1,365,000 800,000 1,112,000 Total cost 2012 ($) 800,000 465,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 235,100 11,124,382 865,250 174,500 9,211,700 1,382,000 Total cost 2010 ($) 400,000 586,000 Total cost 2014 ($) 750,720 33,384,031 1,520,000 2,595,750 2,000,000 10,854,922 599,100 29,762,600 3,719,000 1,382,000 Total project cost to 2014 ($) 13 15 0 RLTP priority Construction RanDC PNCC PNCC PNCC Activity class R R R RTC support for R funding Taihape Napier Road Seal Extension 36 36 12 12 Expected duration (months) Annual allocation Construction Cycling / walking improvements 09/12 Org Objectives Maintenance, Operations & Renewals 2009/12 Administration support - Roading 2009/12 Phase name Project name 97 Phase name Construction Construction Construction Construction Local Roads Special Purpose Road (SPR) Investigation Construction Project name River Rd / RaetihiPipiriki Road Okahukura Saddle Road Seal Extension Waitaanga Road Seal Extension Mountain Road (SPR) 9km Bridge Minor improvements 2009/12 Minor improvements 2009/12 Mountain Road (SPR) Hair Pin at 13.0 km Mountain Road (SPR) 7.6km Fatality Site 0 Expected duration (months) 12 36 36 60 60 RuaDC RuaDC RuaDC RuaDC RuaDC RuaDC RuaDC New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads SS ED ED Objectives New & improved infrastructure for local roads 25,000 889,918 Total cost 2008 ($) 100,000 48,024 668,352 1,054,378 750,000 Total cost 2009 ($) 49,464 752,579 750,000 Total cost 2010 ($) 50,000 50,944 781,288 50,000 50,000 395,817 Total cost 2011 ($) Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Total cost 2014 ($) 100,000 50,000 148,432 2,202,219 50,000 50,000 1,079,378 2,785,735 Total project cost to 2014 ($) 15 0 RLTP priority RuaDC Activity class 36 R R RTC support for R funding 60 Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 98 Group allocation Group allocation Cycling and Shared Use Path Implementation Stage 2 Cycling and Shared use Path Implementation Stage 3 Annual allocation Local Roads Minor improvements 2009/12 Maintenance, Operations & Renewals 2009/12 Administration support - Roading 2009/12 Construction WDC WDC WDC TDC TDC TDC TDC TDC New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads PH PH ED SS Total cost 2008 ($) 37 377,000 185,000 10,625,000 858,800 380,000 3,000,000 183,000 9,375,650 Total cost 2009 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 36 36 36 36 36 3 36 36 RuaDC Objectives Coast Road Seal Extension 09-12 Expected duration (months) 36 Activity class 393,000 177,000 11,285,000 912,400 405,000 1,700,000 194,000 11,113,639 Total cost 2011 ($) 403,000 Total cost 2012 ($) 412,000 Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 382,000 168,000 10,955,000 885,600 395,000 4,000,000 189,000 10,694,280 Total cost 2010 ($) 421,000 Total cost 2014 ($) 1,236,000 1,152,000 530,000 32,865,000 2,656,800 1,180,000 8,700,000 566,000 31,183,569 Total project cost to 2014 ($) 5 RLTP priority Construction Annual allocation Maintenance, Operations & Renewals 2009/12 Administration support - Roading 2009/12 Org R RTC support for R funding Pahiatua Track Route Realignment 2009/12 Phase name Project name 99 Construction Investigation, Design & Construction Investigation, Design & Construction Local Roads Construction Study River Rd / RaetihiPipiriki Road Mangamahu - Bridge Renewal - Wylies Bridge - No.46 Fitzherbert Avenue Extension - New Road construction Minor improvements 2009/12 Preventative Maintenance - Somme Parade Urban Wanganui Transportation Study Expected duration (months) 36 36 36 6 12 WDC WDC WDC WDC WDC WDC Transport planning Renewal of Local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads New & improved infrastructure for local roads AM AM SS ED Objectives WDC Activity class 540,000 889,918 Total cost 2008 ($) 10,591,400 100,000 760,000 750,000 Total cost 2009 ($) 38 11,041,800 55,000 850,000 750,000 Total cost 2010 ($) 11,606,500 880,000 155,000 395,817 Total cost 2011 ($) 1,365,000 Total cost 2012 ($) Total cost 2013 ($) THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 55,000 Total cost 2014 ($) 33,239,700 155,000 540,000 2,490,000 55,000 1,520,000 2,785,735 Total project cost to 2014 ($) 0 13 0 RLTP priority 60 Org THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 R R RTC support for R funding Maintenance, Operations & Renewals 2009/12 Phase name Project name 0 100 Prioritisation process All state highway activities. Major local road improvements over $4.5 million and/or on regional arterial routes. New public transport activities or services. Projects recommended for Regional (R) funding by the Horizons RTC. Community activities (e.g. travel plans and road safety education). Medium Medium Low Efficiency · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 the seriousness and urgency of the transport issue being addressed, taking into account any relevant strategies and national, regional or local priorities the effectiveness of the proposed activity in addressing the issue or problem, and in delivering regional and national strategic objectives · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 safety and capacity on State Highway 1 between Levin and Otaki, of significance to Horizons and the Greater Wellington Regions. standard of the Napier-Taihape road linking the Hawkes Bay and Horizons regions. · Activities with inter-regional significance · 2.6 Recent changes in government priorities as reflected in the GPS mean that a new set of draft assessment criteria was developed and released in June 2009. As noted elsewhere it has not been possible to re-assess all the projects in the Horizons RLTP and prioritise accordingly in the available timeframe. However, the RTC notes that the NZ Transport Agency is required to prepare a National Land Transport Programme which gives effect to the GPS, and that the new assessment criteria may therefore result in different priorities for regional projects. Projects were grouped according to their contribution to one of the three broad regional priorities. These groupings and the assessment profiles were used to determine a proposed regional priority list, which can be found in Section 2.4. 3. Prioritisation process Effectiveness Seriousness and urgency For example, the Ohingaiti–Makohine Realignment project has been assigned an MML profile. This means: The Regional Land Transport Strategy identifies two significant inter-regional issues. They are: 39 The economic efficiency of the proposed activity. This is a measure of value for money based on a benefit/cost ratio (BCR). Where the BCR is less than 2 – Low; between 2 and 4 – Medium; greater than 4 – High. Prioritised projects were rated High (H), Medium (M) or Low (L) for each of the three factors resulting in an assessment ‘profile’ for the project. · Prioritised projects were individually assessed in accordance with the NZ Transport Agency’s project assessment and prioritisation process. This involved consideration of: 2. Complete initial project assessment Priority 1: Maintaining a safe transport system Priority 2: Managing travel demand and improving accessibility Priority 3: Improving route security and route efficiency As discussed earlier, broad regional priorities were developed. These are: 1. Determine broad regional priorities To assist in the prioritisation of the above projects, the RTC has adopted the following process: · · · · · The prioritised list of activities for the three financial years 2009-10 to 2011-12 must contain: As required by the Land Transport Management Act 2003, the RTC has prioritised certain projects submitted by approved organisations and the NZ Transport Agency. This indicates how the Region would like national funding to be allocated to the highest priority projects if funding is limited. 2.5 101 Standard and capacity of State Highway 1 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Standard of Napier-Taihape Road Nationally or regionally significant activities In March 2009 the government identified a number of nationally significant routes. These include the Northern Corridor from Levin to Wellington of which a section (Levin to Otaki) is in the Horizons Region. Investigations into improvements of this route will be fast tracked 2.7 Seal extension of the Horizons portion of the road is now underway and the project appears as a committed activity in the proposed programme. The road is only partially sealed and this prevents it being used more frequently. If sealed, the route could play an increased role in the movement of freight and tourist traffic between the regions, as well as being a viable alternative when SH3 is closed through the Manawatu Gorge. The Napier-Taihape Road is a strategic link between the Horizons and Hawke’s Bay regions especially when the Manawatu Gorge road (State Highway 3) is unavailable due to slips. 2.6.2 This regional programme proposes several small to medium safety improvements on SH 1 south of Levin. A strategy study to identify further areas for improvement is underway in the 2008-09 year. The standard of the route is also variable and is unsatisfactory for a corridor of this importance, as substandard curves, restricted sightlines and side traffic access points are contributing to safety issues. Improving the standard and capacity of State Highway 1 between Levin and Otaki is an issue of significance to both Horizons and the Greater Wellington regions. This stretch of SH1 has experienced considerable growth in traffic volumes of between 2% and 3% annually since 1990. The portion of SH1 between Levin and Otaki is now at a stage where significant safety and capacity issues are emerging. The route is of strategic importance for both regions as it is the main freight corridor into and out of Wellington. Therefore, it plays a significant part in the economies of both regions. 2.6.1 0 40 Activities approved for funding but not yet completed Contribution of RLTP activities to regional and national transport priorities Under Section 16(a) of the Land Transport Management Act 2003, the RLTP must contain the Horizons RTC’s assessment of how the programme complies with Section 14 of the Land Transport Management Act 2003. Figure 6 sets out these requirements and demonstrates how the programme complies with them. 2.10 Figure 5 identifies activities which have already been approved for inclusion in the National Land Transport Programme but which are not yet complete. These are activities which have funding allocated in 2008-09 and beyond. 2.9 No known activities are proposed to be varied, suspended or abandoned. Activities proposed to be varied, suspended or abandoned. Upstream bridge on the Manawatu River (construction commencing 2012). Information about the timing and cost of this activity is to be found on the list of activities in Figure 5. · 2.8 the Manawatu Hill Realignment (construction commencing 2012). Information about the timing and cost of this activity is to be found on the list of activities in Figure 5. · The RTC has determined that the following activities likely to be recommended for inclusion in the NLTP for 2012-15 are regionally significant: and $166.7 million dollars of investigation, design, property purchase and construction funding has been added to the programme for this between 2009-10 and 2016-17. THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 102 Section 14(a) (ii) Section 14(a)((i) The RTC has identified safety as its highest regional priority and has placed those projects and programmes which make a significant contribution to safety at the top of its list. It considers that those safety improvements which cannot be funded from the N (National) fund should have first call on its R (Regional) funds. Contribute to safety and personal security REGIONAL LAND TRANSPORT PROGRAMME 2009-12 41 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Furthermore, as the assessment of the relationship of this programme to police activities (section 2.11) demonstrates, there are close working links between road controlling authorities, the Regional Council and the Police. Programmed safety activities are usually part of a coordinated road safety action plan to address road safety from all angles through education, enforcement and engineering activities. The RLTP contains a number of targeted infrastructure projects to improve the crash record of certain sections of the network. It also contains programmes of community focused activities such as road safety education and the promotion of safe walking and cycling as transport methods. A proposal for an improved bus terminal in Palmerston North is partly aimed at addressing both the safety and personal security concerns of bus passengers. The programme contains a number of activities which promote economic development in the Region. For example, committed activities such as the sealing of the Napier-Taihape Road and the sealing of the Whanganui River Road directly address the needs of tourism and agriculture. The improvement of strategic links between Feilding and Palmerston North, and improvements to routes around Palmerston North facilitate economic activity in these areas. The review of the RLTS in 2009-10 will further refine the Region’s strategic direction and allow it to be responsive to emerging trends and changes in national strategic direction. The RTC’s Significance Policy (see Appendix 3) for variations to this programme will also ensure that the Region can remain responsive to changing community needs, or issues which emerge through the monitoring of the programme’s implementation. Each major activity has been assessed and prioritised in accordance with the issues and priorities set out in the Regional Land Transport Strategy (RLTS), having regard to the New Zealand Transport Strategy. The RTC is confident that it has prioritised the programme to ensure that its top priority activities will contribute to a sustainable and safe transport system. The funding plan set out in the RLTP demonstrates that the proposed activities are affordable to the Region. How the RLTP complies Contribute to assisting economic development Contribute to an affordable, integrated, safe, responsive, and sustainable land transport system Section 14 requirements Figure 6. How the RLTP complies with Section 14 of the Land Transport Management Act 2003 103 Contribute to public health Contribute to improving access and mobility Section 14 requirements 42 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Activities to increase public transport use also have a public health benefit through a reduction in transport emissions and an increase in physical activity, as each bus trip normally starts and ends with a walking trip. The RTC considers that the programme will make some contribution to protecting and promoting public health, through activities aimed at encouraging walking and cycling. These include community focused activities to change travel behaviour and encourage use of walking and cycling for short trips, and infrastructure improvements such as cycle and pedestrian or shared facilities. The RLTP contains a proposed improvement to the Palmerston North bus service to increase the frequency of bus services at peak times. It is estimated that the improvements will increase patronage on the service by 16%. The RTC considers that the RLTP makes an appropriate contribution to improving access and mobility in the Horizons Region. Access and mobility is addressed in this programme through continued support for existing public transport services in the Horizons Region, including urban bus services and a number of commuter and shoppers’ services between towns. The Region supports the continuation of Total Mobility services with increased provision made for growth in the scheme. Community van services in a number of small towns in the Region provide appropriate and cost-effective public transport where fixed route scheduled services cannot be sustained. How the RLTP complies REGIONAL LAND TRANSPORT PROGRAMME 2009-12 104 Section 14(a)(iii) Section 14(b) (ii) Take into account any national land transport strategy Consistent with Regional Land Transport Strategy The Government Policy Statement 2009 was released in May 2009, after the draft RLTP had been prepared and released for consultation. The GPS sets out the specific impacts the government expects to be achieved through the use of the National Land Transport Fund. Consistent with the Government Policy Statement REGIONAL LAND TRANSPORT PROGRAMME 2009-12 43 There is currently no national land transport strategy in place. THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 The RLTP incorporates funding for activities which will address some of the other impacts the government wishes to achieve, particularly in the area of road safety which is the region’s highest priority. Activities which address serious safety issues have been given the highest priority in the programme. The RTC considers that the RLTP also makes an appropriate contribution to providing greater transport choice, reducing adverse environmental effects and contributing to positive health outcomes through activities such as increased public transport services, the provision of Total Mobility, walking and cycling activities etc. The RTC considers that the proposed programme of works is highly consistent with the Regional Land Transport Strategy. The broad regional priorities set out in Section 2.3 are derived from the current RLTS and have been used to determine the priority order placed on activities and projects in the programme. The GPS also states that cost-effective measures to improve the efficiency of existing networks are to be considered as well as investment in new infrastructure. The RLTP’s broad Priority 2 is to manage travel demand and improve accessibility, which is consistent with this statement in the GPS, and a number of activities have been promoted under this priority area. As a result of the Government’s announcements regarding Roads of National Significance, funding has been added to the Horizons RLTP to investigate improvements to the Levin to Otaki section of SH1. Two small improvements on this section of the network were already included in the programme. The GPS states that regional transport committees should ensure that investment in nationally important infrastructure and corridors is given priority because of its contribution to national economic growth and productivity. The Horizons RTC has responded to this by placing investigation funding for improvements to SH1 Levin to Otaki at priority 0, essentially as committed expenditure. This is the only section of the regional network where significant issues as outlined above currently exist. The RLTP is therefore consistent with this stated aim of the GPS. The GPS states that regional transport committees should give priority to transport initiatives that i) improve the provision of infrastructure and services that enhance transport efficiency and lower the cost of transportation through journey time reliability improvements, easing of severe congestion and more efficient freight supply chains and ii) provide better access to markets, employment and areas that contribute to economic growth. The RTC considers that the programme will make some contribution to environmental sustainability through activities to increase walking and cycling and public transport use, and through the construction of stock truck effluent facilities on regional state highways. Contribute to environmental sustainability 105 Take into account likely funding from any source Take into account relevant national and regional policy statements under the Resource Management Act 1991 Take into account National Energy Efficiency and Conservation Strategy 44 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 reduce energy use through reducing the need for travel progressively improve the energy performance of the transport fleet improve the provision and uptake of low energy transport options engineering and education measures in the programme to promote walking and cycling; measures to increase public transport use; and the proposed development of workplace travel plans by the Palmerston North City Council Consider methods to reduce reliance on private transport through urban development planning and district land transport programmes. To have land transport systems and public utility networks which meet the needs of the Region, while avoiding, remedying or mitigating adverse effects. District Councils should “Provide for the safety and efficiency of the district’s land transport infrastructure through provisions in district land transport programmes.” Method 19A.4: Objective 30: Under Method 30.3, The RTC has considered the available sources of funding in developing this programme and believes that its activities are affordable. Section 3 outlines proposed funding sources for the activities in the programme. There are a number of activities in the programme which could be said to support Objective 19a and Objective 30, particularly those which promote road safety and low energy transport options, as described above. To reduce greenhouse gas emissions in the Region. Objective 19a: Activities identified in the RLTP take into account some of the objectives, policies and methods identified in the Regional Policy Statement. The objectives identified in the Regional Policy Statement as having particular relevance to the programme are: · · · The RTC considers that activities in the programme contribute to the first and third objective through: 1. 2. 3. The RTC has taken into account the transport objectives set out in the New Zealand Energy Efficiency and Conservation Strategy 2001. The objectives for transport are to: REGIONAL LAND TRANSPORT PROGRAMME 2009-12 106 Assessment of the relationship of Police activities to the RLTP REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Each RSAP specifies a range of education, engineering and enforcement interventions. Many of these will address national issues and reflect key priorities in the Road Policing Strategy, such as the “fatal five” – speeding, drink/drugged driving, restraints, dangerous/careless driving and high-risk behaviours. Others may focus on district-specific issues where particular circumstances increase the risk of certain types of crashes. District Road Safety Action Plans (RSAPs) provide the main visible link between police and other activities carried out under this RLTP. In all seven districts in the Region, police are fully involved in the development and implementation of RSAPs. These district or clusterwide plans bring together the required engineering, enforcement and education activities to address road safety issues in the district. They involve a collaborative process whereby the key partners, namely the NZ Transport Agency, local authorities, police, ACC and community representatives, agree on risks, identify objectives, direct tasks, set targets, develop plans and monitor and review progress. The participation of a Police representative on the RTC (representing “safety and personal security”) and in the development of the Regional Land Transport Strategy ensures that there is coordination of Police and other transport activities at the regional strategic level. The Strategy is due to be reviewed in 2009-10 and funding for this review is contained in the proposed RLTP. The revised strategy will incorporate police activities into a number of its policies and specific actions on road safety, travel demand management and the promotion of walking and cycling. Road policing activity is directed by the Road Policing Strategy 2010 and is delivered through the National Road Policing Programme. Funding for regional road policing activity is delivered in line with the above strategy, the Central Police District Policing Plan, the Regional Road Safety Plan, risk-targeted patrol plans and district Road Safety Action Plans. As required under Section 16(b) of the Land Transport Management Act 2003, the RTC has assessed the relationship of Police activities to the RLTP. The RTC considers that proposed Police activities for the Region are consistent with many activities identified in the RLTP. 2.11 45 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Community focused activities target specific user groups as well as specific issues, where it is clear that these groups are over-represented in crash statistics. An example of the close link between education programmes provided under this RLTP and police activities is found in the Manawatu/Rangitikei Districts. Driver Reviver stops on long weekends, involving police road safety coordinators, ACC and others educate drivers on the dangers of driving long distances without stopping for rests. This RLTP contains funding for community focused activities. These are largely education programmes to address road safety and transport sustainability issues. In many cases these programmes form part of a district initiative in which police are key partners. The mechanism for developing these activities is once again the RSAP, where activities are jointly planned and each agency has a role to play. The proposed RLTP for 2009-12 contains a significant number of safety improvements on specific sections of our roads, where police activity is an integral part of the solution. For example, the Tararua District RSAP identifies loss of control crashes as an issue, identifies problem road sections and lists a number of minor engineering improvements such as improved signage and surfacing to reduce these. The RSAP also specifies speed enforcement to be undertaken on these problem routes. The Road Policing Programme also makes provision for police education activities and there are close links between the work undertaken by police in this area and community education programmes run by local or regional councils. An example of this in the Horizons Region is the Young Cyclist of the Year competition. This is run by the police education officers in conjunction with Horizons road safety coordinators. It teaches safe road cycling practices to Year 5-8 school children and encourages children to cycle to school. The RSAP will specify what police enforcement, education or engineering improvements may be required to address the issue and how the parties will work together to improve safety in this area. Funding for the engineering and education activities of the RSAP is then sought through this RLTP. Police state that in 2009-10, road policing in the Region will be increasingly targeted at risk areas or issues to achieve better overall outcomes. 107 2.5 3 2 1 1 Support Clerical Intel 86.6 10 Speed camera TOTAL 1.6 Traffic alcohol 4 Traffic management Crash analysis 11.6 School road safety education Crash attendance 1.1 13.6 Community services Visible road safety and general enforcement 5.8 14.3 Restraints 15.1 Drinking or drugged driver control Police resourcing for Horizons Region per year (full-time equivalents) Allocation of police resources as per the 2008-09 Road Policing Programme in the Horizons Region Speed control Target area Figure 7. The table below outlines the level of police resource dedicated to the various types of road policing activities in each district in the Region in 2008-09. As the Road Policing Programme for 2009-10 will not be available until July 2009, it has been assumed for the purposes of this assessment that activities will continue at 2008-09 levels for the three years of the RLTP. The RTC is assured that as long as traffic police resourcing remains at current levels, joint road safety activities will continue to be effective in the Region. Police, territorial authorities and the NZ Transport Agency also work closely together on traffic management for large events and crash investigation. The police state that processes are in place to ensure that they are notified of public events, are able to assess the likely traffic implications and can respond accordingly. The results of police crash investigations are reported to the NZ Transport Agency and territorial authorities, and any engineering faults at the crash site are discussed in detail. REGIONAL LAND TRANSPORT PROGRAMME 2009-12 46 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 108 Funding the RLTP 47 Forecast Expenditure 2009-2019 ($) 4,007,809 293,697,723 410,889,562 165,393,380 185,061,060 146,342,017 369,014,651 55,699,594 10,746,000 32,019,112 13,544,206 0 0 1,686,425,114 REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Activity Class Transport planning Maintenance and operation of local roads Renewal of local roads Maintenance and operation of State Highways Renewal of State Highways New & improved infrastructure for local roads New & improved infrastructure for State Highways Public transport services Public transport infrastructure Walking and cycling facilities Demand management & community programmes Rail and sea freight Regional development Total All Activities Figure 8. Forecast anticipated expenditure and revenue 2009-19 FUNDING THE RLTP National ($) 3,719,434 166,184,889 233,745,497 165,393,380 185,061,060 36,019,857 341,095,751 33,419,756 6,017,760 24,387,612 8,543,724 0 0 1,203,588,720 Funding Sources Regional ($) Local ($) 0 288,375 0 127,512,834 0 177,154,065 0 0 0 0 54,764,195 48,907,365 27,918,900 0 0 22,279,838 0 4,728,240 0 7,631,500 0 5,000,482 0 0 0 0 82,683,095 393,079,549 0 0 0 0 0 6,650,600 0 0 0 0 0 0 0 6,650,600 Other sources ($) The section sets out a financial forecast of anticipated revenue and expenditure on activities for the 10 financial years from 1 July 2009 and discusses the allocation of Regional funds to proposed activities. The information contained within this section of the RLTP has been collated by activity class and is presented in greater detail in Appendix 4. 3. 109 48 Transport planning Maintenance and operation of local roads Renewal of local roads Maintenance and operation of State Highways Renewal of State Highways New & improved infrastructure for local roads New & improved infrastructure for State Highways Public transport services Public transport infrastructure Walking and cycling facilities Demand management & community programmes Rail and sea freight Regional development Total All Activities Activity Classes 0 6,390,013 6,477,600 0 0 450,000 0 0 0 0 0 0 0 13,317,613 480,000 640,000 0 0 89,600 0 0 0 0 0 0 0 1,209,600 HDC 0 DoC 18,911,396 0 0 3,357,915 0 0 14,871,411 0 0 0 0 0 0 682,070 HRC 46,508,174 0 0 0 175,000 0 0 0 10,480,551 0 0 23,867,826 11,922,297 62,500 48,886,124 0 0 240,000 3,026,000 6,218,000 0 0 14,090,131 0 0 11,945,547 13,159,946 206,500 41,289,603 0 0 0 0 0 0 0 7,905,672 0 0 22,191,593 11,192,338 0 34,390,646 0 0 0 0 0 0 0 7,896,846 0 0 15,204,000 11,289,800 0 Total Anticipated Expenditure 2009-12 MDC PNCC RanDC RuaDC 45,608,600 0 0 0 0 0 0 0 12,743,600 0 0 18,705,000 14,160,000 0 TDC 40,573,517 0 0 0 1,152,000 0 0 0 5,486,817 0 0 18,314,000 15,465,700 155,000 WDC 177,167,583 0 0 183,000 6,631,041 0 0 79,736,602 0 40,061,060 50,393,380 0 0 162,500 NZTA 467,862,856 0 0 3,780,915 10,984,041 6,218,000 14,871,411 79,736,602 59,143,217 40,061,060 50,393,380 117,345,566 84,060,094 1,268,570 Total Horizons Region As part of the release of the GPS in May 2009, the government has announced that it will increase Fuel Excise Duty (FED) and Road User Charges (RUC) in October 2009, October 2010 and July 2011 to assist with funding the expenditure targets it has set out in the GPS. The full list of transport activities in Figure 5 identifies individual projects which the RTC suggests should be R funded. The RTC has considered how it would like to see the remaining R funds allocated and has determined that these should be spent on new and improved infrastructure of local roads and State Highways. The recommended allocations in these classes are shown in Figure 8. FUNDING THE RLTP Figure 9. Total anticipated expenditure for Horizons region for the period 2009-12 Regional or R funding is additional revenue collected nationally through a 5c per litre tax added to fuel sales from 1 April 2005 and allocated to each region on a population basis. The estimated total amount of R funding available for this Region in the 10 year period from 1 April 2005 is $116.8 million. The intention of the fund is to provide for additional transport outcomes which would otherwise not be able to be funded from national funds and the NZ Transport Agency seeks the RTC’s recommendations on how the R fund should be allocated. As at January 2009, it was estimated that $40.1 million of this fund had been either spent or committed, with approximately $76.7 million still to be allocated to activities in the Region. Any R funds remaining at the end of the 10 year period will remain available to the Region. REGIONAL LAND TRANSPORT PROGRAMME 2009-12 110 Anticipated expenditure across funding ranges Statement of significant expenditure to be funded from other sources Monitoring of the RLTP measuring actual expenditure against budget across activity classes · THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Monitoring reports will be produced annually during the period of this programme. measuring progress on the delivery of the programmed activities and projects listed in Section 2 · A number of monitoring indicators have been included in the Regional Land Transport Strategy and these provide a measure of the progress against the outcomes of the strategy. These will be further refined during the review of the RLTS in 2009-10. As monitoring of the RLTS will focus on measuring how well the Region is progressing towards its targets and addressing its transport issues, monitoring of the RLTP will be limited to: 3.3 Approximately $6.65 million of the total cost of the upstream bridge on the Manawatu River is expected to come from developer contributions. 3.2 Figure 9 shows the total anticipated expenditure for each approved organisation in the Horizons region in relation to each activity class for the next three years, as well as the Horizons region as a whole. 3.1 49 FUNDING THE RLTP 111 REGIONAL LAND TRANSPORT PROGRAMME 2009-12 50 FUNDING THE RLTP 112 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Activity means a land transport output or capital projects, or both. Activity class refers to a grouping of similar activities. Approved organisations refers to organisations that are eligible to receive funding from the NZ Transport Agency for land transport activities. Approved organisations are defined in the Land Transport Management Act 2003 as including regional councils, territorial authorities, or a public organisation approved by the Governor General (by Order in Council). Benefit /Cost Ratio or BCR refers to the ratio that compares the benefits accruing to land transport users and the wider community from implementing a project or providing a service, with that project’s or service’s costs. Community programme refers to the development and delivery, at the community level, of activities addressing safe and sustainable use of the land transport system. Demand management refers to a generic classification of strategies that encourage more efficient and sustainable travel and transport behaviour. Demand management has the objective of encouraging motor vehicle users to use alternative means of transport when appropriate while also reducing total vehicle kilometres travelled. This includes freight as well as personal travel. Funding assistance rate (FAR) is the percentage of the total cost of an approved activity that the NZ Transport Agency pays. Generic project is a specifically identified common type of improvement project with a construction / implementation cost of $4.5 million or less. Government Policy Statement on Land Transport Funding (GPS) refers to a Government Policy Statement issued under Section 86 of the Land Transport Management Act 2003. Improvements projects refer to improvements to road infrastructure outside work categories defined as local maintenance and renewals. Land transport means transport on land by any means and the infrastructure, goods and services facilitating that transport, including: · coastal shipping (including transport by means of harbour ferries, or ferries or barges on rivers or lakes) and associated infrastructure · the infrastructure, goods and services (including education and enforcement), the primary purpose of which is to improve public safety in relation to that transport Land Transport Management Act 2003 (LTMA) refers to the main statutory framework for land transport planning and funding in New Zealand. The following is a glossary of terms and acronyms used in the RLTP. Appendix 1 Glossary of terms and acronyms 51 APPENDICIES Local authority refers to any territorial authority or regional council within the meaning of the Local Government Act 2002. Local road means any road, other than a State Highway, in the district and under the control of a territorial authority. Local share refers to the portion of the total cost of an activity provided by an approved organisation. Long Term Council Community Plan or LTCCP refers to the 10 year community plan produced by regional and territorial authorities under the Local Government Act 2002. National (N) funds refer to nationally distributed funds. National Land Transport Fund (NLTF) refers to the fund established under Section 10 of the Land Transport Management Act. New Zealand Transport Agency (NZTA) refers to the single Crown entity established under Section 93 of the Land Transport Management Amendment Act 2003 that replaced Land Transport New Zealand and Transit New Zealand from 1 August 2008. Police activities means activities approved by the Minister of Transport in conjunction with the Minister of Police, paid from the National Land Transport Fund, to be delivered by the Police Region means the Region of a regional council, and includes the district of a territorial authority, if the territorial authority is a unitary authority. Regional Land Transport Programme means a Regional Land Transport Programme, prepared under Part 2 of the Land Transport Management Act 2003, as from time to time amended or varied. These programmes prioritise state highway, regional council and territorial authority proposals (excluding minor local roading projects, local road maintenance and existing public transport services) for transport activities in a Region. Regional land transport strategy means a Regional Land Transport Strategy prepared under Part 3 of the Land Transport Management Act 2003. Regional (R) funds refers to funds from a 5 cent per litre increase in fuel excise duty and an equivalent increase in road user charges for light vehicles, to be distributed regionally on the basis of population for 10 years from April 2005. Regional Transport Committee (RTC) refers to a Regional Transport Committee established under Section 105 or clause 11 of schedule 7 of the LTMA. Regional Transport Committees have representation from regional councils, territorial authorities, the New Zealand Transport Agency and the community Territorial authority a territorial authority within the meaning of the Local Government Act 2002. This is usually taken to refer to a city council or a district council 113 · · · · · assisting economic development assisting safety and personal security improving access and mobility protecting and promoting public health ensuring environmental sustainability The regional transport committee must ensure that the programme is consistent with the GPS and any relevant regional land transport strategy, and that it contributes to the following five transport objectives: When a regional transport committee prepares a regional land transport programme, it must be satisfied that it contributes to the aim of achieving an affordable, integrated, safe, responsive, and sustainable land transport system. Core requirements of regional land transport programmes A regional council or regional transport committee may simultaneously prepare and approve a regional land transport programme and a regional land transport strategy, and they may use a single consultation process to do so. They may also publish it as a single document. Horizons has chosen to prepare these documents separately. The next Regional Land Transport Strategy will be prepared in 2009-10. Every three years regional councils must ensure that the relevant regional transport committee prepares a regional land transport programme, and they have to approve it by a date set by the NZ Transport Agency. Preparing and approving Regional Land Transport Programmes Approved organisations and the NZ Transport Agency use regional land transport programmes to recommend funding from the national land transport fund for land transport activities or combination of activities. Eligible activities should contribute to a region’s outcomes as reflected in the relevant regional land transport strategy, and in outcomes set out in a National Land Transport Strategy or Government Policy Statement. An overview of regional land transport programmes Appendix 2 Legislative Requirements REGIONAL LAND TRANSPORT PROGRAMME 2009-12 52 those proposed by approved organisations in the region those relating to State Highways in the region, as proposed by the NZ Transport Agency those that the NZ Transport Agency may propose for the region a. b. c. d. e. the objective(s) to be achieved an estimate of the total cost (and the cost for each year) the expected duration proposed sources of funding other than the National Land Transport Fund any other relevant information An assessment of each activity or combination of activities, which includes: The order of priority, as determined by the regional transport committee, of the proposed activities or combinations of activities c. a. b. Activities or combinations of activities that the regional transport committee decides to include, such as: Activities or combinations of activities, identified by approved organisations in the region, that relate to maintenance, renewals and minor capital works for local roads. A regional land transport programme must contain assessments by the regional transport committee of how the programme complies with the ‘core requirements’ above, and the relationship of Police activities or combination of activities to the regional land transport programme. · · · · In order to seek payment from the National Land Transport Fund, a regional land transport programme must contain the following information for the three financial years to which the programme relates: Form and content of regional land transport programmes The programme must also take into account the National Energy Efficiency and Conservation Strategy and any National Land Transport Strategy. APPENDICIES 114 a statement of transport priorities for the region for the first six financial years of the programme, for which funding will be sought all significant expenditure on land transport activities to be funded from other sources a list of each incomplete activity or combination of activities approved under Section 20 of the Act identification of activities or combinations of activities with inter-regional significance an explanation of the proposed action where an activity or combination of activities is to be varied, suspended or abandoned an indication of the nationally or regionally significant activities likely to be included in the National Land Transport Programme over the next three years a financial forecast of revenue and expenditure on activities for the 10 financial years from the start of the regional land transport programme a description of how the implementation of the regional land transport programme will be monitored a summary of consultation undertaken in the preparation of the regional land transport programme a summary of the policy relating to significance adopted by the regional transport committee any other relevant matters THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 When preparing a regional land transport programme, a regional transport committee must consult: – every affected regional council and territorial authority – every affected approved public organisation – the NZ Transport Agency – the Commissioner of Police – affected health boards and the ACC – NZ Historic Places Trust Consultation requirements A regional land transport programme must be in the form and contain the detail prescribed by the NZ Transport Agency. · · · · · · · · · · · A regional land transport programme should also include: 53 NZ Railways Corporation representative groups of land transport users and providers affected communities and the public in the Region Māori of the region APPENDICIES In response to an amended regional land transport programme sent to them by a regional transport committee, the regional council should either approve the programme and send it to the NZ Transport Agency, or send it to the NZ Transport Agency stating that it had not been approved, with the reasons. The NZ Transport Agency must then treat it as either approved, or consider the regional council’s reasons for not approving it. If a regional council refers a regional land transport programme back to the regional transport committee, the committee may supply additional information, amend the regional land transport programme after consultation if the amendment is significant, or decide to make no changes, and then lodge the regional land transport programme with the regional council again. The regional council may, after considering a regional land transport programme lodged with it, decide to approve it without modification, or refer it back to the regional transport committee with a request that one or more specific aspects be reconsidered. The regional land transport programme automatically includes local roads maintenance and minor capital activities, and existing public transport services. If a regional transport committee decides not to include another activity or combination of activities identified by approved organisations or an activity proposed by the NZ Transport Agency, the regional transport committee must advise them in writing of the decisions and reasons for it. After a regional transport committee has prepared and consulted on its regional land transport programme, it has to be lodged with the regional council. Approving of regional land transport programmes by regional transport committees When carrying out the consultation, RTCs must act in accordance with the consultation principles set out in Section 82 of the Local Government Act 2002. – – – – 115 activities that are in the urgent interests of public safety new preventive maintenance and emergency reinstatement activities in accordance with sections 9.7 and 9.8 of the Programme and Funding Manual addition of an activity or activities that have previously been consulted on in accordance with Section 17 and 18 of the Land Transport Management Act and which the RTC considers complies with the provisions for funding approval in accordance with Section 20 of the Land Transport Management Act a scope change that does not significantly alter the original objectives of the project - to be determined by the RTC replacement of a project within a group of generic projects by another project of the same type · · · · · All amendments or variations to the Regional Land Transport Programme other than the following are considered to be significant for purposes of consultation: The RTC has adopted the following definition to determine when a variation to the Regional Land Transport Programme is significant and must therefore undergo a full consultative process. Appendix 3 Summary of Significance Policy for variation to the RLTP REGIONAL LAND TRANSPORT PROGRAMME 2009-12 54 APPENDICIES 116 2011 ($) 15,874,394 15,874,394 2011 ($) 160,000 2,092,992 4,072,230 4,501,075 3,841,550 3,874,900 4,860,000 5,302,500 28,705,247 2012 ($) 15,000,000 15,000,000 2012 ($) 160,000 2,092,992 4,174,035 4,227,177 3,621,156 3,955,500 4,860,000 5,647,000 28,737,860 2013 ($) 15,000,000 15,000,000 2013 ($) 160,000 2,092,992 4,278,386 4,248,750 3,621,156 4,074,170 4,860,000 5,780,000 29,115,454 2014 ($) 160,000 2,092,992 4,385,346 4,318,678 3,621,156 4,196,400 4,860,000 5,904,000 29,538,572 55 2014 ($) 15,000,000 15,000,000 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 Maintenance and operation of State Highways 2009 ($) 2010 ($) DOC Horizons HDC MDC NZTA 19,760,416 14,758,570 PNCC Rang DC Rua DC TDC WDC Total cost 19,760,416 14,758,570 Maintenance and operation of local roads 2009 ($) 2010 ($) DOC 160,000 160,000 Horizons HDC 2,272,902 2,024,119 MDC 3,876,980 3,973,087 NZTA PNCC 4,272,650 4,386,221 Rang DC 3,621,156 3,729,632 Rua DC 3,652,600 3,762,300 TDC 4,580,000 4,720,000 WDC 5,008,400 5,154,800 Total cost 27,444,688 27,910,159 APPENDICES 2015 ($) 17,500,000 17,500,000 2015 ($) 160,000 2,092,992 4,494,979 4,345,506 3,621,156 4,322,200 4,860,000 6,040,000 29,936,833 The following information outlines anticipated expenditure by activity class for the 10-year period commencing 1 July 2009. Appendix 4. 10-year forecast expenditure profiles 2016 ($) 17,500,000 17,500,000 2016 ($) 160,000 2,092,992 4,607,354 4,370,157 3,621,156 4,452,000 4,860,000 6,188,000 30,351,659 2017 ($) 17,500,000 17,500,000 2017 ($) 160,000 2,092,992 4,722,538 4,392,732 3,621,156 4,585,500 4,860,000 6,334,000 30,768,918 2018 ($) 17,500,000 17,500,000 2018 ($) 160,000 2,092,992 4,840,601 4,419,484 3,621,156 4,723,100 4,860,000 6,471,000 31,188,333 3-year total 50,393,380 50,393,380 3-year total 480,000 6,390,013 11,922,297 13,159,946 11,192,338 11,289,800 14,160,000 15,465,700 84,060,094 10-year total 165,393,380 165,393,380 10-year total 1,600,000 21,040,957 43,425,536 43,482,430 36,540,430 41,598,670 48,180,000 57,829,700 293,697,723 117 Renewal of State Highways 2009 ($) DOC Horizons HDC MDC NZTA 16,530,892 PNCC Rang DC Rua DC TDC WDC Total cost 16,530,892 Renewal of local roads 2009 ($) DOC 270,000 Horizons HDC 2,118,600 MDC 7,762,553 NZTA PNCC 3,807,423 Rang DC 7,194,465 Rua DC 4,215,000 TDC 6,045,000 WDC 6,123,000 Total cost 37,536,041 2010 ($) 12,116,562 12,116,562 2010 ($) 270,000 2,153,700 7,954,556 3,848,384 7,394,750 5,449,400 6,235,000 5,887,000 39,192,790 2011 ($) 11,413,606 11,413,606 2011 ($) 100,000 2,205,300 8,150,717 4,289,740 7,602,378 5,539,600 6,425,000 6,304,000 40,616,735 2012 ($) 20,000,000 20,000,000 2012 ($) 100,000 2,205,300 8,654,484 3,919,406 8,559,465 6,563,612 6,425,000 4,962,000 41,389,267 2013 ($) 20,000,000 20,000,000 2013 ($) 100,000 2,205,300 8,563,347 3,957,472 7,194,465 6,760,520 6,425,000 5,242,000 40,448,104 2014 ($) 270,000 2,205,300 8,777,430 4,010,199 7,194,465 6,963,336 6,425,000 5,740,000 41,585,730 56 2014 ($) 20,000,000 20,000,000 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 2015 ($) 21,250,000 21,250,000 2015 ($) 270,000 2,205,300 8,996,866 3,797,370 7,194,465 7,172,236 6,425,000 5,446,000 41,507,237 APPENDICES 2016 ($) 21,250,000 21,250,000 2016 ($) 270,000 2,205,300 9,221,788 3,834,914 7,194,465 7,387,403 6,425,000 5,577,000 42,115,870 2017 ($) 21,250,000 21,250,000 2017 ($) 270,000 2,205,300 9,452,332 4,272,833 7,194,465 7,609,025 6,425,000 5,711,000 43,139,955 2018 ($) 21,250,000 21,250,000 2018 ($) 270,000 2,205,300 9,688,641 3,911,131 7,194,465 7,837,296 6,425,000 5,836,000 43,367,833 3-year total 40,061,060 40,061,060 3-year total 640,000 6,477,600 23,867,826 11,945,547 22,191,593 15,204,000 18,705,000 18,314,000 117,345,566 10-year total 185,061,060 185,061,060 10-year total 2,190,000 21,914,700 87,222,714 39,648,872 73,917,848 65,497,428 63,680,000 56,828,000 410,899,562 118 2011 ($) 30,895,501 30,895,501 2011 ($) 20,800 150,000 4,466,908 2,732,670 1,020,250 1,448,049 3,017,400 1,600,817 14,456,894 2012 ($) 35,879,049 35,879,049 2012 ($) 800,000 22,247,000 2,165,000 1,590,000 2,894,000 29,696,000 2013 ($) 66,993,000 66,993,000 2013 ($) 200,000 22,649,000 800,000 1,930,000 0 25,579,000 57 2015 ($) 56,155,000 56,155,000 2015 ($) 2,176,000 1,430,000 160,000 3,766,000 APPENDICES 2014 ($) 13,977,000 400,000 1,930,000 55,000 16,362,000 2014 ($) 60,498,000 60,498,000 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 New & improved infrastructure for State Highways 2009 ($) 2010 ($) DOC Horizons HDC MDC NZTA 19,874,198 28,966,903 PNCC Rang DC Rua DC TDC WDC Total cost 19,874,198 28,966,903 New & improved infrastructure for local roads 2009 ($) 2010 ($) DOC 34,400 34,400 Horizons HDC 150,000 150,000 MDC 2,320,318 3,693,325 NZTA PNCC 5,598,778 5,758,683 Rang DC 6,020,172 865,250 Rua DC 4,096,754 2,352,043 TDC 4,445,600 5,280,600 WDC 2,286,000 1,600,000 Total cost 24,952,022 19,734,301 2016 ($) 37,253,000 37,253,000 2016 ($) 861,000 3,466,100 4,327,100 2017 ($) 16,250,000 16,250,000 2017 ($) 1,789,000 50,000 1,839,000 2018 ($) 16,250,000 16,250,000 2018 ($) 1,643,000 3,986,700 5,629,700 3-year total 79,736,602 79,736,602 3-year total 89,600 450,000 10,480,551 14,090,131 7,905,672 7,896,846 12,743,600 5,486,817 59,143,217 10-year total 369,014,651 369,014,651 10-year total 89,600 450,000 11,480,551 79,432,131 11,270,672 14,776,846 12,743,600 16,098,617 146,342,017 119 2010 ($) 4,911,415 4,911,415 2010 ($) 58,000 1,646,700 1,382,000 382,000 3,468,700 Public transport services 2009 ($) DOC Horizons 4,731,072 HDC MDC NZTA PNCC Rang DC Rua DC TDC WDC Total cost 4,731,072 Walking & cycling facilities 2009 ($) DOC Horizons HDC MDC 57,000 NZTA 1,895,000 PNCC 88,000 Rang DC Rua DC TDC WDC 377,000 Total cost 2,417,000 2011 ($) 60,000 3,089,341 1,556,000 393,000 5,098,341 2011 ($) 5,228,924 5,228,924 2012 ($) 61,000 2,742,745 1,220,000 403,000 4,426,745 2012 ($) 5,375,333 5,375,333 2013 ($) 63,000 720,326 3,792,000 412,000 4,987,326 2013 ($) 5,504,342 5,504,342 58 2014 ($) 64,000 561,000 3,986,000 421,000 5,032,000 2014 ($) 5,647,455 5,647,455 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 2015 ($) 66,000 577,000 748,000 431,000 1,822,000 2015 ($) 5,805,583 5,805,583 APPENDICES 2016 ($) 67,000 595,000 672,000 441,000 1,775,000 2016 ($) 5,973,945 5,973,945 2017 ($) 69,000 613,000 267,000 451,000 1,400,000 2017 ($) 6,159,137 6,159,137 2018 ($) 70,000 631,000 430,000 461,000 1,592,000 2018 ($) 6,362,388 6,362,388 3-year total 175,000 6,631,041 3,026,000 1,152,000 10,984,041 3-year total 14,871,411 14,871,411 10-year total 635,000 13,071,112 14,141,000 4,172,000 32,019,112 10-year total 55,699,594 55,699,594 120 DOC Horizons HDC MDC NZTA PNCC Rang DC Rua DC TDC WDC Total cost Transport planning 2009 ($) 296,382 62,500 96,500 62,500 100,000 617,882 2011 ($) 207,891 33,000 240,891 2011 ($) 1,151,784 70,000 63,000 1,284,784 2012 ($) 213,711 73,000 169,000 455,711 2012 ($) 1,184,034 80,000 1,264,034 2013 ($) 218,841 75,000 293,841 2013 ($) 1,212,450 90,000 1,302,450 2014 ($) 224,530 77,000 301,530 59 2014 ($) 1,243,974 100,000 1,343,974 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 2010 ($) 177,797 33,000 144,000 55,000 409,797 Demand management & community programmes 2009 ($) 2010 ($) DOC Horizons 1,084,627 1,121,504 HDC MDC NZTA 53,000 60,000 PNCC 114,000 63,000 Rang DC Rua DC TDC WDC Total cost 1,251,627 1,244,504 APPENDICES 2015 ($) 230,817 80,000 180,000 490,817 2015 ($) 1,278,805 110,000 1,388,805 2016 ($) 237,511 84,000 321,511 2016 ($) 1,315,891 120,000 1,435,891 2017 ($) 244,874 90,000 334,874 2017 ($) 1,356,683 130,000 1,486,683 2018 ($) 252,955 95,000 193,000 540,955 2018 ($) 1,401,454 140,000 1,541,454 3-year total 682,070 62,500 162,500 206,500 155,000 1,268,570 3-year total 3,357,915 183,000 240,000 3,780,915 10-year total 2,305,309 62,500 736,500 206,500 0 0 0 697,000 4,007,809 10-year total 12,351,206 953,000 240,000 13,544,206 121 Maintenance and Ops Local Roads Maintenance and Ops of State Highways Renewal of Local Roads Renewal of State Highways New & Improved Infrastructure for Local Roads New & Improved Infrastructure for State Highways Public Transport Infrastructure Public Transport Services Walking & Cycling Facilities Rail & Sea Freight Demand Management & Community Programmes Transport Planning Total Allocation Total Allocation- All activity Classes 2009($) 27,444,688 19,760,416 37,536,041 16,530,892 24,952,022 19,874,198 118,000 4,731,072 2,417,000 0 1,251,627 617,882 155,233,838 2010 ($) 27,910,159 14,758,570 39,192,790 12,116,562 19,734,301 28,966,903 1,548,000 4,911,415 3,468,700 0 1,244,504 409,797 154,261,701 2011 ($) 28,705,247 15,874,394 40,616,735 11,413,606 14,456,894 30,895,501 4,552,000 5,228,924 5,098,341 0 1,284,784 240,891 158,367,317 2012 ($) 28,737,860 15,000,000 41,389,267 20,000,000 29,696,000 35,879,049 4,070,000 5,375,333 4,426,745 0 1,264,034 455,711 186,293,999 THE REGIONAL LAND TRANSPORT PROGRAMME 2009-12 2013 ($) 29,115,454 15,000,000 40,448,104 20,000,000 25,579,000 66,993,000 72,000 5,504,342 4,987,326 0 1,302,450 293,841 209,295,517 60 2014 ($) 29,538,572 15,000,000 41,585,730 20,000,000 16,362,000 60,498,000 74,000 5,647,455 5,032,000 0 1,343,974 301,530 195,383,261 APPENDICES 2015 ($) 29,936,833 17,500,000 41,507,237 21,250,000 3,766,000 56,155,000 75,000 5,805,583 1,822,000 0 1,388,805 490,817 179,697,275 2016 ($) 30,351,659 17,500,000 42,115,870 21,250,000 4,327,100 37,253,000 77,000 5,973,945 1,775,000 0 1,435,891 321,511 162,380,976 2017 ($) 30,768,918 17,500,000 43,139,955 21,250,000 1,839,000 16,250,000 79,000 6,159,137 1,400,000 0 1,486,683 334,874 140,207,567 2018 ($) 31,188,333 17,500,000 43,367,833 21,250,000 5,629,700 16,250,000 81,000 6,362,388 1,592,000 0 1,541,454 540,955 145,303,663 3 year total 84,060,094 50,393,380 117,345,566 40,061,060 59,143,217 79,736,602 6,218,000 14,871,411 10,984,041 0 3,780,915 1,268,570 467,862,856 10 year total 293,697,723 165,393,380 410,899,562 185,061,060 146,342,017 369,014,651 10,746,000 55,699,594 32,019,112 0 13,544,206 4,007,809 1,686,425,114 122 123 A Significant decision? If Yes Do recommendations meet Significance Policy (contained within the LTCCP) N Item No: 13 Date: 30/06/2009 Report No: 09-94 File No: OMS 10 13 ONE PLAN HEARING COMMITTEE PURPOSE 1. This report is to seek Councillors support for amendment of the Hearing Committee structure for the forthcoming One Plan Hearings (Water). FINANCIAL IMPACT 2. None. BACKGROUND 3. Issues related to the One Plan process were under consideration at the 28 April 2009 Council Meeting and subsequently taken up with the permanent Hearing Panel through the scheduled Procedures Meeting on Tuesday 26 May 2009. These issues included cost, timeframes, and setting Council expectations around One Plan delivery. 4. In response, it is my view that significant steps have been taken both at the Council level and with the Hearing Panel for the One Plan to improve processes which will benefit the One Plan outcomes. These include, but are not limited to, delivery of provisional determinations prior to the end of the financial year (on chapters already heard), increased dialogue with staff as appropriate, and feedback in relation to efficiencies that could be gained in the way the Hearing Panel operates. 5. There is a substantial commitment required by Hearing Panel members in the forthcoming Water Hearings. At the present time the Council has determined a Panel size of seven members. Discussions with the permanent Hearing Committee Members have highlighted potential concerns in relation to the efficiency of such a large Hearing Committee, and the impact hearings of this scale may have on the operation of our normal Council business with key Councillors availability for other commitments. COMMENT 6. Having spoken with the permanent members of the Hearing Committee, and those Councillors affected by a reduction in the Hearing Committee size, I am proposing that we reduce the Hearing Committee for the forthcoming Water Hearings to five members. 7. This will include Ms Joan Allin (Chairperson), Mr Rob van Voorthuysen and Mr Che Wilson (Independent Commissioners), Councillor Jill White (Deputy Chairperson), and Councillor David Meads. 8. It is my view that this Committee has the necessary mix of technical skills, independence, and representation of community values to assist with comprehensive decisions in relation to the One Plan Water matters. 9. This proposal does not affect any other part of the One Plan process, decision writing or delegations granted by Council. 124 10. I wish to acknowledge the significant commitment made by Councillors Main and Guy to this process to date. RECOMMENDATIONS 11. It is recommended that the Council: a. reduces the Hearing Committee to five members with the representation as: Ms Joan Allin (Chairperson), Mr Rob van Voorthuysen and Mr Che Wilson (Independent Commissioners), Councillor Jill White (Deputy Chairperson), and Councillor David Meads, and amend delegation 13 (c) of Report No. 09-61, Item 14, dated 28 April 2009 (at Annex A) accordingly; and c. acknowledges that this decision will have efficiency benefits for the process and that there is no other process amendments required as a consequence. G Murfitt CHAIRMAN ANNEX A Recommendation 13 (c) - Report No. 09-61, Item No. 14, 28 April, 2009 125 ANNEX A TO ITEM 13 Report No. 09-94 RECOMMENDATION 13 (c) - REPORT NO. 09-61, ITEM NO. 14, 28 APRIL, 2009 RECOMMENDATIONS 13. It is recommended that the Council: c. supports and approves the representation on the Water Hearing Panel as outlined below: • Hearing Committee to be chaired by One Plan Hearing Committee Chair – Joan Allin • Deputy Chair – Jill White • Independent Commissioners – Rob van Voorthuysen and Che Wilson • Crs Main, Meads, and Guy 126 127 A Significant decision? If Yes Do recommendations meet Significance Policy (contained within the LTCCP) N Item No: 14 Date: 30/06/2009 Report No: 09-95 File No: OIM 5 00 ELECTRONIC MEDIA CLIPPING SERVICE PURPOSE 1. This report is to inform members of a new electronic media clipping service replacing the current ‘red book’ newspaper clipping service. FINANCIAL IMPACT 2. Funding has been budgeted for this activity for the next financial year. This external budget will replace and undercut the current cost (in hours) of processing clippings manually. BACKGROUND 3. The media clippings are used to monitor and respond to external news published about Horizons. The clippings are also a tool to monitor the use of media releases that are sent out from the Communications team. 4. The current clipping services involves a Communications team member reading all printed media, then cutting the stories out and photocopying them. The copies then get pasted into the red archive book. This process is time consuming for staff, the clippings are not electronically archived, and there is no efficient way to search by key word. 5. The communications team have researched several options for electronic media monitoring, resulting in Media Monitors being our choice for service. The company monitors daily and weekly papers using keywords supplied by us. COMMENT 6. Through the new system the electronic clippings can be accessed two ways. The first through a website portal where clippings can be viewed in list form, stating source, date, and headline. Personalised delivery of the clippings can also be set up using a regular email alert. 7. The new system will allow communications team members, and Councillors to access the relative Horizons Regional clippings on a regular basis. From there users can choose to store them or print them. The communications team will publish the clippings on the intranet for staff to view, and the clippings will also be archived through the intranet. 8. Each councillor will be emailed a log in and password to the portal and be given instructions on how to use it. 9. Examples of the media portal and how the clippings can be viewed are attached at Annex A. 128 RECOMMENDATIONS 10. It is recommended that the Council: a. receives the information in Report No. 09-95 and Annex. Colleen Atkinson COMMUNICATIONS MANAGER ANNEX A Examples of media portal 129 ANNEX A TO ITEM 14 Report No. 09-95 EXAMPLES OF MEDIA PORTAL Log in through the homepage 130 Clippings are separated by press and radio/tv. 131 Clippings are displayed in list form with date, source, and headline. Users can choose to read the headline of the clipping click through to read the full clipping. 132 Clippings appear as scanned versions of the newspaper. 133 A Significant decision? If Yes Do recommendations meet Significance Policy and LGA requirements? No Item No: 15 Date: 30/06/2009 Report No: 09-93 File No: OMS 5 00 AFFIXING OF THE COMMON SEAL PURPOSE 1. This paper reports on documents to which Horizons Regional Council’s Common Seal has been affixed. FINANCIAL IMPACT 2. There is no additional financial impact. COMMENT 3. The Common Seal has been affixed to the following documents: a. b. Under Chief Executive’s Delegated Authority: • Deed of Assignment of Lease: Parewanui Farms Limited, Riverside Agricultural Limited, Horizons Regional Council • Warrant Card: Cameron Burton • Warrant Card: Brent Fanning • Lease Agreement: Horizons Regional Council and Riverside Agricultural Limited • Memorandum of Encumbrance: Geoffrey Sanson, Richard Sanson, Coralie Sanson, and Valerie Brown • Deed of Settlement: Geoffrey Sanson, Richard Sanson, Coralie Sanson, and Valerie Brown Under Urgency: Nil c. To be Approved: Nil RECOMMENDATION 4. It is recommended that the Council: a. acknowledges the affixing of the Common Seal to the abovementioned documents. C A Grant GROUP MANAGER CORPORATE & GOVERNANCE SUPPORT 134