Information on Solution selected – Spring 2016

Transcription

Information on Solution selected – Spring 2016
120-kV
Langlois–Vaudreuil-Soulanges
Line and Supply for Ericsson
INFORMATION ON SOLUTION SELECTED • Spring 2016
The population of the regional county
municipality (MRC) of VaudreuilSoulanges has grown significantly
in the last decade. Between 2001
and 2014, the number of residents
in the MRC increased by 43%.
Combined with industrial and
commercial development, this
population growth has led to a
significant increase in the region’s
electricity consumption and
has overloaded the power system.
Hydro-Québec TransÉnergie needs
to build a new 120-kilovolt (kV)
transmission line on the territory
of the Vaudreuil-Soulanges MRC.
From this new line, Hydro-Québec
TransÉnergie will also build a line
segment to supply Ericsson, which
recently moved into VaudreuilDorion’s industrial area.
Commissioning of the planned
equipment is scheduled for 2017.
A MAJOR PROJECT
FOR THE REGION
• Meets the growing demand
for electricity
• Represents an investment
of $45 million
RESULTS OF THE PUBLIC PARTICIPATION PROCESS
In 2015, Hydro-Québec presented the line routes and consulted community
representatives, affected landowners and the general population. This consultation
allowed Hydro-Québec to learn their various concerns and gather their comments.
Hydro-Québec was able to improve its project and now proposes a slightly
modified route that better meets community expectations.
SELECTED LINE ROUTE
Segment 1
36 m
The 120-kV double-circuit transmission
line will consist of six conductors and
be supported by steel towers. The line
will be approximately 20 km long and will
connect Langlois and Vaudreuil-Soulanges
substations. Work is also planned inside
Dorion, Langlois, Vaudreuil-Soulanges
and Rigaud substations to integrate
the new line to the power system.
No work is required from Langlois
substation to Les Cèdres substation.
The new line will be divided into
two segments.
Existing right-of-way
New right-of-way: 21.5 m
Total right-of-way width: 52 m
From Les Cèdres substation to
Dorion substation (segment 1)
2
Segment 2
Hydro-Québec favored using existing
rights-of-way to avoid the impacts
associated with opening a new line
corridor. For this segment, to be about
8.5 km long, the selected solution is to
dismantle the existing line supported
by wooden H-frames, and rebuild it
on double-circuit steel towers in the
same 30 m right-of-way. This option
allows Hydro-Québec to use existing
servitude rights.
From Dorion substation to
Vaudreuil-Soulanges substation
(segment 2)
This new 7-km-long segment will
run along the existing line between
Les Cèdres and Dorion substations.
This route has the advantage of
grouping together Hydro-Québec’s
lines in a single corridor.
STUDY AREA




342




40
?
45°25'
in
em
Ch
V
e,
ar
az
-L
int
Sa
is
Planned overheadunderground junction
substation
Segment 2
Cité
de
ard
Boulev
adie
Ca n
e
ièr
Riv
VaudreuilSoulanges (MRC)
,M
res
V
èd
ac,
sC
u-L
Le
u-d
tea
Co
45°20'
Ca
Highway
Provincial or secondary highway
Local road
Railway
x, V
ieu
d
a
Substations
and power transmission
-C
L'Île
lines
#
Vaudreuil-surle-Lac, VL
Ericsson
Canada
(planned)
120 kV
230 kV
#
315 kV
735 kV




40
Boundaries
Regional county municipality
(MRC)
Municipality
Secteur de
Vaudreuil
Baie de
Vaudreuil
Secteur de
Dorion
la
Pe L'Île
Terrasser
Vaudreuil, M P rot,
inc
V
ou
rt,
V




20
Pincourt
Dorion
al
on
ti
Na
ie n
d
na
Infrastructure




40




132
Montée Labossière
-des-Jeunes
Va
ud
reu
il
Le
s C -Dor
ion
èd
,V
res
,M
ien
nch
Qui
#
Overhead-underground
junction substation




20
#
-




338




30
Pointe-desCascades, VL
Segment 1
Sa R
in ivi
t-C èr
ha e
rle
s
# Monseigneur74°10'




201
Émard
#
Les Cèdres
Fleuve Saint-Laurent
Salaberry-deValleyfield
Les Cèdres
SaintTimothée




132




530
BeauharnoisSalaberry (MRC)
74°5'
Document for information purposes only. For any other use, please contact Géomatique at Hydro-Québec Équipement et services partagés.
res, M
Les Cèd
y-deSalaberr , V
ld
e
fi
y
Valle
!
nges
e Soula
Canal d
ot, V
e-Perr
-de-l'Îl
Dame
Notre-
ue
cifiq
n Pa
#
Lac des
Deux Montagnes
Ericsson
supply




342
u
-Lo
int
Sa
Saint-Lazare
-
Previously proposed route section
,V
V
on
n, Dori
o
ilds
Hu dreu
u
Va
-
VaudreuilSoulanges
Planned 120-kV double-circuit line
Deux-Montagnes (MRC)
en
di
na
Ca
Riv
ièr
ed
es
Ou
tao
ua
is
P
ac
ifi q
ue
#
Study area
Oka
Hudson
To Rigaud
substation
74°0'
Project component




344
45°25'

74°5'
Kanesatake, EI
Ok
Hu a, M
ds
on
,V
45°20'
74°10'
Beauharnois, V




30
#Langlois
CS
0
on
a ti
o rt
sp
ran
T
X
900
1 800 m
MTM, Zone 8, NAD83
74°0'
7388_bu_hq_037_160317a.mxd
3
ERICSSON SUPPLY
Hydro-Québec will also build a 3.5-km-long
line segment to the Ericsson site at 3500A,
Rue F.-X.-Tessier in Vaudreuil-Dorion, from
the new Langlois–Vaudreuil-Soulanges line.
This segment will begin near Montée
Labossière and will be composed of
a 3-km-long overhead line. It will cross
Highway 40 before reaching an overheadunderground junction substation located
near the Joseph-Carrier industrial park,
just east of Montée Cadieux. From this
point, it will run underground to the
Ericsson connection point since there
isn’t enough room in the industrial park
for an overhead line.
STAGES UNDERWAY AND TO COME
Since December 2015, Hydro-Québec has held meetings with affected landowners
and is carrying out field studies to determine the best location for each tower.
During 2016, Hydro-Québec will complete engineering work and will obtain the
necessary government approvals to carry out the project.
Commissioning of the new line is planned for 2017.
FOR MORE INFORMATION
Info-project Line
Jonathan Petit
1 877 653-1139
Advisor – Community Relations – Richelieu
Direction – Affaires régionales et collectivités
705, boul. Clairevue Ouest, 1er étage
Saint-Bruno-de-Montarville (Québec) J3V 6B6
E-mail: petit.jonathan@hydro.qc.ca
www.hydroquebec.com/langlois-vaudreuil-soulanges
Ce document est également publié en français.
This is a translation of the original French text.
2016E0162-A